HomeMy WebLinkAboutCOM 0730.010 2000-2002 ,a
Harry Kim Barbara Bell
iYdayor " ~ IDerector
ap°V `h~,MOw,P~~
gp~•OF.HP,pd
Ai~~L4;L~~ dJ~ psi ~bi.l.6+b6~L
~J
DEPARTMENT OF ENi~IIZONMENTAL MANAGEMENT ?
25 Aupuni Street, Room 208 ~ Hilo, Hawaii 96720-4252 ` a -
e
(808) 961-8083 • Fax (808) 96]-8086 ~ ~°-t
r~-~
14IElld®~1NDUM
DATE October 11, 2002
fg"'~
T® Councilman Dominic Yagong
Chair, Parks and Environmental Management Committee
Hawaii County Council
t
FR®IVi Barbara Bell, Directo
SU13,ECT : Waste-Reduction Technology Vendors' Presentations
BARLOW PROJECTS, INC. WORKSHEET
Enclosed is a completed vendor worksheet from Barlow Projects, Inc.
If I can be of further assistance, please don't hesitate to contact me.
attachments
Comm. ~
File Naa
~ Imo.
R,ef. To:
Ref. Bate Qc'T ~ ~ ~Q~~
JNZY OF H,e~
Harry Kim Barbara Bell
Mayor Director
•r,~T ~p
f OF~N~'
~~b~l~~iJ d~~ GL4~.+ii1~~
DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
25 Aupuni Street, Room 208 • Hilo, Hawaii 96720-4252
(808) 961-8083 • Fax (808) 961-8086
CONFIRMED SCHEDULE FOR VENDOR PRESENTATIONS
TO PARKS AND ENVIRONMENTAL MANAGEMENT COMMITTEE
OCTOBER 15 AND 16, 2002
_W
DATE/ dVORKSIiEET
TIIVIE VENDOR TECFINOLOGY CONFIRMED RECEIVED
Oct. 15, 2002:
9:00 A.M. Consutech S stems, LLC Incineration YES
10:30 A.M. Environmental Group Waste to Bldg. Matls. YES
1:00 P.M. Brightstar Environmental Thermal Gasification YES
Waste Recovery Systems, Inc. Anaerobic Digestion NO (See Note**)
Oct. 16, 2002:
9:00 A.M. RealEarth Aerobic Composting YES
10:30 A.M. Enerwaste Intl. Corp Incineration YES
1:00 P.M. CCI Canada Com ostin ,Inc. Anaerobic Di estion YES
2:30 P.M. Barlow Projects, Inc. Mass burn incineration YES
NOTES:
**Waste Recovery Systems, Inc. (Anaerobic Digestion) was invited but is unable to be physically
present. They will be submitting the Vendor Worksheet responses, a video tape, and informational
brochures for the Committee. They are also requesting to be notified if an additional presentation is
scheduled for the council committee.
WOI~I~CSF4EET EOM V~NCOftS OE We4~TE ~E®UCTION TECHNOLOGY
FOR @-lA?W~al'I COUNTY COUNCIL COIUIIIA171`~~
ON Pe4~t~CS AND ~NVIF2ONIV@ENT,AL AAANAGE~49ENT
OCTOBER 15 AND 16, 2002, HILO, HAWAII
NOTE: This is an overview for County Council members, Environmental Management
Commissioners, public and news media.
TYPE OF TECHNOLOGY: Waste-to-Energy, Patented Mass-Burn Combustion System
Name of Company: Barlow Projects, Inc.
Years in Business: Barlow Projects has been in business 8 years. The technology has been
operating successfully for five years.
Contact Person: Jody Allione
Mailing Address: 126 Via Xanthe, Newport Beach, CA 92663
Phone: (949) 675-5775
Email: info(a~barlowprojects.com or iallione adelphia.net or jody(a~mail.com
Website: www.barlowprojects.com
What waste stream components will you process? (glass, metal, plastics, greenwaste, paper
fiber, other) The advantage of a mass-burn style waste-to-energy system is that it is capable
of processing all types of municipal, commercial and light industrial wastes. However,
recyclables can be removed on the front end and ferrous metals can be removed from the ash
stream on the back-end if desired.
What components of the waste stream will you not process? The Barlow process will not be
capable of processing oversize and bulky materials that cannot be fed into the combustion
chamber, nor will it handle construction and demolition (C&D) materials.
What percentage of the waste stream will you divert from landfilling? 90% by volume
What is the composition of any residue (in tons and as a percentage of total MSW)? The
residue is made up of combustion ash and fly ash from the air pollution control system. The
U.S. EPA has stated that ash from a modern waste-to-energy facility is non-hazardous and
safe for land filling. After processing it is 10% by volume of the MSW waste stream.
Is the technology scaleable? Yes, the Barlow technology is scalable from 100 - 400 TPD per
train. Facility's can then be designed (or expanded at a later date) to include multiple trains to
handle larger waste streams.
What is the minimum tonnage you can process daily? The Barlow system can be scaled down
to process as little as 100 tons per day per train.
What is the maximum tonnage you can process daily? The Barlow system can be scaled up to
process as much as 400 tons per day per train.
Capital costs: Capital costs vary depending on the size of the facility in question and local
construction costs but we would estimate that it would be between $100,000 - $125,000 per
daily ton of waste processed.
Annual operating costs: Operating costs should be between $25 - $40/Ton before energy
revenues.
Cost per ton: Should be between $45 - $55/Ton in ahigh-energy market place like Hawaii
Financing possibilities: Barlow offers to develop projects with either Public or Private
ownership options depending upon the needs of the customer.
Acreage needed: A minimum of 5 acres
Power generated (in MW): Depends on waste processed and steam usage. A typical 100 TPD
facility will generate 2 MW net of parasitic loads.
Other end products: A WTE facility can generate steam for process or district heating use or
electricity or both (co-generation)
Risks: None. This is a proven technology.
Environmental impacts: Minimal. Modern waste-to-energy facilities must comply with very
strict EPA air and waste water discharge requirements. Waste ash can be used for a variety of
applications and leachate has been shown to be close to US EPA drinking water standards.
Social impacts: Minimal. A modern waste-to-energy facility will present no more noise or traffic
than a landfill and because the enclosed tipping hall is kept under a negative pressure, pulling
all air through the furnace, odors outside the facility are not a problem. A WTE facility will also
employ between 12 - 16 people working multiple shifts.
Timeline from acceptance to full operation: 18 - 24 months after permitting has been
completed.