Loading...
HomeMy WebLinkAboutCOM 0372.200 2024-2026Heather L. Kimball Council District I - H6m6kua, North Hilo, portions of Waimea DATE: TO: FROM: SUBJECT: Phone: (808) 961-8828 Fax: (808) 961-8912 Email: Heather.KimhallPhmvaiicountvrov HAWAI`I COUNTY COUNCIL 25 Aupuni Street, Ste. 1402. Hilo, Hawaii 96720 April 7, 2026 Dr. Holeka Goro Inaba, Council Chair and Members of the Hawaii County Council V�Heather L. Kimball, Council Member District 1 Proposed Amendments to Bill 66, Draft 2; AN ORDINANCE ADOPTING THE COUNTY OF HAWAI`I GENERAL PLAN 2045 AND REPEALING ORDINANCE NO.05-025, AS AMENDED. Transmitted herewith are amendments to Bill No. 66, Draft 2. The amendments are shown below in Ramseyer format with respect to the contents of Appendix A; material to be inserted is underlined, and material to be deleted is bracketed and stricken. Any material not expressly set forth herein is unaffected by these amendments. Due to the limited scope of these amendments, a copy of the new draft of this bill that would result if these proposed amendments were adopted is not attached. Chapter 6, Element 6.1, is amended by adding the following language to be inserted as the second paragraph "The General Plan shall function as an operational implementation document, not solely a policy framework. All policies, actions, and capital investments shall be linked to measurable outcomes, timelines, resnonsible agencies, and funding mechanisms. The County shall adopt a performance -based planning system that integrates land use, infrastructure capacity, fiscal planning, and hazard mitigation into all implementation decisions." 2. Chapter 6, Element 6.1, is amended by amending the following language: "5. Implementation System Establish an implementation system that is based on county -wide, regional, and agency levels of responsibility and accountability to carry out the plan(s)[, ,u ideRfifieafieR and prierhii5alian of e e responsible agents and Comm. o Ref. To: Ref. Date PR "1 2026 stakeholders funding r-e"ir a t" funding seurees, and all.....,t:..«"l. The implementation system shall include: • Measurable performance indicators tied to each objective; • Assigned departmental responsibility; • Defined timelines and milestones, • Identification of funding requirements; and • Public reporting requirements." 3. Chapter 6, Element 6.1, is amended by amending the following language: "The General Plan outlines policy guidance for directing the County's growth and development. [While two Plan i somprehensive and " prw,,ide ., heli4:" and integrated appreaeh, :t is limited :; term" R f "eope and "n f reea i . ] This General Plan shall guide regulatory, fiscal, and infrastructure decisions and shall be implemented through enforceable mechanisms, including ordinances, the capital improvement budget, and administrative procedures. This General Plan is grounded in the understanding that many of the County's greatest challenges cannot be solved with policy, regulation, or independent action. It greatly impacts the daily lives of Hawaii Island residents by shaping community development, infrastructure, and resource management. The General Plan guides decisions on housing, transportation, and public services, ensuring that they align with the island's unique cultural, environmental, and economic needs." 4. Chapter 6, Element 6.2, Section 6.2.4, is amended by adding the following language: "Functional Plans shall be required for all major infrastructure systems, including but not limited to water, wastewater, transportation, and solid waste, and shall include: • Level of service standards; • Capital improvement needs; • Climate and hazard resilience requirements; and • Equity and access considerations." Chapter 6, Element 6.3, is amended by adding the following language: "6.3.2 Fiscal Impact Accountability All maior capital proiects and development approvals shall include a fiscal impact analysis, evaluating lifecycle costs and maintenance obligations." 2 6. Chapter 6, Element 6.4, Section 6.4.2, is amended by amending the following language: "Monitoring Mechanisms Measurable indicators, or performance measures, will be used to monitor progress toward the objectives. Examples of indicators that can be used to monitor the progress of implementation have been provided in the table below. [However-, it that kid:e..a,...s m vaiy over time .. «,...7e and eaeh de...... me.,t is responsible _epei4in . en the :.,a:,...t,..... thatart-.reie..anl] Indicators shall be standardized, consistently tracked, and publicly reported to ensure accountability and comparability over time." Chapter 6, Element 6.4, Section 6.4.2, is amended by amending the following language: "Mayor's Annual Report As part of the Mayor's Annual Report, the County Departments will prepare an implementation status report annually serving to monitor progress towards achieving the goals and objectives identified within the General Plan. [To the e.ae..t possible, the -epe should eentain measurable indieaters related to the goals and objectives of the plans that make up the County Plamiing S The County departments shall present a General Plan implementation report to the County Council as part of the program review required by section 3-16 of the Charter. The implementation report shall include: • Progress toward established targets; • Unmet obiectives: • Recommended amendments or corrective actions; and • Funding gaps." 8. Chapter 6, Element 6.4, Section 6.4.2, is amended by amending the following "5 year Implementation Status Report The Planning Director will include a 5-year status report as part of the Mayor's Annual Report. This status report shall include the status of any urban development plans, functional plans, special area plans, master plans, community development plans, and related priority implementation actions. The director may also provide information regarding the implementation of private development master plans in the 5-year implementation status report. The 5-year implementation report shall include a formal evaluation of whether the County is on track to meet adopted targets and shall recommend policy or programmatic adjustments." 9. Chapter 6, Element 6.4, Section 6.4.2, is amended by adding the following language: "General Plan Dashboard The County shall establish a public -facing General Plan Dashboard that tracks progress on all obiectives. The dashboard shall include: • Real-time or regularly updated performance metrics; • Geographic distribution of capital investments, • Status of implementation actions, and • Progress toward adopted targets." 10. Chapter 6, Element 6.4, Section 6.4.2, is amended by adding the following language: "Recovery and Community Resilience The County shall develop and monitor pre -disaster recovery plans addressing housing, infrastructure restoration, economic recovery and the protection of underserved and vulnerable populations. The County shall also monitor and support community resilience infrastructure, including resilience hubs, community -based emergency communication networks and locally coordinated preparedness programs." 11. Chapter 6, Element 6.4.3, is amended by adding the following language: "All indicators shall be measurable, time -bound, geographically distinct where applicable and linked to responsible agencies. The County shall identify and track indicators for disproportionately impacted or underserved communities, including infrastructure access and hazard exposure." IWOM 1:177 LRB��25-193 0II LRB 93 Di