Loading...
HomeMy WebLinkAboutCOM 0219.001 2000-2002 ~ ~ 1A~ 9 ~ 11 t ~ •O ~L~ COI~L.IN~ May 23, 2001 9845-0200-01 A-252 II ~ 21~ Mr. Christopher Yuen ~ :.i Director t L.,_; , . Planning Department County of Hawaii , 25 Aupuni Street Hilo, Hawaii 96720 Dear Mr. Yuen: Response to DC?T Comments Change of Zone Application (REZ 01-003) TMK 7-4-08: Por 2, 68, 69 & 70 Queen Liliuokalani Trust Keahuolu, North Kona District~lsland of Hawaii Please refer to the April 16, 2001 letter from the State Department of Transportation (DOT), which we received via fax from the Planning Department on May 16, 2001. Please find below our comments in response to DOT's concerns: 1. "The traffic mitigation measures proposed in the traffic impact study are not adequate to address the impact of this project on Queen Kaahumanu Highway and surrounding intersections. Additional mitigation measures must be proposed to address the project impacts." QLT's rezoning application proposes to amend the existing Hawaii County zoning classification for the project area, from Limited Industrial to Mixed Industrial- Commercial. Development of the project area is permitted under the present Limited Industrial zoning classification. The proposed rezoning is not intended to introduce development where development is not permitted, nor is it intended to increase the density of development. The proposed rezoning is intended to provide QLT with greater flexibility to attract prospective industrial and commercial tenants into the Kailua- Kona area. To evaluate traffic impacts from the proposed rezoning, QLT commissioned Wilbur Smith Associates (WSA) to perform a Traffic Impact Study. WSA's study was developed using industry-standard practices, including: • Establishing existing traffic counts based on field observations during peak AM (6:30 a.m.-9:30 a.m.) and PM (3:00 p.m.-6:30 p.m.) traffic periods. ~ / Vox~xl~. No. BELT COLLINS HAWAII LTD. 680 ALA MOANA BOULEVARD, FIRST FLOOR, HONOLULU, HAWAII 96813.5406 U.S.r;~x.;.~! TEL: 808 521.5361 FAX: 808 538-7819 EMAIL: hawaiiCo36eltcollins.com WEB: www.belccollins.com ~~s ~o= ~ ~V~~ PLANNING ENGINEERING LANDSCAPE ARCHITECTURE • ENVIRONMENTAL CONSULTING ~e I~1\ U` HAWAII • SINGAPORE • HONG KONG • AUSTRALIA • THAILAND • MALAYSIA • PHILIPPINES • GUAM • SEATTLE • SCOTTSDALE ~ I~ . Belc Collins Hawaii is an Equal Oppormn¢y Employer. I Mr. Christopher Yuen May 23, 2001 - 01 A-252 Page 2 • Use of standardized methods developed by the Transportation Research Board (TRB) of the National Science Foundation for evaluating the effectiveness and quality of service for roadways and streets. • Assessment of traffic conditions at traffic signal-controlled intersections using the Operations Analysis methodology described in the 1997 Highway Capacity Manual Update to the 1994 Highway Capacity Manual. • The use of a 2020 planning horizon, which is consistent with the present planning horizon for Hawaii County transportation plans. The Traffic Impact Study identified the project-related traffic impacts on roads within the project area and within the immediate vicinity. The study also differentiated impacts from future regional traffic growth (unrelated to the project) from those directly attributable to the project. Future regional traffic growth (unrelated to the project) will significantly impact congestion within the vicinity of the project area, including worsening of LOS conditions on roadways both within the project area and in the immediate vicinity. Project-related traffic will significantly impact traffic conditions within the project area. The Traffic Study has identified required mitigations for these impacts within the project area and QLT is committed to fulfilling these mitigations. However, project-related traffic will not significantly impact traffic congestion at surrounding off-site intersections, over and above regional traffic growth. Project-related traffic will not change the LOS at either the Queen Kaahumanu Highway/Pafani Road intersection or the Palani Road/Kuakini Highway intersection. Extracts from tables within the Traffic Impact Study demonstrating the above are summarized in our response to item 2 below. The County's Department of Public 1Norks has reviewed the recommended mitigations and concurred with the analysis and recommendations within the Study. Conditions to mitigate the traffic conditions identified within QLT's Traffic Impact Study have been included within the Planning Commission's recommendations to the Hawaii County Council. QLT is committed to fulfilling the required mitigations as identified within the Traffic Impact Study and as conditioned by the County. QLT has worked cooperatively with the State DOT on the sale of its land to the State for its widening program, and will continue to do so in the future. Mr. Christopher Yuen May 23, 2001 - 01 A-252 Page 3 2. "The traffic impact study should have included an analysis of the intersection of Queen Kaahumanu t~iighway with Henry Street." To assess off-site traffic impacts south of the project area, the Traffic Impact Study analyzed both the Queen Kaahumanu Highway/Palani Road intersection, which is approximately 1/2 mile south of the project area and closer to the project area than the Queen Kaahumanu Highway/Henry Street intersection, which is approximately 1 mile south of the project area's main entrance at Makala Blvd. Based on analysis within the Traffic Impact Study and summarized .within extracts of tables from the study below, the impacts from project-related traffic on the Queen Kaahumanu Highway/Palani Road intersection was minimal. Since a portion of project-related traffic would turn to and/or from Palani Road, the increase of project-related traffic at the Queen Kaahumanu Highway/Henry Street intersection would be less than at the Palani Road intersection. On this basis, further analysis of intersections further south were not conducted. Tables 2-2, 3-1, and 5-1 from the Traffic Impact Study summarized existing and future conditions at the Queen Kaahumanu Highway/Palani Road intersection without the~roject and are found below: Table 2-2 (extract) Existin Conditions Mornin Peak Hour (LOS) Afternoon Peak Hour (LOS} V/C ADPV LOS V/C ADPV LOS Queen Kaahumanu 0.78 39.7 D 0.93 56.9 E Hi hwa &Palani Road Table 3-1 (extract) 2010 (without the ro'ect) Mornin Peak Hour (LOS) Afternoon Peak Hour (LOS) V/C ADPV LOS V/C ADPV .LOS Queen Kaahumanu 0.83 58.5 E 0.89 73.3 E Hw . &Palani Road Table S-1 (extract) 2020 (without the ro'ect) Mornin Peak Hour (LOS) Afternoon Peak Hour (LOS) V/C ADPV LOS V/C ADPV LOS Queen Kaahumanu 1.04 98.7 F 1.14 164.0 F Hw . &Palani Road Mr. Christopher Yuen May 23, 2001 - 01 A-252 Page 4 With the project, conditions at the Queen Kaahumanu Highway/Palani Road intersection for 2010 and 2020 were adjusted as follows: Table 4-3 (extract) 2010 (with ro'ect) Mornin Peak Hour (LOS) Afternoon Peak Hour (LOS) V/C ADPV LOS V/C ADPV LOS Queen Kaahumanu 0.86 63.0 E 0.91 74.6 E Hw . &Palani Road Table 6-3 (extract) 2020 (with ro'ect) Mornin Peak Hour (LOS) Afternoon Peak Hour (LOS) V/C ADPV LOS V/C ADPV LOS Queen Kaahumanu 1.06 101.9 F 1.17 164.0- F Hw . &Palani Road Project-related traffic volumes do not alter the future LOS for the QKH/Palani Road intersection, and will only affect the ADPV at the intersection by less than 8% in 2010 and less than 4% in 2020. On the basis of the Study's data and analysis, the proposed project will not significantly affect traffic conditions at the QKH/Palani Road intersection, over and above impacts from future regional traffic growth. 3. "Incremental or creeping degradation of LOS, especially when the existing or projected LOS is "E" or worse (in urban areas), must be mitigated (or ideally, improved). The preferable LOS for intersections should be no worse than LOS "D" for urban areas." QLT is committed to maintaining traffic conditions within its project area at acceptable LOS conditions as reflected in DOT's comments. In 1990, QLT completed a comprehensive traffic study as part of its successful State Land Use District reclassification of 1,135 acres of its Keahuolu lands to the Urban District. With the subsequent rezoning of 465-acre Urban Phase 1 area in the area mauka of QKH and since 1995, QLT complied with County conditions and constructed Kamakaeha Avenue, Makala Blvd. and the Luhia Street Extension. QLT has also dedicated land to the County and State for future widening of Palani Road; and recently negotiated the sale of portions of its lands to the State for Queen Kaahumanu Highway widening project. QLT has also complied with conditions imposed by the Land Use Commission (LUC) to conduct Traffic Monitoring Studies, in conjunction with incremental completion of individual developments, including the Kmart Department Store in Mr. Christopher Yuen May 23, 2001 - 01 A-252 Page 5 1996 and the Liberty House in 1998. QLT will conduct another Traffic Monitoring Study shortly after the completion of the HPM "Builder's Express" project and in conjunction with the recently completed Makalapua Stadium Cinemas at Makalapua Center. In total, QLT has expended over $7.5 million in Trust funds for the completion of area roadways. These roadways are now part of the overall roadway network in the Kailua-Kona area and within the project area. QLT's completion of Karnakaeha Ave., Makala Blvd. and Luhia Street have created bypass routes both mauka and makai of the Queen Kaahumanu HighwayPalani Road intersection, thereby relieving congestion along the highway near Palani Road. As demonstrated over the past 10 years with its commitment of funds for infrastructure development, QLT is committed to providing its fair share to improve regional traffic conditions and will continue to do so with this rezoning application. "Makala Boulevard (2010) widening must include:" • "Provisions for a double left turn onto Northbound Queen Kaahumanu Highway, especially needed if Queen Kaahumanu Highway has not been widened. There should be a six-foot buffer (painted or physical median) separating left turning traffic from oncoming traffic." A second left turn lane onto northbound Queen Kaahumanu Highway was recognized within the Traffic Impact Study as a beneficial mitigation of traffic conditions in 2020 (coinciding with Phase 2 development). QLT can comply with this requirement, but recommends that the second left turn lane only he opened after Queen Kaahumanu Highway is widened by the State from its present two-way two lane configuration to its ultimate two- way four lane configuration. This will ensure that two traffic lanes on northbound QKH are available to receive two lanes of traffic turning left from Makala Blvd. onto the highway. QLT has worked with DOT on a good faith basis on the sale of Trust land for the State's widening project and will continue to do so in the future. • "Adequate left turn storage on the makai bound approach to Luhia Street." The applicant will comply and will review any proposed improvements to Luhia Street with the County's Department of Public Works. Mr. Christopher Yuen May 23, 2001 - 01 A-252 Page 6 • "Restrictions to prohibit driveways within 100 feet of Queen Kaahumanu Highway (as widened)." The applicant will comply. • "Install traffic signal conduits at the Luhia Street intersection." The applicant will comply, concurrent with further development of adjoining parcels. 5. "Required roadway improvements shall be provided by the applicant at no cost to the State." With regards to proposed improvements that are project-related and/or within the project area, the applicant will comply up to the level of its fair share. 6. "The LOS condition at the intersection of Kaiwi Street and Queen Kaahumanu Highway (Table 6-3, page 6-5) should be examined more closely. The traffic report should discuss why the left turn LOS (from Queen Kaahumanu) is equal to or better than a right turn LOS (onto Queen Kaahumanu). We feel that traffic improvements should be proposed for this intersection and the assumptions reconsidered (i.e., the 2020 with project evaluation assumed it would be STOP controlled)." The analyses of traffic conditions at the STOP sign-controlled intersection of Queen Kaahumanu Highway and Kaiwi Street reflects the methodology in Chapter 10, Unsignalized Intersections," of the Highway Capacity Manual Update, Special Report 209, 1997 (HCM). The delays to vehicles turning right from Kaiwi Street and left from northbound Queen Kaahumanu Highway are a function of two factors: A. The volume of the conflicting traffic they must cross or merge with, which is the southbound traffic on Queen Kaahumanu Highway for both turning movements. B. The length of the gap between southbound vehicles needed for the vehicles to make their crossing or merging maneuver, referred to as the critical gap. The critical gaps needed for vehicles to make aleft- or right-turn are presented in Table 10-1 of the HCM. With the future four-lane Queen Kaahumanu Highway, vehicles turning right from the side street typically need an average gap of 6.9 seconds between southbound vehicles to start up, turn into the southbound lane, and accelerate to avoid being overtaken and struck by the approaching vehicle. Mr. Christopher Yuen May 23, 2001 - 01 A-252 Page 7 Vehicles turning left from the northbound Queen Kaahumanu Highway across the southbound traffic need an average gap of 4.1 seconds between southbound vehicles to start up and cross the two southbound lanes before the approaching southbound vehicle arrives at the crossing point. Since the right-turn vehicles need a longer gap in southbound traffic than the left- turn traffic, the right-turn vehicles would have to sit and wait a longer time than the left-turn vehicles for such a gap to occur, if the numbers of right- and left-turn vehicles were similar. In the morning peak hour, the forecast number of vehicles turning left into Kaiwi Street far exceeds the number turning right from Kaiwi Street. With the much higher volume, the left-turn traffic would use more of the available gaps and would wait longer on average to find a gap of sufficient length, as compared to the lower number of vehicles turning right. This results in a longer average delay for the left- turn vehicles in the morning peak hour than for the right turns. !n the afternoon peak hour, the forecast number of vehicles turning right is almost the same as the number turning left (with diversion of some right turns to Eho Street). With similar volumes and a much longer critical gap requirement, the right- turn vehicles must wait substantially longer than the left-turn vehicles, on average, to find a sufficient gap in the southbound through traffic on Queen Kaahumanu Highway to complete their turn. "We require the submittal and approval of construction plans for all work to be done within Queen Kaahumanu S-highway right-of-way." The applicant will comply. On behalf of QLT, we thank you for this opportunity to submit our comments in response to DOT's concerns. If you have any questions or comments, please do not hesitate to call either Jim Beli or myself at (808} 521-5361. Sincerely, BELT COLLINS HAWAII LTD. Gene Yong Senior Planner cc: Queen Liliuokalani Trust Department of Transportation WSA