Loading...
HomeMy WebLinkAboutCOM 0364.000 2002-2004 J+tV OF GOB Harry Kim Mav~. Christopher 7. Yuen ~r,.n Dimcmr •tf OF~H~~' Roy R Takemoto Deputy Dlrenor ~111tYT~'~J II~ ~lt~lt%~tt PLANNING DEPARTMENT 101 Paaahi Street, Suite 3 Hilo, fiawaii 96"720-3043 (808)961-8288 Fax(808)961-8742 0 ~ w October 1, 2003 c ~ O ~7 z rn Bruce Tsuchida, President ~ 3 Townscape, Inc. ~ ~ 1-n 900 Fort Stree Mall, Suite 1160 ~ ~ ' ~ a D " Honolulu, HI 96813 ~ Dear Sir: SUBJECT: Puna Regional Circulation Plan Project Consultant Notice of Selection SPR Federal Aid Project No. SPR-0010(25) Work Item I-HC-4.03 Puna District. Island of Hawaii We are pleased to inform you that Townscape, Inc. has been selected by the Planning Department as the project consultant to create a Puna Regional Circulation Plan (PROP). The PROP is a State Planning and Research (SPR) Federal Aid Project (No. SPR-0010(25), Work Item I-HC-4.03) providing a grant to develop a regional transportation circulation plan for the exceptionally fast-growing Puna District of Hawaii County. Selection A three-member PRCP consultant selection committee consisting of one representative each from the Planning Department, the Department of Public Works and the PROP Community Advisory Group (CAG) was created to evaluate and rank previously qualified planning and traffic engineering consulting firms. Townscape, Inc. was ranked at the top of a list of five finalists. Fundine The PRCP SPR Federal Aid Project No. SPR-0010(25) provides $120,000 in contract services monies for the entire project. Hawaii County will provide in-kind services totaling $30,082 in labor towards completion of the project. A contract detailing the products and services to be Comm, No. J 6 Ref, Tot ~ Bruce Tsuchida, President Townscape, Inc. Page 2 October 1, 2003 provided by the consultant is being prepared and. after review by Corporation Counsel for legality, will be presented for your review and acceptance. Proiect Obiectives The purpose of the PRCP is to develop along-range regional transportation circulation plan for the Puna area of the island of Hawaii. The PROP shall propose specific County arterial and collector corridors necessary to mitigate present deficiencies and to serve future regional land transportation demands. The RRCP will include recommendations to adopt an official roadway map or other implementation options to respond 1.o proposed projects that maybe impacted by proposed corridors. The corridor locations and widths shall consider multi-modal options. Proiect Description The PRCP shall provide a detailed analysis of the circulation of the Puna district, particularly in the area encompassed by the roughly triangular azea of Puna bounded by the area depicted on the attached map. The Hawaii Long Range Land Transportation Plan (HLRTP), Hawaii County General Plan and adopted County of Hawaii zoning designations shall provide a basis of reference in considering alternatives to accommodate multi-modal options within the corridors. However, these basic tenets shall be subject to critical review as necessarily dictated by the existing transportation patterns and land uses as determined by the results of the project research and CAG input. Townscape, Inc. will be required to work closely with the CAG in defining the projects' scope, methodology, and work plan. The Planning Department has recruited a group of approximately 20 individuals representing across-section of the Puna district subdivisions, community action groups, business interests, landowners, and interested citizens to participate on the CAG. This group anticipates playing an integral role in defining the project's direction and methodology. Up to six (6) meetings will be scheduled by the Planning Department in coordination with Townscape, Inc. and the CAG to facilitate community/consultant interaction. Additionally, the Planning Department will schedule up to three (3) public informational meeting on the project at which the Townscape team will he expected to report on the project's progress and to solicit additional public input. Proiect Duration The 5nal report shall be due not later than eight (R) months from the date of consummation of the construct between Townscape, Inc. and Hawaii County. A written request for additional time to complete the project shall be submitted to the Planning Director for consideration. The request for additional time shall include a description of the circumstances and justification for the request. Bruce Tsuchida, President Townscape, Inc. Page 3 October 1, 2003 If you have any questions, you may call Staff Planner, Larry Brown at 961-8288. Sincerely, `P / - may. .~,i...., k CHRISTOPHER J. YL.J~N Planning Director LMB:mad P:\WPWIN60\Iarry\Puna Regional Circulation Plan\TwnscapeSelect.doc Encl: Project Area Map cc: Ms. Susan Gagorik -Long Range Planning Mr. William Takaba -Finance Department Mr. Thomas frown -Mass Transit /Hon. James Arakaki -Hawaii County Council Hon. Gary Safarik -Hawaii County Council Hon. fob Jacobson -Hawaii County Council