HomeMy WebLinkAboutCOM 0690.003 2000-2002
08/23/02 FRI 08:18 FA% 808 329 2597 NPS Aaloko-~onokohau NHP ~ 001
~latidnaf par!€ 5arooidt ICalgko-Nonakahau 73-4786 Kanaiani StrEet # 14
tt.. U.S. Depaa~4me~rt afi flee Ireri~a®r N3Uanal Histariol P3fic Kailua-Kona, ~Sawai'i 96740
~ $D$ 3Z~-SB87 Phone
808 329-0597 F2x
~C~a®~~~®h~~ Fax
r-~
~~x ~6urrilber : ~ a
~~Z.~~~.~„~5 G
Z 3%G z-
P~g~s doll®~na:
~®a>innr~~mts: ~ ~ d r ~
~ ~ N~ ~ S ~t ~ 67
E7CP~RIEFI~E Y~l.69 d6NBERICA ~ ,
;~f. ~rUG ~ ~0 ~
08/23/02 FRI 08:18 FAg 808 329 2597 NP5 Haloko-Honokohau NHP ~j002
United Mates Department o~ the Interior
~p ~
NA'1'IONAI, PARK SERVICE
~ xAr.ot~o-xoHa~o~aAv Na.~ox~, xrsroxlcAL PAS
73-4786 ICaualani St., A14
Kailua-Kona, Fisu+nfi 9b74Q
August 22, 2002
I~awaii Island County Council
2S Apo~i Street, Room 209
Milo, I~awaii 9b720
Dear lC~awaii Island County Council Meanbers:
Thank you for the oppoxt~mity to comment on the Change of Zone Appkicatiom (REZ 02-
009) frozaa TSA Corporation (TSA), Tl 7-3-051:060, for a change froaxx Open (O) to
Industrial-Commercial Mixed District (1l~ICX-la) to facilitate expansion oftl~e I~lolco
Industrial Park. The National Park Service has taken an active role in This proposed
development since its inception before the State Land Use Commission (LllC). Kaloko-
llonokohau National kliEStorical Park is situated makai of the proposed development and
the existing Phases I and II ofthe industrial park., As demons~ratad before tYae LUC seed
as expressed in our eornments to the Coa~nty Planing Department, the National Park is
priaxaarily concerned with the protection of the pristilze groundwater tbat flows from flee
rnostt~tain mauka ofthe Park (under ali of tk~ zxlaaaka developlraertt) atad into the Park's
nearshore axed coastal waters. 1
he 1r~ark's cultural sad natural resources, inckudix~ the
uaost significant wetland aloaag the Kona coast, axe sustained by this fresh groundwater.
Should this tivater becon~ eontaxniuated, the resources of the National Park are at risk.
Surface water runoff is a sigtuflcar~t nationrvvide problem for grouldwater pollution and,
coz~ssequemtly, oz~e of the greatest threats of this proposed development to the Kati®aa2~1
Park. The LUC found that surface water runoff froat~. roadways is exposed to petroleum
products, metals and other pollutants that threatest the resources of the Tlational Park,
(LUC FFCl,DO, Findixig oflaact 309.) Accordingly, flee LUC imposed signi,~cant
conditions on the nevY development aimed at co~olling and contaaniatg polluted surface
water runoff: But because of arguments gnat fprth by TSA and flze County' during the
LUC hearings, the LUC stopped short of applying surface water ruxtoffmitigation
measures to flee construction and xl~air?tenaxlce of the County roads within the
development. Zt is these roads that tl~e Paz~lc cozxles before the County Council to address.
The Park also requests that the County specifically exclude a particularly threaten~g use
from the planned development co>omlezcial pest coa~trol facilities. I'estieide and
pesticide-related cosnpou~nds are capable of traveling long distasaces, swan when
iraciclentally released into a water source, and aa~e knovvza to cause devastating irnpacis to
aqu~etic resources.
08/23/02 FItI 08:18 FA% 808 329 2597 NPS Raloko-Honokohau NHP I~j003
wring the recezxt County Council meeting on ~.u~gust 13, 2002, JD~'. Stanley Bond., the
Resource Manager from the Park., presented. the ]Park's request that storm. water rtea~of!'
from Coaanty dedicated roadways be treated before enteric the ground and. ihaS the
Cotatxty specifically exclude cox~sercial pest control facilities, fin respoa~se to our
request, the Council asked the .Park to subarait speoi~c written recondations tixat
v+ould address tk~e Patk's concerns. tour reco~rnendatians are as follows:
1~or surface watere~a~rao~ the Park concurs in principle with TS.A satbnaitted engineered,
drawings fqr vegetated swales along all roadways within the proposed devcloprr~ent. The
Park acltnodvledges float these swales will offer some reduction in pollntarits frown roads.
1-Iowever, it is not. adequate for floe water rapt 1roma the swales to be released directly
into dry wells. ~e reca~sesad that the Couoty, like the LUC, acquire that all roadway
dry wells include a catcbraent basaxa, saach that all surface water, after passing through a
vegetated Swale, will run into the catel~ent basin prior to entering the dry well. Catcka
basins help remove sedinaaerits grid larger debris that can pass through a sevale
ura~nitigated. Therefore, the Park submits that an adccluate system of vegetated swages,
catcbrnent basins, and dry wells is an adequ snitigatian rrteasure for storrxa water runoff
froffi roadways within the proposed development.
As for the threat of pesticide releases, the National Park offers the foIIowizzg language
concerning pest coni7roI facilities:
Cor,~u[sxercial pesticide, pest control and/or extermination. facilities aa°e prohibited.
The intent is to exclude cor~nercial businesses based upon use of these products,
including bulk storage, distribution, or manufacturing. The retail sale ofpre~pack~ed
pesticides to the general public ®vould not be erected. The term pesticide iaicludes
herbicides, insecticides, and other related compo`amds.
The lark requests that these conditions be imposed by the County on all devel®pment
mauk~a. of the National Park, including the McClean and ~u developffients.
Itepreseaat$tives o#'ICaloko~Honakohau. National klastorical Park will attend tlic aaext
County Council meeting on August 27`~ to answer any questions the Council meaoabers
may have. Thank you for your consideration of tkae important resources of the National
Park..
Sincerely,
l.Jtie~~
Geraldine Bell
Superintendent