April 1, 2002
Mr. James Leonard, Managing Director
PBR Hawaii -Hilo
101 Aupuni Street, Suite 310
Hilo, HI 96720-4276
Dear Mr. Leonard:
Change of Zoale ®rdinance No. 88-158 (REZ 609) Coaaditioa~ U
Specia110~Ianagerrlent Area Use Permit No. 273
Special 1Vlanagenlent Area Use Permit No. 311
Applicant: ~VI3 I~ukio Resorts, LLC
Subject: Annual Progress Report
TIVII~: 7-2-4:16; 7-2-16:1-8; 7-2-17:1-32; 7-2-18:1-33; 7-2-19:1-30;
7-2-20:1-26
This is to acknowledge receipt your February 12, 2002 letter providing an annual
progress report, as required under Condition U of the above referenced ordinance. We
have reviewed the annual report and have no objections to statements made, nor do we
have any additional comments to make in regards to compliance with conditions set forth
in the ordinance.
Thank you for your attention to this matter. By copy of this letter, the annual progress
report will be forwarded to the County Council and the Planning Commission for their
information.
Com?Y'i, No<
File No._
Ref. > _
~,ef. date rJ ~ ~
Mr. James Leonard, Managing Director
PBR Hawaii -Hilo
Page 2
April 1, 2002
We look forward to receiving your next annual report on or before October 27, 2002.
Should you have any questions, please contact Eileen O'Hora-Weir or Susan Gagorik of
our Hilo office at 961-8288.
Sincerely,
/
j
CHRISTOPHER N
Planning Director
EOW:pak
p:lwpwin60\eileen\letters\LKukioREZ609SMA273&311 eow
cc w/report: Planning Department -Kona
/~Iawali County Council
Planning Commission
_ +j•.:
::::l,.
LAND PLANNING ~ ~ - ~ i ~
LANDSCAPE ARCI~7'ECTURE ~ ~ - - -
ENVIRONMENTAL STUDIES February 12, 2002
1.-__. ,
Wn-t. FYiaNxBxANbi: ~A~LA
Crtutwrav Mr. Christopher Yuen, Director
Planning Department
'IY3omAS s: wr~EN, AsLA County of Hawaii
PR~'3'7D6NT
25 Aupuni Street, Room 109
srhb Di~r_~ni~~. , Hilo, Hawaii 96720
~'xsct 7n'~ t r f
RiISSE 's:J. F7[r.<.;. ~1i.;', s'x ~1: q~v~e r~~y~~r~~~o~ ig~y~Qp~ygy~~s~e
EY ( r I} < Pn°i~-r~T;' ~ ~ ~ i7F~ ®i.` ~s® ~i196a1~~+~s ~~-1~~
~P~~ Ate l A i<JSI~ N®. X73
l~~ LTS F~ 1~I®. 31 ~
~ ~I}I~~IA~'~T2: ~ PLC
~r5, r>« ~ : 3I~I~9 ~~AC~ (~oa~xi~1~~ ~e~ent K®n~
s ~ . . C®t~ ORS
< , : 7-~-04:1C; 7-~-~~: ~-~-17:1-32;
7-~-1~:1-~~; 7-~-19:1-3®; 7-~-~®:1-26
z: < > ~ .2 `S' Dear Mr. Yuen:
On behalf of WB Kukio Resorts, LLC (WBK), the following is a report on
the status of development and compliance with the conditions of
approval for the subject Change of Zone Ordinance and Special
Management Area-Use Pey-xr~its related to the resort development.
Status of Development
WBK has made substantial progress in the development of the resort
property at Kuki`o. Related to the development of the project's water
system, in August of 2001 WBK received Board of Land and Natural
t` f Resources (BLNR) approval allowing for the construction of water utility
F,~~ ~ r improvements on State lands which will connect Kuki`o's mauka potable
' ' ` wells with the resort property. In October of 2001 WBK also received
_ BLNR approval to enter into a direct lease of approximately 3.5-acres for
utility purposes, and to initiate construction of other related water utility
improvements on State lands including a water treatment plant, water
~;,~:>r;, tank and an irrigation reservoir.
.
roc E
~ On the County level, WBK has received several approvals related to the
Kuki`o development. In January of 2001, WBK received Final Plan
` Approval for the Hotel Complex (Beach Club) and revised Plan approvals
on August 11, 2000 and September 20, 2001. In May of 2001, WBK
received Final Plan Approval for the planned improvements at Kikaua
~ t ~ s f:; r Point Park and Final Plan Approval of the Wastewater Treatment Facility.
f. s':
3
.5:~~ SS'' ~q.p}. r
Mr. Christopher Yuen, Director
SiT6~TECT: AIoTNUAI. PI2®~IZESS 1tEP®12T
CI~1®TCYE Z®NE ®I~INa~NCE ~~-155
SPECIL~ ~(~ElOidENT A USE PlER1VIIT N®. x°73
SPECK AGEIVIENT A USE PENT N®. 311
® I~/I~EVEI,OPEl~: I~UI~YO ®1STS, I.IeC
I)E~EIeC3P NT: I~UI~IO iiEACI~ (Po~all~ 12e~ent I~oraa Coat)
®1tT; T KEYS: 7-~-®4:16; ~-~-16:1-5, ~-~-1~:1-32;
~-2-15:1-33; '7-~-19:1-30; ~-~-2®:1-26
February 12, 2002
Page 2
Grading Permit approvals for the various infrastructure related improvements
for the water utility and roadways in the mauka area acid golf course in the
makai areas have also been received.
At this point in construction WBK is nearly complete (80%) with construction
of the Phase lA infrastructure and roads including the project access from
Queen Ka`ahumanu Highway and has initiated the golf course construction on
both the mauka and makai portions of the property. Construction of the Beach
Club has also started and is expected to be substantially completed by the end
of 2002 concurrent with the structural improvements (restrooms and
pathways) at Kikaua Point Park.
Compliance With Conditions of A.pnroval
Attached for your reference is a set of charts that outline the various conditions
of approval and the status of compliance with these conditions. You will note
that nearly all conditions of the subject ordinance and permits that can be met
at this time have been addressed, and the only remaining conditions that have
not been fully complied with are primarily those that are to be addressed in the
course of development.
Should you have any questions regarding this report or require additional
information, please do not hesitate to contact me at 961-3333.
Sincerely,
PBR HAWAII
AMES M. LEONARD, AICP
Managing Director -Hilo Uffice
Enclosures.
xc: Sam Ainslie, WB Maniniowali BJ Kobayashi, Kobayashi Group
Wally Campbell, WB Maniniowali Kathy Inouye, Kobayashi Group
E. Divita, Discovery Land Kevin Kasai, Kobayashi Group
Carl Carlson, WB Maninowali Steve Lim, Carlsmith Ball
Milton Morinaga, WB Kukio Tom Witten, PBR Hawaii
Annual Progress Report 2002.wpd
V6TB Kukio
Change of Zone Ordinance No. 88-158 - (October 27, 1988)
2002 Anaaual Progress Deport
February 12, 2002
Ord 88-158/ A Comply with Stated Conditions of Approval. C?n-going WB Kukio(WBK) agrees to comply with all stated
conditions of approval as stated below.
Ord 88-158/ B Provide proof of a private water well(s) of Complied A Water Engineering Report was approved by the
such quality and quantity adequate to meet Department of Health-Safe Drinking Water Branch
the needs of the proposed development. (DOH-SDWB) on June 8, 2000. The County of
Hawaii Department of Water Supply (DWS)
confumed on July 17, 2000 that Condition B had
been met.
Ord 88-158/ C Submit Preliminary Subdivision Plans within Complied In October of 1989 the prior owner, Huehue Ranch
one year of the effective date of SMA Use Associates, L.P. (HRA), received a one year
Permit 273 (October 27, 1988). extension of time to meet Condition 3 and
Ordinance 88-158 Condition C. In meeting the
condition, Preliminary Subdivision Plans were
submitted to the Planning Department on October
I5, 1990 although action on the Tentative
Subdivision Approval was deferred.
Submit Final Subdivision Plat Maps within Complied Following purchase of the property by WBK, a
one year from the date of Tentative revised Subdivision Plan was submitted and
Subdivision Approval. Tentative Subdivision approval was received on
February 4, 2000. In meeting Condition C, Final
Subdivision Approval was granted on August 1 I ,
2000.
Ord 88-158/ D Approval by the Department of In process DOT approval of the intersection Construction
Transportation (DOT)-Highways Division of Plans was received on August 7, 2000 (File No.
the Construction Plans for a fully Hwy-PS2.9210). The planned intersection
channelized intersection at Queen improvements at Queen Kaahumanu Highway are
Kaahumanu Highway and the proposed resort currently under construction.
entry road.
Ord 88-158/ E Approval of a Traffic Monitoring Program by Complied An updated Traffic Impact Analysis Report (TIAR)
the DOT-Highways Division prior to that includes a monitor program was approved by
obtaining Final Subdivision Approval for any the DOT in a letter dated August 7, 2000.
portion of the proposed development.
Ord 88-158/ F Construct all roadways within the proposed In process Construction Plans for the subdivision roadways for
development in accordance with the the initial phase of development have been reviewed
requirements of the Department of Public and approved by the Department of Public Works as
Works (DPW). part of the Phase IA Final Subdivision Approval.
Construction of the Phase IA roadways is near
completion.
Page -1-
WB Kukio
Change of Zone Ordinance No. 88-158 - (October 27, 1988)
2002 Annual Progress Report
February 12, 2002
Per~ait/ Noe C~~dgte®~ ~tataas ~oa~m~~ts!rSfatus
Ord 88-158/ G Provide roadway connections to the adjacent In process Construction Plans for the subdivision roadways for
property along the southwestern and the initial phase of development have been approved
northeastern boundary at the time of as part of the Phase I Final Subdivision Approval.
development in a manner meeting the The Phase I Subdivision roadways are currently
approval of the DPW. under construction including roadway connections
to the adjacent properties.
Ord 88-158/ H No lots shall have direct access from Queen In process Construction Plans for the project access
Kaahumanu Highway except through an improvements have been approved by the DOT and
access point approved by the State are currently under construction as indicated on all
Department of Transportation. Other access Subdivision Plans, access to all interior lots are from
to the proposed lots shall be from the interior interior roadways.
roadways.
Ord 88-158/ I A drainage system shall be installed meeting In process Construction plans for the project drainage system
with the approval of the Department of was approved as part of the Phase IA subdivision
Public Works. approval and is currently under construction with
the Phase IA infrastructure.
Ord 88-158/ J All residential, commercial and hotel units In process A letter of July 27, 2000 from DOH approved plans
and uses shall be connected to a Sewage for the Kukio Bay Wastewater Treatment Plant.
Treatment Plant, public or private, meeting WBK is currently constructing a private sewage
with the approval of the appropriate treatment plant to service all residential, commercial
governmental agencies. and hotel units in the proposed development. The
proposed sewage treatment plant will have a standby
The Sewage Treatment Plant shall have a diesel power generator to operate the plant in the
stand-by generator to operate the plant in the even of an electrical power outage.
event of an electrical power outage.
Ord 88-158/ K Method used to satisfy an affordable housing Complied WBK has provided the County an in-lieu payment
requirement must be approved by the Office of $236,000.00 in satisfaction of the affordable
of Housing, subsequent to review and housing requirements for the full development and
recommendation and Community in compliance with the County Affordable Housing
Development (OHCD), prior to issuance of Policy as contained in Ordinance 98-1. In a letter
Final Plan Approval for any phase or dated August 9, 2000, the Planning Department
increment of the proposed resortlresidential acknowledges receipt of in-lieu payment and
development. compliance of Condition K.
Page -2-
WB Kukio
Change of Zone Ordinance No. 88-158 - (October 27, 1988)
2002 Annual Progress lZeport
Februargy 12, 2002
Per-nlitr''_°vd ~ _ ~`2~u~~~iot~ ~ta.~u~; ~on~~~ts, St~ta~
Ord 88-158/ L Submit an Archaeological Survey and Coteyplied A full Archaeological Reconnaissance Survey and
Mitigation Plan to the Planning Department Mitigation Plan, prepared by Paul H. Rosendahl,
and the Department of Land and Natural Ph.D., Inc. (PHRI) and approved by the State
Resources (DLNR)-Historic Sites Section for DLNR, Historic Site Preservation Office
review and approval prior to Tentative (HSPO)was submitted to the Planning Department
Subdivision Approval and/or prior to any with the SMA Use Permit application for the
land preparation activity being conducted on infrastructure, golf course development, and
the property. subdivision at Kukio Beach(SMA Permit No. 273).
A Mitigation Plan for Data Recovery, Interim Site
Preservation and Burial Treatment was also
approved by the DLNR -HSPO and the Planning
Director . All data recovery work on the site has
been completed and a report on the findings of the
data recovery phase has been approved by DLNR-
HSPO. Sites recommended for preservation have
been protected with appropriate buffer zones and
protective fencing, as recommended by DLNR-
HSPO. A Final Site Preservation Plan for the Kukio
project was also approved by DLNR-HSPO in a
letter dated May 30, 2001.
Ord 88-158/ M Cease work if unidentified sites or remains On-going Should any unanticipated archaeological sites be
are encountered. uncovered during land preparation, WBK will stop
work immediately and notify the Planning Director.
In such case, work would not resume until
appropriate clearance is given by the Director.
Ord 88-158/ N All proposed buildings, other than those Complied WBK has observed a minimum setback of 100 feet
directly related to the golf course operations, between all buildings and the edge of the fairways,
shall observe a minimum setback of 100 feet greens and tee areas of the golf course, as reflected
from the edge of the fairways/greens/tee in all plans submitted for Plan Approval.
areas of the golf course unless a lesser
setback is approved by the Planning Director.
If deemed necessary, additional setbacks or
other mitigating measures, such as additional
landscaping along certain portions of the golf
course boundaries, may be imposed at the
time of Plan Approval review.
Ord 88-158/ O Submit plans for review and approval of the On-going Should WBK initiate further residential
implementation of the mauka community development within the mauka property, plans for a
park to the Department of Parks and mauka community park will be submitted to P & R
Recreation (P & R) and the Planning Director and to the Planning Director for review and
prior to Final Plan Approval of the first approval prior to Final Plan Approval for the first
mauka residential development. mauka residential increment.
Page -3-
WB Kukio
Special Management Area Use Permit No. 273 - (October 27, 1988)
2002 Annual Progress Report
February 12, 2002
1'er~nitl No- ~:~~ad ~ti®a~ ~ ~l~la~s ~ ~onana~~tsf ~~tatus
Ord 88-158/ P Al] conditions of SMA Use Permit No. 273 Complied Satisfaction of these related conditions are
and Q will be complied with. addressed separately under SMA Use Permit No.
273 prior to Final Plan approval for the first mauka
residential increment.
Ord 88-158/ R Comply with Chapter 205A, HRS, relating to In process All development has been in compliance with
Coastal Zone Management and Rule 9 of the requirements of Chapter 205A, HRS.
Planning Commission relating to Special
Management Area
Ord 88-158/ S Submit an SMA Use Permit Application for Complied The prior owner, HRA, submitted an SMA Use
the first hotel within 3 years from the Permit application for the hotel development on
effective date of this Ordinance. October 5, 1990 and received Permit Approval on
January 31, 1991 (SMA Use Permit No. 311).
Ord 88-158/ T Comply with all applicable laws, rules, On-going WBK will comply with all applicable laws, rules,
regulations and requirements. regulations and requirements.
Ord 88-158/ U Provide Annual Progress Reports. In process WBK will provide Annual Reports to the County in
accordance with this requirement.
Page -4-
WB Kukio
Special Management Area Use Permit No. 273 - (July 29, 1988)
2002 Annual Progress Report
February 12, 2002
~'eff~g~; Ntso ~~n~i~fl~ StaYats ~afnme~a~s~ Sfia~us
SMA 273/ 1 Effective Date of SMA Use Permit 273. Complied The SMA Use Permit became effective
simultaneously with the effective date of the Change
of Zone request (October 27, 1988)
SMA 273/ 2 Comply with Stated Conditions of Approval. On-going WB Kukio(WBK) agrees to comply with all stated
conditions of approval as stated below.
SMA 273/ 3 Submit Preliminary Subdivision Plans within Complied In October of 1989 the prior owner, Huehue Ranch
one year of the effective date of SMA Use Associates, L.P. (HRA), received a one year
Permit 273 (October 27, 1988). extension of time to meet Condition 3 and
Ordinance 88-158 Condition C. In meeting the
condition, Preliminary Subdivision Plans were
submitted to the Planning Department on October
15, 1990 although action on the Tentative
Subdivision Approval was deferred.
Submit Final Subdivision Plat Maps within Complied Following purchase of the property by WBK, a
one year from the date of Tentative revised Subdivision Plan was submitted for
Subdivision Approval. Tentative Subdivision approval which was received
on February 9, 2000. Final Subdivision Approval
was granted on August 11, 2000.
Subdivision Plans affecting lands adjacent to Complied A 1 SO-foot wide planting easement along Queen
Queen Kaahumanu Highway shall denote a Kaahumanu Highway is designated on all
150-foot wide planting easement adjacent to Subdivision Plans submitted for approval. As noted
and along each side of Queen Kaahumanu in the letter dated July 27, 2000, the Applicant plans
Highway. to leave the entire area within the 150-foot planting
easement in its natural state. Structural
improvements in this area would be limited to
signage, entry features and infrastructure related
improvements such as roads and utilities.
Page -5-
WB Kukio
Special Management Area Use Permit No. 273 - (July 29, 1988)
2002 Annual Progress Report
February 12, 2002
Permit/ No. Co~aditi€a>t~ Sta~i>« Comnieaats/ Status
SMA 273/ 4 Submit for Plan Approval review to the Complied In meeting Condition 4, plans for the resort golf
Planning Department plans for the golf course and clubhouse were submitted for Plan
course and clubhouse within one year of Approval on October 27, 1989 by the prior owner,
effective date of SMA Use Permit 273 Huehue Ranch Associates (HRA). HRA had
(October 27,1988). received Grading Permit Approval for the resort
golf course on March 18, 1992 at which time HRA
initiated the grading (mass excavation) of the resort
golf course. Construction of the HRA course was
halted in 1994.
Commence construction within one year In process WBK subsequently received Final Plan and Revised
from the date of receipt of Final Plan Final Approvals for a revised golf course and
Approval and be completed within 3 years clubhouse design August 8, 2000 and September 20,
thereafter. 2001, respectively. Grading permit approval for the
golf course was received in October 2000 and
construction was initiated January 2002.
Completion of the Kukio golf course is expected by
the first quarter of 2004.
SMA 273/ 5 Provision of a fully channelized intersection In process DOT approval of the intersection Construction
at Queen Kaahumanu Highway and the Plans were received on August 7, 2000 (File No.
proposed resort entry road meeting the Hwy-PS2.9210). The planned intersection
approval of the Department of Transportation improvements at Queen Kaahumanu Highway are
(DOT)-Highways Division. currently under construction.
SMA 273/ 6 Approval of a Traffic Monitoring Program by Complied An updated Traffic Impact Analysis Report (TIAR)
the DOT-Highways Division prior to that includes a monitor program was approved by
obtaining Final Subdivision Approval for any the DOT in a letter dated August 7, 2000.
portion of the proposed development.
SMA 273/ 7 Construct all roadways within the proposed In process Construction Plans for the subdivision roadways for
development in accordance with the the initial phase of development have been approved
requirements of the Department of Public as part of the Phase I Final Subdivision Approval.
Works (DPW). The Phase I Subdivision roadways are currently
under construction.
SMA 273/ 8 Provide roadway connections to the adjacent In process A roadway connection to the adjacent properties
property along the southwestern and indicated is within the approved Phase IA
northeastern boundary at the time of Subdivision Plans and will be constructed in
development in a manner meeting the conjunction with the subdivision roadways.
approval of the DPW.
Page -6-
WB I~ukio
Special Management Area Use Permit No. 273 - (July 29, 1988)
2002 Annual Progress Report
February 12, 2002
P~~°mgtl N~so ~o~diti~n State Iv`e~~m~entsl Status:
SMA 273/ 9 Submit for approval to the Planning Complied In a letter from the Planning Director dated October
and 10 Department a Water Quality and Marine Life 8, 1991, the Water Quality and Marine Life
Monitoring & Mitigation Plan &Anchialine Monitoring & Mitigation Plan & Anchialine Pond
Pond Management Plan (Plans) Management Plans were approved with the
understanding that the Plans may be updated over
time to reflect the new monitoring protocols under
development by the Task Force on Water Quality
Monitoring for West Hawaii. Final Plans
addressing the proposed protocols were submitted
for PD approval on October 31, 1991.
The Plans have been further updated by WBK to
reflect changes to the overall project Master Plan
and to better detail the implementation procedures
of the Plan. The updated Plan (November 10, 2000)
was approved by the PD on December 10, 2000.
SMA 273/ 11 Submit an Archaeological Survey and Complied A full Archaeological Reconnaissance Survey and
Mitigation Plan to the Planning Department Mitigation Plan, prepared by Paul H. Rosendahl,
and the Department of Land and Natural Ph.D., Inc. (PHRI) and approved by the State
Resources (DLNR)-Historic Sites Section for DLNR, Historic Site Preservation Office on January
review and approval prior to Tentative 8, 1990. A Mitigation Plan for Data Recovery,
Subdivision Approval and/or prior to any Interim Site Preservation and Burial Treatment was
land preparation activity being conducted on also approved by the DLNR -HSPO and the
the property. Planning Director . All data recovery work on the
site has been completed and a report on the findings
of the data recovery phase has been approved by
DLNR-HSPO. Sites recommended for preservation
have been protected with appropriate buffer zones
and protective fencing, as recommended by DLNR-
HSPO in consultation with the Hawaii Island Burial
Council. A Final Site Preservation Plan for the
Kukio project was also approved by DLNR-HSPO
on May 30, 2001.
SMA 273/ 12 Cease work if unidentified sites or remains On-going Should any unanticipated archaeological sites be
are encountered. uncovered during land preparation, WBK will stop
work immediately and notify the Planning Director.
In such case, work would not resume until
appropriate clearance is given by the Director.
Page -7-
WB Kukio
Special Nlanageinent Area Use Permit No. 273 - (July 29, 1988)
2002 Annual Progress Report
February 12, 2002
Permit/ No. Co~di>Edon Status Coua~nets/:Status
SMA 273/ 13 A mauka-makai public access shall be In process A Comprehensive Public Access Plan was
provided. A lateral pubic access throughout submitted to the Planning Department for review
the length of the property shall also be and approval in June 1991. The Plan provides for
provided. A minimum of one public mauka-makai access from the highway to the
shoreline parking stall for every ten hotel and shoreline and lateral access throughout the length of
residential units and a restroom/shower the property. An updated Public Access Plan
facility shall be provided at the mauka-makai (October 2000) reflecting the changes to the project
access. An easement shall be recorded with development and detailing the measures for
the State Bureau of Conveyances for the implementation was submitted by WBK and
public access and parking area. The location, received the Planning Director's approval on August
time of construction and/or availability, 9, 2000.
restriction on use, signage, and related
improvements for the public shoreline access Preparation of the Shoreline Public Access Plan and
and parking area shall be approved by the planning for the proposed Kikaua Point Park
Planning Director. Best efforts shall be used (disputed parcel) have been coordinated with DLNR
to secure the necessary governmental permits and the Planning Department to ensure that access
for the development of an ocean front park to and along the shore is maintained over this
on the makai side of the property tot he south portion. Applications for a Conservation District
of the existing beach. Use Permit and Special Management Area Use
Permit (SMA No. 336) allowing for the proposed
park improvements have been approved by the State
and County, respectively.
Public Access and park related improvements are
currently under construction and are planned to be
completed and open to the public concurrent with
the opening of the hotel (Beach Club) facilities in
late 2002_
An easement will be recorded with the Bureau of
Conveyances prior to the opening of the public
access and parking area.
Parking stalls will be provided in a ratio of one
parking stall per every ten resort (residential and
hotel) unit.
SMA 273/ 14 Use of pesticides and herbicides shall On-going Pesticide and herbicide use at Kukio will comply
conform with applicable regulations of with all applicable State and Federal regulations.
appropriate government agencies.
SMA 273/ 15 Minimize dust and runoff sedimentation. On-going WBK has implemented a regular program for dust
Measures shall be in compliance with and erosion control which is in conformance with
construction industry standards and practices construction industry standards and practices.
utilized during construction.
Page -8-
WB Kukio
Special Management Area Use Permit No. 273 - (July 29, 1988)
2002 Annual Progress Report
February 12, 2002
P~rnait/ No C~~~ilEioa~ Status C®Fasmentsi' St~Ius
SMA 273/ 16 All residential, commercial and hotel units In process In a letter of July 27, 2000 DOH approved plans for
and uses shall be connected to a sewage the Kukio Bay Wastewater Treatment Plant. WBK
treatment plant, public or private, meeting is currently constructing a private sewage treatment
with the approval of the appropriate plant to service all residential, commercial and hotel
governmental agencies. The sewage units as part of the Kukio infrastructure
treatment plant shall have a stand-by development in the proposed development. The
generator to operate the plant in the event of proposed sewage treatment plant will have a standby
an electrical power outage. diesel power generator to operate the plant in the
event of an electrical power outage.
SMA 273/ 17 All proposed buildings, other than those Complied WBK has observed a minimum setback of 100 feet
directly related to the golf course operations, between all buildings and the edge of the fairways,
shall observe a minimum setback of 100 feet greens and tee areas of the golf course, as reflected
from the edge of the fairways/greens/tee in all plans submitted for Plan Approval.
areas of the golf course unless a lesser
setback is approved by the Planning Director.
If deemed necessary, additional setbacks or
other mitigating measures, such as additional
landscaping along certain portions of the golf
course boundaries, may be imposed at the
time of Plan Approval review.
SMA 273/ 18 Develop and submit for review and approval Complied A Job Training Program addressing the operational
a Job Training Program for the operating phase of the hotel was approved in an August 9,
phase of the hotels to the Planning 2000 letter from the Planning Director.
Department prior to receipt of Final Plan
approval for each of the proposed hotels.
SMA 273/ 19 Submit for review and approval a Complied A Construction Housing Mitigation Plan pertaining
Construction Housing Mitigation Plan to the to the hotel (Beach Club), including a regular
Planning Department prior to Final Plan reporting schedule, was approved on August 9,
approval for each of the proposed hotels. 2000.
The Plan shall include a regular reporting
schedule to allow the Planning Department to
monitor the construction housing impact.
SMA 273/ 20 Submit for review and approval an Complied An Emergency Preparedness and Response Plan
Emergency Preparedness and Response Plan was submitted to the Planning Director and Civil
to the Planning Director and the Civil Defense Agency. The County Civil Defense
Defense Agency prior to occupancy of the approved the plan on October 23, 2000 and a copy
first hotel or residential development. of the approved Plan was provided to the Planning
Director.
SMA 273/ 21 All utility lines shall be underground. In process In compliance with Condition 21, all utility lines
within the Kukio development are being placed
underground.
Page -9-
W16 I~ul~io
Special Nlanagenaent Area Use Perffiit 1010.273 - (July 29, 198)
2002 Annual Progress Report
February 12, 2002
P~r~xaBt+~`~oo ~ '~an~lif~g~n ~t~tus ~€t~~-e~t~~ ~ta~~s
SMA 273/ 22 No improvements shall be allowed within the Complied No improvements are currently planned within the
40-foot shoreline setback area unless a 40 foot shoreline setback area.
Shoreline Setback Variance has been applied
for and granted by the Planning Commission.
SMA 273/ 23 Comply with all affected conditions in the On-going All affected conditions in the Change of Zone
accompanying change of zone. application will be complied with.
SMA 273/ 24 Comply with all applicable laws, rules, On-going WBK will comply with all applicable laws, rules,
regulations and requirements. regulations and requirements.
SMA 273/ 25 Provide Annual Progress Reports. In process WBK will provide Annual Reports to the County in
accordance with this requirement.
SMA 273/ 26 A Time Extension for compliance with the On-going WBK acknowledges that a Time Extension for
Conditions of Approval may be granted. compliance with the Conditions of Approval may be
granted by the Director.
Page -10-
~ Kuki~
Special 1Vlanagemeaa~ Area Use Peranit 1®Im. 311 - (~ebruary .15,1991)
2002 r~naaeaal l'r®gress 1Zep®rt
FebruargT 12, 2002
SMA 311/ 1 Comply with Stated Conditions of Approval. On-going WB Kukio (WBK) agrees to comply with all stated
.conditions of approval as stated below.
SMA 311/ 2 Submit-Plans for the hotel development to C®mplied Several extensions of time- were requested by the
the Punning Department. Secure Final Plan prior owner, IIRA, and. granted by the Planning
Approval within eighteen months from the Director, thereby extending the date in which to
effective date of the SMA Use Permit. secure Final Plan Approval for the proposed hotel
development to 3uly 31, 1995. On May 30, 1995,
HRA submitted- a request;to the County Planning
Commission for a furt~tex extension of time in which
to comply with this .condition. At a public hearing
on September i4, 1995, the Planning Commission
granted a request to allow an additional five years
(to September 28, 2000) in which to obtain Final
-Plan Approval for hotel development. In meeting
Condition 2, Final Plan Approval for the hotel
(Beach Club) was issued on August 8, 2000.
SMA 311/ 3 Commence construction within one year On-going Construction is proceeding in a imely manner and
from the date of receipt of Final Plan in compliance with Condition 3.
Approval and be completed within two years
thereafter.
SMA 311/ 4 Submit Preliminary Subdivision Plans for-the Complied Preliminary Subdivision Plans for the proposed 43-
single-family residential development within lot single-family residential development were
one year from. the effective date of this submitted to the County Planning Department in
permit 3anuary 1992 .although action on the Subdivision
Application was deferred. Revised Preliminary
Subdivision Plans were submitted by WBK on
November 22, 1999- and Tentative Subdivision
Approval was received on February 4, 2000.
Secure Final Subdivision Approval within Complied Final Subdivision Approval for the initial phase of
one year from the date of receipt of Tentative development (Phase I) was- received by WBK on
Subdivision Approval. August 11, 2000.
SMA 311/ 5 All proposed buildings, other than those C®mplieal WBK has observed a minimum setback of 100 feet
directly related to the golf course operations, between all buildings>and the edge of the fairways,
shall observe a minimum setback of 100 feet greens and tee areas of the golf course, as reflected
from the edge of the fairways/greens/tee in all plans submitted-for Plan Approval.
areas of the golf course unless. a lesser
setback is approved by the Planning
Director.
If deemed necessary, additional setbacks or
other mitigating measures, such as additional
landscaping along certain portions of the golf
course boundaries, may be imposed at the
time of Plan Approval review.
Page -11-
WB Kukio
Speeial Management Area Use Permit No. 311 -(February 15, 1991)
2002 Annual Progress 12eport
February 12, 2002
.~et-mill ?~c~. '1?'t3at~t~®~' Status ~~a~s~ae~t~~,~ ~~a~us
SMA 311/ 6 Establish a 100-foot setback area from the Comlrlied WBK has adhered to the required setbacks though
Certified Shoreline in which the construction a lesser setback, as provided for in Condition No. 6,
of structures shall be prohibited, unless a has been approved by the Planning Director for a
lesser setback is approved by the Planning Beach Activity Center and Canoe Hale. The 100-
Director. The 100-foot setback line shall be foot setback line has been delineated on plans for
delineated on plans for Plan Approval and Plan Approval.
building permit(s).
SMA 311/ 7 The minimum 40-foot shoreline setback line In process WBK is complying with this condition. No
shall be staked by a registered surveyor prior structural improvements requiring a Shoreline
to any land alterations in the affected area. Setback Variance are currently planned within the
Written confirmation shall be submitted in 40-foot setback area.
conjunction with requested permit(s). No
improvements shall be allowed within the
40-foot shoreline setback area unless a
Shoreline Setback Variance has been applied
for and granted by the Planning Comm~ission.
SMA 311/ 8 Access to the project site shall comply with In process DOT approval of the Construction Plans for the
the requirements of the State Department of access improvements was received on August 7,
Transportation-Highways Division. Access 2000 (File No. Hwy-PS2.9210) and intersection and
improvements shall be completed prior to access related improvements at Queen Kaahuxnanu
issuance of a Certificate of Occupancy for Highway are currently construction.
any portion of the hotel (Beach Club).
SMA 311/ 9 All roadways within the proposed In process All Construction Plans for the subdivision roadways
development shall be constructed in have been reviewed and approved by DPW as part
accordance with the requirements of the of the Final Subdivision Approval process.
Department of Public Works (DPW).
A frontage road, as shown on the In process A frontage road is shown on all Subdivision Plans
Subdivision Plans, shall be constructed and will be constructed concurrent with the
within one (1) year from the issuance of the subdivision roads and within one year from the
Certificate of Occupancy for the hotel issuance of a Certificate of Occupancy for the hotel
development or at such time as required by which is scheduled to occur in late 2002.
the DPW and Planning. Curbs, gutters, and
sidewalks shall be constructed unless
alternate resort roadway standards are
approved by the Chief Engineer and the
Planning Director.
SMA 311/10 A drainage system shall be installed meeting In process Construction Plans for the Kukio drainage system
the approval of the Department of Public have been received and approved by DPW as part of
Works. the Final Subdivision process.
Page -12-
.
W13 Kukio
Special l~l[ana~euaent Area 1Jse PerrBait No. 311 - (February 15,1991)
2002 ~aauual l~a-o~ress Report
la ebruary 12, 2002
i~`~t~~al1 a~~ ~ ~ ~~~t~~~~ ~~~t~t~~ ~~~a~t~stl~~~~ ~sl~~~t
SMA 311/ 11 All residential, commercial and hotel units In process DOH approved of plans for the Kukio Bay
and uses shall be connected to a sewage Wastewater TreatmentPlant was received in a letter
treatment plant, public or private, meeting of .luly 27, 2000. WB'K is currently constructing a
with the approval of the appropriate private sewage treatment plant to service all
governmental agencies. The sewage residential, commercial and hotel units in the
treatment plant shall have a stand-by proposed development. The sewage treatment plant
generator to operate the plant in the event of will have a standby diesel power generator to
an electrical power outage. operate the plant in the event of an electrical power
outage.
SMA 311/ 12 Submit an Archaeological Survey and CompBaed A-full Archaeological Reconnaissance Survey and
Mitigation Plan to the Planning Department Mitigation Plan, prepared by Paul H. Rosendahl,
and the Department of Land and Natural Ph.D., Inc. (PHRI) and approved by the State
Resources (DLNR)~Iiistoric Sites Section for DLNR, Historic Site Preservation Office
review and- approval prior to Tentative (HSPO)was submitted to the Planning Department
Subdivision Approval ancUor prior to any with the SMA Use Permit application for the
land preparation activity being conducted on infrastructure, golf course development, and
she property. subdivision at Kukio Beach(SMA Permit No. 273).
A Mitigation Plan for D«ta Recovery, Interim Site
Preservation and Burial Treatment was also
approved by the DLNR -HSPO and the Planning
Director . All data recovery work on the site has
been completed and a report on the fmdings of the
data recovery phase has been approved by DLNR-
HSPO. -Sites recommended for preservation have
been protected with appropriate buffer zones and
protective fencing, as recommended by DLNR-
HSPO in consultation with the flawaii Island Burial
Council. A Final Site Preservation Plan for the
Kukio project-was also approved byDLNR-HSPO
on May 30, 200.1.
SMA 311/ 13 Cease, work 4f unidentified sites or remains On-going Should any unanticipated .archaeological sites be
are encountered. uncovered Burin. g land preparation, WBK will stop
work immediately and notify the Planning Director.
In .such case, -work would not resume until
appropriate clearance is given by the Director.
SMA 3l 1/ 14 Submit for review and approval an C®naplied An Emergency Preparedness. and Response Plan
Emergency Preparedness and Response Plan was submitted to the Planning Director and Civil
to the Planning Director and the Civil Defense Agency. The. County Civil Defense
Defense Agency prior to occupancy of the approved the plan on October 23, 2000.
first hotel or residential development.
Page -13-
WB I~ukio
Special Managegnent Area Use PerYnit No. 311 - (February 15, 1991)
2002 Annual Progress Report
February 12, 2002
. ~'crnaeYd ?~d¢~e ~~nc~ef~ott ` St2tlu~ +1u`atnas~a~~at~l Sf~Bt~
SMA 311/ 15 Submit for approval to the Planning Complied In a letter dated October 8, 1991 from the Planning
and 17 Department a Water Quality and Marine Life Director, the Water Quality and Marine Life
Monitoring & Mitigation Plan &Anchialine Monitoring & Mitigation Plan & Anchialine Pond
Pond Management Plan (Plans). Management Plans were approved with the
understanding that the Plans may be updated over
The Water Quality and Marine Life time to reflect the new monitoring protocols under
Monitoring & Mitigation Plans shall be development by the Task Force on Water Quality
submitted to and approved by the Planning Monitoring for West Hawaii. Final Plans
Department prior to issuance of a Grading addressing the proposed protocols were submitted
Permit and/or prior to any land preparation for PD approval on October 31, 1991.
activity being conducted on the property.
The Plans have been further updated to reflect
changes to the overall resort Master Plan, and to
better detail the implementation measures of the
Plan and improvements within the ponds. The
updated Plan (November 10, 2000) was approved on
December 10, 2000 by the Planning Department.
SMA 311/ 16 Comprehensive Public Access Plan In process WBK is complying with Condition 16 as set forth
under Condition 13 of SMA Use Permit No. 273.
WBK received approval of the Comprehensive
Public Access Plan on August 9, 2000.
SMA 311/ l8 Minimize dust and runoff sedimentation. On-going Measures have been implemented in concert with
Measures shall be in compliance with industry standards and practices to minimize dust
construction industry standards and practices and run off during construction.
utilized during construction.
SMA 311/ 19 All utility lines shall be underground On-going In compliance with Condition 19 all utility lines
have been placed underground.
SMA 311/ 20 Submit for review and approval a Complied A Construction Housing Mitigation Plan pertaining
Construction Housing Mitigation Plan to the to the hotel (Beach Club) was prepared and
Planning Department prior to Final Plan submitted by WBK to the Planning Department and
approval for each of the proposed hotels. approved on August 9, 2000.
The Plan shall include a regular reporting
schedule to allow the Planning Department
to monitor the constnuction housing impact.
SMA 311/ 21 An employee housing assessment and Complied Condition 21 pertaining to the employee housing
mitigation plan shall be submitted for review requirements for the resort hotel has been addressed
and approval by the Planning Department in as part of the overall resort Affordable Housing
consultation with the Office of Housing and Program. The requirements for employee housing
Community Development (OHCD) prior to have been satisfied through the payment of an in-
Final Plan Approval. lieu fee to OHCD. Confumation of receipt of the
in-lieu payments and satisfaction of Condition 2 ] is
noted in the April 13, 2000 letter from OHCD and
the August 9, 2000 letter from the Planning
Director, respectively.
Page -14-
~V~ I~ukio
Speciaa Management Area Use Perani~ 101m. 311 - (February 15, 1991)
2002 Annual Pr®gress IZep®rt
February 12, 2002
SMA 311 / 22 Develop and submit for review and approval Coanplieal A Job Training Program- addressing the operational
a Job Training Program for the operating phase of the hotel was prepared and submitted to the
phase of the hotels to the Planning Planning Department for review and approval.
Department prior to receipt of Final Plan Approval of the Job Training Program was
approval for each of the proposed hotels. confirmed in an August 9, 2000 letter from the
Planning Director.
SMA 311/ 23 Applicant shall make the best possible use of In process WBK will make use of available cost effective
available cost effective energy savings energy saving technology in the design of the resort
technology in the design of the resort development, to the furthest extent practical.
development. Energy conscious design and technology has been
incorporated into the planning and design of the
resort facilities based on life cycle cost analysis.
Energy conscious design and technology will In process In a letter submitted to the Planning Director dated
be incorporated based on both life cycle cost October 23, 2001, WBK described some of the
analysis and the architecture of the resort. measures that have been incorporated as part of the
project in meeting the requirements of Condition
23. In the design of the project facilities, WBK has
incorporated the following energy savings design
features:
• Use of day lighting;
• Use of natural ventilation;
• Reduction of heating loads through
generous overhangs, landscaping, and
proper building orientation where site
conditions allow;
• Use of low wattage lighting fixtures, where
practical; and
• Use of waste heat recovery in combination
with central cooling facilities;
• The encouragement of solar water heating
and energy conscience design in residential
structures.
SMA 311/ 24 Comply with all affected conditions imposed On-going WBK is in compliance with all other permits and
by the State Land Use Commission, ordinances as detailed in the attached reports.
Ordinance No. 87-49 (Change of Zone) and
SMA Use Permit No. 273.
SMA 311/ 25 Comply with all applicable laws, rules, On-going WBK will comply with all applicable laws, rules,
regulations and requirements. regulations and requirements.
SMA 311/ 26 Provide Annual Progress Reports. In process This report is being submitted in meeting the
reporting requirements of Condition 26.
SMA 311/ 27 Acknowledges that a Time Extension for On-going WBK acknowledges that a Time Extension for
compliance with the Conditions of Approval compliance with the Conditions of Approval may be
may be granted. granted by the Director.