HomeMy WebLinkAboutBIL 136 Draft 04 2024-2026 - PART II - CIPCOUNTY OF HAWAVI
PART II
CAPITAL BUDGET AND SIX -YEAR
CAPITAL IMPROVEMENTS PROGRAM
FY 2026 - 2027
BILL NO. 136, DRAFT 4
TABLE OF CONTENTS
Part II
CAPITAL BUDGET AND SIX -YEAR
CAPITAL IMPROVEMENTS PROGRAM
FY 2026 - 2027
CAPITAL BUDGET ORDINANCE
CAPITAL IMPROVEMENTS PROGRAM BY DEPARTMENTS
CivilDefense.................................................................5
Department of Environmental Management................15
Department of Finance.................................................29
Department of Parks and Recreation ............................35
Department of Public Works.........................................61
Fire Department...........................................................91
Office of Housing and Community Development .......... 101
Planning Department....................................................125
(This Page Intentionally Left Blank)
Matt Kaneali`i-Kleinfelder
Hawaii County Council
District 5
Phone No.: (808) 961-8263
matt.kanealii-kleinfelder@hawaiicounty.gov
HAWAI`I COUNTY COUNCIL
County of Hawaii
C-')
Hawaii County Building
cc�
25 Aupuni Street, Suite 1405 • Hilo, Hawaii 96720
DATE: June 9, 2026—<
CD
TO: Dr. Holeka Goro Inaba, Council Chair,;►
and Members of the Hawaii County Council
Na
FROM: Matt Kameali`i-Kleinfelder, Council Member
SUBJECT: Transmitting Bill No. 136, Draft 4; Capital Budget for Fiscal Year 2026-2027
Attached is Bill No. 136, Draft 4, the Capital Budget for fiscal year 2026-2027. Bill No. 136,
Draft 3, was amended with the contents of Communication No. 75 5. 10 by amending the
following project:
PROJECTS
APPROPRIATION
(in thousands)
DPR - Spencer Kalani Schutte District Park New Community
Center/Shelter & Improvements
7,000
Net Increase
7,000
This amendment was duly approved at a Special Meeting of the Council on June 4, 2026. Bill
No. 136,,Draft 3, as amended to Draft 4, passed second and final reading. This project listed
above increased appropriations in the Capital Budget by $7,000,000 for a total of $384,700,000
and 47 projects.
MKK/sc
Att.
Comm. No.
Ref. To: Co knG V
Ref. Date A -
Hawaii County is an Equal Opportunity Provider and Employer
�tY uF N'4Y
,1
COUNTY OF HAWAI`I •
qTE GF•411.'�
ORDINANCE NO.
STATE OF HAWAFI
BILL NO. 136
DRAFT 4
AN ORDINANCE RELATING TO PUBLIC IMPROVEMENTS AND FINANCING THEREOF FOR THE FISCAL
YEAR JULY 1, 2026 TO J U N E 30, 2027.
BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAI'I:
SECTION 1. The following amounts to be received from the sale of general obligation
bonds, and other sources are hereby appropriated to the projects and for the purposes
designated in Section 2.
CAPITAL PROJECTS FUND
Funding Source
Amount
Federal Grants Receivable
$55,700,000
State Grants Receivable
$20,500,000
General Obligation Bonds, Capital
Projects Fund Balance and/or Other
Sources
$299,500,000
Private
$8,500,000
Other Cty Fund — PONC Maintenance Fund
$500,000
Total
$384,700,000
SECTION 2. The monies to be provided from the sources specified in Section 1 shall be
appropriated for the purposes and in the amounts as follows:
[The remainder of this page is intentionally left blank]
FY NO.
PROJECTS
APPROPRIATIONS
(in thousands)
FEDERAL GRANTS RECEIVABLE
202620
DPW - Road and Bridge Improvement Projects, Federal and State -Funded
16,000
202625
DPW - Kilauea Avenue Safe Routes to School - Waiakea
16,000
202626
DPW - Ka'ahakini Stream Bridge [29-1] Replacement
10,000
202629
DPW - Waianuenue Avenue Bridge Modernization
13,500
202644
PLAN - Downtown Hilo Multimodal Plan Evaluation and Monitoring
200
Subtotal
55,700
STATE GRANTS RECEIVABLE
202611
DPR - Princess Abigail Wahiika'ahu'ula Kawananakoa Center Renovation
31500
202617
DPR - Spencer Kalani Schutte District Park New Community Center/Shelter &
Improvements
5,000
202627
DPW - Four Mile Creek Bridge [22-7] Reconstruction
12,000
Subtotal
20,500
GENERAL OBLIGATION BONDS, CAPITAL PROJECTS
FUND BALANCE AND/OR OTHER SOURCES
202601
CD - Land Mobile Radio (LMR) Core to West Hawai'i
300
202602
CD - Kamehameha Park Building Replacement
300
202603
CD - Land Mobile Radio (LMR) Fire Suppression Installation
600
202604
DEM - Repair/Replacement of Wastewater Facilities
10,000
202605
DEM - Rural Transfer Station Repairs and Enhancements
2,000
202606
DEM - Kula'imano & Papa'ikou Rehabilitation and Replacement
9,500
202607
DEM - Na 'alehu Wastewater System
40,000
202608
DEM - Oceanview Transfer Station - Phase 2
500
202609
DPR - ADA Compliance
5,000
202610
DPR - Repairs/Improvements to Facilities
25,000
202611
DPR - Princess Abigail Wahiika'ahu'ula Kawananakoa Center Renovation
7,500
202612
DPR - Isaac Kepo'okalani Hale Beach Park Improvements
15,000
202613
DPR - Papa'ikou Community Center
2,000
202614
DPR - Kikala-Keokea New Park Development (Reapp.)
1,500
202615
DPR - Laupahoehoe Boat Ramp
10,000
202616
DPR - Hawaiian Paradise Park New District Park
3,000
202617 1
DPR - Spencer Kalani Schutte District Park New Community Center/Shelter &
Improvements
7,000
202618
DPW - Reroofing at Various Fire and Police Stations
6,000
202619
DPW - Facilities Improvements
14,000
202620
DPW - Road and Bridge Improvement Projects, Federal and State -Funded
4,000
202621
DPW - Coconut Island Bridge
8,000
202622
DPW - Road and Bridge Improvement Projects, Islandwide
10,000
202623
DPW - Drainage Improvement Projects, Islandwide (reapp.)
4,000
202624
DPW - Miscellaneous Improvement Projects, Islandwide
3,500
202625
DPW - Kilauea Avenue Safe Routes to School - Waiakea
4,000
202627 1
DPW - Four Mile Creek Bridge [22-7] Reconstruction
6,000
202628
DPW - Banyan Drive Shoulder Improvements
2,000
202629
DPW - Waianuenue Avenue Bridge Modernization
4,500
202630
FIRE - NFPA 1851-Compliant PPE Extractor Installation
3,300
202631
FIRE - Hawaiian Paradise Park Fire Station Dormitory Addition
1,500
202632
FIRE - Kea'au Fire & Police Station - New Facility (Multi -Agency)
2,000
202633
OHCD - Facilities Repairs/Maintenance and Renovation
1,500
202634
OHCD - Old Hilo Memorial Hospital Renovations
10,000
202635
OHCD-'O'okala Subdivision infrastructure
5,000
202636
OHCD - Kamakoa Nui Infrastructure and Housing
11,000
202637
OHCD - Kukuiola Village - Permanent Supportive Housing
20,000
202638
OHCD-'Ouli'Ekahi Cottage Renovations
6,000
202639
OHCD - Kaiminani Affordable Housing
1,000
202640
OHCD -Affordable Housing Planning, Feasibility, and Design
1,000
202641
OHCD - Na Kahua Hale o Ulu Wini WWTP - PV System
9,000
202642
OHCD - Na Kahua Hale o Ulu Wini Roof and PV Refurbishment
14,000
202643
FIN - Land acquisition for county operations
5,000
202645
DPR - Waikoloa Gymnasium (Reapp.)
2,000
202646
DPW - Lindsey Road Extension
1,000
202647
DPR - Banyan Trees Park Comfort Station
1,000
Subtotal
299,500
PRIVATE
202611
DPR -Princess Abigail Wahiika'ahu'ula Kawananakoa Center Renovation
3,500
202617
DPR - Spencer Kalani Schutte District Park New Community Center/Shelter &
Improvements
5,000
Subtotal
8,500
OTHER CTY FUND — PONC MAINTENANCE FUND
202647 1
DPR -Banyan Trees Park Comfort Station
500
Subtotal
500
Grand Total
384,700
SECTION 3. The Director of Finance shall open appropriate accounts for each project,
make monies available, and expend funds for the projects listed herein.
SECTION 4. The appropriation and authorization in Section 2 includes land purchase, plans,
site preparation, equipment purchase, improvements to land, and construction.
SECTION 5. The Mayor shall initiate authorized projects taking into consideration the
factors of public need, general financial condition of the general fund, highway fund, sewer fund,
parking meter fund, bikeway fund, beautification fund, vehicle disposal fund, solid waste fund,
golf course fund, geothermal relocation revolving fund, housing fund, and fair share
contributions as well as the County's general economic conditions.
3
CIVIL DEFENSE
TALMADG E MAG N O,
ADMINISTRATOR
(This Page Intentionally Left Blank)
Department: Civil Defense Agency
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2026-2027
PRIORITY
PROJECT
2026-27 FY FUNDING
in thousands
FUNDING FORECAST BY FISCAL YEAR
in thousands)
TOTAL
ESTIMATED
PROJECT
COST
County
G.O. Bond
State
Federal
Private'
CBA,
Other"
Prior
Funds
Allotted
_ T s ��
Request
1m26-27
2027-28
2028-29
2029-30
2030-31
2031-32
Beyond 6
Years
1
CD - Land Mobile Radio (LMR) Core to West Hawaii
300
300
1,700
2,000
2
CD- Kamehameha Park Building Replacement
300
"t s'.3D6
300
3
CD - Land Mobile Radio (LMR) Fire Suppression Installation
600
�600,
600
900
900
900
900
1,800
6,600
4
CD- New Emergency Operations Center
31,000
31,000
S
-
6
a*f
7
.=3
8
9
10
TOTAL
1,200
-
-'^ 1,260
33,300
1100
1 900
900
900
1 1,8001
39,900
Created By: Bliss Kato • Private: Foundation Grants
Date: 1/22/2026 '• Community Benefit Assessments: FalrShore, Park Dedication, Etc. other. GET, Fuel Tax and other non-bondsources
v
co (This Page Intentionally Left Blank)
E.
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Civil Defense Agency
2. SUBMITTER: Talmadge Magna DATE: 1/22/2026
3. PROJECT NAME: CD - Land Mobile Radio (LMR) Core to West Hawaii
4. LOCATION (COUNCIL DISTRICT): 7,8
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: 7-4-020:021 / North Kona
7. TOTAL COUNTY FUNDS NEEDEDTHIS FY: 300,000
8. PROJECT ELIGIBILITY, ✓ all
I ❑ Land acquisition
0 Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
thatapply:
10 Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study
0 Information/communications tech.
❑Q High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Hawai'i County Civil Defense Agency is proposingto move the backup Land Mobile Radio core from the PublicSafetV Building in Hilo to Kailua-Kona Police Station.
11. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply:
D. New facility/infr./bldg. /if Yes: ❑�
Needed to continue current level ofservices.
A. Addresses public health/safety, ✓if Yes:
Eliminates o documented hazard.
B. Service improvements, ✓all that apply:
❑ Access to El Quality of ❑ Quantity of
E. Operational efficiency and leveraging
Opportunities:
No change in operating costs.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes:
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
/if Yes:
DPW
Additional info:
12. LONG RANGE PLANS/
Q Dept. Priority
Details: Maintaining LMR system is an essential task.
❑ Comm. Value
Details:
COMMUNITY VALUES, check
0 General Plan
Details: Coordinates the County's disaster preparedness and response program.
❑Admin Priority
Details:
at least one and all that apply,
❑ CDP
Details.
QMultlHazard Mit
Details: Diversityofsystem distribution forimpacts from incidents and/orevents.
provide details:
Other Plans
Details: Part of the Statewide Communications Interoperability Plan (SLIP).
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: 0
1 DESCRIBE: Chapter 7 of Hawaii County Code requires Civil Defense to maintain the Land Mobile Radio System to provide first responder communications.
Is. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
I ❑ Promotes energy and resource conservation
Q Reduces hazard risk
❑ Preserves/protects ournotural/cultural env.
I ❑ Cost benefit analysis
❑ Promotes economic vitality
0 Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
E]Previously Appropriated
Staff available to manage project
❑External funds/resources ready to proceed
that apply:
en t to an reques a opera mg u ge
❑
❑ Can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request•
>A: Fy 26_Zj,
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
it -
30011
1,700
$2,000
TOTAL:
11,-
-,:,z,$300'1
$1,700
1
$2,000
18. O & M COSTS (x $1000):
119. FUNDING SOURCE (x $1000):
Cty G.O. Bond
11555 . �s�) F"`'
„ 300"
1,700
$2,000
State Revolving Fund
State CIP
Federal;
Private (Grants)
k
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
' $300
$1,700
$2,000
o (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Civil Defense Agency
2. SUBMITTER: Talmadge Magna DATE:
PROJECT NAME: CD - Kamehameha Park Building Replacement
4. LOCATION (COUNCIL DISTRICT): 9
S. COUNCIL BENEFIT DISTRICT(S): All
73.
6. TMK/CDP PLANNING AREA: 5-4-009:004 / North Kohala
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 300,000
S. PROJECT ELIGIBILITY, ✓ all I
❑ Land acquisition
Infrastructure improvement
❑� New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply: 10
Nonrecurring rehabilitation I
❑ Planning, feasibility, eng., or design study I
0 Information/communications tech.
0 High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Purchase and install a replacement building at Kamehameha Park Land Mobile Radio site that houses current radio system equipment. Recommend a composite building that is better suited to
withstand the harsh environmental conditions in this location. Estimate cost estimates shown to install the structure at the site are available.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: 0
Needed to continue current level ofservices.
A. Addresses public health/safety, ✓if Yes: 0
Eliminates a documented hazard.
B. Service improvements, ✓all that apply:
❑ Access to 0 Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net decrease in operating cost and maintains services.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: 0
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
✓if Yes: 0
DPW
Additional info:
12. LONG RANGE PLANS/
0 Dept. Priority
Details: Maintaining the LMR System is an essential task.
❑Comm. Value
Details:
COMMUNITY VALUES, check
0 General Plan
Details: Coordinates the Ccunty's disaster preparedness and response program.
❑Admin priority
Details:
at least one and all that apply,
❑ CDP
Details:
[]Multi Hazard Mit
Details:
provide details:
Other Plans
Details: Statewide Communications InteroperabilityPlan (SCIP).
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: 0
DESCRIBE: Chapter 7 of Hawaii County Code requires Civil Defense to maintain the Land Mobile Radio System to provide first responder communications.
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
0 Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
I ❑ Promotes economic vitality
0 strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
0 Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
en i ie an requested operating u ge
❑
El can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This,Request
`%: tY 26 27 €
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
;F;s, , ;, 100'
°;£': £200.
$100
$200
TOTAL:
' .. .$3001
$300
18. O & M COSTS (x $1000):
19. FUNDING SOURCE (x $1000):
Cty G.O. Bond
=300=
$300
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
$300=
$300
N (This Page Intentionally Left Blank)
W
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENTAND DIVISION: Civil Defense Agency
2. SUBMITTER: Talmadge Magno DATE: 1/22/2026
3. PROJECT NAME: CD - Land Mobile Radio (LMR) Fire Suppression Installation
4. LOCATION (COUNCIL DISTRICT): All Districts
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: Multiple locations
7. TOTAL COUNTY FUNDS NEEDEDTHIS FY: 600,000
B. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply: ID
Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study
Information/communications tech.
0 High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Procure and install a clean agent fire suppression system. Currently there is no automatic fire suppression system at any of the Land Mobile Radio and microwave sites. This not only protects
County -owned equipment, but also equipment from State, Federal and external partners.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: r❑
Fills gap in current services.
A. Addresses public health/safety, ,if Yes: O
Eliminates a documented hazard.
B. Service improvements, ✓all that apply:
❑ Access to 0 Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net increase in operating cost.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: �
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
✓if Yes:
DPW
Additional info:
12. LONG RANGE PLANS/
0 Dept Priority
Details: Maintaining the LMR System is an essential task.
❑ Comm. value
Details:
COMMUNITY VALUES, check
❑Q General Plan
Details: Coordinates the County's disaster preparedness and response program.
❑Admin Priority
Details:
at least one and all that apply,
❑ CDP
Details.,
E]MultmamniMit
Details:
provide details:
0 Other Plans
Details: Statewide Communications InteroperabilityPlan (SCIP).
Additional info:
13. CTY. MATCHING FUNDS REQ'D? "if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ED
DESCRIBE: Chapter 7 of Hawaii County Code requires Civil Defense to maintain the Land Mobile Radio System to provide first responder communications.
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
Q Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
0 strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
Staff available to manage project
TO External funds/resources ready to proceed
that apply:
en i to an reques a operating budget ❑
El Can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000): IF
Prior Funds Allotted
(not lapsed)
This Request
141 FY26-27
I FY 27-211
I FY 28-29
1 FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
;-,',"*'>'A00'
, r ,a
1%- "'f'A%I00;
T1400
100
100
1 400
150
150
600
150
150
600
ISO
150
600
ISO
ISO
600
300
300
1,200
$1,100
$1,100
$4.400
TOTAL:
<'$600r
$600
1 $900
I $900
1 $900
1 $9001
$1,800
1 $6,600
18. O & M COSTS (x $1000):
-
19. FUNDING SOURCE (x $1000):
Cty G.O. Bond
<"' 600
600
900
900
900
900
1,800
$6,600
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
1
$600
1 $900
1 $900
1 $900
$9001
$1,800
1 $66600
(This Page Intentionally Left Blank)
DEPARTMENT OF
ENVIRONMENTAL
MANAGEMENT
DANIELGIRVAN,
DIRECTOR
15
(This Page Intentionally Left Blank)
T
V
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: Department of Environmental Management FISCAL YEAR 2026-2027
PRIORITY
PROJECT
2026-27 FY FUNDING
(in thousands)
FUNDING FORECAST BY FISCAL YEAR
(in thousands)
TOTAL
ESTIMATED
PROJECT
COST
County
G.O. Bond
State
Federal
Private*
CBA,
Other**
Priorn
Funds
Allotted
ThfsMW
Request_
v2026;27s
2027-28
2028-29
2029-30
2030-31
2031-32
Beyond 6
years
1
DEM - Repair/Replacement of Wastewater Facilities
10,000
14,023
;^"^`z 10,000:
10,000
10,000
10,000
10,000
10,000
10,000
84,023
2
DEM- Rural Transfer Station Repairs and Enhancements
2,000
13,097
`� ;.; 2,000�
2,000
2,000
2,000
2,000
2,000
2,000
27,097
3
DEM-Kula9mano & Papa'ikou Rehabilitation and Replacement
9,500
300
<"; '=•9,SQ0
8,000
17,800
4
DEM- N5'51ehu Wastewater System
40,000
5,160
�',;y40,000`
28,000
28,000
101,160
5
DEM- Oceanvlew Transfer Station - Phase 2
Soo
��O%As00'
3,500
4,000
6
DEM - Pua Sewer Pump Station Force Main Replacement
3,927
:;;xi;;XO.M^y
32,OOD
28,000
63,927
7
DEM- Improvements to East Hawaii Sort Station
270
^=
4,500
4,770
8
DEM - Replacement of Kona Baseyard Building
600
2,000
2,600
9
DEM-Replacement of Waimea Baseyard Building
600
2,000
2,600
10
DEM - Leachate Mitigation System, EHRSS
250
2,000
2,250
11
DEM - Leachate Mitigation System, East Hawal9 Stations
2,000
2,000
2,000
2,000
2,000
10,000
12
DEM - Kealakehe Scrap Metal Site Remedlation Phase 2
Soo
1,500
2,000
13
DEM- Leachate Mitigation Sytem, Hilo TS
'=1:%"^
2,000
2,000
14
DEM- Replacement of Kdua Disposal Area
%,'<s":%`=?�
600
1,000
2,000
3,600
1s
DEM- Replacementof Hilo Disposal Area
xsz ^'a
600
1,000
3,000
4,600
16
DEM- Leachate Mitigation System, West Hawai'i
1,000
1,000
1,000
1,000
1,000
5,000
17
DEM - Landfill Gas Collection and Control System, WHSL
4,606
',
2,000
6,606
18
DEM- Ka'0mana Gardens Collector Sewer
? :"`^z=
6,600
6,600
19
DEM- Poo SPS Renovation
2,561
%;
32,000
34,561
20
DEM - Wailoa SPS Renovation and Dual Force Mains:;;
•.T"r
10,000
10,000
21
DEM - Onekahakaha SPS Renovation and Dual Force Mains
i-,y�'�_'
12,000
12,000
22
DEM-Ainako'Aina Nani Collector Sewer
10,250
10,250
23
DEM - Pauka'a SPS New Force Main
8,800
8,800
24
DEM - North Kona SPS, FM, Hina Lani Gravity Sewer, West Hawai'I Busness Park Gravity
Sewer
2,662
24,000
26,662
25
DEM- Ainako Interceptor Sewer Phase 2
10,200
10,200
26
DEM - K61ea SPS Renovation and Dual Force Mains
�" '`,.• '
10,000
10,000
27
DEM- Kalaniana'ole Collector Sewer Phase 2
12,000
12,000
28
DEM - Wailuku Force Main and Gravity Sewer Replacement
- •
16,000
16,000
29
DEM - Keapil FM Replacement/SPS Renovation and Relocation
" '
2,000
2,000
30
DEM - Kealakehe SPS Renovation and Force Main Replacement
15,000
15,000
31
DEM- Pu'u'eo Gravity Sewer Replacement
8,800
8,800
32
DEM- Lanlhau SPS Upgrade
71
3,000
3,000
33
DEM -P-19 SPS and Force Main Replacement
5,500
5,500
34
IDEM -Closed Kallua Landfill Improvements and Other Mitigation
25,000
25,000
TOTAL
1
1 62,000
46,606
62,000
1 55,950
50,700
26,000
52,000
43,000
224,150
560,406
Created By: Robin Bauman ' Private: Foundation Grants
Date: 1/25/2026 " Community Benefit Assessments: FairShore, Park Dedication, Etc. Other. GET, Fuel Tax and other non -bond sources
00 (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division
2. SUBMITTER: Chris Laude DATE: 1/S/2026
3. PROJECT NAME: DEM - Repair/Replacement of Wastewater Facilities
4. LOCATION (COUNCIL DISTRICT): 1, 2, 3, 6, 7, 8
S. COUNCIL BENEFIT DISTRICT(S): 1, 2, 3, 6, 7, 8
6. TMK/CDP PLANNING AREA: Various
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 10,000,000
8. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
❑� Infrastructure improvement
[Z New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
0 Nonrecurring rehabilitation 121
Planning, feasibility, eng., or design study I
E Information/communications tech.
[D High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Major repairs and/or replacement of wastewater facilities at various locations to ensure compliance with regulations under HAR 11-62, Wastewater Systems; HAR 11-54, State Water Quality
Standards; HAR 11-55, State Water Pollution Control; and the US Environmental Protection Agency.
11. PROJECT JUSTIFICATION& OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. -if Yes: ❑
N/A
A. Addresses public health/safety, ✓if Yes: 121
Eliminates a documented hazard.
B. Service improvements, ✓all that apply:
❑ Access to F41 Quality of 0 Quantity of
E. Operational efficiency and leveraging
Opportunities:
Results in netdecrease in operating costand improves services.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacementof
facility/infrastructure/building, /If Yes: 0
Project will restorefulloperationstoasset.
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
Dept. Priority
Details: Aging WW facilities repair or replacement to ensure continued operations.
[]Comm. Value
Details:
COMMUNITY VALUES, check
❑ General Plan
Details:
❑AdminPriority
Details:
at least one and all that apply,
❑ CDP
Details:
❑Multi Hazard Mit
Details:
provide details:
❑Other Plans
Details:
Additional info:
13. CTY, MATCHING FUNDS REQ'D? ✓if Yes: ❑
1 DESCRIBE:
14. LEGAL MANDATE? ✓!fYes:
DESCRIBE: DOH HAR 11-62 and all NPDES permits require utilites to repair their facilities to maintain compliance.
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
I E] Promotes energy and resource conservation
Q Reduces hazard risk
Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
Promotes economic vitality
P/1 Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
R] Previously Appropriated
Staff available to manage project
TO External funds/resources ready to proceed
that apply:
'dentifled and requenea operating DUGge
❑
❑ Can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $3000):
Prior Funds Allotted
(not lapsed)
Thls Request
="" FY 26=27
FY 27-28
I FY 28-29
I FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
1,369
-"; `,'�'-- ,A,000
1,000
1,000
1,000
1,000
1,000
1,000
$8,369
Construction
12,654
'-""e: z9,000
9,000
9,000
9,000
9,000
9,000
9,000
$75,654
TOTAL:
$14,023
' "$10,000
$10,0001
$10,000
1 $10,000
1 $10,000
1 $10,00ol
$10,000
1 $84,023
18. O & M COSTS (x $1000):
19. FUNDING SOURCE (x $1000):
CtyG.O.Bond
" r
14,023
' "�,'UO,000
10,000
10,000
10,000
10,000
10,000
10,000
$84,023
State Revolving Fund
0,
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
$14,023
"- ' $10,000
$10,000
1 $10,0001
$10,000
1 $10,0001
$10,000
1 $10,000
1 $84,023
o (This Page Intentionally Left Blank)
N
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Environmental Management -Solid Waste Division
2.SUBMITTER: Mike Rivera DATE: 12/30/2025
3. PROJECT NAME: DEM- RuralTransferStationRepairsandEnhancements
4.LOCATION (COUNCIL DISTRICT): All
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: Various
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 2,000,000
B. PROJECT ELIGIBILITY, ✓ all
In Land acquisition
Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
El Planning, feasibility, eng., or design study
❑ Information/communications tech.
High ❑ Med. ❑ Low
10. PROJECr/PROGRAM
DESCRIPTION:
This project is for necessary infrastructure repairs and improvements to the rural transfer station locations such as construction of recycling and green waste collection facilities and
modifications to refuse collection facilities.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: ❑
N/A
A. Addresses public health/safety, /If Yes: ❑�
Reduces risk ofa documented hazard.
B. Service improvements, ✓all that apply:
12] Access to R1 Quality of F11 Quantity of
E. Operational efficiency and leveraging
Opportunities:
Results in net increase in operating cost but improves services.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: �
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
Dept. Priority
Details: Improves overall services to the public
comm. Value
Details: Improves access to disposal and recycling
COMMUNITY VALUES, check
❑ General Plan
Details:
❑Admin Priority
Details:
at least one and all that apply,
❑ CDP
Details:
[]Multi Hazard Mit
Details:
provide details:
❑Other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14.LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
10 Promotes energy and resource conservation
Q Reduces hazard risk
21 Preserves/protects our natural/cultural env.
I ❑ Cost benefit analysis
[ZI Promotes economic vitality
0 Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
Previously Appropriated
Staff available to manage project
❑External funds/resources ready to proceed
that apply:
g'aenviled ano requested opera ng u ge
O Can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This,Request
FY 26-27 :-"
Fir 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
f;`=,n
Design/Survey
947
$947
Construction
12,150
,',-' , -2,000
2,000
2,000
2.000
2,000
2,000
2,000
$26,150
TOTAL:
$13,097
=", __`'' $2,000'
$2,000
$2,000
$2,000
1 $2,000
$2,000
$2,000
$27,097
18. 0 & M COSTS (x $1000):
4-
19. FUNDING SOURCE(x$1000):
Cty G.O. Bond
'�F' a`
���`�
13,097
�.s �1.
=' . `F2,000%
&
�;;Ili����
2,000
' E FF' 1011,
f M, ^
CAI `�```*s�- .. ,i
2,000
���1���� '
2,000
e�..�t.;:�wm�:�i��
2,000
.A' € € #
=���t'
2,000
�u
2,000
bMR S #£%`U F FroFR
�:``�`?�n�:%�a�>�r�?',�
$27,097
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
1 $13,097
= >"'$2,000
1 $2,000
1 $2,000
$2,000
1 $2,000
1 $2,000
1 $2,000
1 $27,097
nNi (This Page Intentionally Left Blank)
N
W
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENTAND DIVISION: Department of Environmental Management - Wastewater Division
2. SUBMITTER: Chris Laude DATE: 1/5/2026
3. PROJECT NAME: DEM - Kula'imano & Papa'ikou Rehabilitation and Replacement
4. LOCATION (COUNCIL DISTRICT): 1
S. COUNCIL BENEFIT DISTRICT(S): 1
6. TMK/CDP PLANNING AREA: 2-7-004:126, 2-8-007:075/Hamakua
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 9,500,000
S. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
Infrastructure improvement
2 New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
Planning, feasibility, eng., or design study
10 Information/communications tech.
[21 High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Project will address various items at the Kula'imano & Pgpa'ikou WWTPs such as replacement of inoperable headworks screening equipment, headworks electrical and motor control center
improvements, headworks odor control replacement, new grit removal screening equipment, aeration basin blowers and turbine aerator replacement, aeration line replacement, site
improvements for portable dewatering equipment, and secondary clarifiers equipment replacement.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. 'if Yes: n
Needed to continue current level ofservices.
A. Addresses public health/safety, 'if Yes: ❑�
Eliminates o documented hazard.
B. Service improvements, ✓all that apply:
❑ Access to 0 Quality of M Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net decrease in operating cast and improves services.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacement of
facility/infrastructure/building, 'if Yes:
Necessary repair/maintenance/replacement per
maintenance plan/schedule.
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
0 Dept. Priority
Details: Upgrade severely damaged WWTPs due to age of asset
❑Comm. Value
Details:
COMMUNITY VALUES, check
❑ General Plan
Details:
❑AdminPriority
Details:
at least one and all that apply,
❑ CDP
Details:
[]Multi Hazard Mtt
Details.
provide details:
❑ other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? /if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? /if Yes: R1
DESCRIBE: Compliance with Administrative Order on Consent (EPA Docket No. SDWA-UIC-AOC-2017-0002).
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
Q Reduces hazard risk
❑r Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
Promotes economic vitality
21 Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
Project currently underway
Previously Appropriated
Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
entifted and reques a opera tng Midget
❑
❑ can realistically encumberfunds
I List phases already completed: Preliminary Engineering Report
Additional in
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted 11
(not lapsed)
This Request
FY 26-27 4,1
FY 27-28
1 FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
sf<s
Land Acquisition
Design/Survey
300
''; • • 1',500'
$1,800
Construction
=x ° `_'< 8,000-
8,000
$16,000
TOTAL:
$-300
`;:• `•$9,S00,
$8,000
$17,800
18. O & M COSTS (x $1000):
19. FUNDING SOURCE x 3000
Cty G.O. Bond
I
300
'
r- '9,b00
:E d is j "F a
8,000
'
„ M"
a a F
$17,800
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
$300
'--,— $9,S00;
$8,000
1
$17,800
(This Page Intentionally Left Blank)
IV
Cn
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division
3. PROJECT NAME: DEM - Na 'alehu Wastewater System
2. SUBM17TER: Chris Laude DATE: 1/5/2026
4. LOCATION (COUNCIL DISTRICT): 6
S. COUNCIL BENEFIT DISTRICT(S): 6
6. TMK/CDP PLANNING AREA: 9-5 / Ka'0
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 40,000,000
8. PROJECT ELIGIBILITY, ✓ all
L�] Land acquisition
F[D Infrastructure improvement
New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
21 Planning, feasibility, eng., or design study
L41 Information/communications tech.
2 High ❑ Med. ❑ Low
10. PROJEcr/PROGRAM
DESCRIPTION:
Project is to close three large capacity cesspools and construct: new transmission main; new pump station; new package treatment plant; a reuse or disposal system for the treated wastewater;
and new wastewater collection system.
11. PROJECT JUSTIFICATION& OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: ❑�
Fills gap in current services for underserved area/demographic.
A. Addresses public health/safety, /if Yes: 2
Eliminates a documented hazard.
B. Service improvements, ✓all that apply:
ID Access to D Quality of 2 Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net increase in operating cost but improves services.
Has no reduction of construction costs.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: D
Necessary repair/maintenance/replacement per
maintenance plan/schedule.
F. Fasters inter -departmental collaboration
✓if Yes: ❑
NA
Additional info:
12. LONG RANGE PLANS/
[D Dept. Priority
Details. Expand sewer service to underserved and underrepresented community.
❑ Comm. Value
Details:
COMMUNITY VALUES, check
❑ General Plan
Details:
❑Admin Priority
Details:
at least one and all that apply,
details:
❑ CDP
Details:
[]Multi Hazard Mit
Details.
provide
❑ Other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? /If Yes: F11
DESCRIBE: Compliance with Administrative Order on Consent (EPA Docket No. SDWA-UIC-AOC-2017-0002).
15. SUSTAINABILITY FOCUS, ✓all that apply: Promotes energy and resource conservation 12 Reduces hazard risk ❑ Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ❑Cost benefit analysis 12 Promotes economic vitality 21 strengthens and sustains our community
Additional info: El
16. PROJECT READINESS, ✓all
21 Project currently underway
❑e Previously Appropriated
10 staff available to manage project
❑ External funds/resources ready to proceed
that apply:
en i ie an reques a operating gbudget—
❑
El Can realistically encumberfunds
List phases already completed: Preliminary Engineering Report
Additional info:
17. EXPENDITURE PHASING (X $1000):
Planning
Land Acquisition
Design/Survey
Construction
Prior Funds Allotted
(not lapsed)
1,844
22`,
3,294
This Request
'= -FY 26=27; -
`" s s, s =
i=' `; <-c
t z 40,000,
FY 27-28
28,000
FY 28-29
28,000
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
$1,844
$22
$3,294
$96,000
TOTAL:
$5,160
'' ',$40,000
$28,0001
$28,000
$101,160
18. O & M COSTS (x $1000):
5,160
Iz£
r .% 140,000,,l
28,000
28,000
F
Iit!
r�%r iii&�-
r
€, r
$101,160
19. FUNDING SOURCE (: 1000 x $ )
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
$5,22-L"140,000-1
$28,000 1
$28,000
$101,160
rn (This Page Intentionally Left Blank)
N
4
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENTAND DIVISION: Department of Environmental Management -Solid Waste Division
3. PROJECT NAME: DEM - Oceanview Transfer Station - Phase 2
17. SUBMITTER: Mike Rivera DATE: 12/30/2025
14. LOCATION (COUNCIL DISTRICT): 6
S. COUNCIL BENEFIT DISTRICT(S): 6
6. TMK/CDP PLANNING AREA: 9-2-150:060 / Ka'Q
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 500,000
8. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
Infrastructure improvement
New bldg., structure,
or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
0 Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study
❑ Information/communications tech.
21 High ❑ Med. ❑ Low
10. PROJECr/PROGRAM
DESCRIPTION:
This project is to complete the site design and construction of Phase 2 which will provide improvements to utilize 120-CY open top walking floor trailer to collect and transport MSW. Project will
also provide spaces for recycling components.
11. PROJECTJUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: Ld
Fills gap in current services.
A. Addresses public health/safety, *if Yes: 0
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
Access to El Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net decrease in operating cost and improves services.
lu/A
C. Repair/maintenance/replacement of ❑
facility/infrastructure/building, /if Yes:
Necessoryrepoir/maintenance/replacement.
F. Fosters inter -departmental Collaboration
/if Yes: El
N/A
Additional info:
12. LONG RANGE PLANS/
Dept. Priority
Details: Develop into Fully Operating facility
Comm. Value
Details: Fullyfunctioning transferstation
COMMUNITY VALUES, check
❑ General Plan
Details:
❑Admin Priority
Details:
at least one and all that apply,
details:
❑ CDP
Details:
[]Multi Hazard Mit
Details:
provide
❑Other Plans
Details:
Additional info:
13. Cry. MATCHING FUNDS REWD? "if Yes: ❑
I DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply: ❑ Promotes energy and resource conservation ❑ Reduces hazard risk 21 Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ❑ Cost benefit analysis ❑ Promotes economic vitality ❑ Strengthens and sustains ourcommunity
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
0 staff available to manage project
❑ External funds/resources ready to proceed
that apply:Identirleal
ana requested operating budge
0 Can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Planning
Prior Funds Allotted
(not lapsed)
This Request
FY-26-27�r ,
;A -
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Land Acquisition,-
Design/Survey
Construction
'S00
3,500
$500
$3,500
TOTAL:
%t ". "'$500"
$3,500
$4,000
18. O & M COSTS (x $1000):
py r
" 500,
3,500
$4,000
19. FUNDING SOURCE (x $1000):
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
l ,
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
: ;r $500
$3,500
$4,000
co N (This Page Intentionally Left Blank)
DEPARTMENT OF
FINANCE
DIANE NAKAGAWA,
DIRECTOR
29
(This Page Intentionally Left Blank)
30
Department: FINANCE
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 202E-2027
2026-27 FY FUNDING
FUNDING FORECAST BY FISCAL YEAR
(in thousands)
(in thousands)
TOTAL
ESTIMATED
Prior
, This'?,
Beyond 6
PROJECT
County
CBA,
Funds
,Request
PRIORITY
PROJECT
G.O. Band
State
Federal
Private`
Other"
Allotted
;026-27,
2027-28
2028-29
2029-30
2030-31
2031-32
y ears
COST
1
FIN- Land acquisition for countyoperations
5,000
5,000
TOTAL
5,000
-„saoo
s,Dao
Created By: Shannon Arquitola • Private: Foundation Grants
Date: 4/27/2026 '" Community BenefitAssessments: Fair Share, Park Dedication, Etc. Other: GET, Fuel Tax and other non -bond sources
n (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Finance 12.
SUBMITTER: Shannon Arquitola DATE: 4/27/2026
3. PROJECT NAME: FIN - Land acquisition for county operations
4. LOCATION (COUNCIL DISTRICT): All
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: All
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 5,000,000
8. PROJECT ELIGIBILITY, ✓ all
0 Land acquisition
❑ Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study
❑ Information/communications tech.
❑ High 21 Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Funding to acquire land and related property interests to support County operations, facility planning, and future infrastructure, to be managed and administered by the Property Management
Division ofthe Department of Finance.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: ❑
N/A
A. Addresses public health/safety, ,if Yes:
"selectfrom drop down menu**
B. Service improvements, ✓all that apply:
0 Access to 0 Quality of [Z Quantity of
E. Operational efficiency and leveraging
opportunities:
N/A
N/A
C. Repair/maintenance/replacementof
facility/infrastructure/building, ✓if Yes: ❑
F. Fosters inter -departmental collaboration
✓if Yes: 0
N/A
Additional info:
12. LONG RANGE PLANS/
❑Dept. Priority
Details:
121 Comm. Value
I Details: Enables the County to site critical infrastructure where it Is most needed
COMMUNITY VALUES, check at
El General Plan
Details: Conforms to many sections of the General Plan for ongoing county operations
❑� Admin Priority
Details., Enables the acquisition of land forhigh priority countyfacilitles
least one and all that apply,
❑CDP
Details:
❑ Multi Hazard
Details:
provide details:
'
❑Other Plans
Details:
❑Mitigation Plan
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓If Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes:
oesME:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
0 Reduces hazard risk
M Preserves/protects our natural/cultural env.
El Cost benefit analysis
0 Promotes economic vitality
ElStrengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
2 Project currently underway
❑ Previously Appropriated
2 Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑Identified and requested operating budget needs
2 Can realistically encumberfunds
List phases already completed:
Additional info: Per DPW - project is in planning phase.
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This"Request
'FY 26 27 iK`
FY 27-28
FY 28-29
FY 29-30
FY 30 31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
TOTAL:
18. 0 & M COSTS (x $1o00):
19. FUNDING SOURCE x$1000
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
�g e r<Krx
r :,' '=5;000x
'-$5;000
e., -
4rr� 500,
:; 7 y n
v ;u
i
a
?^s3 =F
€` °+
v war x��%''=may_?=
$5,000
$5,000
=;=w��t =`w:
$5,000
TOTAL:
R $S'000'
$5,000
� (This Page Intentionally Left Blank)
DEPARTMENT OF PARKS
AND RECREATION
C LAYTO N H O N IVI A,
DIRECTOR
35
(This Page Intentionally Left Blank)
36
Department: Parks and Recreation
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2026-2027
PRIORITY
PROJECT
2026-27 FY FUNDING
in thousands)
FUNDING FORECAST BY FISCAL YEAR
(in thousands
TOTAL
ESTIMATED
PROJECT
COST
County
G.O. Bond
State
Federal
Private"
CBA,
Other"
Prior
Funds
Allotted
" This-,,,
"
_Request`
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
Beyond 6
years
1
DPR-ADA Compliance
5,000
20,000
N Ytw 5,000
25,000
2
DPR-Repairs/Improvementsto Facilities
25,000
25,000
;ws'rg25,000
25,000
25,000
25,000
25,000
25,000
ongoing
175,000
3
DPR- Princess Abigail WahTika'ahu'ula Kawananakoa Center Renovation
7,500
3,500
3,500
-
t11,, "14,5D0
14,500
4
DPR- Isaac Kepo'akalani Hale Beach Park Improvements
15,000
3,000
;:� „ tl00
18,000
5
DPR- P5pa9kou Community Center
2,000
12,500
14,500
6
DPR- Kikala-Kenkea New Park Development (Reapp.)
1,500
'his'_€, 1500
1,500
7
DPR- Laupahoehoe Boat Ramp
10,OOD
43 lO,'ODO,
10,000
8
DPR- Hawaiian Paradise Park New District Park
3,000
':; 3,0D0'
35,000
3,000
25,000
66,000
9
DPR -Spencer Kalani Schutte District Park New Community Center/Shelter & Improvements
7,000
5,000
5,000
750
., r 17,000
17,750
10
DPR-Walk6loa Gymnasium(Reapp.)
2,000
-_"zoDo
2,000
11
DPR-Banyan Trees Park Comfort Station
1,000
500
1,500
TOTAL
79,000
8,500
8,500
1 5001
48,750
x. „`r96,560`
25,000
72,500
28,000
25,OOD
50,000
345,750
Created By: James M. Komata, Park Planner ' Private: Foundation Grants
Date: March 27, 2026 •' Community BenefitAssessments: Fair Share, Park Dedication, Etc. Other. GET, Fuel Tax and other non -bond sources
W
v
o (This Page Intentionally Left Blank)
County of Haivai7
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENTAND DIVISION: Department of Parks and Recreation 12.
SUBMITTER: James M. Komata, Park Planner DATE: 1/16/2026
3. PROJECT NAME: DPR -ADA Compliance
4. LOCATION (COUNCIL DISTRICT): Island -wide
5. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: Various
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 5,000,000
S. PROJECT ELIGIBILITY, ✓ all 10
Land acquisition
g Infrastructure improvement
Ej New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
El Nonrecurring rehabilitation I
R) Planning, feasibility, eng., or design study I
❑ Information/communications tech.
2 High ❑ Med. [I Low
10. PROJECT/PROGRAM
DESCRIPTION:
Elimination of architectural barriers and the provision of accessibility improvements at various recreational sites, facilities, amenities, etc. as set forth in the County of Hawai'1's Self -Evaluation and
Transition Plan, as amended by the federal court, and as determined in conjunction with ongoing priorities and needs identified with the federal court; as required to comply with the Americans with
Disabilities Act and similar accessibility regulations and obligations of the County. Includes improvements necessary to ensure the longevity and viability of the assets.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: El
Fills gap in current servicesforunderservedarea/demographlc.
A. Addresses public health/safety, ✓if Yes: ❑'
Reduces risk ofa documented hazard.
B. Service improvements, ✓all that apply:
F11 Access to 2Qualityof j]Quantity of
E. Operational efficiency and leveraging
opportunities:
Results lnnet decrease Inoperating cost and Improves services.
Reduces cost by less than 20%by bundling with adjacent projects.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: 121
Necessary repair/maintenance/replacement per
maintenance plan/schedule.
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
❑�Dept.Priority
Details.,DPR'shlghestpriority
Comm. Value
Details: Community members consistently advocatefor greaterADA compliance ofparks
COMMUNITY VALUES, check at
OGeneral Plan
Details: Reference 12.2(a) and 12.3(b) amongst others
2Admin Priority
Details: Administration acknowledges need to Increase ADA compliance of parks island -wide
least one and all that apply,
❑�CDP
Details: All approved CDPs recognize ADA compliance as a priority
[]Multi HazardMn
Details:
provide details:
❑Other Plans
Details:
Additional info:
13. cry. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: El
DESCRIBE: ADA Act (1990), Title 28 CFR 35.150; COH's Consent Decree U.S.D.C. Civil No. 97-011025PK -June 4, 1998 including ongoing court proceedings
15. SUSTAINABILITY FOCUS, /all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
❑.r Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
El Cost benefit analysis
0 Promotes economic vitality
2 Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, -'all
❑� Project currently underway
❑� Previously Appropriated
0 Staff available to manage project
ElExternal funds/resources ready to proceed
that apply:
❑� Identified and requested operating budget needs
2 Can realistically encumberfunds
List phases already completed: Planning, Design, Permitting (varies by individual project)
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
11 This Request
y FY 26 27,,
FY 27-28
FY 2&29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
w">
Land Acquisition
Design/Survey
1,500
;,' : =
$1,500
Construction
28,500
Yt-,1S,'0GO'l
$23,500
TOTAL:
$20,000]1
$5,000
I
$25,000
18. O & M COSTS (x $3000):
19. FUNDING SOURCE x$1000):
1010 1—
20,000
%- `;'"i'5,'000
$25,000
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other CtV Fund - (describe)
:TbTAQ1
$20,000
•--'$5,000
1
$25,000
o (This Page Intentionally Left Blank)
a
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. SUBMITTER: James M. Komata, Park Planner DATE: 1/16/2026
3. PROJECT NAME: DPR - Repairs/Improvements to Facilities 4. LOCATION (COUNCIL DISTRICT): Island -wide
S. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/CDP PLANNING AREA: Various
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 25,000,000
8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition I [Z Infrastructure improvement E] New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one:
that apply: D Nonrecurring rehabilitation I El Planning, feasibility, eng., or design study I ❑ Information/communications tech. 0 High ❑ Med. ❑ Low
10. PROJECT/PROGRAM The repair, renovation, upgrade, addition to, modification, alteration, improvement, demolition, landscaping, development, etc. of park sites, facilities, amenities, infrastructure, utilities,
DESCRIPTION: components, etc. necessary to facilitate and support safe use thereof and to address the needs of department staff, programs, activities, communities, recreational groups, etc. to fully or best
utilize the department's inventory of land and recreational developments to support the needs of the public.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D.
A. Addresses public health/safety, -'If Yes: 0
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply: 0 Access to El Quality of 0 Quantity of E.
OPP
C. Repair/maintenance/replacementof Necessary repair/maintenance/replacementper F. F
Facility/infrastructure/building, "if Yes: maintenance plan/schedule.
Additional info:
12. LONG RANGE PLANS/ QDept. Priority Details: DPR's highest priorityfollowingADA-compliance projects
COMMUNITY VALUES, check at 2]General Plan Details: Reference 12.2(a) and 11.3(b) amongst others
least one and all that apply, OCDP Details: All approved CDPs recognize the need to address deteriorating faci
provide details:
❑Other Plans Details:
Additional info:
13. Cry. MATCHING FUNDS REQ'D? ✓if Yes: ❑ DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑ DESCRIBE:
New facility/infr./bldg. ✓if Yes: 21
Fills gap In currentservices.
Operationalefficiency and leveraging Results In net decrease In operating cost and Improves services.
ortunities: Reduces cost by less than 2096 by bundling with adjacent projects.
asters inter -departmental collaboration N/A
✓if Yes: ❑
O Comm. Value IDetails. Community members consistently advocate for greater upkeep and maintenance efforts
QAdmin Prlority IDetalls, Administration acknowledges need to enhance repair and maintenance efforts
lities ❑Multi Hazard Mit Details:
15. SUSTAINABILITY FOCUS, ✓all that apply: 0 Promotes energy and resource conservation R Reduces hazard risk p Preserves/protects our natural/cultural env.
Provide additional information as appropriate: El Cost benefit analysis 0 Promotes economic vitality El Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all 0 Project currently underway Previously Appropriated 0 Staff available to manage project ❑� External funds/resources ready to proceed
that apply:
�Identifled and requested operating budget needs � Can realistically encumberfunds List phases already completed: Planning, Design, Permitting (varies by project)
Additional info:
17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted This Request Beyond 6
(not lapsed) -' FY 26.27" ° FY 27-211 FY 28-29 FY 29-30 FY 30-31 FY 31-32 Years TOTAL:
Planning =% a
Land Acquisition
118. o & M COSTS (x $1000): II II ` :`, --�' _ I I I I I I I I
19. FUNDING SOURCE
(x$ 1. 'll=` _ ''mom;
3000 j a _ _
Cty G.O. Bond 25,000 2S,000' 25,000 25,000 25,000 25,0001 25,000 ongoing $175,000
State Revolving Fund
State CIP
110therCtvFund -(describe)
New facility/infr./bldg. ✓if Yes: 21
Fills gap In currentservices.
Operationalefficiency and leveraging Results In net decrease In operating cost and Improves services.
ortunities: Reduces cost by less than 2096 by bundling with adjacent projects.
asters inter -departmental collaboration N/A
✓if Yes: ❑
O Comm. Value IDetails. Community members consistently advocate for greater upkeep and maintenance efforts
QAdmin Prlority IDetalls, Administration acknowledges need to enhance repair and maintenance efforts
lities ❑Multi Hazard Mit Details:
15. SUSTAINABILITY FOCUS, ✓all that apply: 0 Promotes energy and resource conservation R Reduces hazard risk p Preserves/protects our natural/cultural env.
Provide additional information as appropriate: El Cost benefit analysis 0 Promotes economic vitality El Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all 0 Project currently underway Previously Appropriated 0 Staff available to manage project ❑� External funds/resources ready to proceed
that apply:
�Identifled and requested operating budget needs � Can realistically encumberfunds List phases already completed: Planning, Design, Permitting (varies by project)
Additional info:
17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted This Request Beyond 6
(not lapsed) -' FY 26.27" ° FY 27-211 FY 28-29 FY 29-30 FY 30-31 FY 31-32 Years TOTAL:
Planning =% a
Land Acquisition
118. o & M COSTS (x $1000): II II ` :`, --�' _ I I I I I I I I
19. FUNDING SOURCE
(x$ 1. 'll=` _ ''mom;
3000 j a _ _
Cty G.O. Bond 25,000 2S,000' 25,000 25,000 25,000 25,0001 25,000 ongoing $175,000
State Revolving Fund
State CIP
110therCtvFund -(describe)
15. SUSTAINABILITY FOCUS, ✓all that apply: 0 Promotes energy and resource conservation R Reduces hazard risk p Preserves/protects our natural/cultural env.
Provide additional information as appropriate: El Cost benefit analysis 0 Promotes economic vitality El Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all 0 Project currently underway Previously Appropriated 0 Staff available to manage project ❑� External funds/resources ready to proceed
that apply:
�Identifled and requested operating budget needs � Can realistically encumberfunds List phases already completed: Planning, Design, Permitting (varies by project)
Additional info:
17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted This Request Beyond 6
(not lapsed) -' FY 26.27" ° FY 27-211 FY 28-29 FY 29-30 FY 30-31 FY 31-32 Years TOTAL:
Planning =% a
Land Acquisition
118. o & M COSTS (x $1000): II II ` :`, --�' _ I I I I I I I I
19. FUNDING SOURCE
(x$ 1. 'll=` _ ''mom;
3000 j a _ _
Cty G.O. Bond 25,000 2S,000' 25,000 25,000 25,000 25,0001 25,000 ongoing $175,000
State Revolving Fund
State CIP
110therCtvFund -(describe)
118. o & M COSTS (x $1000): II II ` :`, --�' _ I I I I I I I I
19. FUNDING SOURCE
(x$ 1. 'll=` _ ''mom;
3000 j a _ _
Cty G.O. Bond 25,000 2S,000' 25,000 25,000 25,000 25,0001 25,000 ongoing $175,000
State Revolving Fund
State CIP
110therCtvFund -(describe)
N (This Page Intentionally Left Blank)
A
W
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENTAND DIVISION: Department of Parks and Recreation 2. SUBMITTER: James M. Komata, Park Planner DATE: 1/16/2026
3. PROJECT NAME: DPR - Princess Abigail Wahiika'ahu'ula Kawananakoa Center Renovation 4. LOCATION (COUNCIL DISTRICT): 3
S. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/CDP PLANNING AREA: 2-1-023:120 / Hilo
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 7,500,000
S. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition Infrastructure improvement I El New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one:
that apply: D Nonrecurring rehabilitation I ❑ Planning, feasibility, eng., or design study I ❑ Information/communications tech. [21 High ❑ Med. ❑ Low
10. PROJECT/PROGRAM Addresses repairs and improvements at the facility and its site to remedy conditions that affect the playablity and usability of the multi -purpose center in support of community functions, school
DESCRIPTION: functions, and recreational uses and programs that rely on this facility for success. Roofing, painting, flooring, sports equipment, bleachers, electronic systems, fenestrations, kitchen, doors and
windows, and numerous other building components require repair, replacement, or provisions for success of current, ongoing and future uses of this vital community resource.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply: D. New facility/infr./bldg. "If Yes: O
Needed to continue current level of services.
Operational efficiency and leveraging No change in operating costs.
ortu nities: No opportunity, not adjacent to project to capitalize on cost saving.
osters inter -departmental collaboration N/A
"IfYes: ❑
❑ Comm. Value Details: Access to the Island is imperative for cultural, recreational, and maintenance purposes
❑� Admin Priority Details: Administration strongly supports this project
MMultl Hazard Mit Detalls:
A. Addresses public health/safety, -'If Yes:
El
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
El Access to El Quality of E] Quantity of
E.
OPP
C. Repair/maintenance/replacement of
Facility/infrastructure/building, ✓if Yes:
❑�
Necessaryrepalr/maintenance/replacement.
F. F
Additional info:
12. LONG RANGE PLANS/
COMMUNITY VALUES, check at
least one and all that apply,
provide details:
❑DDeptPrlority
Detalls:DPR'shighest priorityfollowingADA-compliance projects
OGeneral Plan
Details: Reference12.2(a) and 12.3(b), amongst others
❑CDP
Details:
El other Plans
Details:
Additional info:
13. Cry. MATCHING FUNDS REQ'D? ✓if Yes: 0
DESCRIBE: State CIP and OHA Grant funds require COH match
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply: ❑ Promotes energy and resource conservation 0 keauces nazara rtsx U ~reserves/protects our naturai/cuiturat env.
Provide additional information as appropriate: ❑ Cost benefit analysis ❑ Promotes economic vitality El Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all 0 Project currently underway Previously Appropriated 0 Staff available to manage project ❑ External funds/resources ready to proceed
that apply:
❑Identlfled and requested operating budget needs ❑� Can realistically encumber funds List phases already completed: Design and permitting in -progress
Additional info:
17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted Tpis Request Beyond 6
(not lapsed) i3 FY 26=27% FY 27-28 FY 28-29 FY 29-30 FY 30-31 FY 31-32 Years TOTAL:
118. O & M COSTS (x $1000):
19. FUNDING SOURCE(x$1000):
Cty G.O. Bond 7,500- $7,500
State Revolving Fund
State CIP 3,500 $3,500
Federal
Private (Grants) 3,500 $3,500
CBA (Fair Share, Park Dedication, etc)
OtherCtvFund- (describe)
$ (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation
2. SUBMITTER: James M. Komata, Park Planner DATE: 1/16/2026
3. PROJECT NAME: DPR - Isaac Kepo'okalani Hale Beach Park Improvements
4. LOCATION (COUNCIL DISTRICT): 4
S. COUNCIL BENEFIT DISTRICT(S): 4 & 5
6. TMK/CDP PLANNING AREA: 1-3-008:014, 016, 021 & 1-4-093:048, etc. / Puna
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 15,000,000
S. PROJECT ELIGIBILITY, ✓ all
ElLand acquisition
El Infrastructure improvement
0 New bldg., structure, or addition
9. PROJECT URGENCY/NEED, "one:
that apply:
El Nonrecurring rehabilitation
El Planning, feasibility, eng., or design study
ElInformation/communications tech.
0 High ❑ Med. [I Low
10. PROJECT/PROGRAM
DESCRIPTION:
Addresses the restoration and enhancement of the existing park facilty to address heightened needs for recreational opporunities in lower Puna following the 2018 lava flow and its impacts to
this park and inundation of'Ahalanui Beach Park.
11. PROJECTJUSTIFICATION&OUTCOME(S),select and/or answer all that apply:
D. New facility/infr./bldg. ,if Yes: 0
Fills gap In current servicesforunderservedarea/demographic.
A. Addresses public health/safety, ✓if Yes: ❑
NIA
B. Service improvements, ✓all that apply:
El Access to 2Quality of (]Quantity of
E. Operational efficiency and leveraging
opportunities:
Results In net Increase in operating cost but Improves services.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacement of ❑
facility/infrastructure/building, ✓if Yes:
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
€fYes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
Dept. Priority
Details: Consistent with Department's vision, mission, and goals
j] Comm. Value
Detalls: Desired and valued by the community
COMMUNITY VALUES, check at
General Plan
Details: Restoration and enhancement supports the General Planss goals & objectives
ElAdmin Priority
Details: Administration strongly supports this project
least one and all that apply,
OCDP
Details:
[]Mull Hazard Mit
Details:
provide details:
[]OtherPlans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: 0
DESCRIBE: Use of allocated FEMA funding requires signifant supplemental County funds for project to be viable (though not a true matching requirement)
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
12Promotes energy and resource conservation
[2] Reduces hazard risk
0 Preserves/protects our natural/cultural env.
0 Cost benefit analysis
12 Promotes economic vitality
Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
2 Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑Identified and requested operating budget needs
12 Can realistically encumberfunds
List phases already completed: N/A
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request
; FY 26-27.�'
FY 27-28
FY 28-29
FY 29-30
FY 30 31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
3,000
$3,000
Construction
V'11t r 151000
$15,000
TOTAL:
$3,000
;`$15,D001
$18,000
18. O & M COSTS (x $1000):
19. FUNDING SOURCE x$1000 :
( )
I�11I.�I�=�� �
3,000
-.€
^-,",�,1S,000=
w: €
� €
= �" F I2tn i3�I :
I....
$18,000
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
r <.
CBA (Fair Share, Park Dedication, etc)
0ther Cty Fund -(describe)
TOTAL:
$3,000
; $15,000
$18,000
(This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 12.
SUBMITTER: James M. Komata, Park Planner DATE: 1/16/2026
3. PROJECT NAME: DPR - Papa'ikou Community Center
4. LOCATION (COUNCIL DISTRICT): 1
S. COUNCIL BENEFIT DISTRICT(S): 1, 2 & 3
6. TMK/CDP PLANNING AREA: 2-7-004:121 / Hamakua
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 2,000,000
8. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
Infrastructure improvement
0 New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study
❑ Information/communications tech.
0 High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Replacement of the existing plantation -era designed/constructed community center facilty determined to be irreperable due to extent of deteriotation throughout the single -wall, wood
construction facility and for Building Code compliance cocnerns as a high occupancy facility. Facility has been closed to all uses for over a year with no practicable means of restoring to safe use
short of replacement.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: El
Needed to continue current level ofservices.
A. Addresses public health/safety, ✓if Yes:
Eliminates a documented hazard.
B. Service improvements, ✓all that apply:
21 Access to 2Quality of 21Quantityof
E. Operational efficiency and leveraging
opportunities:
Results In net decrease in operating cost and improves services.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: ❑
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
❑+ Dept. Priority
Details: consistent with Department's vision, mission, and goals
Comm. Value
Details: Desired and valued by the community
COMMUNITY VALUES, check atO
General Plan
Details.,
❑AdminPriority
Details: Administration strongly supports this project
least one and all that apply,
QCDP
Details.
OMulti Hazard Mit
Details:
provide details:
❑Other Plans
Details.,
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? 'if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
Promotes energy and resource conservation
❑ Reduces hazard risk
0 Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
Promotes economic vitality
strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
Project currently underway
0 Previously Appropriated
staff available to manage project
External funds/resources ready to proceed
that apply:
❑'ldentifledand requested operating budgetneeds
12 can realistically encumberfunds
List phases already completed: Design and permitting in -progress
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted 113his
(not lapsed)
Request
FY 26-27%.
FY 27-28
FY 28-29
FY 29-30
FY 30 31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
"= 2,000
12,500
$2,000
$12,500
TOTAL:
=wa"' $2,000
$12,500
1
$14,500
18. O & M COSTS (x $3000):
19. FUNDING SOURCE (x $1000):
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
rz r""
::"2,000.
12,500
:'�_
$14,500
TOTAL:r
—�
`°, z $2,000
$12,500
$14,500
o (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation
2. SUBMITTER: James M. Komata, Park Planner DATE: 1/16/2026
3. PROJECT NAME: DPR - Kikala-Kd6kea New Park Development (Reapp.)
4. LOCATION (COUNCIL DISTRICT): 4
S. COUNCIL BENEFIT DISTRICT(S): 4
6. TMK/CDP PLANNING AREA: 1-2-043:068 / Puna
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,500,000
8. PROJECT ELIGIBILITY, ✓ all
El Land acquisition
Infrastructure improvement
0 New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
El Planning, feasibility, eng., or design study
❑ Information/communications tech.
0 High [:1 Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Development of anew public park in the Kalapana area intended to support the desire and efforts of the residents in the surrounding areas for gathering and other park -related functions.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. "if Yes: El
Fills gap In current servicesforunderservedarea/demographic.
A. Addresses public health/safety, ✓if Yes: ❑
NIA
B. Service improvements, ✓all that apply:
ED Access to 2Quality of 2] Quantity of
E. Operational efficiency and leveraging
opportunities:
Results In net increase in operating cost but improves services.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: ❑
NIA
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
12Dept. Priority I
Details: Consistent with Departments vision, mission, and goals
Comm. Value
Details: Desired and valued by the community
COMMUNITY VALUES, check at
General Plan
Details: Consistent with General Plans' goals and objectives
2Adm1n Priority
Details: Administration strongly supports this project
least one and all that apply,
❑� CDP
Details: Augment's park and recreational facility inventory as population grows
[]Multi Hazard Mlt
Details:
provide details:
❑other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
I DESCRIBE:
14. LEGAL MANDATE? /If Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
0 Promotes energy and resource conservation
❑ Reduces hazard risk
21 Preserves/protects our natural/cultural env.
I ❑ Cost benefit analysis
21 Promotes economic vitality
0 Strengthens and sustains our community
Additional info:
26. PROJECT READINESS, ✓all
El Project currently underway
E] Previously Appropriated
10 Staff available to manage project
External funds/resources ready to proceed
that apply:
❑' Identified and requested operating budget needs
12 Can realistically encumberfunds
List phases already completed: Planning documents in progress
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
Tfiis Reque"st
"> .
^ %FY 26=2T
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning'
Land Acquisition
Design/Survey
Construction
a yµ
s'
> y% - •200
"i>-1,3pp'
$200
$1,300
TOTAL:
$1,500'
$1,500
18. O & M COSTS (x $1000):
19. FUNDING SOURCE (x $100D):
az�lpw -ai&TWo
'''s'3 -3,>1,500
£: <"
t '�'r
=gym:
$1,500
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
"
Private (Grants)
"
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
='-" $1;50a
$1,500
o (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 12. SUBMITTER- James M. Komata, Park Planner DATE: 1/16/2026
3. PROJECT NAME- DPR - Laupahoehoe Boat Ramp 4. LOCATION (COUNCIL DISTRICT): 1
S. COUNCIL BENEFIT DISTRICT(S): 1 6. TMK/CDP PLANNING AREA: 3-6-002:024 / Hamakua
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 10,000,000
B. PROJECT ELIGIBILITY, ✓ all El Land acquisition 0 Infrastructure improvement 0 New bldg., structure, or addition j9.. PROJECT URGENCY/NEED, ✓one:
that apply: ElNonrecurring rehabilitation El Planning, feasibility, eng., or design study ❑ Information/communications tech. 0 High ❑ Med. [I Low
10. PROJECr/PROGRAM l Reconstruction of the sole public boat ramp serving the Hamakua Coast, currently closed due to deterioration.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D.
A. Addresses public health/safety, ✓if Yes:
El
Eliminates a documented hazard.
B. Service improvements, ✓all that apply:
0 Access to El Quality of El Quantity of
E.
opp
C. Repair/maintenance/replacementof
facility/infrastructure/building, ✓if Yes:
ID
Project will restorefull operations to asset.
F. F
Additional info:
12. LONG RANGE PLANS/
COMMUNITY VALUES, check at
least one and all that apply,
provide details:
El Dept. Priority
Details: Consistent with Department's vision, mission, and goals
E]General Plan
Details: Consistent with General Plans' goals and objectives
❑r CDP
Details:
❑0therPlans
Details:
Additional info:
13. cry. MATCHING FUNDS REQ'D? "if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
New facility/infr./bldx. ✓if Yes:
Needed to continue current level of services.
Operational efficiency and leveraging No change In operating costs.
ortu nities: No opportunity, not adjacent to project to cc
asters inter -departmental collaboration N/A
,"ifYes: 2]
❑� Comm. Value Details: Desired and valued by the community
❑� Admin Priority IDetails. Administration stronglysupports this project
on
15. SUSTAINABILITY FOCUS, Vail that apply: 2] Promotes energy and resource conservation ❑ Reduces hazard risk p Preserves/protects our natural/cultural env.
Provide additional information as appropriate: ElCost benefit analysis 12 Promotes economic vitality [0 Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all 2] Project currently underway Previously Appropriated Staff available to manage project External funds/resources ready to proceed
that apply:
Dldentifled and requested operating budget needs 21 Can realistically encumberfunds List phases already completed: Planning and design in -progress
Additional info:
17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted llplis Requfst, Beyond 6
(not lapsed) NFY• 26 27°- 1 FY 27-28 FY 28-29 1 FY 29-30 1 FY 30-31 1 FY 31-32 1 Years I TOTAL:
Planning
Land Acquisition
I18. 0& M COSTS (x $1000): II 114 a =" < °I 1 I I I I I I
19. FUNDING SOURCE(x$1000):�,if<"Ii
Cty G.O. Bond 7K'I
$10,000
State Revolving Fund
State CIP
Federal Private (Grants)CBA (FairShare, Park Dedication, etc)
nf., rfi, _�d_i,go«�ih.1
n (This Page Intentionally Left Blank)
a,
w
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. SUBMITTER: James M. Komata, Park Planner DATE: 1/16/2026
3. PROJECT NAME: DPR - Hawaiian Paradise Park New District Park 4. LOCATION (COUNCIL DISTRICT): 4
S. COUNCIL BENEFIT DISTRICT(S): 3,4 & 5 6. TMK/CDP PLANNING AREA: 1-5-039:267 / Puna
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 3,000,000
8. PROJECT ELIGIBILITY, ✓ all ❑ Land acquisition 0 Infrastructure improvement 0 New bldg., structure, or addition 9. PROJECT URGENCY/NEED, ✓one:
that apply: ❑ Nonrecurring rehabilitation ❑ Planning, feasibility, eng., or design study I ❑ Information/communications tech. 0 High ❑ Med. ❑ Low
10. PROJECT/PROGRAM Development of a new district park in the Hawaiian Paradise Park subdivision to include initial offsite and onsite infrastructure and utilities, new sports and recreational facilities, and
DESCRIPTION: complementary park amenities in accordance with final park master plan document. 7�
11. PROJ ECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. N
A. Addresses public health/safety, -'If Yes:
0
N/A
B. Service improvements, ✓all that apply:
0 Access to 0 Quality of 0 Quantity of
E. 0
opp
C. Repair/maintenance/replacementof
Facility/infrastructure/building, ✓if Yes:
El
F. F
Additional info:
12. LONG RANGE PLANS/
COMMUNITY VALUES, check at
least one and all that apply,
provide details:
ODept. Priority
Details: Consistent with Department's vision, mission, and goals
El General Plan
Details: Consistent with General Plans' goals and objectives
OCDP
Details.,
❑other Plans
Detalls:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? /if Yes: ❑
DESCRIBE:
Fills gap in current services for underserved area/demographic.
perational efficiency and leveraging Results In net increase In operating cost but improves services.
ortu nities: No opportunity, not adjacent to project to capitalize on costsoving.
asters inter -departmental collaboration N/A
,'if Yes: 0
0 Comm. Value Detalls: Desired and valued by the community
2]Adm1n Priority IDetalls. Administration strongly supports this project
❑Multliiazard Mit Details:
15. SUSTAINABILITY FOCUS,,/all that apply: 0 Promotes energy and resource conservation ❑ Reduces hazard risk I El Preserves/protects our natural/cultural env.
Provide additional information as appropriate: I El Cost benefit analysis 0 Promotes economic vitality El Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all 0 Project currently underway Previously Appropriated 0 Staff available to manage project 0 External funds/resources ready to proceed
that apply: f 9 P ❑ Y f P Y P P P ❑Identt led and requested operating budget needs Can realistically encumberfunds List hoses already completed. Park master Ian and EA completed.
Additional info:
17. EXPENDITURE PHASING (X $1000): Prior Funds Allotted ThisµRequest, Beyond 6
(not laosedl '-FY 715-i ,•' FY 27-28 FY 28-29 FY 29-30 FY 30-31 FY 31-32 Years TOTAL:
118. O& M COSTS (x $1000).. II I1,4. `1,' , '_''''% I I I I I 1 1
19. FUNDING SOURCE (x $1000):
Cty G.O. Bond 3,000- 35,000 3,000 25,000 $66,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
0ther Cty Fund -(describe)
TOTAL: $3,000 1 $35,000 1 $3,000 - $25,000 $66,000
(This Page Intentionally Left Blank)
CA
M
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation
2. SUBMITTER: James E. Hustace DATE: 5/27/2026
3. PROJECT NAME: DPR - Spencer Kalani Schutte District Park New Community Center/Shelter & Improvements
4. LOCATION (COUNCIL DISTRICT): 9
S. COUNCIL BENEFIT DISTRICT(S): 1,8,9
6. TMK/CDP PLANNING AREA: (3) 6-7-002:063 / South Kohala
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 7,000,000
8. PROJECT ELIGIBILITY, ✓ all I
❑ Land acquisition
EP Infrastructure improvement
[o New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply: 10
Nonrecurringrehabilitation 10
Planning, feasibility, eng., or design study I
❑ Information/communications tech.
[D High ❑ Med. ❑ Low
. PROJECT/PROGRAM
SCRIPTION:
F
Development of additional phased recreational improvements at the facility, formerly known as Waimea District Park, consistent with the master pan as well as addressing supplemental needs
identified with existsing improvements for enhanced usability.
11. PROJECT JUSTIFICATION& OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: [D
Fills gap in curren t services for underserved area/demographic.
A. Addresses public health/safety, ✓if Yes• 0
'
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
121 Access to El Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net increase in operating cost but improves services.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: 121
Necessary repair/maintenance/replacement per
maintenance plan/schedule.
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
Q Dept Priority
Details: Consistent with Department's vision, mission, and goals
Comm. Value
Details: Desired and valued by the community
COMMUNITY VALUES, check
Q General Plan
Details: Consistent with General Plans' goals and objectives
[DAdmin Priority
Details: Administration strongly supports this project
at least one and all that apply,
[D CDp
Details:
[]Multi Hazard Mit
Details:
provide details:
El other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: [D
I DESCRIBE: State funding is secured and requires a 1:1 match.
14. LEGAL MANDATE? ✓if Yes: [I
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
I E] Promotes energy and resource conservation
Q Reduces hazard risk
[21 Preserves/protects our natural/cultural env.
I p Cost benefit analysis
OO Promotes economic vitality
p Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑project currently underway
Previously Appropriated
� Staff available to manage project
n External funds/resources ready to proceed
that apply:
❑ luenuilea and requestea operating buuger
Can realistically encumberfunds
List phases already completed: Park design complete.
Additional info:
17. EXPENDITURE PHASING (X $3000): IF
Prior Funds Allotted
(not lapsed)
This Request
-' Filg 27,,
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
xx
Land Acquisition
" x
Design/Survey
750
'°
$750
Construction
', 1, ,17,000,1
$17,000
TOTAL:
$750
' : ': $17,000
$17,750
18. O & M COSTS (x $1o0D):
19. FUNDING SOURCE(x$1000):
Cty G.O. Bond
='•, ,i 7,000
$7,000
State Revolving Fund
State CIP
' 5,000
$5,000
Federal
Private (Grants)
750
'%-5,000-
$5,750
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
<_
TOTAL:
1 $750
• 11$17,000
$17,750
rn (This Page Intentionally Left Blank.)
Ul
v
County of Hawairi
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENTAND DIVISION: Department of Parks & Recreation
2. SUBMITTER: James E. Hustace DATE: 5/13/2026
3. PROJECT NAME: DPR - Waikoloa Gymnasium (Reapp.)
4. LOCATION (COUNCIL DISTRICr): 9
S. COUNCIL BENEFIT DISTRICT(S): 9
6. TMK/CDP PLANNING AREA: (3) 6-8-041:XXX/South Kohala
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 2,000,000
B. PROJECT ELIGIBILITY, ✓ all
El Land acquisition
❑Infrastructure improvement
Q New bldg., structure, or addition
9. PROTECT URGENCY/NEED, ✓one:
that apply: ID
Nonrecurringrehabilitation I
El Planning, feasibility, eng., or design study I
❑ information/communications tech.
[D High ❑Med. El Low
10. PROJECT/PROGRAM
DESCRIPTION:
Planning and design fora Waik6loa Gymnasium. Initial work needed to build a gymnasium and multipurpose community facility.
11. PROJECT JUSTIFICATION& OUTCOME(S), select and/or answer all that apply:
D. New facility/Infr./bldg. 'if Yes: 21
Fills gap in current servlcesfor underserved area/demographic.
A. Addresses public health/safety, 'if Yes'
'
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
❑ Access to ❑ Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net increase in operating cost but improves services.
Reduces cost by 20% or more by bundling with adjacent projects.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: El✓if
NIA
F. Fosters inter -departmental collaboration
Yes: 0
Civil Defense
Additional info:
12. LONG RANGE PLANS/
Dept. Priority
Details: Enhancing Park Facilities and Recreation Services
I ❑r Comm. Value
IDetails: Recreational benefits. Needed community space.
COMMUNITY VALUES, check
Q General Plan
Details: Reference 12.5.6.2
❑Admin Priority
Details:
at least one and all that apply,
21 CDP
Details: Reference Chapter5: Waik6loa Village Plan
r4 Multi Hazard Mit
Details: Appropriate evacuation site in Waikoloa Village.
provide details:
❑ other Plans
Details:
Additional info: Opportumityto partner with Civil Defense and the Waikoloa community to identify emergency preparedness needs. Opportunity to coordinate with OHCD and regional housing development.
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
1 DESCRIBE:
14. LEGAL MANDATE? /If Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
I ❑ Promotes energy and resource conservation
❑ Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
O Promotes economic vitality
O Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
Project currently underway
❑Q Previously Appropriated
El Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
en t to and requested opera mg u ge
kE
❑, Can realistically encumberfunds
Listphases already completed:
Additional info: Can be sited on existing County
property in the Kamakoa Nui development area.
17. EXPENDITURE PHASING (X $1000):
IF —Prior Funds Allotted
(not lapsed)
This Request
FY26-27 = "
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
i
M} '
-<':2;000
s, l;
$2,000
TOTAL
-= '<$2,000
$2,000
18. O & M COSTS (x $1000):
19. FUNDING SOURCE (x$1000):
Cty G.O. Bond
:It iii=
0-_2,000
r F€ �
.2101 I �
II IIl� itm
t - ' €si,:<;I ?ims
L 1 ,l':ER ��K
$2,000
State Revolving Fund
State CIP
Federal`
Private (Grants)
CBA(FairShare, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
'- $2,000
$2,000
o (This Page Intentionally Left Blank.)
V7
(O
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Department of Parks & Recreation
2. SUBMITTER: James E. Hustace DATE: 5/21/2026
3. PROJECT NAME: DPR - Banyan Trees Park Comfort Station
4. LOCATION (COUNCIL DISTRICT): 9
S. COUNCIL BENEFIT DISTRICT(S): 9
6. TMK/CDP PLANNING AREA: (3) 5-5-015:042/North Kohala
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,500,000
8. PROJECT ELIGIBILITY, ✓ all
El Land acquisition
Infrastructure improvement
New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
ID Nonrecurringrehabilitation
❑ Planning, feasibility, eng., or design study
I ❑ Information/communications tech.
[D High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Development of a new comfort station at Banyan Trees Parkin the Hawi Town Center to support community and public users.
11. PROJECT JUSTIFICATION& OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. /if Yes: 21
Fills gap in current servicesfor underserved area/demographic.
A. Addresses public health/safety, /if Yes:
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
ID Access to O Quality of O Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net increase in operating cost but improves services.
Has no reduction of construction costs.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: ❑
NIA
F. Fosters inter -departmental collaboration
✓if Yes:
N/A
Additional info: No public comfort station exists in Hawi.
12. LONG RANGE PLANS/
❑� Dept. Priority
Details: Enhancing Park Facilities and Recreation Services
❑✓ Comm. Value
Details: Community members advocating for public restroom.
COMMUNITY VALUES, check
2 General Plan
Details: Reference 14.3.5.5
❑Admin Priority
Details:
at least one and all that apply,
Q CDP
Details: Reference Chapter 4.4: Infrastructure & Public Facilities
❑MultlHazard Mit
Details:
provide details:
[I Other Plans
Details:
Additional info: Reinvigorates previously purchased PONC parcel.
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
1 DESCRIBE:
14. LEGAL MANDATE? /If Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
I ❑ Promotes energy and resource conservation
❑ Reduces hazard risk
[21 Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
O Promotes economic vitality
0 Strengthens andsustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
0 Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
E] Identutea ana requested operating budget
Can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This"Request
z TFY26-27 _"
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
s. �;250=
a 1;250
$250
$1,250
TOTAL
$1;500•
$1,500
18. O & M COSTS (x$100D):
:'"r,;'-: •-
r ==
,£. r
>Ma`r >:: € 5aw..k
3> <I<`uat::
=n sn ..
$1,000
19. FUNDING SOURCE (x$1000):
Cty G.O. Bond
d€
= - "1,000/
State Revolving Fund
State CIP
Federal
Private (Grants)
x M
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - PONC Maintenance Fund
001
$500
TOTAL:
- ;,$1;S00'
$1,500
o (This Page Intentionally Left Blank.)
DEPARTMENT OF PUBLIC
WORKS
WESLEY SEGAWA,
DIRECTOR
61
(This Page Intentionally Left Blank)
62
Department: Public Works
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2026-2027
PRIORITY
PROJECT
2026-27 FY FUNDING
(in thousands)
FUNDING FORECAST BY FISCAL YEAR
(in thousands)Prior<<`;T
TOTAL
ESTIMATED
PROJECT
COST
County
G.O. Bond
State
Federal
Private'
CBA,
Other;'
P
Funds
Allotted
s =
JRequest
2026-27
2027-28
2028-29
2029-30
1 2030-31
2031-32
Beyond 6
years
-A,
1
DPW- Reroofing at Various Fire and Police Stations
6,000
; i ��:6,000
6,000
2
DPW- Facilities Improvements
14,000
22,832
`="3,4,000
14,000
14,000
14,000
14,000
14,000
106,832
3
DPW- Road and Bridge Improvement Projects, Federal and State -Funded
4,000
16,000
20,000
20,000
20,000
20,000
20,000
20,000
120,000
4
DPW -Coconut [stand Bridge
8,000
, ,,Odb
1
8,000
5
DPW- Road and Bridge Improvement Projects, Islandwide
10,000
wZ,,X0,000
10,000
10,000
10,000
10,000
10,000
60,000
6
DPW - Drainage Improvement Projects, Islandwide (reapp.)
4,000
3,000
:F?f Q,00Q
4,000
4,000
4,000
4,000
4,000
27,000
7
DPW- Miscellaneous Improvement Projects, Islandwide
3,500
=.;'3,500
2,000
2,000
2,000
2,000
2,000
13,500
8
DPW- Kilauea Avenue Safe Routes to School - Walikea
4,000
16,000
`% 20,000
20,000
9
DPW - Ka'ahakini Stream Bridge (29.1] Replacement
10,000
I0,000
30,000
10
DPW - Four Mile Creek Bridge [22-7] Reconstruction
6,000
12,000
18,DOQ
18,000
11
DPW- Banyan Drive Shoulder Improvements
2,000
<•,��•�'2,00R
2,000
12
DPW- WaiSnuenue Avenue Bridge Modernization -HMGP
4,500
13,500
k2.5,.32
:�`18,000
18,000
13
DPW- Lindsey Road Extension
1,000
_ "foo0
5,000
6,000
TOTAL
67,000
12,000
55,500
"x 134,500
55,000
50,000
50,000
50,000
50,000
415,332
Created By: Kelsey Kalua-Lewis ' Private: Foundation Grants
Date: 03/27/26 •' Community Benefit Assessments: Fair Share, Park Dedication, Etc. Other: GET, Fuel Tax and other non -bond sources
Cl)
w
(This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW Building Division 12.
SUBMITTER: Aaron Spielman DATE: 12/29/2025
3. PROJECT NAME: DPW - Reroofing at Various Fire and Police Stations
4. LOCATION (COUNCIL DISTRICT): 1,2,3,8
S. COUNCIL BENEFIT DISTRICT(S): Various
6. TMK/CDP PLANNING AREA: Various
7. TOTAL COUNTY FUNDS NEEDED THIS FY: $6,000,000.00
B. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
❑Infrastructure improvement
❑ New bldg., structure, or addition
9. URGENCY/NEED, ✓one:
that apply:
0 Nonrecurring rehabilitation
El Planning, feasibility, eng., or design study
ElInformation/communications tech.
El High ElMed. ❑ Low
F1O. PROJEPROJECT
CT/PROGRAM
DESCRIPTION:
This project will replace the roofs for Waiakea Fire Station, Kaumana Fire Station, Kailua Fire Station, and Honokaa Police Station.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: 0
Needed to continue current level ofservices.
A. Addresses public health/safety, ✓if Yes:
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
❑ Access to 2 Quality of 0 Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net decrease in operating cost and improves services.
Has no reduction of constructlon costs.
C. Repair/maintenance/replacementof
facility/infrastructure/building, /if Yes: El
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
✓if Yes:
N/A
Additional info:
12. LONG RANGE PLANS/
❑� Dept Priority
Details: Projectconsistent with multi -departmental goals.
❑Comm. Value
Details:
COMMUNITY VALUES, check at
2 General Plan
Details: Project consistent with General Plan section 10 Public Facilities.
DAdmin Priority
Details: Consistent with general priorities of administration.
least one and all that apply,
❑CDP
Details:
❑Multi Hazard Mtt
Details:
provide details:
❑Other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS ROXD? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
1S. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate: I
E]Promotes energy and resource conservation
IQ Reduces hazard risk
I ❑ Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
I ❑ Promotes economic vitality
❑ Strengthens and sustains our community —�d
Additional info: New roof will be built to meet current energy code standards.
16. PROJECT READINESS, ✓all
0 project currently underway
❑ Previously Appropriated
❑ Staff available to manage project
ElExternal funds/resources ready to proceed
that apply:
El identified and requested operating budget needs
I ❑ can realistically encumberfunds
List phases already completed:
Additional info: Funds were encumbered for design.
Project is currently still in the design phase.
17. EXPENDITURE PHASING (X $3000):
Prior Funds Allotted
(not lapsed)
This Request'
_ FY 2647 r'-:
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
;
< 6,00n'
$6,000
TOTAL:
'- ;$6,000
$6,000
18. O & M COSTS (x $3000):
19. FUNDING SOURCE (x $3000):
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
; : `=µ-6,000'
> 5"
$6,000
TOTAL:
"$6,000
$6,000
rn (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW Building Division
2. SUBMITTER: Aaron Spielman DATE: 12/29/2025
3. PROJECT NAME: DPW - Facilities Improvements
4. LOCATION (COUNCIL DISTRICT): All
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: All
7. TOTAL COUNTY FUNDS NEEDED THIS FY: $14,000,000.00
S. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
0 Infrastructure improvement
New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
2 Nonrecurring rehabilitation
21 Planning, feasibility, eng., or design study I
❑ Information/communications tech.
0 High ❑ Med. ❑ Low
. PROJECT/PROGRAM
SCRIPTION:
F
This project represents various facility improvements to address energy efficiency, ADA compliance, hardening, deferred maintenance, additions, renovations, and repairs. It also includes new
facilities to replace exisiting facilities that are beyond service life.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: 0
Needed to continue current level ofservices.
A. Addresses public health/safety, ✓if Yes:
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
21 Access to 2Quality of OQuantity of
E. Operational efficiency and leveraging
opportunities:
Results In net decrease in operating cost and Improves services.
Has no reduction ofconstructlon costs.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: ❑
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
,if Yes: 0
N/A
Additional info:
12. LONG RANGE PLANS/
❑� Dept Priority
Details: Project consistent with multi -departmental goals.
❑ Comm. Value
Details:
COMMUNITY VALUES, check at
General Plan
Details: Project consistent with General Plan Section 10 Public Facilities.
DAdmin Priority
Details: Consistent with general priorities of administration.
least one and all that apply,
❑CDP
Details:
[]Multi Hazard Mit
Details:
provide details:
El Other Plans
Details:
Additional info:
13. CTY, MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14.LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
Promotes energy and resource conservation
7Q Reduces hazard risk
❑Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
❑ Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
Ej Project currently underway
2 Previously Appropriated
❑ Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑Identified and requested operating budget needs
Can realistically encumberfunds
List phases already completed:
Additional in
17. EXPENDITURE PHASING X $1000):
(
Prior Funds Allotted
(not lapsed)
This Request
'i11;-,K 6=2T7?
FY 27-28
FY 28-29
FY 29-30
FY 30 31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
2,634
7,";-' '-1,400
1,400
1,400
1,400
1,4001
1,400
$11,034
Construction
20,198
: =�"-12,600
12,600
12,600
12,600
12,600
1 12,600
$95,798
TOTAL:1
$14,000
1 $14,0001
$14,0001
$14,000
1 $14,000
1
1 $106,832
18. O & M COSTS (x $1000):
19. FUNDING SOURCE(x$1000-.
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
0ther CtV Fund -(describe)
-
22,832
= �,`,i;:=
'14,000,
..*-
>
;z a
s
`
14,000
14,000
14,000
14,000
14,000
$106,832
TOTAL:
$72,8 22
f,' .'04 000'
$14,000
$14,000
$14,000
$14,000
$14,000
$306,832
ono (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW - Engineering Division 12.
SUBMITTER: Alan Keone Thompson DATE: 12/26/2025
3. PROJECT NAME: DPW - Road and Bridge Improvement Projects, Federal and State -Funded 14.
LOCATION (COUNCIL DISTRICT): All
S. COUNCIL BENEFIT DISTRICT(S): All 16.
TMK/CDP PLANNING AREA: Various
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 4,000,000
8. PROJECT ELIGIBILITY, ✓ all I
❑ Land acquisition
Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
[21 Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study I
❑ Information/communications tech.
❑ High 0 Med. ❑ Low
30. PROJECT/PROGRAM
DESCRIPTION:
Road and bridge infrastructure improvement projects or required inspections receiving Federal or State funding through various methods, including Statewide Transportation Improvement
Program (STIP), grants, etc.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. /if Yes: ❑
N/A
A. Addresses public health/safety, /if Yes: 0
Community concerns exists around conditions.
B. Service improvements, ,'all that apply:
El Access to 0 Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net decrease In operating cost and Improves services.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: El✓if
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
Dept Priority
Details:lmproveroadway and bridge safety.
QComm. Value
Details: Enhances quality oflifeforresidents,
COMMUNITY VALUES, check at
OGeneral Plan
Details: Obj. 22: Safetyfor vulnerable users,Obj. 23: Maintain public transport system.
QAdmin Priority
Details: Provide matching funds to leverage non-Countyfunding sources.
least one and all that apply,
❑CDP
Details:
❑Multi Hazard Mit
Details:
provide details:
❑Other Plans
Details:
Additional info:
13. cry. MATCHING FUNDS REQ'D? ✓if Yes: 0
DESCRIBE: Typically 80% Federal, 20% County
14. LEGAL MANDATE? /If Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, Vail that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
0 Reduces hazard risk
[21 Preserves/protects our natural/cultural env.
I ❑ Cost benefit analysis
❑ Promotes economic vitality
0 Strengthens and sustains our community
Additional info: :d
16. PROJECT READINESS, 'all
❑ Project currently underway
❑ Previously Appropriated
Staff available to manage project
External funds/resources ready to proceed
that apply:
❑Identifled and requested operating budget needs
El Can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
not lapsed)
This Request
s'- FY 26 2T s.
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition%
Design/Survey
Construction
z•= f; 4•<
'A- tP20,000
20,000
20,000
20,000
20,000
20,000
1
$120,000
TOTAL:
=- 20,0061
$20,0001
$20,0001
$20,0001
$20,0001
$20,0001
$120,000
18. O & M COSTS (x $3000):
19. FUNDING SOURCE(x$3000):
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
0ther Cty Fund -(describe)
I� I => II:
?? ?�l'
;= . 4,000'
-16;000
4,000
16,000
n
4,000
16,000
a : fi
4,000
16,000
x :r:=�
4,000
16,000
' ! �
4,000
16,000
$24,000
$96,000
TOTAL:
, , ',$20,000
$20,000
$20,000
$20,000
$20,000
$20,000
$120,000
o (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW - Engineering Division 12.
SUBMITTER: Alan Keane Thompson DATE: 3/27/2026
3. PROJECT NAME: DPW - Coconut Island Bridge
4. LOCATION (COUNCIL DISTRICT): 3
S. COUNCIL BENEFIT DISTRICT(S): 3
6. TMK/CDP PLANNING AREA: 2-1-03 / Hilo
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 8,000,000
B. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
0 Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ,one:
that apply:
❑ Nonrecurring rehabilitation
El Planning, feasibility, eng., or design study
❑ Information/communications tech.
2 High ❑ Med. El Low
GRAM
E77
This projectwill includethe design, permitting, and construction forremoval ofan existing bridge structure, installation ofatemporary replacement bridgesection, and installation ofa new
permanent bridge substructure and superstructure providing access to Coconut Island.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: El
Needed to continue current level ofservices.
A. Addresses public health/safety, ✓if Yes: El
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
0 Access to 0 Qualityof ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results to net decrease in operating cost and Improves services.
Has no reduction of construction costs.
C. Repair/maintenance/replacement of
,,
facility/infrastructure/building, /If Yes: ❑
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
/if Yes: 0
Parks
Additional info:
12. LONG RANGE PLANS/
Dept. Priority
Details: improve roadway and bridge safety.
0 Comm. Value
Details: Enhances quality of life for residents.
COMMUNITY VALUES, check at
❑General Plan
Details:
❑Admin Priority
Details:
least one and all that apply,
OCDP
Details: Community safety.
[]Multi Hazard Mit
Details:
provide details:
❑other Plans
Details.,
Additional info:
13. cry. MATCHING FUNDS RECI'D? /if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? /if Yes: ❑
DESCRIBE:
15. SUSTAINABILI Y FOCUS, ✓all that apply:
Provide additional information as appropriate:
I ❑ Promotes energy and resource conservation
Reduces hazard risk
0 Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
2 Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, "all
[:]Project currently underway
❑ Previously Appropriated
Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑ldentifled and requested operating budget needs
2 can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request]
;FY 26 27 =
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
'cx ; 3;600'1
`" a5,000
$3,000
$5,000
TOTAL:
%� $8,000
$8,000
18. O & M COSTS (x $1000):
19. FUNDING SOURCE (x$1000):
IP=I-?
i Yff,
" :'(��=�=
Cty G.O. Bond
- 8,60d,
$8,000
State Revolving Fund
State CIP
Federal
Private (Grants)
"` z
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
` _ "R"
TOTAL:
tj I-$$'0W'1
1
$8,000
n (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW - Engineering Division
2. SUBMITTER: Alan Keane Thompson DATE: 12/26/2025
3. PROJECT NAME: DPW - Road and Bridge Improvement Projects, Islandwide
4. LOCATION (COUNCIL DISTRICT): All
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: Various
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 10,000,000
S. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
E Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
[0 Nonrecurring rehabilitation I
❑ Planning, feasibility, eng., or design study
❑ Information/communications tech.
❑ High R1 Med. ❑ Low
. PROJECr/PROGRAM
SCRIPTION:
F
Inspection, repair, and construction of road and bridge improvement projects, islandwide.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: ❑
N/A
A. Addresses public health/safety, ✓if Yes: 0
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
21 Access to 0 Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net decrease in operating cost and Improves services.
No opportunity, not adjacent to project to capitalize on cost saving.
C. Repair/maintenance/replacementof
facility/infrastructure/building, ✓if Yes: ❑
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
[]Dept. Priority
Details:Improveroadway and bridge safety.
Comm. Value
Details: Enhances quality oflifeforresidents.
COMMUNITY VALUES, check at
OGeneral Plan
Details: Obj. 23: Maintain public transport system.
❑� Admin Priority
Details: Prioritized in General Plan.
least one and all that apply,
❑SDP
Details:
[]Multi Hazard Mit
Details.,
provide details:
❑Other Plans
Details:
Additional info:
13. Cry. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
0 Reduces hazard risk
0 Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
❑ Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
Staff available to manage project
ElExternal funds/resources ready to proceed
that apply:
El Identified and requested operating budget needs
❑ Can realistically encumber funds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed
This Request,
z r.�,
' ' FY.26 27;%
FY 27-28
1 FY 28-29
1 FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
a
- +,
""1,0,0001
10,000
10,000
10,000
10,000
10,000
$60,000
TOTAL:11
11
$10,000
$10,0001
$10,0001
$10,0001
$10,0001
$10,0001
$60,000
18. 0 & M COSTS (x $1000):
19. FUNDING 1000 : SOURCE(x$
Cty G.O. Bond
>w'-"'10,0001
10,000
10,000
10,000
10,000
10,000
$60,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
0ther CtV Fund - (describe)
TOTAL:
""'s 410,000
$10,0o0
$10,000
$10,000
$10,000
$10,000
$60,000
(This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW - Engineering Division
2. SUBMITTER: Alan Keone Thompson DATE: 12/26/2025
3. PROJECT NAME: DPW - Drainage Improvement Projects, Islandwide (reapp)
4. LOCATION (COUNCIL DISTRICT): All
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: Various
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 4,000,000
B. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
I 0 Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study
I ❑ Information/communications tech. IEEE]❑
High 0 Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Inspection, repair, and construction of drainage improvement projects, islandwide.
11. PROJECT JUSTIFICATION& OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: ❑
N/A
A. Addresses public health/safety, ✓if Yes: El
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
❑ Access to 2 Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net decrease in operating cost and improves services.
No opportunity, not adjacent to project to capitalize on costsaving.
C. Repair/maintenance/replacement of
facili /infrastructure/building, ✓if Yes: ❑�
tYif
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
✓, Yes: ❑
///q
Additional info:
12. LONG RANGE PLANS/
❑� Dept. Priority
Details:Improvefloodingsafety concerns.
(]Comm. value
Details: Communitysafety driven.
COMMUNITY VALUES, check at
2]General plan
Details. Addresses flooding and other natural hazards.
❑� Admin Priority
Details., Protects public health and/or safety.
least one and all that apply,
details:
2CDP
Details: Community safety.
❑MultlHazardMit
Details.,
provide
El Other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? /if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
0 Reduces hazard risk
Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
2 Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑� Previously Appropriated
Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
[Identified and requested operating budget needs
0 Can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $3000):
Prior Funds Allotted
(not lapsed)
This Request
«`=FY 26-27 `
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
3,000
; ` 4,000,
4,000
1 4,0001
4,000
1 4,000
1 4,000
1
$27,000
TOTAL:
$3,000
";='=<= $4,000>
$4,000
$4,000
1 $4,0001
$4,000
$4,000
1
$27,000
18. O & M COSTS (x $1000):
==;.x„•;a<,y
19. FUNDING SOURCE (1000 x $ )•
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
0ther Cty Fund -(describe)
3,000
,< A000.
4,000
4,000
4,000
4,000
4,000
$27,000
TOTAL:11
7ii,000
>r ° ''-$4,000
1 $4,000
$4,000 1
$4,0001
$4,0001
$4,000 1
$27,000
rn (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW - Engineering Division
2. SUBMITTER: Alan Keane Thompson DATE: 12/26/202S
3. PROJECT NAME: DPW - Miscellaneous Improvement Projects, Islandwide
4. LOCATION (COUNCIL DISTRICT): All
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: Various
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 3,500,000
8. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
0 Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
El Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study
I ❑ Information/communications tech.
❑ High 21 Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Acquisition, design/survey, inspection, repair, and construction of miscellaneous improvement projects, islandwide.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: ❑
N/A
A. Addresses public health/safety, ✓if Yes:
community concerns exists around conditions.
B. Service improvements, ✓all that apply:
❑ Access to O Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net decrease in operating cost and improves services.
No opportunity, not adjacent to project to capitalize on costsaving.
C. Repair/maintenance/replacement of ❑
facility/infrastructure/building, ✓if Yes:
Necessary repair/maintenance/replacement
F. Fosters inter -departmental collaboration
✓if Yes: El
N/A
Additional info:
12. LONG RANGE PLANS/
Dept. Priority
Details:lmprove various safety concerns.
comm. value
Detalls: community safety driven.
COMMUNITY VALUES, check at
General Plan
Details: Obj.23: Maintain public transport system.
[2]Admin Priority
Details: Protects public health and/orsafety.
least one and all that apply,
details:
OCDP
Details., community safety.
[]Multi Hazard Mtt
Details:
provide
❑Other Plans
Details:
Additional info:
13. cry. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE: '
14.LEGAL MANDATE? /If Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply: •
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
Reduces hazard risk
0 Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
[21 Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
0 Stajf available to manage project
❑ External funds/resources ready to proceed
that apply:
El identified and requested operating budget needs
0 Can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $3000):
Prior Funds Allotted
(not lapsed)
This'Request
%x FY 26-27s°
FY 27-28
1 FY 28-29
1 FY 29-30
1 FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
:, - _7",'
Design/Survey=
;
Construction
x ='i-%3,500z
2,000
2,000
2,000
2,000
2,000
$13,500
TOTAL:
<'?" ;;$3,500
1 $2,000
1 $2,000
1 $2,0001
$2,000
1 $2,000
1
$13,500
18. O & M COSTS (x $1000):
19. FUNDING SOURCE (x $1000):rF:
Cty G.O. Bond
z
-,,,3,500
2,000
2,000
2,000
2,000
2,000
$13,500
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
$3,500'
$2,0001
$2,000
1 $2,000
1 $2,000
1 $2,000
1
$13,500
co (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW - Engineering Division
2. SUBMITTER: Alan Keane Thompson DATE: 1/20/2026
3. PROJECT NAME: DPW - Kilauea Avenue Safe Routes to School - Waiakea
4. LOCATION (COUNCIL DISTRICT): 2
S. COUNCIL BENEFIT DISTRICT(S): 2 & 3
6. TMK/CDP PLANNING AREA: 2-2 / Hilo
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 4,000,000
B. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
21 Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study
❑ Information/communications tech.
0 High ❑ Med. ❑ Low
. PROJECT/PROGRAM
SCRIPTION:
F
This project will construct concrete sidewalks and drainage improvements.
11. PROJECT JUSTIFICATION& OUTCOM E(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: El
Fills gap Incurrent servlcesforunderservedarea/demographic.
A. Addresses public health/safety, /if Yes: ❑�
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
0 Access to El Quality of El Quantity of
E. Operational efficiency and leveraging
opportunities:
Results In net decrease in operating cost and Improves services.
Has no reduction of construction costs.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: El✓if
NIA
F. Fosters inter -departmental collaboration
Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
Dept. Priority
Details: Improve roadway safety.
0 Comm. Value
Details., Enhances quality of life for residents.
COMMUNITY VALUES, check at
OGeneral Plan
Details. obi. 22: Safetyfor vulnerable users.
Admin Priori
❑ h'
Details: Provide matchln gfundstoleveragenon-Countyfundingsources.
least one and all that apply,
details:
�
❑CDP
Details: Community safety.
❑Multi Hazard Mlt
Details:
provide
❑Other Plans
Details.
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓!fYes: El
DESCRIBE: 80%Federal 20%County
14. LEGAL MANDATE? /if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
0 Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
El Promotes economic vitality
El Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
0 Project currently underway
❑ Previously Appropriated
Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑Identijted and requested operating budget needs
p Can realistically encumber funds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request
F1f 26 27 3:;-
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
y
'"'x "<20,000
$20,000
TOTAL:
- $20,000
$20,0 00
18. O & M COSTS (x $1000):
19. FUNDING SOURCE(x$3000):
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
OtherCtyFund- (describe)
hmy
" Z4;000;
f' 16,000
"y '
$4,000
$16,000
TOTAL:
:,-%$20,000-
$20,000
o (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENTAND DIVISION: DPW - Engineering Division
2. SUBMITTER: Alan Keane Thompson DATE: 1/20/2026
3. PROJECT NAME: DPW - Ka'ahakini Stream Bridge [29-11 Replacement
4. LOCATION (COUNCIL DISTRICT): 1
S. COUNCIL BENEFIT DISTRICT(S): 1,2
6. TMK/CDP PLANNING AREA: 2-8-04,09 / Hamakua
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 0
B. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study I
❑ Information/communications tech.
El High ❑ Med. ❑ Low
. PROJECT/PROGRAM
SCRIPTION:
F
Project will replace the existing bridge superstructure with a similar superstructure on new abutments. Bridge is currently closed to traffic.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. /if Yes: ❑
N/A
A. Addresses public health/safety, ✓if Yes: 0
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
0 Access to 0Quality of El Quantity of
E. Operational efficiency and leveraging
opportunities:
Results In net Increase In operating cost but improves services.
Has no reduction of construction costs.
C. Repair/maintenance/replacement of
facility/infrastructure/building, /If Yes: ❑
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
Dept. Priority
Details: Assessment and repairs required by State and Federal programs.
Comm. Value
Details: Enhances quality of life for residents.
COMMUNITY VALUES, check at
GeneralPlan
Details: obl.23:Maintain public transport system.
❑�AdminPriority
Details: Provide matchingfunds to leverage non-countyfunding sources.
least one and all that apply,
OCDP
Details: Community safety.
[]Multi Hazard Mit
Details:
provide details:
❑other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? 'if Yes: ❑
DESCRIBE: 100% Federal
14. LEGAL MANDATE? /If Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ,'all that apply:
Provide additional information as appropriate:
El Promote energy and resource conservation
Reduces hazard risk
0 Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
❑ Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
0 Project currently underway
❑ Previously Appropriated
2 Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
El identified and requested operating budget needs
0 Can realistically encumber funds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request
FY, 26-27•T
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
�X
-10,000
$10,000
TOTAL:
::; , $10,000'
$30,000
18. 0 & M COSTS (x $1000):
19. FUNDING SOURCE (x$1000):
CtY G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
-0 "
€.• i`n.
>• xs
% ' 10,000
-'1'�
'
€H I
(:: (a
�'a ..
$10,000
TOTAL:
; '$30,000
$10,000
N (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW - Engineering Division
2. SUBMITTER: Alan Keone Thompson DATE: 1/20/2026
3. PROJECT NAME: DPW - Four Mile Creek Bridge [22-7] Reconstruction
4. LOCATION (COUNCIL DISTRICT): 3
S. COUNCIL BENEFIT DISTRICT(S): 3
6. TMK/CDP PLANNING AREA: 2-4-04 / Hilo
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 6,000,000
8. PROJECT ELIGIBILITY, ✓ all
21 Land acquisition
FRI Infrastructure improvement
[I New bldg., structure, or addition E3121
. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
Planning, feasibility, eng., or design study
ElInformation/communications tech.
High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
is project will design and construct anew reinforced concrete bridge to replace/reconstruct the existing Four Mlle Creek Bridge. The existing one -lane 100-year old bridge is a historical bridge and Its historic features will be retained while
dernizing and implementing the necessary structural and safety Improvements. Hydrologic and hydraulic studies will determine Its associated upstream and downstream channel Improvements to ensure its 100-yearstorm design conveyance
pacity. The Intersection at Haihal Street and KlIguea Avenue will be analyzed to determine what improvements will be needed to be implemented In order to accommodate the proposed new two lane bridge, all In accordance with AASHTO
Esien.
11. PROJECrJUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: p
Addresses anticipatedfuture need.
A. Addresses public health/safety, ✓if Yes: 0
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
0 Access to El Quality of ❑Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net increase in operating cost but Improves services.
Has no reduction of construction costs.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: ❑'
Necessary repair/maintenance/replacement per
maintenance plan/schedule.
F. Fosters inter -departmental collaboration
✓if Yes: 0
Fire
Additional info:
12. LONG RANGE PLANS/
Dept Priority
Details.*Bridg andsurrounding area needs improvementsforsafety and Increase Incapacity.
QComm.Value
Details: Bridge andsu unding area needs Improvementsforsafety and Increase In capacity.
COMMUNITY VALUES, check at
General Plan
Details: Obi. 23: Maintain public transport system.
2Admin Priority
Details: Project is a focus for both the State and County.
least one and all that apply,
❑CDP
Details:
[]multi HazardMit
Details:
provide details:
El other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: El
DESCRIBE: State Provide $12M (2/3 cost), County provide $6M (1/3 cost).
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
Reduces hazard risk
Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
❑ Strengthens and sustains our community
Additional info: 71
16. PROJECT READINESS, ✓all
0 Project currently underway
2 Previously Appropriated
0 Staff available to manage project
External funds/resources ready to proceed
that apply:
❑Identified and requested operating budget needs
2 Can realistically encumberfunds
List phases already completed:
Additional info:
117. EXPENDITURE PHASING (X $3000):
Prior Funds Allotted
(not lapsed)
f i,s,Request
- FY 26 27 F''
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
-=18,000.
$18,000
TOTAL:
$18,000
$18,000
18. O & M COSTS (x $1000 :
19. FUNDING SOURCE x$1000
�.'
"
!ijl€li��=_`I:
M,:=6,000`
$6,000
Cty G.O. Bond
State Revolving Fund
State CIP
", J-12,000
$12,000
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
OtherC Fund -(describe)
^;'
TOTAL:
-"'€'$18,000'
$18,000
� (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW - Engineering Division
2. SUBMITTER: Alan Keane Thompson DATE: 1/29/2026
3. PROJECT NAME: DPW - Banyan Drive Shoulder Improvements
4. LOCATION (COUNCIL DISTRICT): 3
S. COUNCIL BENEFIT DISTRICT(5): 3
6. TMK/CDP PLANNING AREA: 2-1-03,05 / Hilo
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 2,000,000
S. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
❑ Planning, feasibility, eng., or design study
❑ Information/communications tech.
❑ High E] Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
This project will construct roadway shoulder improvements along Banyan Drive. Improvements will include a sidewalk on the mauka side ofthe roadway, widening of the roadway shoulder to
provide additional parking, and additional street lighting.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: ❑�
Fills gap in currentservicesforunderservedarea/demographic.
A. Addresses public health/safety, ✓if Yes: ❑�
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
17, Access to 0 Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net decrease In operating cost and Improves services.
Has no reduction of construction casts.
C. Repair/maintenance/replacement of
facility/infrastructure/building, ,if Yes: ❑
NIA
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
Dept. Priority
Details: Improve roadway safety.
Comm. Value
Details: Enhances quality of life for residents.
COMMUNITY VALUES, check at
General Plan
Details: Obi. 22: Safetyfor vulnerable users.
❑ Admin Priority
Details:
least one and all that apply,
❑+ CDP
Details: Community safety.
❑ MuirlHo:ordMir
Details:
provide details:
El other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? 'if Yes: ❑
DESCRIBE:
15.S USTAINABILITY FOCUS, -'all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
0 Reduces hazard risk
El our natural/cultural env.
❑ Cost benefit analysis
0 Promotes economic vitality
D Strengthens and sustains our community
Additional info:
i6. PROJECTREADINESS, ✓all
❑project currently
Previously Appropriated
❑� Staff available to manage project
El Externalfunds/resources ready to proceed
that apply:
Eland requested operating budget needs
0 Can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $3000):
Prior Funds Allotted
(not lapsed)
This Request
`1 FY•26-27:•--
I
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
:i ',,2'000'1
$2,000
TOTAL:
� S�%-$2,000
$2,000
18. O & M COSTS (x $1000):
19. FUNDING SOURCE (x$1000):
= 3a""=„z n.k ==rFF=
3�xi==��F�aF�
CF
__
.f
' w^^Fir ji"z.'t
;IIr<:;=F�r-��::
w=IF £' @
R�r:;F: �i=:
3 s3j i•
�,z£�i<li n�
�F>
�,!
w�u:�i
Cty G.O. Bond
"2,000
$2,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)s`A
Other Cty Fund - (describe)
TOTAL:
�'$2,000
$2,000
rn (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: DPW - Engineering Division
2. SUBMITTER: Alan Keane Thompson DATE: 3/27/2026
3. PROJECT NAME: DPW - Waianuenue Avenue Bridge Modernization - HMGP
4. LOCATION (COUNCIL DISTRICT): 2
5. COUNCIL BENEFIT DISTRICT(S): 2
6. TMK/CDP PLANNING AREA: 2-3-25,26,32 / Hilo
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 4,500,000
S. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
[2] Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation 12
Planning, feasibility, eng., or design study I
❑ Information/communications tech.
❑ High 0 Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
This project will design and modernize the existing bridge. The existing bridge is a historical bridge and its historic features will be retained while modernizing and implementing the necessary
structural and safety improvements. Hydrologic and hydraulic studies will determine its associated upstream and downstream channel improvements to ensure its 100-year storm design
conveyance capacity.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: ❑
A. Addresses public health/safety, ✓if Yes: 0
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
0 Access to I] Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
No change In opreating costs.
Has no reductlon of construction casts.
C. Repair/maintenance/replacement of
facility/infrastructure/building, /if Yes: El✓if
Necessary repaidmaintenance/replacement.
F. Fosters inter -departmental collaboration
Yes: ❑
Additional info:
12. LONG RANGE PLANS/
❑r Dept. Priority
Detalls: Improve roadway and bridge safety.
❑Comm. Value
Details:
COMMUNITY VALUES, check at
OGeneral Plan
Details: Ohl. 23: Maintain public transport system.
QAdmin Priority
Details: Prioritized in General Plan.
least one and all that apply,
OCDP
Details: Communitysafety.
saf•
❑Mu1tlHazardMn
Details:
provide details:
[]OtherPlans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: 0
DESCRIBE: 75% Federal FEMA HMGP funds, 25% County
14. LEGAL MANDATE? ✓if Yes: ❑
IDESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
0 Reduces hazard risk
[A Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
[21 Strengthens and sustains our community
Additional info:
I& PROJECT READINESS, ✓all
0 Project currently underway
❑ Previously Appropriated
R Staff available to manage project
ff External funds/resources ready to proceed
that apply:
❑Identified and requested operating budget needs
El Can realistically encumber funds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request
x ,FY 26.27: ;'
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
=`
a :'',18',000
$18,000
TOTAL:
18. 0 & M COSTS (x $1000):
19. FUNDING SOURCE (x$3000):
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
11 h : =i?<;"'1' wmmy
'$18,ODO'l
•-v -" `
n
±1;500
: `13,500'
m � n'F
(�
��ix£�
f:Fl
k'I:' 3> 't
$18,000
wm.-amnow
$4,500
$13,500
TOTAL:
_ •" $18,000:
$18,000
o (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT ND DIVISION: Department of Public Works
2. SUBMITTER: James E. Hustace DATE: 5/13/2026
3. PROJECT NAME: DPW -Lindsey Road Extension
4. LOCATION (COUNCIL DISTRICT): 9
S. COUNCIL BENEFIT DISTRICT(S): 9
6. TMK/CDP PLANNING AREA: (3)-6-7-002:070 / South Kohala
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,000,000
8. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
0 Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurringrehabilitation
0 Planning, feasibility, eng., or design study
I ❑ Information/communications tech. 112
High ❑ Med. ❑ Low
10. PROJECr/PROGRAM
DESCRIPTION:
Extension of Lindsey Road from the intersection with Mamalahoa Highway southward to intersect with 'Ala 'Ohi'a Road.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: 0
Fills gap in current services.
A. Addresses public health/safety, /If Yes: 0
Reduces risk of o documented hazard.
B. Service improvements, ✓all that apply:
0 Access to 0 Quality of 0 Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net increase in operating cost but improves services.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, /If Yes: El✓if
NIA
F. Fosters inter -departmental collaboration
Yes: ❑
N/A
Additional info: Provides an opportunity to engage
with the Hawai'i Department of Education as they resume master plan efforts for their Waimea Elementary & Middle School campus.
12. LONG RANGE PLANS/
0 Dept. Priority
Details: Infrastructure Modernization
0 Comm. Value
I Details: Relieves Intersection Pressure, Safety & Multimodal Access
COMMUNITY VALUES, check
0 General Plan
Details: Reference 13.2.S.6.2
❑Admin Priority
Details:
at least one and all that apply,
0 CDP
Details: Reference Chapter 4., Waimea Town Plan
QMultiHazard Mit
Details., Grid connectivity and providing access to alternative routes.
provide details:
El Other Plans
Details: HDOTWaimea Roadway Improvements Project
Additional info: Provides an opportunity to work with private landowner. Enhances grid connectivity. Relieves strain of limited road network.
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
I DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
I 0 Promotes energy and resource conservation
0 Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
12 Cost benefit analysis
12 Promotes economic vitality
O Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
0 Staff available to manage project
0 External funds/resources ready to proceed
that apply:
I U!'dentijied and requested operating g u ge
0 Can realistically encumber funds
List phases already completed:
Additional info: Alignment identified. Nearly 1/3 of the future roadway is paved, maintained, and currently used by the community.
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed);
rhis'Request'
FY 26-27. '
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
s, "500'
s"<500
-N'='-V'
1 5,000
$500
$500
$5,000
TOTAL:
c$1"000'1
$5,000
1
$6,000
18. O & M COSTS (x $1000):
: —,' ` " - ';
19. FUNDING SOURCE x$1000
( )•
Cty G.O. Bond
; :» ^^ is
......... ..�...y..3`....'-....... .<
�£i,�
�VII'000°
4 }
-
$1,000
State Revolving Fund
State CIP
-"'._
Federal
Private (Grants)
5,000
$5,000
CBA (Fair Share, Park Dedication, etc)
--
Other Cty Fund - (describe)
TOTAL:
<77,sto00'
$S,000
$6,000
o (This Page Intentionally Left Blank.)
FIRE DEPARTMENT
DANIEL VOLPE,
TEMPORARY FIRE CHIEF
(This Page Intentionally Left Blank)
92
Department: FIRE
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2026-2027
PRIORITY
PROJECT
2026-27 FY FUNDING
(in thousands)
FUNDING FORECAST BY FISCAL YEAR
(in thousands)
TOTAL
ESTIMATED
PROJECT
COST
County
G.O. Bond
State
Federal
Private*
CBA,
Other**
Prior
Funds
Allotted
`-" Thisr-
iReiju st-
`2026-27`
2027-28
2028-29
2029-30
2030-31
2031-32
Beyond 6
Years
1
FIRE-NFPA1851-Compliant PPE Extractor Installation
3,300
""„3,30q
3,300
2
FIRE- Hawaiian Paradise Park Fire Station Dormitory Extension
1,500
A,--1,So0
1,500
3
FIRE-Kea'au Fire and Police5tation- New Facility (Multi -Agency)
2,000"<''Z,000
5,000
5,000
5,000
17,000
4
FIRE -Maintenance Shop -New Facility
-
684
-
2,500
2,500
2,500
8,184
S
FIRE -Central Fire Station -New Facility;'
750
2,500
2,500
2,500
8,250
6
FIRE-Honoka'a Fire Station -New Facility
-
750
2,500
2,500
2,500
8,250
7
FIRE -Hawaiian Paradise Park- New Apparatus Building
-
!
300
2,500
1,800
8
FIRE-Kea'au FireStation Reroofing
i-
85
750
835
9
FIRE -Central FireStation(Complete Rehabilitation)
-
-
3,000
3,000
3,000
2,000
11,000
10
TOTAL1
6,8001
684
00
9,000
15,885
17,750
8,000
2,000
60,119
Created By: Ian Chadwick * Private., Foundation Grants
Date: 4/17/2026 ** Community Benefit Assessments: FalrShore, Park Dedication, Etc. Other: GET, Fuel Tax and other non -band sources
4 (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT ND DIVISION: Fire 12.
SUBMITTER: Ian Chadwick DATE: 4/16/2026
3. PROJECT NAME: FIRE - NFPA 1851-Compliant PPE Extractor Installation 14.
LOCATION (COUNCIL DISTRICT): Various
S. COUNCIL BENEFIT DISTRICT(S): Various 16.
TMK/CDP PLANNING AREA: Various
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 3,300,000
B. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
0 Infrastructure improvement
0 New bldg., structure, or addition
EEA
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
2 Planning, feasibility, eng., or design study
❑ Information/communications tech.
0 High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
This project will ensure that we thoroughly clean our firefighter turnout gear, increase safety for our first responders, mitigate rising firefighter cancer rates and exposure, and become compliant
with the NFPA 1851 guidelines for turnout gear cleaning. Improvements will be made to our facilities to accommodate the 17 extractors that were funded by a federal grant.
11. PROJEQJUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. elf Yes: El
Fills gap in current services.
A. Addresses public health/safety, ✓if Yes: 0
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
2 Access to ❑ Quality of 2 Quantity of
E. Operational efficiency and leveraging
opportunities:
Results In net decrease In operating cost and improves services.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: ❑
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
"If Yes:
Fire
Additional info: These extractors could be used by any county department that has contaminated clothing and/or PPE that needs to be cleaned.
12. LONG RANGE PLANS/
12Dept. Priority
Details:This project is essential to ensure the safety of our personnel and the public.
❑ comm. Value
Details.,
COMMUNITY VALUES, check at
❑General Plan
Details:
❑ Admin Priority
Details:
least one and all that apply,
❑cop
Details:
❑ Multi Hazard
Details:
provide details:
❑Other Plans
Details:
❑Mitigation Plan
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? /if Yes: ❑
DESCRIBE:
214. LEGAL MANDATE? ✓if Yes:
OFSCRIBE:The general dory clause of OSHA (Section 5(a)(1) of the o5H Act), which requires employers to provide a Workplace free from recognized hazards that are causing or likely to cause death or serious physical ham.
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
=[2] duces hazard risk
0 Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
El Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
2 Project currently underway
Previously Appropriated
0 Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
Identified and requested operating budget needs
0 Can realistically encumberfunds
List phases already completed:
Additional info: Project is currently in Planning phase with Epi Consultants.
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed
This Request
^-FN26471V]
FY 27-28
I FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
"'- .!�"A 3,300
$3,300
TOTAL:
18. 0 & M COSTS (x $1000):
="<`$3,300
$3,300
19. FUNDING SOURCE (x $1000):
Cty G.O. Bond
°'<3,300
$3,300
State Revolving Fund
State CIP
s =
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other CtV Fund - (describe)
TOTAL:
' %$3,300
$3,300
m (This Page Intentionally Left Blank)
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Fire
2. SUBMITTER: Ian Chadwick DATE: 4/16/2026
3. PROJECT NAME: FIRE- Hawaiian Paradise Park Fire Station Dormitory Addition
4. LOCATION (COUNCIL DISTRICT): 4
S. COUNCIL BENEFIT DISTRICT(S): 3,4
6. TMK/CDP PLANNING AREA: 1-5-040:065/Puna
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,500,000
B. PROJECT ELIGIBILITY, ✓ all
ElLand acquisition
Infrastructure improvement
I New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation I
❑ Planning, feasibility, eng., or design study I
❑ Information/communications tech.
0 High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
The current station configuration is meant for two personnel with afire engine. Now that there are five personnel at this station with the addition of an ambulance unit and a brush truck, more
living space is needed.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes:
Needed to continue current level ofservices.
A. Addresses public health/safety, 'if Yes: 21
Eliminates a documented hazard.
B. Service improvements, ✓all that apply:
0 Access to El Quality of 0 Quantity of
E. Operational efficiency and leveraging
opportunities:
N/A
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, /if Yes: 0/if
Project will restorefull operations to asset.
F. Fosters inter -departmental collaboration
Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
(]Dept. Priority
Details: Provide all hazard emergency services to residents and visitors.
❑ Comm. Value
Details:
COMMUNITY VALUES, check at
❑General Plan
Details:
❑ Admfn Priority
Details:
least one and all that apply,
❑CDP '
Details:
❑ Multi Hazard
Details:
provide details:
E] other Plans
Details:
❑ Mitigation Plan
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑ ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
0 Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑ Promotes economic vitality
El Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ,'all
2 Project currently underway
E] Previously Appropriated
Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑Identified and requested operating budget needs
I ❑ Can realistically encumberfunds
List phases already completed: Project currently in design phase.
Additional info: The project is currently in the Design Phase
17. EXPENDITURE PHASING (X $1000): IF
Prior Funds Allotted
(not lapsed)
This Regpest
, FY•28 27•�
FY 27-28
FY 28-29
FY 29-30
FY 30.31
FY 31-32
Beyond 6
Years
TOTAL:
Planning'`'
Land Acquisition
Design/Survey
Construction
= =' 1,500`
$1,500
TOTAL:
v'" $1,500
$1,500
18. O & M COSTS (x $1000):
19. FUNDING SOURCE (x $3000):
j W-' 2
k _
� � s §,`
13
ME-- � F 11 Y
$1,500
Cty G.O. Bond
" a ;500',
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)."
Other Cty Fund - (describe)
TOTAL:
-"$1;500
$1,500
o (This Page Intentionally Left Blank)
County of Hawaii
MULTI AGENCY- PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. LEAD DEPARTMENT AND DIVISION: Fire
2. SUBMITTER: Ian Chadwick DATE: 12/20/2025
3. PROJECT NAME: Kea'au Fire & Police Station - New Facility
4. LOCATION (COUNCIL DISTRICT): 3
S. PARTNER AGENCY/DIVISION(S): Police
6. TMK/CDP PLANNING AREA: TBD/Puna
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 2,000,000
B. PROJECT ELIGIBILITY, ✓ all
Land acquisition
❑ Infrastructure improvement New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
❑� Planning, feasibility, eng., or design study ❑� Information/communication tech.
❑v High ❑ Med. ❑ Low
10. PROJECT/PROGRAM Construction of a new fire station to replace the Kea'au fire station. The Kea'au Fire Station is located In a fast growing community, and a new facility that can accommodate
DESCRIPTION: additional personnel and apparatus is desperately needed. Additionally, the current station's roof design makes it nearly impossible to prevent water intrusion and mold growth,
posing a health hazard to employees. The proposal includes a shared facility between Police and Fire.
11.PROJECT]USTIFICATION&OUTCOME(S),select and/or answer all that apply: IC.
Repair/maintenance/replacementof
y/. / g ✓. ❑
facilit infrastructure buildin , if Yes: �
Assetllkelyto cease operating within nextSto lD years.
A. Addresses ublichealth safe ✓if Yes: ❑� Lacko documented hazardhutsae concern
p / tY, f JtY
B. Service improvements, ✓all that apply: ❑� Access to ❑+ Qualityof ❑O Quantityc
D. New facility/infr./bldg. "If Yes: ❑ INeeded
to continue current levelo)services.
Additional info:
12. LONG RANGE PLANS/ COMMUNITY VALUES, check
at least one and all that apply, provide details:
0 General Plan
IDetalls. Provide all hazard emergencyservices to residents and visitors.
❑ Multi Hazard
Details:
❑ CDP
Details:
❑ Miagation Plan
Details:
Other Plans
Details:
13. SUSTAINABILITY FOCUS, 'all that apply:
Provide additional information as appropriate:
0 Promotes energy and resource conservation 2 Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
❑� Promotes economic vitality
' Strengthens and sustains our community
14. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request,
.:'Wi6r,27"�;^
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
I Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
" :: `� S00
+-m1,500'
" "
5,000
5,000
5,000
$500
$1,500
$15,000
TOTAL-.1
y` :>' .$2,OOtl
$5,000
$5,000
$5,000
$17,000
iS.FUNDING SOURCE(x$1000):
Cty G.O. Bond
2,000�
5,000
5,000
S,000
$17,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)'"
TOTAL:
- x s $2,000
$5,000
$5,000
$5,000
$17,000
16. FUNDING SOURCE(x$1000):
4 " vi i(:
n
i K:�x
s
&6=
E z
^r 1% 1
: (�i((�
r Fi Ei F'
!sw of i €
^:r t� k us
Cty G.O. Bond
State Revolving Fund
„r'- •`
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL-.1
17. FUNDING SOURCE (x$1000):
"'CCl1 80cY Dhffl):01
01111) ,x,
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
o (This Page Intentionally Left Blank)
OFFICE OF HOUSING AND
COMMUNITY DEVELOPMENT
KE HAU LAN I COSTA,
HOUSING ADMINISTRATOR
101
(This Page Intentionally Left Blank)
102
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: Office of Housing & Community Development FISCAL YEAR 2026-2027
PRIORITY
PROJECT
2026-27 FY FUNDING
(in thousands
FUNDING FORECAST BY FISCAL YEAR
in thousands
TOTAL
ESTIMATED
PROJECT
COST
County G.O. Bond
State
Federal
Private"
CBA,
Other'"
Prior<
Funds
Allotted
,T is ;
;Request
"ZOZ6.27
2027-28
2028-29
2029-30
2030-31
2031-32
Beyond 6
Years
1
OHCD- Facilities Repain/Maintenance and Renovation
1,500
Sao
wV"1,500
1,500
1,500
1,500
1,500
1,500
9,500
2
OHCD- Old Hilo Memorial Hospital Renovations
10,000
16,500
„X10,006
10,000
10,OOD
46,501)
3
OHCD-'b'akala Subdivision Infrastructure
5,000
s, 5,000
5,000
4
OHCO- Kamakoa Nul Infrastructure and Housing
11,000
15,120
%`11,000
26,120
5
OHCO- Kukuiola Village- Permanent Supportive Housing
20,000
710
20,000
10,000
30,710
6
OHCO-'6uli'Ekahl Cottage Renovations
6,000
6,000
6,000
18,000
7
OHCD- Kalminani Affordable Housing
1,000
4,200
171> 4;,1,000
4,900
10,100
B
OHCD- Affordable Housing Planning, Feasibility, and Design
1,000
1,000
14V 1,000
1,000
1,000
1,000
1,000
1,000
7,000
9
OHCD- NB Kahua Hale o Ulu Wlni WWTP-PV System
9,000
9,000
9,000
10
OHCD- NS Kahua Hale o Ulu Wini Roofand PV Refurbishment
14,000
":•14,OW
14,000
11
OHCD- Haihai Affordable Housing Project
1,000
14,000
15,000
12
OHCD-'Alnak6 Affordable Housing Project
: •��
16,000
16,000
TOTAL
78,500
39,030
`%i.` 78,500
63,400
1 18,500
1 2,5001
2,500
1 2,5001
1 206,930
Created By: Kehaulani M. Costa • Private: Foundation Grants
Date: 1/7/2026 "' Community Benefit Assessments: Fair Share, Park Dedication, Etc. Other: GET, Fuel Tax and other non -bond sources
O
W
C) (This Page Intentionally Left Blank)
0
M
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Office of Housing & Community Development
Kehaulani M. Costa DATE: 1/5/2026
3. PROJECT NAME: OHCD - Facilities Repairs/Maintenance and Renovation
CIL DISTRICT): All
S. COUNCIL BENEFITDISTRICT(S): All
[6.TnMK/CDPINGAREA: Various Island Wide
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,500,000
S. PROJECT ELIGIBILITY, ✓ all I
❑ Land acquisition
9 Infrastructure improvement
❑✓ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply: 10
Nonrecurring rehabilitation 10
Planning, feasibility, eng., or design study
❑ Information/communications tech.
2 High ❑ Med. ❑ Low
10. PROJECr/PROGRAM
DESCRIPTION:
OHCD maintains several facilities throughout the island. Three of these facilities are over 20 years old and require significant renovations, repairs, and maintenance beyond routine upkeep.
Repairs, maintenance & renovations projects are medium to large scale and are necessary to ensure continued project viability. Repairs include resurfacing of roads, ADA compliance, interior
unit renovations including energy efficiency fixtures and appliances, photovoltaic systems, and tree trimming.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes:
Needed to continue current level ofservices.
A. Addressespublic health/safety, ✓if Yes: ID
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
Access to El Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in netdecrease in operating costand maintains services.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: ❑
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
✓if Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
E]Dept. Priority
Maintains and extends the life of 0110 facilities/project
❑ comm. Value
COMMUNITY VALUES, check
General Plan
Section 9, Housing
❑Admin Priority
at least one and all that apply,
❑ CDP
[]Multi Hazard Mit
provide details:
❑ other Plans
Additional info: Reduce expenditures on operational budgets to address aging facilities before it becomes a bigger problem. Eliminate temporary and piecemeal fixes.
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes:
DESCRIBE: ADA accessibility as required & DOH requirements (where applicable)
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
Promotes energy and resource conservation
0 Reduces hazard risk
0 Preserves/protects our natural/cultural env.
Cost benefit analysis
❑� Promotes economic vitality
El Strengthens and sustains our community
Additional info: Reduce operational costs through sustainable, long-term facility solutions, avoiding temporary and piecemeal fixes that lead to greater future expense.
16. PROJECT READINESS, Vail
ID Project currently underway
❑ Previously Appropriated
Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑ luenriried and requested operating budgerEl
Can realistically encumberfunds
List phases already completed:
Additional info: $500,000 alloted; Trimmed trees, renovation of Kualimano Elderly housing units underway- 50 units.
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
7his,Request'
FY26-27
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
<%<."s;%`350-
350
350
350
350
350
$2,100
Construction
500
'R'-;IVY I-'1So'1
11150
1,150
1,150
1,150
1,150
$7,400
TOTAL:
-$500
>""'""M°$1;SDD`
$1,500
1 $1,500
1 $1,500
1 $1,500
1 $1,500
1
$9,500
18. O & M COSTS (x $1000):
19. FUNDING SOURCE x 1000 :
( $ )
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
f &&°"`I€l€><
S 3� . 1 � Rt
500
'Sr
"•= � •1,500
' ' " ,
;
t €� (_
£ i;
1,500
s�Ii>�§..
1,500
( si e
`` �I
1,500
y i€,, y, tt
�� 1 S sf
1,500
r.>
A C'.
1,500
yw t`z=
ACK." N
_
# "W
$9,500
TOTAL:
$500
•"'% - $I'Swl
$1,5001
$1,500
1 $1,500
1 $1,500
1 $1,500
1
$9,500
CD (This Page Intentionally Left Blank)
rn
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Office of Housing & Community Development
2. SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026
3. PROJECT NAME: OHCD -Old Hilo Memorial Hospital Renovations
4. LOCATION (COUNCIL DISTRICT): 2
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: 2-3-026:008 / Hilo
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 10,000,000
S. PROJECT ELIGIBILITY, ✓ all
I ❑ Land acquisition
Infrastructure improvement
New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
I0 Nonrecurring rehabilitation
12 Planning, feasibility, eng., or design study I
❑ Information/communications tech.
21 High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION'
This project will continue to renovate the old Hilo Memorial Hospital building (56,852 square feet) to provide safe and habitable "white box" public spaces that meets Hawal'I County Code, State and federal requirements. The project will involve
plumbing, electrical, mechanical work (eg. fire sprinkler, fire alarms, and elevator system), ADA Improvements, selective restoration/replacement of Interior windows to seal the building, new flooring, repair exterior finishes and exterior painting. Site
work activities will Include soil erosion control, grading, excavation, drainage, and water systems, sewer system Installation, asphalt paving, and other utilities. Demolition of delapidated workshop building; misc. debris and solid waste removal.
11. PROJECTJUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: P1
Needed to continue current level ofservices.
A. Addresses public health/safety, /if Yes:
Eliminates a documented hazard.
B. Service improvements, ✓all that apply:
21 Access to 2 quality of 0 quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net increase in operating cost but improves services.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes:
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
/If Yes: ❑
N/A
Additional info: Federal funds totaling $16.SM have been secured to date for the renovation
12. LONG RANGE PLANS/
0 Dept. Priority
Preservation of publicspaces for community services for residents
❑ comm. value
COMMUNITY VALUES, check
OGeneralPlan
Section 9, Housing
❑AdminPriority
Priority to maintain office spacesforpublic&community servicesforresidents
at least one and all that apply,
❑ CDP
QMulti Hazard Mit
Hazardous materials, ADA compliance issues, Fire Safety Issues
provide details:
Q Other Plans
Priority#1 in the Homelessness & Housing Strategic Roadmap
Additional info: Reduce expenditures on operational budget to address aging facilities before it becomes a bigger more expensive problem. Eliminate band aid fixes.
13. cry. MATCHING FUNDS RECI,'D? ✓if Yes: ❑
I DESCRIBE:
FIR. LEGAL MANDATE? /If Yes: El
I DESCRIBE: ADA accessibility as required & DOH requirements (where applicable)
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
12 Promotes energy and resource conservation
Q Reduces hazard risk
❑✓ Preserves/protects our natural/cultural env.
0 Cost benefit analysis
12 Promotes economic vitality
2 Strengthens and sustains our community
Additional info: Reduce operational costs through sustainable, long-term facility solutions, avoiding temporary and piecemeal fixes that lead to greater future expense.
16. PROJECT READINESS, ✓all�Q.,Prcject.,
currently underway
❑Previously Appropriated
❑� Staff available to manage project
❑� External funds/resources ready to proceed
that apply:
en r ian reques a operating audget
21 Can realistically encumberfunds
List phases already completed: EIS completed,• 16.5M in federal funds received
Additional info: Re -roofing, hazmat removal, and tree trimming is currently out for bid ($16.SM)
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request
h
s<�.FY26=27=
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning"
Land Acquisition
Design/Survey
nwf
Construction
16,500
—'tl ;000
10,000
10,000
$46,500
TOTAL:
$16,500
-=, -. $10,0004
$10,0001
$10,000
1
$46,500
18. O & M COSTS (x $1000):
r, 111 `1 ; M
19. FUNDING SOURCE (x $1000):
CtyG.O.Bond
= ;101000
10,000
10,000
$30,000
State Revolving Fund
-
State CIP--------------
Federal
16,500
_
$16,500
Private (Grants)
CBA (Fair share, Park Dedication, etc)
Other Cty Fund - (describe)
=;
TOTAL:1
$16,500
,$10,000
$20,0001
$10,000
1
1
$46,500
C) (This Page Intentionally Left Blank)
0
(O
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Office of Housing & Community Development
2. SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026
3. PROJECT NAME: OHCD-'O'okala Subdivision Infrastructure
4. LOCATION (COUNCIL DISTRICT): 1
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: 3-9-001:034 / Hamakua
7. TOTAL COUNTY FUNDS NEEDEDTHIS FY: 5,000,000
B. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
0 Infrastructure improvement
❑ New bldg., structure, or addition 7711
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
El Planning, feasibility, eng., or design study
❑ Information/communications tech.
(D High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
OHCD expects to receive permits to install roads and infrastructure for the '0'okala Affordable Housing Project. The installation of a road and infrastructure for this subdivision will allow for the
development of about 30 homes by OHCD and non-profit self-help affordable housing developers.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: ❑�
Fills gap in current services for underserved area/demographic.
A. Addresses public health/safety, ✓If Yes' ❑'
Community concerns exists around conditions.
B. Service improvements, -'all that apply:
El Access to 2 Quality of 17, Quantity of
E. Operational efficiency and leveraging
opportunities:
No change in operating costs.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: ❑
N/A
F. Fosters inter -departmental collaboration
✓if Yes: 0
DPW
Additional info:
12. LONG RANGE PLANS/
P1 Dept. Priority
Creating affordable housing opportunities is the Department's mission
10 Comm. Value
COMMUNITY VALUES, check
2 General Plan
Section 9, Housing
❑✓ Admin Priority
Affordable housing and infrastructure
at least one and all that apply,
Q CDP
Identify and facilitate use ofsuitable public lands for affordable housing
Multi Hazard Mit
provide details:
❑ other Plans
Additional info: OHCD has identified this County -owned parcel as suitable a suitable location to build an affordable housing subdivision in this Council district.
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, "all that apply:
Provide additional information as appropriate:
I ❑ Promotes energy and resource conservation
❑ Reduces hazard risk
El Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
12 Promotes economic vitality
El Strengthens and sustains our community
Additional info: Stable housing supports long-term health and safety, sustainable and resilient households, and stronger communities for generations to come.
16. PROJECT READINESS, ✓all
2 Project currently underway
❑ Previously Appropriated
Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑Identijied and requested operating budget .0
Can realistically encumberfunds
Listphases already completed: Feasibility study
Additional info: Completed a feasibility study for building affordable housing at this site; completed
road and infrastructure design. Ready to bid. $4M alloted then real loted to cover renovation of Cull W WTP.
17. EXPENDITURE PHASING (X $1000):jr—
Prior Funds Allotted
(not lapsed)
This Request
0,��' ,,•,..£
: - FY26-27,,v
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
= ` 5,000<
$5,000
18. O & M COSTS (x $1000):
I
5,000,
$5,000
19. FUNDING SOURCE x 1000:
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
° '-
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
= "$S,000
$5,000
o (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Office of Housing & Community Development
2. SUBMITTER: James E. Hustace DATE: 5/20/2026
3. PROJECT NAME: OHCD - Kamakoa Nui Infrastructure and Housing
4. LOCATION (COUNCIL DISTRICT): 9
S. COUNCIL BENEFIT DISTRICT(S): 7, 8, 9
6. TMK/CDP PLANNING AREA: 6-8-041:002 - 006, :012 / South Kohala
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 11,000,000
S. PROJECT ELIGIBILITY, ✓ all
I ❑ Land acquisition
Infrastructure improvement
(A New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
I ❑ Nonrecurringrehabilitation
El Planning, feasibility, eng., or design study 10
Information/communications tech.
[D High ❑ Med. ❑ Low
10. PROJECr/PROGRAM
DESCRIPTION:
OHCD will construct the next infrastructure phase for the County -owned subdivision which allows for single-family units for workforce housing in Waik6loa. Infrastructure includes roads,
sidewalks, curbs, gutters, all related utilities, and housing. A request for proposal will be issued for these parcels once the infrastructure is constructed with CIP FY 2024-25 funds for this
subdivision. This subdivision will meet the affordable workforce housing demand in this area for families with income up to 140%AMI. This request includes any and all related costs.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: 0
Fills gap in current services for underserved area/demographic.
A. Addresses public health/safety, ✓if Yes: El
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
C7 Access to [D Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
No change in operating costs.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: El✓if
N/A
F. Fosters inter -departmental collaboration
Yes:
DPW
Additional info: OHCD completed a master plan in 2022.OHCD is awaiting DPW permits to build the road and advertise the construction bid.
12. LONG RANGE PLANS/
0 Dept. Priority
Creating affordable housing opportunities is the Department's mission
[]comm. value
COMMUNITY VALUES, check
Q General Plan
Section 9, Housing
DAdmin Priority
Affordable housing infrastructure and housing is a priority
at least one and all that apply,
[D CDP
Identify and facilitate use ofsuitable public lands, expand affordable housing
E]MultiHazard Mit
provide details:
❑ other Plans
Additional info:
13. Cry. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
1s. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
Q Promotes energy and resource conservation
Reduces hazard risk
0 Preserves/protects our natural/cultural env.
El Cost benefit analysis
12 Promotes economic vitality
pStrengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
El Project currently underway
❑ Previously Appropriated
Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑ en ie an requested operating u ge
❑, Can realistically encumberfunds
Listphases already completed: 91 homes, park, road planning and infrastructure design
Additional info: Ready to bid road; allocated $122M; plan to request additional $8M this FY. Received $SAM AHP, and $9.6M home sale receipts
17. EXPENDITURE PHASING (X $1000): IF
—Prior Funds Allotted
(not lapsed)
This Request
' <FY26-2j&?
FY 27-28
FY 28-29
1 FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
I TOTAL:
Planning
500;
$500
Land Acquisition
r "
Design/Survey
500Y
$500
Construction
122
10,tl00"
12,000
$22,122
TOTAL:
$122
'µ"=` $11,000
1
1 $12,000
$23,122
16. O & M COSTS x $1000):
19. FUNDING SOURCE x 1000
( $ ):
Cty G.O. Bond
_£.'ss��'.1.I.�.�...�....€'�....,v:.........��.."�v _�".��.=`.z.::��
122
z
" _?�€
:-" 11,000
" �, £
st "t��;���a�3�Lx S
F ` I
12,000
> f I �11=€��I�
r
CT€€=°=-i
- � � �>
I<u F �`<<
III., t `�=3� >t=�
?i> t =,=;t
0NN Z F ' :
�^��,zs�s€;� '"` l
$23,122
State Revolving Fund
£ '
State CIP
Federal
Private (Grants)
} '
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (AHP and Revolving Fund)
1 14,998
`
$14,998
TOTAL:
$15,120
"$11'0001
$12,000
1
$38,120
n, (This Page Intentionally Left Blank)
i
W
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Office of Housing & Community Development
2. SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026
3. PROJECT NAME: OHCD - Kukuiola Village - Permanent Supportive Housing
4. LOCATION (COUNCIL DISTRICT): 8
S. COUNCIL BENEFIT DISTRICT(S): 7, 8, 9
6. TMK/CDP PLANNING AREA: 7-4-020:004 / Kona
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 20,000,000
8. PROJECT ELIGIBILITY, ✓ all
El Land acquisition
Infrastructure improvement
New bldg., structure, or addition
PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
0 Planning, feasibility, eng., or design study
❑ Information/communications tech. EEEII_
High ❑ Med. ❑ Low
10. PROJECr/PROGRAM
DESCRIPTION:
e Kukuiola Project continues the development of 19.1 acres consisting of the Kukuiola Shelter and the Kukuiola Permanent Supportive Housing Project with the following components:
rastructure and 50 single-family units with kitchen and bathroom and a multi -purpose center for service providers, laundryservice, meeting and gathering space, storage and tool shed, solar
Etwatersystemand PV system. These funds are needed to supplement/replace federal funds received to coverall of the planned units.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: 0
Fills gap in current services jar underserved area/demographic.
A. Addresses public health/safety, ✓if Yes:
Community concerns exists around conditions.
B. Service improvements, ,'all that apply:
F41 Access to F11 Quality of El Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net increase in operating cost but improves services.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, /if Yes: ❑
NIA
F. Fosters inter -departmental collaboration
-'If Yes: ❑
N/A
Additional info:
12. LONG RANGE PLANS/
[ZDept. Priority
Builds new permanentsupportive housing for homeless & low income residents
❑ Comm. Value
COMMUNITY VALUES, check
Q General Plan
Section 9, Housing
DAdmin Priority
Priority to increase affordable housing in the County
at least one and all that apply,
❑ CDP
❑Multi Hazard Mn
provide details:
Q Other Plans
Priority#1 in the Homelessness & Housing Strategic Roadmap
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? /If Yes:
DESCRIBE: Fair Housing Act and ADA accessibility as required
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
Q Promotes energy and resource conservation
❑ Reduces hazard risk
❑� Preserves/protects our natural/cultural env.
I El Cost benefit analysis
10 Promotes economic vitality
I [D strengthens and sustains our community
Additional info: Housed individuals and families reduces homelessness and allows for improved health and safety, while promoting economic improvements within a household, and strengthening our communities.
16. PROJECT READINESS, ✓all
2 Project currently underway
❑ Previously Appropriated
0 Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑ Identified and requested operating budget
needs
❑�
Can realistically encumberfunds
s phases already comp e e : Roadcompleted; Shelter currently un ervertica w now; plans anff
specifications for permanent supportive housing complete with permits; ready to bid permanent supportive
Additional inReady to Bid
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request;
".`; W 26-27 �'=�
�' 27 28
FY 26-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
-
Land Acquisition
Design/Survey
710
;:
$710
Construction
20,000
10,000
$30,000
TOTAL:
$710
$20,000'1
$10,000
$30,710
18. O & M COSTS (x $1000):
19. FUNDING SOURCE (x$1000):
Cty G.O. Bond
i Y lit iuI I€ .�I- %
710
1-0I�'
20,000
10,000
i f _
;I 1'il;
$30,710
State Revolving Fund
State CIP="
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
TOTAL:
$710
, -Q$20;000'1
$10,000
$30,710
.(This Page Intentionally Left Blank)
Cn
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Office of Housing &Community Development
SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026
3. PROJECT NAME: OHCD-'0uli'Ekahi Cottage Renovations
LOCATION (COUNCIL DISTRICT): 9
S. COUNCIL BENEFIT DISTRICT(S): 9
TMK/CDP PLANNING AREA: 6-2-015:045 / South Kohala
[6.
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 6,000,000
S. PROJECT ELIGIBILITY, ✓ all I
❑ Land acquisition
0 Infrastructure improvement
New bldg., structure, or addition
i9. PROJECT URGENCY/NEED, ✓one:
thatapply: 10
Nonrecurring rehabilitation
21 Planning, feasibility, eng., or design study 10
Information/communications tech.
[D High ❑ Med. ❑ Low
1.0. PROJECT/PROGRAM
DESCRIPTION:
The '0uli'Ekahi affordable housing project features 33 cottages that have not been renovated since being built approximately 30 years ago. These aging units need upgrades to meet current
code and in 2024 DPW bid this renovation project at $14M. Bids came in much higher than the federal funds available. There are permits available for the project.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: ❑�
Needed to continue currentlevel ofservices.
A. Addresses public health/safety, ✓if Yes: El
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
I] Access to El Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in netdecrease in operating costand improves services.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: ❑
Necessary repair/maintenance/replacement.
F. Fosters inter -departmental collaboration
✓if Yes: R1
DPW
Additional info:
12. LONG RANGE PLANS/
0 Dept. Priority
Maintains and extends the life of OHCD facilities/project
❑ Comm. Value
COMMUNITY VALUES, check
❑+ General Plan
Section 9, Housing
❑� Admin Priority
Maintains and extends the life of County owned facilities
at least one and all that apply,
❑ CDP
❑Multi Hazard Mrt
provide details:
❑Other Plans
Additional info: Reduce expenditures on operational budgets to address aging facilities before it becomes a bigger problem. Eliminate temporary and piecemeal fixes.
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
I DESCRIBE:
]4. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
10 Promotes energy and resource conservation
0 Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
19 Cost benefit analysis
Promotes economic vitality
0 Strengthens and sustains our community
Additional info: Reduce operational costs through sustainable, long-term facility solutions, avoiding temporary and piecemeal fixes that lead to greater future expense.
16. PROJECT READINESS, ✓all
❑project currently underway
❑ Previously Appropriated
21 Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑ taen 7 re an —requested operating u ge t
Can realistically encumberfunds
List phases already completed.
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request•
= ; FY 26=27m
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
s_ '
--6,000,
6,000
6,000
$18,000
TOTAL:
= •$6,000
$6,000
1 $6,0001
1
1
1
$18,000
18. O & M COSTS (x $1000):
=; 6,000',
6,000
6,000
$18,000
19. FUNDING SOURCE (x$1000):;
Cty G.O. Bond
State Revolving Fund
State CIP
t"-,ys >•_
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (describe)
=::; 71
1-1—Iffl
TOTAL.
X1161000
1 $6,0001
$6,0001
1
1
$18,000
a, (This Page Intentionally Left Blank)
County of Hawairi
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Office of Housing & Community Development
2. SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026
3. PROJECT NAME: OHCD - Kaiminani Affordable Housing
4. LOCATION (COUNCIL DISTRICT): 8
S. COUNCIL BENEFIT DISTRICT(S): 7, 8, 9
6. TMK/CDP PLANNING AREA: 7-3-010:056 / Kona
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,000,000
B. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
Infrastructure improvement
❑� New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
Planning, feasibility, eng., or design study
❑ Information/communications tech.
2 High ❑ Med. [I Low
10. PROJECr/PROGRAM
DESCRIPTION:
OHCD will construct infrastructure for the County -owned workforce housing subdivision in Kailua-Kona to enable workforce rental housing. Improvements include roads, sidewalks, curbs,
gutters, and all related utilities. Upon completion, an RFP will be issued using FY 2024-25 Affordable Housing Production funds. Any bid cost overruns will be covered by CIP funds. This request
includes all related project costs.
11. PROJECT JUSTIFICATION& OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: F171
Fills gap in current servicesforunderservedarea/demographic.
A. Addresses public health/safety, ✓if Yes: ❑�
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
0 Access to R] Quality of 174 Quantity of
E. Operational efficiency and leveraging
opportunities:
No change in operating costs.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: El
NSA
NIA
F. Fosters inter -departmental collaboration
Yes:
DPW
Additional info:
12. LONG RANGE PLANS/
❑+ Dept. Priority
Creating affordable housing opportunities is the Department's mission
❑ Comm. value
COMMUNITY VALUES, check
0 General Plan
Section 9, Housing
2Admin Priority
Affordable housing and infrastructure
at least one and all that apply,
❑ CDP
[]Multi Hazard Mrt
provide details:
❑ other Plans
Additional Info:
13. CTY. MATCHING FUNDS REQ'D? /If Yes: ❑
DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
Is. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
I ❑ Promotes energy and resource conservation
❑ Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
12 Promotes economic vitality
Strengthens and sustains our community
Additional info: Stable housing supports long-term health and safety, sustainable and resilient households, and stronger communities for generations to come.
16. PROJECT READINESS, ✓all
n Project currently underway
❑ Previously Appropriated
2 Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
g4aenflileu ana requested operating budger
21 Can realistically encumberfunds
List phases already completed:
Additional info: Funds alloted. Environmental assessment complete; SHPD 6E and AIS underway. Rcvd $4.2M AHP grant.
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted 11
(not lapsed)
This Request
FY 26-27''=
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
S00
-,•':= ';'`
$500
Land Acquisition
Design/Survey
700
l:^
$700
Construction
3,000
a" " " r -1,000,
4,900
$8,900
TOTAL:
$4,200
fM',", $1,000f
$4,9D0
1
$10,100
18. 0 & M COSTS (x $1000):u
c< °° -<
19. FUNDING SOURCE ( $ 1000 x ):
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (AHP)
4,200
1;000
4,900
$1,000
$9,100
TOTAL:
$4,200
' ''=='=$1;000"
$4,900
$10,100
(This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Office of Housing & Community Development
2. SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026
3. PROJECT NAME: OHCD-Affordable Housing Planning, Feasibility, and Design
4. LOCATION (COUNCIL DISTRICT): All
S. COUNCIL BENEFIT DISTRICT(S): All
6. TMK/CDP PLANNING AREA: Various Island Wide
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 1,000,000
B. PROJECT ELIGIBILITY, ✓ all
❑ Land acquisition
❑ Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
thatapply:
❑ Nonrecurring rehabilitation I
@ Planning, feasibility, eng., or design study 10
Information/communications tech.
El High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
To increase affordable housing, OHCD is focusing on utilizing State- and County -owned lands for development. The process to identify and determine lands suitable for affordable housing
requires planning, feasibility, engineering, survey, and design services prior to acquisition or seeking public/private partnerships for development. This funding will allow OHCD to absorb
preplanning costs such as planning, feasibility, engineering, or design studies to preparethe parcel for housing development. This includes any and all related costs.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ,if Yes: F-11
Fills gap in current servicesfor underserved area/demographic.
A. Addresses public health/safety, /If Yes: ID
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
0 Access to 0 Quality of n Quantity of
E. Operational efficiency and leveraging
opportunities:
N/A
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, /if Yes: El
N/A
F. Fosters inter -departmental collaboration
Yes: El
Planning
Additional info:
12. LONG RANGE PLANS/
❑� Dept. Priority
Creating affordable housing opportunities is the Department's mission
❑ Comm. Value
COMMUNITY VALUES, check
❑� General Plan
Section 9,Housing
❑�AdminPrlority
Development ofinfrastructurefor affordable housing
at least one and all that apply,
2 CDP
Identify and facilitate use ofsuitable public lands for affordable housing
❑Multi Hazard Mit
provide details:
❑ other Plans
Additional Info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
DESCRIBE:
14.LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
❑ Promotes energy and resource conservation
❑ Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
I ❑ Cost benefit analysis
121 Promotes economic vitality
❑� Strengthens and sustains our community
Additional info: Stable housing supports long-term health and safety, sustainable and resilient households, and stronger communities for generations to come.
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
ID Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
❑Identyled and requested operating u ge
�can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000): IF
Prior Funds Allotted
(not lapsed)
This,Request
�-FY 26�27 • V
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
278
=- :—•500-
Soo
500
Soo
Soo
500
$3,278
Land Acquisition
m.
Design/Survey
722
- v' S00
500
500
Soo
Soo
Soo
$3,722
Construction
TOTAL:
$1,000
'°'%;E $1,000]
$1,000
$1,000
$1,000
$1,000
$1,000
$7,000
18. 0 & M COSTS (x $10o0):
19. FUNDING SOURCE(x$1000):I
Cty G.O. Bond
1,000
a, `%= 1000
1,000
1,000
1,000
1,000
1,000
$7,000
State Revolving Fund
'
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (AHP)
TOTAL:
I $11000
.M. "'-$J.'000'1
$1,000
1 $1,000
1 $1,0001
$1,0001
$1,000
1
1 $7,000
o (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Office of Housing & Community Development
UBMITTER: Kehaulani M. Costa DATE: 1/5/2026
3. PROJECT NAME: OHCD - Na Kahua Hale o Ulu Win! WWTP - PV System
OCATION (COUNCIL DISTRICT): 8
S. COUNCIL BENEFIT DISTRICT(S): 8,9
MK/CDP PLANNING AREA: 7-3-009:055 / Kona
[6.
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 9,000,000
S. PROJECT ELIGIBILITY, ✓ all I
❑ Land acquisition
TO: Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ,one:
that apply: 10
Nonrecurring rehabilitation 121
Planning, feasibility, eng., or design study
❑ Information/communications tech. EE]12
High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
Na Kahua Hale o Ulu Wini affordable housing project operates a separate WWTP from the Kealakehe WWTP serving Kona. The Ulu Wini WWTP electrical bills are the second highest for all
County facilities per OSCER. OHCD desires to install a PV system to offset the electrical bills for the low-income affordable housing project. The funding will allow OHCD to design and build the
system. This includes any and all related costs.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ✓if Yes: [21
Fills gap in current servicesforunderservedarea/demographic.
A. Addresses public health/safety, ✓if Yes: P1
Community concerns exists around conditions.
B. Service improvements, ✓all that apply:
21 Access to R1 Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in net decrease in operating cost and maintains services.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, /if Yes: El✓if
NIA
F. Fosters inter -departmental collaboration
Yes: [21
DEM
Additional info:
12. LONG RANGE PLANS/
0 Dept. Priority
Creating affordable housing opportunities is the Department's mission
❑ Comm. Value
COMMUNITY VALUES, check
2GeneralPlan
Section 9, Housing
E]AdminPriority
Development ofinfrastructurefor affordable housing
at least one and all that apply,
❑ CDP
[]Multi Hazard Mit
provide details:
2 Other Plans
Priority## in the Homelessness & Housing Strategic Roadmap
Additional info: OHCD and OSCER have identified the Ulu Wini WWTP as a candidate for a PV system to cut costs to this affordable housing project.
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: ❑
I DESCRIBE:
14.LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
I 0 Promotes energy and resource conservation
Q Reduces hazard risk
❑ Preserves/protects our natural/cultural env.
FffCost benefitanalysis
P/1 Promotes economic vitality
0 Strengthens and sustains our community
Additional info: State mandate to convert to as much renewable energy generation by 2040. This project will assist with achieving that goal and reduce operational costs forthis affordable housing project.
16. PROJECT READINESS, ✓all
project currently underway
❑ Previously Appropriated
❑� Staff available to manage project
TO External funds/resources ready to proceed
that apply:
Lp7len ttle an requested operating Duager
0 Can realistically encumberfunds
List phases already completed:
Additional info: Initial funds need for planning and Design - $1M
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
This Request
E'- Fy26-27_Ma
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
>#,- 9,000
$9,000
TOTAL:
Y: "& t$9,000
I
$9,000
18. O & M COSTS (x $1000):
�? e �
h M;""
; °: H,° - 9,000"
RI ii
B�MNVRN
1 `iI` 1I
1
OWNWOi
$9,000
19. FUNDING SOURCE(x$1000):
Cty G.O. Bond
State Revolving Fund
;• ? ti
State OF
Federal
a
Private (Grants)r,ez-
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (AHP)
TOTAL:
=> K s $9,000
$9,000
N (This Page Intentionally Left Blank)
N
W
County of HawaN
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Office of Housing & Community Development
2. SUBMITTER: Kehaulani M. Costa DATE: 1/5/2026
3. PROJECT NAME: OHCD - Na Kahua Hale o Ulu Win! Roof and PV Refurbishment
4. LOCATION (COUNCIL DISTRICT): 8
S. COUNCIL BENEFIT DISTRICT(S): 8,9
6. TMK/CDP PLANNING AREA: 7-3-009:055 / Kona
7. TOTAL COUNTY FUNDS NEEDED THIS FY: 14,000,000
S. PROJECT ELIGIBILITY, ✓ all
I ❑ Land acquisition
[D Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
ID Nonrecurring rehabilitation
O Planning, feasibility, eng., or design study I
❑ Information/communications tech.
[21 High ❑ Med. ❑ LOW
10. PROJECT/PROGRAM
DESCRIPTION:
Na Kahua Hale O Ulu Wini affordable housing project is approx. 15 years old. The PV system is obsolete and needs to be replaced with new panels to insure the longevity of the roofing material.
The roof will be repainted which requires removing existing solar water heater panels and the PV system. A new PV system with roof repairs will ensure 96 units are continuously available to
�rentto low-income families by the County. The capital projectwill design and refurbish the system. This includes any and all related costs.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bidg. "ifYes: 7
Fills gap in current services for underserved areo/demographic.
A. Addresses public health/safety, -'If Yes: ❑�
Community concerns exists around conditions.
B. Service improvements, "all that apply:
ID Access to 21 Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
Results in netdecrease in operating costand maintains services.
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, ✓if Yes: ❑
NIA
F. Fosters inter -departmental collaboration
/if Yes: 21
DEM
Additional info:
12. LONG RANGE PLANS/
0 Dept. Priority
creating affordable housing opportunities is the Department's mission
❑ comm. Value
COMMUNITY VALUES, check
Q General Plan
Section 9, Housing
DAdmin Priority
I Development of infrastructure for affordable housing
at least one and all that apply,
❑ CDPMulti
Hazard Mlt
provide details:
❑ Other Plans
Additional Info:
13. cry. MATCHING FUNDS REQ'D? *if Yes: ❑
I DESCRIBE:
14. LEGAL MANDATE? ✓if Yes: ❑
DESCRIBE:
15. SUSTAINABILITY FOCUS, *'all that apply:
Provide additional information as appropriate:
Q Promotes energy and resource conservation
Q Reduces hazard risk
El Preserves/protects our natural/cultural env.
Cost benefit analysis
121 Promotes economic vitality
El strengthens and sustains our community
Additional info: State mandate to convert to as much renewable energy generation by 2040. This project will assist with achieving that goal and reduce operational costs for this affordable housing project and tenants.
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
❑� Staff available to manage project
❑ External funds/resources ready to proceed
that apply:
U!'clentified and requeWed operating PuDget
❑� can realistically encumberfunds
List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
(not lapsed)
ThiS,Regtie5t
M" Wi&27 ""
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
=y= 14,000'1
$14,000
TOTAL:
M—r w$14,000
1
$14,000
18. O & M COSTS (x $1000):
cr :=" -=
19. FUNDING SOURCE (x $1000):
Cty G.O. Bond
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
Other Cty Fund - (AHP)
'•`-14,000
* t**=
tom
=1r ljiI.'?;b:jib";;
$14,000
TOTAL:
$14,00W1
1
1
1
1
$14,006
(This Page Intentionally Left Blank)
PLANNING DEPARTMENT
JEFFREY DARROW,
DIRECTOR
125
N
-v
oa
ro
5
m
_�
O�
7
N
�G
r
ro
W
v
Department: Planning
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2026-2027
PRIORITY
PROJECT
2026-27 FY FUNDING
(in thousands)
FUNDING FORECAST BY FISCAL YEAR
in thousands
TOTAL
ESTIMATED
PROJECT
COST
County
G.O. Bond
State
Federal
Private*
CBA,
Other**
Prior
Funds
Allotted
€ii ThiS':'+
Request
:2026-27-
2027-28
2028-29
2029-30
2030-31
2031-32
Beyond
years
1
Downtown Hilo Multimodal Plan Evaluation and Monitoring
200:,;
=200
200
2
;Ir'
3
-
5
7
8
9
10
�"t,'f'�
-
TOTAL
200
zoo
200
Created By: Bethany Morrison * Private: Foundation Grants
Date: 4/23/2026 ** Community BenefitAssessments: FalrShare, Park Dedication, Etc. Other. GET, Fuel Tax and other non -bond sources
co (This Page Intentionally Left Blank)
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2026 - 2027
1. DEPARTMENT AND DIVISION: Planning Department- Long Range Division
2. SUBMITTER: Bethany Morrison DATE: 4/23/2026
3. PROJECT NAME: Downtown Hilo Multimodal Plan Evaluation and Monitoring
4. LOCATION (COUNCIL DISTRICT): 2
S. COUNCIL BENEFIT DISTRICT(S): 2
6. TMK/CDP PLANNING AREA: Varies/ South Hilo
7. TOTAL COUNTY FUNDS NEEDED THIS FY:
8. PROJECT ELIGIBILITY, ✓all
El Land acquisition
❑ Infrastructure improvement
❑ New bldg., structure, or addition
9. PROJECT URGENCY/NEED, ✓one:
that apply:
❑ Nonrecurring rehabilitation
0 Planning, feasibility, eng., or design study
❑ Information/communications tech. E]i0
High ❑ Med. ❑ Low
10. PROJECT/PROGRAM
DESCRIPTION:
This project will support effective implementation of the Downtown Hilo Multimodal Master Plan by developing a performance monitoring framework, tracking progress overtime, and
strengthening coordination among County and State agencies. It will facilitate data -driven decision -making to guide future investments and improvements, ensure accountability, and promote
alignment across departments.
11. PROJECT JUSTIFICATION & OUTCOME(S), select and/or answer all that apply:
D. New facility/infr./bldg. ,if Yes: ❑
N/A
A. Addresses public health/safety, ✓if Yes: El
Reduces risk of a documented hazard.
B. Service improvements, ✓all that apply:
0 Access to 0 Quality of ❑ Quantity of
E. Operational efficiency and leveraging
opportunities:
N/A
N/A
C. Repair/maintenance/replacement of
facility/infrastructure/building, /if Yes: El✓if
NIA
F. Fosters inter -departmental collaboration
Yes: 0
DPW
Additional info:
12. LONG RANGE PLANS/
ODept.Priority
Details: Prmo ote a healthy andsustainable community via alternate modes of transportation
E] Comm. Value
Detalls:Sustalnable development and environmental stewardship
COMMUNITY VALUES, check at
21 General Plan
Details: 2Do5GP, Sec. 13.2.2Transportation Goals
❑AdminPriority
Details:
least one and all that apply,
QCDP
Details:
❑Multi Hazard Mit
Details:
provide details:
❑other Plans
Details:
Additional info:
13. CTY. MATCHING FUNDS REQ'D? ✓if Yes: [:]I
DESCRIBE: N/A Project is 100%federally funded throuh Hawai'i Department of Transportation's State Planning and Research Program.
14. LEGAL MANDATE? 'if Yes: ❑
DESCRIBE: N/A
15. SUSTAINABILITY FOCUS, ✓all that apply:
Provide additional information as appropriate:
I El Promotes energy and resource conservation
[2] Reduces hazard risk
El Preserves/protects our natural/cultural env.
❑ Cost benefit analysis
21 Promotes economic vitality
[21 Strengthens and sustains our community
Additional info:
16. PROJECT READINESS, ✓all
❑ Project currently underway
❑ Previously Appropriated
Staff available to manage project
External funds/resources ready to proceed
that apply:
❑Identified and requested operating budget needs
❑Can realistically encumberfunds
I List phases already completed:
Additional info:
17. EXPENDITURE PHASING (X $1000):
Prior Funds Allotted
not lapsed)
This Requests
:=FY 26-271 "
FY 27-28
FY 28-29
FY 29-30
FY 30-31
FY 31-32
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
: "; 200`
4;;,, '
$200
TOTAL:
%= $200,
$200
18. 0 & M COSTS (x $1000):
19. FUNDING SOURCE x$1000):
Cty G.O. Bond
.y IF'
la'
State Revolving Fund
State CIP
Federal
200
$200
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
^`•••
Other Cty Fund - (describe)
T0TAL:1
1
' ` ' " f �',$20M;
$200
o (This Page Intentionally Left Blank)
SECTION 6. Severability. If any provision of this ordinance or the application thereof is held
invalid, such invalidity shall not affect other provisions or applications of the ordinance which can
be given effect without the invalid provision or application, and to this end, the provisions of this
ordinance are declared to be severable.
SECTION 7. As required by Section 10-6(a) of the Hawaii County Charter, the estimated cost
of each capital improvement pending or proposed to be undertaken, the estimated operating cost,
and the pending or proposed method of financing are set forth in the attached Project Data and/or
Financial Impact Statement sheets.
SECTION 8. This ordinance shall take effect on July 1, 2026.
Hilo, Hawaii
Date of Introduction:
Date of 1st Reading:
Date of 2nd Reading:
Effective Date:
REFERENCE Comm._ 755.12
COUNCIL MEMBER, COUNTY OF HAWAII
4