HomeMy WebLinkAboutCOM 0548.000 2000-2002Harry Kim
Mayor
March 6, 2002
County of Hawaii
Finance Department
25 Aupuni Street, Room 118 • Hilo, Hawaii 96720
(808)961-8234 . Fax(808)961-8248
Honorable James Arakaki, Chairperson and
Members of the County Council
Hawaii County Council
25 Aupuni Street
Milo, Hawaii 96720
Re: Operating Budget
William Takaba
Director
Nancy E. Crawford
Deputy Director
Enclosed is a bill for an ordinance amending the Operating Budget by
appropriating a $80,000 Keahole to Honaunau Regional Circulation Plan Grant
from the State Department of Transportation. This grant will be used to develop a
long-range regional transportation circulation plan for the particularly fast-growing
and congested region encompassing Keahole to Honaunau.
If there are any questions, please do not hesitate to call the Planning Department.
Q
1�
William Takaba
Director of Finance
APPROVED:
Harry Kim
Mayor
Enc.
cc: Planning
e li 1
Form #: B-52
%/18/91
DEPARTMENT: Planni
STAFF CONTACT: Roy Takemoto
A. REQUEST:
DEPARTMENT OF FINANCE
REQUEST FOR COUNCIL ACTION
DATE: February 28, 2002
PHONE: 961-8288
The Planning Department has received an $80,000 federal grant, passed through the State Department of
Transportation, to develop a regional transportation circulation plan for a particularly fast-growing and congested
rection encompassing Keahole to Honaunau. County matching will be as in-kind services (approximately
$20,000 of labor or direct expenses). At this time we would like to set up a revenue account to accommodate
this grant and appropriate the amount as detailed below.
1. Consultant Services ($80,000): To enter into a consultant services contract to assist in the preparation of
the plan. The consultant services contract will be in the amount of $80,000.
S. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED):
Objectives: To develop a long-range regional circulation plan for the Keahole to Honaunau area on the
island of Hawaii. This regional circulation plan will identify future County arterial and collector road corridors
to mitigate present deficiencies and to serve future regional land transportation demand needs based on the
approved Hawaii Long Range Land Transportation Plan, General Plan land use and adopted County zoning
designations. The plan will include recommendations to adopt an official roadway map or other
implementation options to respond to proposed projects that may be impacted by proposed corridors. The
corridor locations and widths will consider multi -modal options.
Project Justification: For certain regions with high development potential, such as the Keahole to Honaunau
region, an intermediate planning level is necessary to bridge the generalized planning framework of the
HLRLTP and the more detailed highway design phases. This intermediate level of detail enables the legal
establishment of proposed arterial and collector corridors in the face of ongoing development so that a
continuous and feasible corridor is available when CIP funds are allotted to design and construct a project.
See attachment for the Department of Transportation approval of the project and commitment of funds.
SIGNED: �. �:—z.;. ; s=-� DATE: fl1;i E Tir
Depwent Head
State of Hawaii
Department of Transportation, . g
MEMORANDUM _r
F STP 8.0052
TO: HWY DATE: OCTOBER 2, 2001
FROM: STP Julia M. Tsumoto)
SUBJECT: FY 2002 SPR PROGRAM, FEDERAL -AID PROJECT NO: SPR -0010(24)
The following FY 2002 SPR Work items have been approved, effective October 1, 2001. We
are awaiting the establishment of the charge codes and work order numbers, and will provide this
information to you as soon as we receive it.
Also, as a reminder, FHWA will not accept any charges to the FY 2001 SPR Program made after
September 30, 2001.
Work Item No. & Title
Part I — Planning, Statewide Projects
Div/Br
I -SW
- 1.02
SPR Program Administration
STP
I -SW -
2.02
Statewide Transportation Planning Process
STP
I -SW -
3.02
Hawaii Statewide Transportation Plan (HSTP)
STP
I -SW -
4.02
Safety Management System Study (SMS)
HWY-T
I -SW -
5.02
Pavement Management System Study (PMS)
HWY-L
I -SW -
6.02
Crash Studies FY 2001 — 2002
HWY-T
I -SW -
7.02
Crash Locations
HWY-T
I -SW -
8.02
Title VI & EJ: Demographic Database Profile
STP
I -SW -
9.02
Update of Bike Plan Hawaii
HWY-T
I -SW -10.02
Highway Performance Monitoring System (HPMS)
HWY-PH
Part I — Planning, County Projects
I -HC -1.02
CTPP — Hawaii County
I -HC -2.02
Hawaii County Regional Forecasting
I -HC -3.02
Hilo Traffic Circulation and Improvement Study
I -HC -4.02
Keahole to Honaunau Regional Circulation Plan
I -KC -1.02
CTPP — Kauai County
i -KC -2,02
Kauai County Regional Forecasting
STP
STP
HC -DPW
HC -PD
STP
STP
Coordinator
K. Tatsuguchi
D. Nakagawa
D. Nakagawa
A. Takeshita
C. Miyashiro
P. Yamamoto
J. Higaki
R. Miyasaki
V. Llorin
G. Sulijoadikusumo
D. Nakagawa
R. Miyasaki
B. Ishii
N. Hayashi
D. Nakagawa
R. Miya.saki
HWY
Page 2
October 2, 2001
Work Item No. & Title (Con't)
STP 8.0052
Div/Br Coordinator
I -KC -3.02
Kapaa Traffic Circulation Study
HWY-K
R. Acob
I -KC -4.02
Comp Roadway Corridor Plan-Kuhio Hwy (Rte
560)HWY-K
F. Reyes
I -MC -1.02
CTPP — Maui County
STP
D. Nakagawa
I -MC -2.02
Maui County Regional Forecasting
STP
R. Miyasaki
I -MC -3.02
Maui Joint State/County Interim Transp Plan
STP
R. Miyasaki
Dart I— Planning, Special Projects
I -SP -1.02 Pavement Distress Recording Equipment Purchase HWY-L S. Ege
& Training
Part I — Planning, Other Projects, Information
I -OP -1.02 Transit Technical Study STP K. Tatsuguchi
I -OP -2.02 Intermodal Management System (IMS) STP D. Nakagawa
I -OP -3.02 Highway Statistics — Finance, Motor Vehicles, HWY-PH S. Tasaka
Drivers & Fuels
Part II — Resea=rch
II -1.02
Research Administration
HWY-LC
A. Makino
II -2.02
Transportation Research Board
HWY-LC
A. Makino
II -3.02
Research Implementation and Technology Transfer HWY-LC
A. Makino
II -4.02
University of Hawaii Research Projects
HWY-LC
A. Makino
1I-5.02
Long Term Pavement Performance (LTPP) Study
HWY-LS
C. Miyashiro
If there are any questions, please contact Ken Tatsuguchi of my staff at 587-2028.
KT:km
c: DEP-J, PPB, HWY-SM, HWY-L, HWY-LC, HWY-LS,
HWY-K, HWY-T, HWY-PH, HC -DPW, HC -PD, STP(DN, RM, KT)
GRANT SUMMARY
(Supplement to B-52, Request for Council Action)
---------------------------------------------------------------------------------------
Typfe of Grant Appropriation bein requested:(New or an additional appropriation)
New (for this fiscal year period).
OR
❑ Additional appropriation (to an existing grant);
Is a draft agreement attached?
Has the original grant notification been transmitted to
Z Yes ❑ No
Council? ❑ Yes ❑ No
Name of Grant Program: State Planning & Research (SPR) Program, Fed -Aid Proj. no. SPR -0010(24)
Grantor: Federal ;Highway Administration through the State (Department of Transportation
County Grantee Department or Agency: Planning Department
County Grantee Contact Person: Roy Takernoto
Amount of Grant: $80,000.00
Phone Number: 961-8288
Grant Period (Commencement & Completion): October 1, 2001 to September 30, 2002
Purpose of Grant: Prepare the Keahole to Honaunau Regional Circulation Plan.
County Match required?:
❑ Yes ❑ No
If yes, Matching Amount?
$20,000 Budgeted in account# : 5141-01-011
In-kind? Explain: Entire snatch is labor or direct expenses (e.g., meals, per diem).
Explanation:
County's personnel requirements: Amount of new position(s)? No new positions.
Qty: Permanent: ❑ Temporary: ❑, Duration:
Fell -time: ❑ Part-time: ❑, Time Element:
Qty: Contractual: ❑ Explain:
Explanation: The County's match will include labor from the Deputy Managing Director, Deputy
Planning Director, Public Works Engineer, Mass Transit Director and
various planning staff.
Additional Comments about Grant: The $80,000.00 grant will be used for a contract with a private
consultant.
B-52 Grant Summary Form