Loading...
HomeMy WebLinkAboutCOM 0018.001 2002-2004 d-'• Phillip Rowell and Associates 47-273'D' Hui hra 31reEl Kansd+e~ FkwBN 067M PhMC: (808) 23&820a FAX: (008) R36~4~75 emaitpro~u~J1~BEe.nat December 16, 2002 REI:ENtty Mr, Curl DeWeesa ~ 8 _ . Sunstone Realty Partners, LLP la I ?!o v 1001 t3lstwp StroaL Pauahi Tower, Suite 1250 Ii0' Honolulu, H196813 ~P~ aC Dear Curt: Par your request, attached is a summery of rscgnmendellons of the traffic study for the Alii Cove Condominium project. 1 have provided adtlitional information relative to minimum requirements to accommodate project generated traffic, Very truly yours, PNILLIP ROWELL AND ASSOCIATES V ~ PhilNp J. Rowell, P.E. Principal Comm. No. File No. z (r'taSOAfOd ReF. To: Ret. Date 1 i ZOU2 E/i; 30Vd `•Ytd00~E ZO'9) 030 `,VLSI 588 808 ~A8 1N35 pescription of Proposed Roadway Improvements Alii Cove Contlaminiums 7. Alii Drrve al Lunapula Road The proposeq improvements consist of widening the westbound approach of Lunapula Road within the existing right of way at Atil Drive to provide separate left and right tum lanes. This improvement is shown schematically in the attached graphic. The left taro storage lane should ba a minimum of 10 feet wide and 125-feet long- This will accornmadate the eftemoon peak hour volume of 1331eft turning vehicles and will he Conalstenl with the design criteria of the Amedcan AssoGation of Slate Highway and Transportation Officials. The second modificatlon is to convert the intersedton to an all•way STOP sign controlled intersection. As discussed In the YIAR, traffic along Atri Drive that dose net have fo stop for existing conditions wilt have to stop in Mrs future. The ievet•of-service for AIN Drive traMa wIN decrease. Upon the compledon of the Alii Parkway, this STOP signs could be removed due to the reduced trefflc voume expected at this time. 2. Walua Road ar Kuakini Highway Tha deficient movement at this intersection is the oastbound lea and through movement for Walua Road. This movemem operates al alevel-of-Service (LOS) F during the morning and ariemoon peak periods wittrout and with the pro}ect. To mitigate this deficiency, a median refuge lane should be inatetled along Kuakini Nighway. This would allow left tams from Watua Road to rrorthbountl Kuetdni Higfrway l0 fie completed in two stages. The LOS of the eastbound left turn would tmprova fhe LOS C dunng the rooming and LOS E during the afternoon. The median storage should be a minimum of 10 fcet wide. 3. RaoomrrtertCed No improvements are rewmmentled for the intersection of AIIi Ddve at Walua Road or Walua Road al Lunapula Road. E/I 3JVd °INd00-E i:0-9L~~30 ~YG9i 988 BOB ~A8 1N35 f BY: BOB BB5 1574; DEC-16-n2 3:GDPf~; PAGE 3/3 ALII DRIVE _ OP I I I I fn to z ' -i m ~R`d i -Ni -Nlm rr„yl ` I m SV~ ZgmjO ,i ~ ~ rr.~,l m fit 2 i ~ m~ro m 1 o z v, I o~ I m wz LS m z 1 y I 1 ~ ~ II TQ II Q LIS C II A 'Y) m rte- Z r "a ZT ~ ~ m'f ~ ii n ~ m Cam= O mm~ o a 11 Boa crow " x ~ z~uv ~ p ~ C ~ i i ~ m 11 m ~m~ w a m a ~ Z' ~ i O Q m ~ 1 ~ ~ n m ss pJ t t ~ mZi I, Q ~ II ~ z -1