July 19, 2001
Mr. Dennis K.W. Lee, P.E.
Director of Engineering ,
Department of Public Works
County of Hawaii
25 Aupuni Street
Hilo, Hawaii 96720
Dear Mr. Lee:
Subject: Kealakehe Wastewater Treatment Plant
Operation and Maintenance Inspection
Attached for your information and use is our Operation and
Maintenance Inspection Report for the subject facility. The
inspection was conducted on June 21, 2001. The facility is given
an overall rating of "UNACCEPTABLE" because the reuse projects have
not been constructed. Plant effluent continues to be disposed of
into the "temporary" percolation pond.
Other deficiencies are cited in the attached report.
Please submit, within 60 days of receipt of this letter, a
corrective action plan addressing the noted deficiencies. A
reasonable time schedule for completion of the plan actions should
also be included.
If you have any questions, please call Steven Sato of our
Wastewater Branch at direct toll free no. 974-4000, ext. 64294.
Sincerely,
L~ .
THOMAS E. ARIZUMf/~E. CHIEF
Environmental Management Division
Ss:erm
Attachment
/ Comm. No.
c: Y County Council Public Works Chairperson, (w/report}
EPA Region IX, Attn: Tom Huetteman, (w/report) File No.
DDEH, (w/report) Ref. '~O'
~4~t~AUG
OPERATION AND MAINTENANCE INSPECTION REPORT
INTRODUCTION
1. Facility: Kealakehe Wastewater Treatment Plant
2. Date of Inspection: June 21, 2001
3. Inspector(s): Steven Sato
4. Facility Representative(s) / Job Title:
Mark Norman / WWTP Operator III
BACKGROUND
1. Current status of deficiencies cited in previous inspection
reports:
Deficiency: The County needs to accelerate implementation of
the reuse projects. DOH letter dated July 23, 1999
to Mr. Jiro Sumada of the County of Hawaii's
Department of Public Works, requested the County to
submit a revised and realistic construction
schedule for the effluent projects. To date, DOH
has not received any written official response from
the County.
Status: A revised construction schedule for the effluent reuse
projects was submitted by the County in August 1999.
The Contractor Fill Station project which was scheduled
to be completed by December 2000 has not yet been
constructed. The Highway Transmission Pipe project has
been put on hold due to delays in the State Department
of Transportation's Queen Kaahumanu Highway widening
project. This project will enable the reuse of effluent
for irrigation of landscaping at Honokohau Harbor and
along the access road between Kaahumanu Highway and
Honokohau Harbor, which is required to be constructed
under the terms of the Consent Order for Docket No. 90-
WW-EO-10 (DOH v. County of Hawaii), and originally
required to be completed by October 31, 1998. The
County has twice requested and been given extensions of
the deadline. The current extended deadline for the
Kealakehe WWTP Operation and Maintenance Inspection Report
July 19, 2001
Page 2
project's completion is August 2002. Also; the Reservoir and R-1
Upgrade projects are also behind schedule. Currently reported to be in
progress is the design phase of a Demonstration Wetlands project.
Deficiency: The chlorinator has been malfunctioning since
May 2000. The chlorine gas feed rate was
fluctuating, resulting in unreliable readings.
Meeting chlorine residual requirements for R-2
water quality has been very difficult for the
operators to achieve. The laboratory data showed
an increasing trend in fecal coliform values since
the time of chlorinator malfunctions. The reuse of
effluent at the "Swing Zone" driving range was
suspended on May 29, 2000.
Status: A new tank-mounted vacuum regulator chlorinator was
installed and since then the facility has had no
problems in meeting the chlorine residual requirements
for R-2 water quality. The reuse of effluent at the
"Swing Zone" was resumed on July 7, 2000.
Deficiency: Grit Classifier No. 2 was removed from service in
February 2000 due to corrosion problems. To date,
completion of the repair work on the classifier is
still uncertain.
Status: The grit classifier was sent to an outside contractor
approximately two months ago. The unit is being rebuilt
using stainless steel.
Deficiency: The motor cage of the grit chamber turntable motor
was noted to be heavily corroded. The cage housed
the rotating shaft of the motor. For safety and
Liability reasons it is recommended that the cage
be repaired.
Status: The corrosion on the motor cage was not as severe as it
appeared. Corrosion was removed by wire-brushing and
the motor cage was repainted.
Deficiency: Effluent Pump No. 3 became inoperable on April 12,
2000. The impeller head bonded to the casing,
causing the motor to be overloaded. The run time
of the pump was only 3, 000 hours. The
Kealakehe WWTP Operation and Maintenance Inspection Report
July 19, 2001
Page 3
two remaining effluent pumps are expected to reach
the 3,000-hour run time by the end of this year.
Considering that the pumps are relatively new, the
County should investigate the cause of the problem.
Status: The cause of the problem was determined to be due to a
build-up of corrosion on the bell housing, resulting in
binding of the impeller and subsequent overloading of
the motor. A purchase order was issued for the repair
and modification work on Effluent Pump No. 3 on May 31,
2001. Modifications included the installation of a
stainless steel wear ring in the casing, replacement of
the column and lineshaft tube with stainless steel
piping, and conversion from an oil lubricated system to
a grease lubricated system. The pump was placed back in
service and a problem with air suction into the pump was
encountered. The County is presently considering the
installation of a new mechanical seal to contend with
the problem. Effluent Pump Nos. 1 and 2 also need to be
modified, but the work will not be done until the
modifications to Pump No. 3 have been demonstrated to be
effective.
Deficiency: Safety railings should be provided at the stairs at
the effluent pump station. The operators use the
stairs to open the valves.
Status: Railings were installed on the stairs and platforms
located at the Effluent Pump Station. The work was
completed on August 25, 2000.
Deficiency: Chain Links should be installed around the influent
channel to prevent personnel from accidentally
falling into the channel.
Status: A Hawaii Occupational Safety and Health Division (HIOSH)
Consultation Advisor performed a Safety Survey of the
facility on May 25, 2000. The Consultation Advisor
determined that the facility's current method of
cordoning off the access stairway to the influent
channel area with a chain is sufficient to meet HIOSH
requirements.
Kealakehe WWTP Operation and Maintenance Inspection Report
July 19, 2001
Page 4
Deficiency: The temperature reading at the blower's suction was
slightly over 100 degrees Fahrenheit. Heat could
damage the blowers.
Status: A large portable fan was installed at the blower room as
a temporary corrective measure. A long-term fix is now
being designed.
2. NPDES Permit Status:
Not applicable.
3. Enforcement Action:
The County is under a Consent Order, Docket No. 90-WW-EO-10,
Department of Health v. County of Hawaii, which became effective
on March 13, 1997. The terms of the Consent Order require the
County to construct a reuse system to use properly treated
effluent to irrigate landscaping at Honokohau Harbor and along the
access road between Kaahumanu Highway and Honokohau Harbor. The
consent order deadline for the project's completion was October
31, 1998. On February 24, 1998 the DOH approved a County request
for an extension of the deadline to August 2000. On November 24,
1999 the DOH approved another County request for an extension of
the deadline to August 2002.
4. Capacity Analysis:
Average flow: 1.44 MGD (For the period 5/1/00 to 4/30/01)
Design flow: 5.31 MGD; Percent of design capacity: 27%
Previous year's comparison: Last year's flow averaged 1.30 MGD.
This year's flow is averaging about 140,000 gpd more and is
reportedly due to additional sewerline connections.
Kealakehe WWTP Operation and Maintenance Inspection Report
July 19, 2001
Page 5
5. Influent/Effluent Data Analysis: (Based on monthly averages for May
2000 through April 2001)
Influent BODS: 277 mg/1 (grab sample)
Effluent BODS: 6.1 mg/1 (grab sample)
Influent TSS: 148 mg/1 (grab sample)
Effluent TSS: 17 mg/1 (grab sample)
pH (min.): 6.9 (grab sample)
pH (max.): 9.2 (grab sample)
Effluent limits are 30 mg/1 and 30 mg/1 for BODS and TSS,
respectively.
The reclaimed water guidelines for R-2 water require the
following:
a. The median density of fecal coliform bacteria measured in the
disinfected effluent does not exceed 23 per 100 milliliters
based on the last seven days for which analyses has been
completed.
Review of the facility's recorded data revealed no
violations.
b. The density of fecal coliform bacteria does not exceed 200
per 100 milliliters in more than one sample in any 30-day
period.
Review of the facility's recorded data revealed no
violations.
c. Chlorine residual in the disinfected effluent shall not be
less than 0.5 mg/l.
Review of the facility's recorded data revealed no
violations.
Kealakehe WwTP Operation and Maintenance Inspection Report
July 19, 2001
Page 6
6. Modifications/Additions - Planned/Present Construction Status:
Effluent Pump No. 3 was modified with a stainless steel insert and
riser pipe. The County also has reuse projects planned for
construction as previously noted in this report.
CURRENT INSPECTION
1. Maintenance:
Preventive Maintenance: X Current Backlogged
Comments: Preventive maintenance (PM) duties are all up-to-
date. PM duty schedules are listed on separate
weekly, monthly, quarterly, semi-annual, and annual
sheets and stored in a 3-ring binder. The operator
checks off, dates, and initials the completed
duties.
Corrective Maintenance: X Satisfactory Unsatisfactory
Items requiring repair/replacement:
1. Grit Classifier No. 2.
2. Chlorine motive water line burial.
3. Grit Pump No. 1.
Comments: The completed corrective maintenance work order
sheets are not completely filled out. Man-hours
and parts used are not recorded on the work order
sheets.
2. reuse:
The facility has a DOH approved effluent irrigation plan:
X Yes No Not applicable
Comments: Effluent is currently reused only at the "Swing Zone"
driving range.
Kealakehe WWTP Operation and Maintenance Inspection Report
July 19, 2001
Page 7
3. NPDES or Chapter 62 Violations (effluent limitations, spills, etc.)
There were no violations noted.
4. Visual quality of effluent on date of inspection (inspector's
judgment)
The effluent was observed to be relatively clear and light-green
in color.
5. Facility's Present Deficiencies:
a. The County continues to utilize the temporarily approved
seepage pit for effluent disposal. Effluent reuse projects
have been slow to materialize.
b. Grit Classifier No. 2 is still under repair.
c. Grit Pump No. 2 is inoperable.
SLTiKI~ARY
1. General Rating:
ACCEPTABLE CONDITIONAL ACCEPTANCE X UNACCEPTABLE
Explanation: The Kealakehe WWTP is given this rating because the
County continues to utilize the temporarily
approved seepage pit for effluent disposal. Also,
very little progress has been made in construction
of the reuse projects.
2. General Comments / Recommendations:
We have the following recommendations:
1. Performance of process control analyses should be
periodically conducted at various points throughout the
Kealakehe WWTP Operation and Maintenance Inspection Report
July 19, 2001
Page 8
treatment ponds. As a best management practice, the
recordation of weather conditions, pond color, pH, and
dissolved oxygen is recommended. Also, periodic
identification of the ponds' active microorganisms should
also be recorded. Should changes in effluent quality occur,
the recorded data could help the operator in identifying and
correcting the trouble source;
2. Chemical testing for moisture accumulation at the bottom of
the underground fuel storage tank should be conducted
monthly; and
3. Man-hours and cost of parts utilized should be logged on the
work order sheets for historical reference.