Loading...
HomeMy WebLinkAboutCOM 0130.000 2002-2004 OrtY h Harry Kim William Takaba 6i~; Mnl or Director Nancy E. Crawford .~j•.;. Deputy Director h OI~M~~ County of Hawaii Finance Department ~ 25 Aupuni Street, Room 118 • Hilo, Ilawaii 96720 (808) 9GI-8234 • Fax (808) 961-8248 February 6, 2003 Honorable James Arakaki, Chairperson and Members of the County Council Hawaii County Council 25 Aupuni Street Hilo, Hawaii 96720 Re: Operating Budget Enclosed is a bill for an ordinance amending the Operating Budget by increasing the Sewer Fund's Fund Balance Reserve for the Equipment Replacement Fund by $1,100,000 and appropriating it to the Replacement Reserve Account. The funds will be used for the Hilo Wastewater Treatment Plant Biotower Pump Replacement ($800,000) and for the King Kamehameha Sewage Pump Station Modifications ($300,000). If there are any questions, please do not hesitate to call the Department of Environmental Management. William Taka a Director of Finance APPROVED: rWY" _ Harry Kr irrf Mayor Enc. 30 Comm. No. cc: Public Works, Environmental Mgt F51e No. t l l `f Ref. To: Ref. Date FEB 1 0 2003 Form B-52 7/18/91 DEPARTMENT OF FINANCE REQUEST FOR COUNCIL ACTION DEPARTMENT: Environmental Management DATE: February 5, 2003 STAFF CONTACT: Peter Boucher PHONE: 961-8338 A. REQUEST: Appropriation of a portion of the Designated Equipment Replacement Fund Balance (2271.21) distributed to the following: Hilo WTP Biotower Pump Replacement $800,000.00 King Kamehameha SPS Modifications $300,000.00 B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): Hilo WTP Biotower Pump Replacement: The scope of this project is to replace the four Biotower pumps which convey flow from the primary to the secondary treatment processes at the Hilo Wastewater Treatment Plant. The original pumps, which were installed as part of the original construction, were of the wrong design and have operated poorly for the life of the plant. Of the original four pumps, only one is currently operational. Kinp Kamehameha SPS Modifications: The scope of the project is the complete renovation of the King Kamehameha Sewage Pump Station in Kona. Originally budgeted to cost $250,000, structural damage identified during design will require more extensive modifications to repair. In addition, the existing stand-by generator has broken down and we curreetly are relying on a portable generator for stand-by power, SIGNED: ~i!%!%i~%~~ ~ DATE: ~ s/~'~l Department Head