September 13, 2001 OiDOI-I~001
Thomas E. Arizttrni, P.E.
Chief; Environmental Management Division
State I)epartrrient of 1^lealth
l?.O. Eox 3378 - ~
Hanolulu,l°Iawaii 96801 ~
Subject: KealakeheWastewvatelr'l~reaeatPla~nt 7
Year 2001 ®peratiom and 1llaimtenance Inspection Respomse.-;
j
_ ~ ~J
The County o£ I~awaii Wastewater Division has received the azuiu.al Operation and ~
MaintenancelCompliance Evaluation ~spection Report (1;MD1W:13 010587) for the
I~ea,lakehe Wastewater 7Creatignent Plant for the Ycar 2001 and provides the following
corrective action plan to address the deficiencies cited in the report.
Itefn ResulCin iTa "iTn~cceptal~le" Itatim
,l _ ~`lt~uttiv continues to uF.ilaze the terrzari~ approved seerwa~e~ for ~$}luent
DisDOSaI and very latll~rogress has been anade
t__~nstr'ucti~~n of the ,tte
use
Pry:
Asemi-municipal course was originally planned to accept the maj ority of the effluent
from the treatment plant and provide an additional source of revenue for the Iaivisivn.
The developer, I~ealakehe Associates, has since defaulted on their contract with the
Cour?ty. On 8/29/O1, the County's Corporatian Counsel notified the developer that
the aforementioned contract is canceled. The County niay now be able to proceed
with alternative development of the site for golf course or other use compatible with
the Governor's Executive Order, which conveys the property for water reclamation
purposes- We are currently awaiting direction from the May<rr regarding how the
County intends to proceed with development of the reclamation site. This cauld
potentially utilize the majority of the effluent cuxrerltly generated by the plant.
The County has also recently been working with the Bureau of Reclamation (130R)
and several other governrment agencies and community groups to develop constructed
wetlands in thy; buffer zone recently acquired through Executive Order from the
Governor. Purpose of the wctiands would be to (1) Reduce the cost of upgrading the
treatment process to R-1, (2) Provide alternative habitat for endangered bird species,
and {3) Provide recreational opportunities for the local and visitor community.
+~ra~an, ial~ •
;file r3c~a
~f. fio:
lief. l~at~ ~
1221/01 FRI 10:42 FA% 8089618644 DPW-WASTEWATER DIVISION X1002
Kealakehe Wastewater Treatment Plant Year 200I 4perati®n and Mait~tenanee Inspection Report
Page 2 of 3
OtlAe~- Def cie~tcfes: '
2. Grit Classi er No 2 was removed
from service in Febr~sarv ZOUO due to corrosion
problems.
'l°he repair work to Grit Classifier No. 2 has been cornpletcd and the County is
currently in thcprocess of re-installing the Grit Classifier. Repair tv the Chit
Classifier consisted of re-building of the entire housing utilizing Type 316 Stainless
Steel. A.s a point of clarification, the County would like to advise the AE:partmont of
~eaith that the delay in repair was due to the fact-that rao bids read been received
during previous bids for repair of the Grit Classifier.
e~ CompletianDate for installation of the Grit Classifier i:~ Cletober 2001.
3. ~ uent I'unzp No.
Intake of air into the piping system is attributed to drainia~g of the pump coluxnrl
during periods when the purtap is off line in lieu of "air suction" into the system via
the sbaf~t seal. Braining of the pump cola in itself is not considered to be abnormal
since colutnns for deep weld pumping systenns are often designed such that the
coltarnn is drained when the pump is shut off
`The County will be installing an. automatic AirNacuum relief valve on the discharge
header in order to allow venting of air (cutreattly, zzo provisions were made for release
of air in the pump discharge header) and is currently in the prcNcess of procurement of
the material for installation on the header.
With regazd to ~ffluezct Pugnps No. 1 and Z, modification of tkiese pumps e~vould occur
at such time that operation of the pumps is affected.
'Target Cornt~letiorr Date for installation of the AirNacuunn lte,lief Valve is March
X02 in order to allow adequate time for receipt of the egtliptr~ent.
4. 7`emDerature Readln ~e Blower Suction is slightly over 100 a:'egrees ,~°ahrenheit.
Heat could atna a the bdowers:
As indicated in the report, cooling is currently being provided, utilizing a large
portable fan.
far eg t Completion Ji7atc for installation of a permanent xnethc~d of coolinb of the
Blower Room is Tune 2
5. Grit Puntn No. 2 is Ino
er,~„
able:
Grit Pump No. 2 has been repaired..
Com
lp eted
12!21101 FRI 10:43 FA% 8089618644 DPW-WASTEWATER DIVISION X003
Kealakc~e Wastcwates Trea~nent Plant Year 2001 ~pcration anti Maitltenante L~lspectiotl Repozt
psgc 3 of 3
Recomxcaendatioxds: '
1. Recordation o weather eores~itions, pond color. pH. and Aissol•ved OxY,~en is
recommended Also eriodlc identifteation ofthe pond's mierc~or.~anisms should be
rec d d.
Recordation of pf€, Dissolved Oxygen, and periodzc identification of the pond's
uAicroorgaraisms will be performed. With regard to weather conditions and pond
color, only abnormal occurrences will be recorded in order to m~ainimize recording of
repetitious data.
2. Chemical testing for tnois ur accumulation at the bottom of the under roan uel
storage tank should be recorded monthly
the existing underground fuel storage tank and piping is fiber~plass aad is therefore
not subject to corrosion by moisture. The County will pe~iodic,ally .inspect the tank to
ensure there is no accumulation of water which would affect t6~e generator.
3. Man-hours and cost o~arts should be log,Reci q,~, the Work Or~~er Sheets for
~'istorical Reference:
Approximate Man~hours and Cost of Parts will be recorded fog' futtue Work Orders.
Should there be any cvrx~~nents or questions on the above, plcasc contact Peter Boucher,
P,E., Division Chief at 808-961-833$ or correspondence maybe sent via facsimile to
808-961-8644.
Sincerely,
Galen Kuba, P.E.
Director
Departrracnt of Environmental Management
cc: Wastewater ]Division
Councilman Dominic 1''agong, l~nvironn?ental Management Chairman
Chairperson, Enviroz?mentai Management Conunission
4 ~ !,ter \\i
4! . \979 Y
b Vim`',`" 'dry
Pt••` ` 5
BENJAMIN J. CAYETANO ' BP.UCE S. ANDERSON, Ph.D., M.RF
GOVERNOR OF HAWAII I ~ ti ~y~ DIRECTOR OP HEALTH
~r
~
~~~d4~~
DEPARTMENT OF HEALTH
In reply, please refer to
P.O. BOX 3378 END! WB
HONOLULU, HAWAII 96801
010843
September 27, 2001
Mr. Peter Boucher, P.E.
Chief, Wastewater Division
Department of Environmental Management
County of Hawaii
25 Aupuni Street
Hilo, Hawaii 96720
Dear Mr. Boucher:
Subject: Kealakehe Wastewater Treatment Plant
Operation and Maintenance (O&M) Inspection
Corrective Action Plan
Your corrective action plan addressing the effluent reuse
deficiency cited in our O&M Inspection report is not acceptable.
The plan does not include a time schedule for construction and
implementation of your wetlands and other effluent reuse
projects.
Please submit, within 60 days of receipt of this letter, a
revised corrective action plan. If you have any questions,
please call Steven Sato of our Wastewater Branch at 586-4294.
Sincerely,
0
7
L-D
THOMAS E. Ak1ZUMI, "t'.E., CHIEF :.j
Environmental Management Division ~ -
V
SS : erm
:h
w
_
W.~.STE~ATER DIVISION '
DEPARTMEYf OF ENVIRON~bfENTAL MAi'VAGENIENT
fir== 108 RAILP.OAD AVENUE - HILO, HAWAII 96720
~ ' r (808) 961-8338 -FAX (808) 961-8644 ~
November 6, 2001
Thomas. E. Arizumi, P.E.
Chief, Environmental Management Division
State Department of Health
P.O. Box 3378
Honolulu, Hawaii 96801
Subject: Kealakehe'~Vastewater Treatment Plant
Operation and Idlaintenance (OSz1Vi) Inspection
Corrective Action Plan
In response to your letter dated September 27, 200.1 (EMDIWB 010843) the 1Vastewater Division
has attached a time schedule for construction and implementation of our wetlands and other reuse
projects as requested. Please be advised however, that this schedule is only an estimate, since the
actual schedule may vary significantly depending on funding availability and coordination with the
State DOT Highway's proposed highway widening project which continues to experience delays.
Should you have any comments or questions on the above please feel free to contact the
undersigned at 961-8338.
Peter Boucher, P.E.
Division Chief
cc: Environmental Mana~~ment Commission
C__t~le.
o~ _
v p ! a a a a a
~p C11 A W N a O O OD J A V7 A W N ~
. ~
. a .n-.
1
~ ~ ~ ~ ~
a _ _ ` ~
p 7 [D O ~ O ~ fA O ~ O [p ~ '7°
7 p1 C1 7 ~ 7 N ' 7 N ' 7 < ~
N C N ~ m N ~ ~ N 47 ~ N y r 3
y c ~ m r ~ ~ ~ Z ~ p ~
~ 17 7 'D `Z z 3 ].7 j R j N
a o ~ ~ C r j Ra
I ~
~ C
~ d a b
(p ~ ~ U7 W W O W W ~1 W W tD W a UI
N A d O W N N O O N d O A O W A p
(p O O O O O O O O O O O W O O 4 3
~ N 0. 0. 2 A d d d 0. 0. 0. Q 0. d t.8,
(D
T T Q
~ ~ p
A ~ _
I ~ 't N N A
~ ~ I 1. o ~ ~i
9 ~ ~ N
f ' i ~ ' ~ D
s
E
W ~ ~
5 k{M app
}j£ l f ~ .K 5~ qty 1~y~~p1
~ 4 t >
0. 4 ~ j33 . 3 A Y
Y:;
` + wt 3ryY
Xis..
W 111
' 'x < ~ r; tY p iTl
•J
s w ~ `g9
i ~ N
h; o,.
:'Y ~ {iS ,7
~ fa S yv ' A
~y 3~ _ ' j _
~ ~
~
c
~ Y ~
~ ~ 3 N N
O i_m ' ~~e O
cp € ,5 p A
s { tv.~r:~
~ ~
3 A
f~ 4 _
p
s'>
.'Y~ ff
r,.,.,
p
>:<8
tc:. N
a N
i;. 3.F f ~
W
::fiW ~ :K
ry{ti
L
~:~:J ^
A
f. f+
q*,1~~95y , ;
~y ~..Y,
y : ;
f • } - BRUCE S. M.P.H.
BENJAMIN J. CAYETANO I t.
GOVERNOR OF HA'NAII ~ -f y'~,2~' DIRECTOR OF HEALTH
~x
s 1 s-~ r
°'.Pw.yy~y+~a ~~l~l~~_,L:.cl 1'.; L. /~.(_'JI I lJt j
~~7'01 ~ O~ ~P1WYl~ 6l~de ~ d/ I ~1 ~i• ~r~
DEPARTMENT OF HEALTH
In reply, please refer to
P.O. BOX 3378 END! WB
HONOLULU, HAWAII 96801
011082
November 27, 2001
Mr. Peter Boucher, P.E.
Chief, Wastewater Division
Department of Environmental Management
108 Railroad Avenue
Hilo, Hawaii 96720
Dear Mr. Boucher:
Subject: Kealakehe Wastewater Treatment Plant
Operation and Maintenance Inspection
Revised Corrective Action Plan
Your revised corrective action plan which includes a time
schedule for construction and implementation of your effluent
reuse projects is acceptable. Thank you for your response.
If you have any questions, please call Steven Sato of our branch
at 586-4294.
Sincerely,
DENNIS TUL CHIEF