HomeMy WebLinkAboutCOM 0011.000 2000-2002 r
L L
\ovember 2. 2000
200RR3
Mr Robert Yanabu
Chef Engineer
Department of Public Works
Countv of Hawau
25 Aupum Street
Htlo, Hawau 96720
Dear h1r Yanabu
Subject Papa~kou Wastewater Treatment Plant
NPDES Compliance Evaluation Inspection
Attached for your information and use is our NPDES Compliance Evaluation Inspection report
for the sublet[ facility The inspection was conducted on September 21, 2000 The facthty was
found to be satisfactonly maintained and operated and is given an overall rating of "Acceptable "
If you hate any questions, please call Steven Sato of our Wastewater Branch at 586-4294
Sincerely,
THOMAS E ARIZUMI, P E ,CHIEF
Em~tronmental Management Drv~ston
SS erne
Attachment
c EPA, Region 9 (Attn Tom Huetteman, w- report)
DOH, Clean 61'a[er Branch (w/ report)
,~~Counry Council Public Works Chairperson (wi report)
(AItVn. N0.
file ?~o "GCn
Ret. To: v M~
Ref. Date NOV 2 9 2000
CLEAN WATER BRANCH
STATE DEPARTMENT OF HEALTH
P.O. BOX 3378
HONOLULU, HAWAII 96801
NPDES COMPLIANCE INSPECTION REPORT
PER.MITTEE: COUNTY OF HAWAII
DEPARTM1lE\T OF PUBLIC WORKS
FACILITY: PAP4IKOU-PAUKAA WASTEWATER TRE4T~IE\T PLANT
PERMIT NO.: HI 0021113
DATE OF INSPECTIO\; September 21, 2000
REPORT PREPARED BY: STEVEN SATO
DATE PREPARED: October 26, 2000
United States Envlronmentel Protection Agency Form Approved
~ EPA Washington, D C Y0460 OMB No 2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A National Data System Coding (I e , PCS)
Transaction Code NPDES yrlmo/day Inspection Type Inspector Fac Type
tU zU 3IH~1~0~0~2~1~1~1~3~11 1200092117 1eU 1sU 2oU
Remarks
21I I I I I I I I I I I I I I I I I I ~ I I I I I I I I I I ~ I I I I ~ I I I I I ~ ~ ~ ~ ~ ~ I66
Inspection Work Days Facility Sall Monitoring Evaluation Rating B7 OA _ --_______-Reservetl-----------------
67 1 2 p 9 70U 71U 72U 73 W74 75I I I I I I I I00
Section f3 Facility Data
Name antl Location of Facility Inspected (tor rnduslne/ users discharging to POTW also include POTW Entry Time/Dale Permit Efleclive Dale
name antl NPDES permit number
10 45 am Jan 22, 1999
Papalkou-Paukaa Wastewater Treatment Plant 9/21/2000
Papalkou, Hawaii Exit Time/Date Permit Expiration Dale
12 45 pm Jan 22, 2004
9I21I2000
Name(s) of On-Sde Representative(s)/Tille(syPhone and Fax Number(s) Other Facility Data
Lyle Hlrota/SupenntendenUTel 961-8754IFax 961-8687
Charles Dawrs/Supervlsor/Tel 961-8753/Fax 961-8687
Name, Address of Responsible Official/TitlelPhone and Fax Number(s)
Robert Yanabu/Chief Engineer/961-8321
Department of Public Works, County of Hawaii
25 Aupuni St , Hllo, Hawaii 96720 vas tacteOd No
Section C Areas Evaluated During Inspection (Check only those areas evaluated)
Permit X Flow Measurement X Operations 8 Maintenance CSOISSO (Sewer Overflow)
Records/Reports X Self-Monilonng Program X Sludge Handling/Disposal Pollution Prevention
Facility Site Review Compliance Schedules Pretreatment Multimedia
Efnuent/Receivrng Water Laboratory Stonn Water Other
Section D Summary of FlndingslComments (Attach additional sheets o(namtlve end checklists as necessary)
SEE ATTACHED FINDINGS
Name(s) and Signature(s) of Inspector(s) Agenry/OfticdPhone and Fax Numbers Dete
Steven Sato DOH, WWB 1586-4294 10-26-00
Ken Muranaka ~ ~Yr"^ DOH, WWB / 586-4294 10-26-00
Libby B Stoddard ~ 5~sZ1~. DOH, CWB 1586-4309 10-26-00
Signature of Management O A Reviewer Agency/Ofrice/Phone and Fax Numbers Data
EPA Form 3580.3 (Rev 9-94) Previous editions are obsolete
FINDINGS
INTRODUCTION
Department of Health (DOH) personnel S Sato, K Muranaka, and L Stoddard conducted an
NPDES Compliance Evaluation Inspection (CEI) of the County of Hawau's (COH) Papaikou-
Paukaa Wastewater Treatment Plant (PPWWTP) on September 21, 2000 Lyle Hirota,
Superintendent. and Charles Dawrs, Superyisor, represented the facility dunng the inspection
\PDES PERMIT NO HI0021113 was issued to the COH and became effective on January 22,
1999 and will expire at midnight on January 22, 2004 The penni[ authonzes the discharge of
secondary treated wastewater from the PPW~h'TP, located m Papaikou, Hawau, to the receiving
waters named the Pacific Ocean at Waipahi Point, through Outfall Senal No OOl at Latitude
19°47'09" Longitude 155°OS' l9" R', m accordance with the effluent limitations, monrtonng
requvements and other conditions as set forth m the permit and m the DOH "Standard NPDES
Pennrt condmons," dated October 1, 1997
FACILITY DESCRIPTION
The PPWWTP is a secondary treatment plant that services the Paukaa, Puueopaku, Papaikou,
and Onomea communities on the island of Hawan The plant has a design capacity of 0 35
million gallons per day (mgd) The facility's treatment processes include banninution, gnt
removal, activated sludge, secondary clarification, chlorination and dechlonnahon Waste
activated sludge is aerobically digested, followed by dew•atenng with a Duai Cell Gravity (DCG)
unit Approximately 60 cubic feet of dew•atered sludge is transported weekly [o the COH Hilo
Landfill for disposal
STATUS OF PAST DEFICIENCIES
The current status of deficiencies cited m last year's Operation and Maintenance inspection
report include the follow•mg
Deficiency The headworks venlila[ion si~stem was Inoperable For Itabtkry and
personae( sujeh•, the rennlanon s}•stem should be inspected and repaired
Status A larger replacement fan was purchased and the installation completed on
January 5, 2000
Deftciency The chlorine a/arm x•as inoperable
Status Anew chlorine alarm w•as installed on February 1, 2000
Deficiency The chlorine contact tank contained a 6 to !2-inch layer of sludge on the
bortonr of the tank Sludge carryover with the final effluent can occur during
peak flogs or when the sludge denitrifies
Status The sludge layer on the bottom of the tank was removed Vacuuming of the tank
is performed at least once per month In addition, plant personnel perform
weekly sludge checks with a sludge Judge and cleaning done if necessary
Deficiency The fire extinguisher in the Control Budding was noted to be completely
discharged
Status The fire extinguisher was replaced with a fully charged fire extinguisher
Inspecnon of the facility's fire extinguishers is performed on a monthly basis
RECORDS/REPORTS
Revrew• of the facility's Discharge Monitoring Report data showed that the facility processed an
average flow of 0 09 mgd or 26 percent of the design capacity for the one-year period
September 1999 to August 2000 The flow for the prior one-year period averaged 0 105 mgd or
30 percent of the design capacity The decrease in flow is attributed to the dry weather
conditions during the past year In the next few years, new sewer connections are anticipated to
add approximately 0 034 mgd to the present flows
The following data taverage for the past year) for the facility was compiled based on monthly
averages for the period September I, 1999 to August 31, 2000
Influent BODS 205 mgrl (flow-propomonal composite sample)
Effluent BODE 2 0 mg;'I (flow-proportional composite sample)
Influent TSS 282 mg!I (flow-proportional composite sample)
Effluent TSS 1 7 mg%I (flow-proportional composite sample)
pH (min) 6 1 (grab sample)
pH (max) 7 4 (grab sample)
Permit hmtts are as follows
PARAMETER DISCHARGE LIMITATION
BODS 30 mg~l (30-day average)
45 mg/I (7-day average)
85 removal)
Total Suspended Solids 30 mgil (30-day average)
45 mg/I (7-day average)
85 removal)
pH Range 6 0 - 9 0 Standard Units
Total Residual Chlonne 7 5 ug/I
Enterococc~ 7!100 ml
No v~olanons of the effluent pemut hmitahons were noted
The COH submitted the facility's NPDES regmred annual reports for operations and sludge
management for the 1999 calendar year
There were no spills or bypasses reported by the fac~lrty dunng the past year The fac~lrty also
received no odor complaints m the past year
MODIFICATIONS/ADDITIONS
Dunng the previous year, a manual transfer s~a•ttch and connectors to provide for the connection
of a portable emergency generator was installed at the fac~l~ry Also, the fac~l~ty's Chlonne alarm
was replaced with a new electronic unit with an external siren
OBSERVATIONS
Influent flow is measured by a Gpolleth weir and ultrasonic level sensor which is calibrated
semiannually by COH mechanics The most recent calibration was performed on July 27, 2000
Influent flow samples are Flow-proportional composites taken with an automatic sampler The
sampler nozzle was located near the tank wall where grease/scum was accumulating
A V-notch weir and ultrasonic level sensor (m sl~lhng well) measures the effluent flow The
access cover for the st~lhng well ~s bolted down and therefore the ms~de of the sUlhng well ~s not
inspected by the operators It w•as recommended that the operators tnspecvclean the stilling well
at the lime the mechanics perform the semiannual cal~brat~on Effluent samples are also flow-
proportional composites taken with an automatic sampler Additionally, grab samples are taken
for monitoring pH, total residual chlorine and enterococc~
All plant egwpment was operational Secondary clarifier \0 1 was undergoing routine overhaul
work and should be completed shortly The DCG unit was not m use on the day of the
mspect~on, but was reportedly operational Preventive maintenance work w•as reported to be up-
to-date
All treatment processes were functioning satisfactorily Plant effluent was observed to be clear
SUb1~1ARY
The Papa~kou Wastewater Treatment Plant ~s given a general rating of "ACCEPTABLE " The
fac~hty was determined to be satisfactorily maintained and operated
We have the following recommendations
I Hose down the accumulated grease%scum on the walls of the tank where the influent sampler
nozzle ~s located a few hours prwr to the start of the 24-hour sampling period This should
result m a more representative influent sample, and
2 Inspect and clean (if necessary) the stilling well for the effluent ultrasonic sensor during each
cal~brat~on event
zooasa