Loading...
HomeMy WebLinkAboutCOM 0490.001 2000-2002 FEASIBILITY STUDY ~ ~'r--~--~°~~-°°•° PALAI WATERSHED ~-~=°°s-°~'~~`~"~~"~°~' SOUTH HILO ~'fl~ Army Corps of Engineers has conducted a reconnaissance Study and an alternative was identified with favorable B/C ratio and a 6.5 million design/construction cost. Feasibility Study will now be conducted to identify and formulate potential alternatives that address flood mitigation and to obtain approval of project construction. A detailed analysis of the alternatives will be performed including cost estimates and environmental studies. Schedule: Start 2002 Complete 2005 Funding: County responsible for 50% of feasibility study cost Total County Cash Share $335,225 Total In Kind Services $82,800 Total Project Cost $836,050 (see attached funding schedule) Description: Construct a 1,00 ft long unlined open channel along the perimeter of the Hilo Golf Course to divert water from Palai Stream to Haihai Street. Construct a 1000 ft underground box culvert from Haihai Street to Kanoelehua Avenue Bridge.See attached plan. ~e ~~a 1" i1e ;Vo. Ref. ~'o;-. ' Ref. Tate . r~._ f o ~ ~ A TRUE NORTH D ~ ~ ~ ~ r D ~ ~ ~ m ~ o rn D C7 A [Y1 ~ D ~ ~ ~ ®o ~ ftl ~ O y cs ~ "t7 r 1 D ~ v r ~ i,~ W ~ A N ~ ~ ~ ~ ~ ~ ~ - r`' ~~.s so ~ a Z ~ ~ o~ ~ ~ . 1- N~ ~N1 °d°~ ~ ~ I~ ~ A I~ _ .Q 9 ~ 1 F~ o '4 ~ o ~ s Palai Stream Flood Control Protect, Protect Mana~ernent Plan -continued m._._..,_. ~ _._....e-.., 14.0 SCHEDULE OF FISCAL YEAR FUNDING The feasibility study is scheduled to start in the second quarter of the federal government's FY02 and is anticipated to be completed by the end of the second quarter of FY05. The federal governmcnt's fiscal year begins 1 October. The cost share breakdown of study funds by federal fiscal year is shown below in Table 3. TABLE 3. COST SNARE BREAKDOBVN BY )FEDERAL FISCAL YEAR . FY02 FY03 FY04 FY05 TOTAL Federal Gover~aaraent $170,430 $111,2Q5 $113,390 $23,000 $41:8,025 County ~sI' Ila~vai`ii, DPI (Project Sponsor) $170,430 $111,205 $113,390 $23,000 $418,025 Cash Contribution $143,750 $ 77,395 $ 91,080 $23,000 $335,225 In-Kind Services 26,680 $ 33,810 $ 22,310 $ 0 $ 82,800 TOTAL ESTIMATED STUDX COST $340,860 $222,41:0 $226,780 $46,000 $836,050 The net County of Hawaii (Project Sponsor) share for FY02, FY03, FY04 and FY05 reflects a credit for in-kind services performed by the project sponsor during the feasibility study. The total credited amount resulting from in-kind services was estimated at $82,800. A#Icr deducting the credit-from in-kind services, the total non-federal cash contribution to be provided by the project sponsor will be $335,225. 15.0 RESOURCE CONTROL The PM will manage, analyze and control all project and study costs and budgets in accordance with the approved PMP. However, management of funds to provide the required technical products within the authorized budget of the PMP remains the responsibility of the various functional chiefs. The PM's control and management of the overall project and study funds does not relieve the respective chiefs from this responsibility. 16.0 LOCAL COOPERATION PLAN The responsibilities of the project sponsor throughout this feasibility study are clearly defined in the Feasibility Cost Sharing Agreement. Additionally, individual line items in the form of in- kind services for which the sponsor is responsible are identified in the network analysis and work breakdown schedule. 21