Loading...
HomeMy WebLinkAboutCOM 0569.001 2002-2004Harry Kim Mayor March 24, 2004 AT vwunfv of atxal`i DEPARTMENT OF PUBLIC WORKS Aupuni Center 101 Pauahi Street, Suite 7 • Hilo, Hawaii 96720-4224 (808) 961-8321 • Fax (808) 961-8630 The Honorable James Y Arakaki Council Chairperson and Members of the County Council Hawaii County Council Hilo HI 96720 Subject: Fuel Tax 2004 Proposal Bruce C. McClure Director Ronald K. Takahashi Deputy Director Attached are documents for your information and use in your deliberation of the administrations fuel tax proposal. Fuel Tax 2004 — Highlights This is the five-page document that we handed out at the public information meetings. Fuel Tax Allocation Formula, $50 This is similar to sheet 5 of the above document. It is another example of the same formula but using a second sample price for Kona asphalt. This formula will be more fully explained at the committee meeting. The formula's purpose is to see that each district has the same opportunity to have its roads resurfaced regardless of the cost of asphalt. A formal ordinance will be forthcoming when the new bids are opened for fiscal year 2004-05. Department of Public Works Highway Maintenance Division Budget Narrative for FY 2004-05 This is the department's justification for the additional positions for the Highway Maintenance Division. Comm. No. Ref. To: Ref. Datefflff imL The Honorable James Y Arakaki Council Chairperson and Members of the County Council March 24, 2004 Page 2 Traffic Budget Needs for FY 04-05 Justification for Fuel Tax Increase This is the department's justification for the additional positions for the Traffic Division. Summary of Fuel Tax Resurfacing Projects Contracted vs. Inhouse This is a summary of all of the resurfacing projects that have been completed since the additional 3.8 cents fuel tax was authorized in 1988. Further information on the subject will be provided at the committee meeting. Please note in the comparison that the cost per mile is drastically different. We would like to point out, however, that the figures are slightly misleading because most contracted resurfacing jobs had 24 foot or wider pavements while many of the inhouse projects had roads that were less than 24 feet wide. We look forward to our discussion on this very important issue of how we will maintain our road system that allows each of us to travel to work, shop or play on this very BIG island. - f. &,-ccx� Bruce C. McClure, P.E. Director, Department of Public Works u/:. 1 APPROVED: Harry Kim Mayor, County of Hawaii Fuel Tax 2004 - Highlights What The Administration is proposing to increase the existing 8.8 cent per gallon fuel tax by 4.0 cents (a total of 12.8 cents) to be expended in the highway fund. Concurrently, the Mass Transit will be proposing an increase of 2.0 cents for transportation expenditures, for a collective total increase of 6.0 cents per gallon (a total of 14.8 cents). For an average car with a 20 gallon tank filling up monthly, that's $14.40 additional taxes paid each year. Why • Additional roads are added to our inventory annually. (This does not include roads in limbo) • We are the only County that resurfaces its roads in house. (We save money doing this) • We are unable to keep up with our regular maintenance and operational responsibilities (examples: pot -hole patching, grass cutting, litter pick-up, herbiciding, overhang cutting, culvert & ditch maintenance, road re -striping, installation & repairing street lights & traffic signals). How The value for the fuel tax increase was determined after looking at: • What it would cost to have adequate staff and equipment to maintain our road system. Benefits We would be able to resurface roads on a 20 -year cycle We would be able to keep up with our regular responsibilities — lessen the ratio of number of miles per employee • We would be able to better address traffic flow problems • We would have more traffic division staff in N/S Kona, and N/S Kohala districts to improve maintenance and response times When The administration will submit the fuel tax increase to the County Council in March 2004. Revised: 03/09/04 Page 1 of 5 Fuel Tax 2004 - Highlights Kauai: 13.00 with 220 miles of road and 70 employees ( 3.1 miles/ employee) Maui: 18.00 with 607 miles of road and 130 employees (4.7 miles / employee ) Honolulu: 16.50 with 1,156 miles of road and 400 employees (2.9 miles/ employee) State (Big Island): 16.00 with 335 miles of road and 109 employees (3.1 miles/ employee) Hawaii: 8.80 with 904 miles of road and 136 employees ( 6.6 miles / employee) -Federal: 18.40 Proposal Hawaii: 12.80 with 904 miles of road and 188 employees (4.8 miles / employee) • 5 to 1 Program (i.e. 5 miles of road per employ - Resurface 30 to 35 miles each year (i.e. 20 year - 35 new positions - 13 new pieces of equipment - Implemet upon passage of increase • Traffic Division's Design and Maintenance - 17 new positions: (6 for Design & 11 for Mail - 6 new pieces of equipment - Implemet upon passage of increase Subtotal 5.0 0.0 8.8 9.0 3.8 0.0 12.8 Revised: 03/09/04 Page 2 of 5 Base Local Road Improvements Roads in Limbo Total (Never Sunsets) I (Sunsets after 10 years) HRS§ 243-5, 10, (7/1/55 - 6/30/57) Res 387-88, Original additional 3.80 Res 97-03, Due Aug'04 History Res 147, 1957 Original, 30 Res 192-97, Reauthorized Res 129, 1977 Raised to 50 1904 Res 241-98, Reauthorized to 2008 904 725 + 179 TEA 460 t Miles of Road Kauai: 13.00 with 220 miles of road and 70 employees ( 3.1 miles/ employee) Maui: 18.00 with 607 miles of road and 130 employees (4.7 miles / employee ) Honolulu: 16.50 with 1,156 miles of road and 400 employees (2.9 miles/ employee) State (Big Island): 16.00 with 335 miles of road and 109 employees (3.1 miles/ employee) Hawaii: 8.80 with 904 miles of road and 136 employees ( 6.6 miles / employee) -Federal: 18.40 Proposal Hawaii: 12.80 with 904 miles of road and 188 employees (4.8 miles / employee) • 5 to 1 Program (i.e. 5 miles of road per employ - Resurface 30 to 35 miles each year (i.e. 20 year - 35 new positions - 13 new pieces of equipment - Implemet upon passage of increase • Traffic Division's Design and Maintenance - 17 new positions: (6 for Design & 11 for Mail - 6 new pieces of equipment - Implemet upon passage of increase Subtotal 5.0 0.0 8.8 9.0 3.8 0.0 12.8 Revised: 03/09/04 Page 2 of 5 Personnel: Fuel Tax 2004 - Highlights HIGHWAY FUND - PROJECTED FUEL TAX INCREASE Highway - 35 positions Traffic- 17 positions Supplies Equipment replacement Annual additional recurring expenditures Assumes $820,000 fuel tax revenue per 1 cent One time costs: Highway add'I equipment Traffic W Hawaii new facility Traffic E Hawai'i facility impry Traffic Add'I equipment Add'I materials and supplies Add'I administrative costs (travel, training, etc.) Contractual catch up costs TOTAL ONE TIME ONLY COSTS TO KEEP UP: Available Fund Balance at FY end 6/30/03 TOTAL AN Add Assumed Appropriation lapsing to FB Highway Maint. Traffic $ 1,455,208 837,109 $ 63,100 87,235 $ 700,000 133,000 2,218,308 1,057,344 $ 3,275,652 $ 0.027 $ 0.013 0.04 $ 958,200 $ 850,000 $ 300,000 $ 233,400 $ 450,000 $ 10,700 $ 606,000 $ 2,450,100 (A) $ 3,408,300 $ 2,994,498 $ 500,000 (B) $ 3,494,498 B -A $ 86,198 Assumed fuel tax increase if shortfall (B -A) above ANTICIPATED FUEL TAX INCREASE PER GALLON 0.040 Revised: 03/09/04 Page 3 of 5 Fuel Tax 2004 - Highlights District Item Kau Puna S. Hilo N. Hilo Hamakua N. Miles 61 188 276 102 H E M Existing 10 22 45 20 I P G H L Additional 2 15 6 0 w o A E YE S Total 12 37 51 20 & a S. Kohala N. Kona S. Kona All Island Total 128 149 904 19 20 6 142 3 9 35 22 29 171 E T M Existing 12 5 10 / (27)* 27 R P F o Additional 1 6 10 17 F Y I E C E Total 13 11 20 / (37)* 44 S * Located in East/West Hawai'i but does islandwide Revised: 03/09/04 Page 4 of 5 FUEL TAX ALLOCATION FORMULA Assumptions: -Hot Mix #4 used for almost all repaving jobs, per Highway Division FY04 Cost of AC $ Hilo Local Road Kona Difference $ -Hilo area prices apply to North and South Hilo, Puna, Hamakua, and Hot Mix #2 $ 44.00 $ 69.00 157% South Hilo for 75% of work in North and South Kohala and Ka'u Hot Mix #3 $ 45.00 $ 70.00 156% Hamakua -Kona area prices apply to North and South Kina, and for 25% of work Hot Mix #4 $ 36.00 $ 71.00 197% South Kohala in North and South Kohala and Ka'u Hot Mix #5 $ 51.00 $ 73.00 143% South Kona -AC accounts for 82% of repaving cost Cold Mix $ 57.00 $ 76.00 133% Allotment for 2004-2006: Total 724.1 n/a $ 540,000 $ 188,673 $ PART 1: For other costs $3,000,000 x 18% = $ 540,000 allocated on mileage basis - 18% 238,266 $ 238,30d'% $ 275,700 $ PART 2: For purchase of AC $3,000,000 x 82% = $ 2,460,000 allocated on mileage adjusted for AC cost - 82% 27.9 124% 34.7 4.00% $ 0 $ 3,000,000 20,807 $ 119,160 $ 119,200- $ PART 1 - Allocation formula based on number of miles, to be used for 18% of total: (cost not affected by the price of AC) $ Total Total Adj. Allocation 617,700 $ Local Road Present Allocation $ Miles $ 714,300 Amount Puna 172.4 23.81% $ 128,568 South Hilo 181.5 25.07% $ 135,354 North Hilo 33.2 4.59% $ 24,759 Hamakua 66.5 9.18% $ 49,593 North Kohala 27.9 3.85% $ 20,807 South Kohala 75.2 10.39% $ 56,081 North Kona 84.6 11.68% $ 63,091 South Kona 22.2 3.07% $ 16,556 Ka'u 60.6 8.37% $ 45,193 66.5 Total 724.1 n/a $ 540,000 P Adjusted allocation formula based on number of miles adjusted for the cost of AC, to be used for 82% of total: Local Road AC Cost Weighted Adjusted Adjusted Miles Factor Miles Allocation Allocation -AC Puna 172.4 100% 172.4 19.88% $ 489,132 Part 1 (see above) Other Costs $ 128,568 $ Total Total Adj. Allocation 617,700 $ - : Rounded 617,700 Present Allocation $ Changes $ % Chane Chanc e (96,600) -13.5% $ 714,300 South Hilo 181.5 100% 181.5 20.93% $ 514,951 $ 135,354 $ 650,305 $ 650,300; $ 751,800 $ ` (101,500) -13.5% North Hilo 33.2 100% 33.2 3.83% $ 94,195 $ 24,759 $ 118,954 $ 119,000: $ 137,700 $ (18,700) -13.6% Hamakua 66.5 100% 66.5 7.67% $ 188,673 $ 49,593 $ 238,266 $ 238,30d'% $ 275,700 $ (37,400) -13.6% North Kohala' 27.9 124% 34.7 4.00% $ 98,353 $ 20,807 $ 119,160 $ 119,200- $ 115,500 $ 3,700 3.2% South Kohala' 75.2 124% 93.2 10.75% $ 264,563 $ 56,081 $ 320,643 $ 320,600, $ 311,400 $ 9,200 3.0% North Kona2 84.6 197% 166.7 19.22% $ 472,852 $ 63,091 $ ;' 535,943 $ 535,900 ' $ 350,400 $ 185,500 52.9% South Kona2 22.2 197% 43.7 5.04% $ 124,082 $ 16,556 5 140,638 $ 140,600 $ 92,100 5 48,500 52.7% Ka'u' 60.6 124% 75.1 8.67% $ 213,198 $ 45,193 $ 258,391 $ 258,400 $ 251,100 $ 7,300 2.9% Total 724.1 n/a 867.1 100.00% $ 2,460,000 $ 540,000 $ 3,000,000 $ 3,000,000 $ 3,000,000 $ n/a "AC cost factor is (197% x 25% + 100% x 75%), since 25% of AC for district comes from higher priced Kona sources Page 5 of 5 2 A cost factor is 197%, representing cost differential in Kona vs Hilo AC price FUEL TAX ALLOCATION FORMULA, $50 Assumptions: -Hot Mix #4 used for almost all repaving jobs, per Highway Division FY04 Cost of AC not affected by the price of AC) Hilo Kona Difference -Hilo area prices apply to North and South Hilo, Puna, Hamakua, and Hot Mix #2 $ 44.00 $ 69.00 157% $ 128,568 for 75% of work in North and South Kohala and Ka'u Hot Mix #3 $ 45.00 $ 70.00 156% $ 24,759 -Kona area prices apply to North and South Kina, and for 25% of work Hot Mix #4 $ 36.00 $ 50.00 139% $ 20,807 in North and South Kohala and Ka'u Hot Mix #5 $ 51.00 $ 73.00 143% $ 63,091 -AC accounts for 82% of repaving cost Cold Mix $ 57.00 $ 76.00 133% Allotment for 2004.2006: Total 724.1 n/a $ 540,000 PART 1: For other costs $3,000,000 x 18% = $ 540,000 allocated on mileage basis - 18% Puna PART 2: For purchase of AC $3,000,000 x 82% = $ 2,460,000 allocated on mileage adjusted for AC cost - 82% 22.12% $ 544,186 $ 128,568 $ { 1iF2,755""" $ 3,000,000 714,300 '$ South Hilo 181.5 100% 1 - Allocation formula based on number of miles, to be usi (cost not affected by the price of AC) °Ch3hges, Local Road C iLvl� Arnoun 172.4 23.81% $ 128,568 Hilo 181.5 25.07% $ 135,354 Hilo 33.2 4.59% $ 24,759 kua 66.5 9.18% $ 49,593 Kohala 27.9 3.85% $ 20,807 Kohala 75.2 10.39% $ 56,081 Kona 84.6 11.68% $ 63,091 Kona 22.2 3.07% $ 16,556 60.6 8.37% $ 45,193 Total 724.1 n/a $ 540,000 Part 2 - Adjusted allocation formula based on number of miles adjusted for the cost of AC, Part 1 °Ch3hges, C to be used for 82% of total: (see above) ° _ <��' Local Road AC Cost Weighted Adjusted Adjusted Other Present $ a79 Miles Factor Miles Allocation Allocation -AC CostsL Allocation Puna 172.4 100% 172.4 22.12% $ 544,186 $ 128,568 $ { 1iF2,755""" $ 714,300 '$ South Hilo 181.5 100% 181.5 23.29% $ 572,911 $ 135,354 $ 7Qt,265', $ 751,800 North Hilo 33.2 100% 33.2 4.26% $ 104,797 $ 24,759'1254560"; $ 137,700 •.°�.r 513^/q Hamakua 66.5 100% 66.5 8.53% $ 209,909 $ 49,593 $ 275,700 North Kohala' 27.9 110% 30.6 3.93% $ 96,654 $ 20,807 :' 117`-,4661 $ 115,500 South Kohala' 75.2 108% 81.2 10.42% $ 256,361 $ 56,081 ¢ 2,:4,W 312,440. $ 311,400 North Konaz 84.6 139% 117.6 15.09% $ 371,189 $ 63,091 $ 4340 :$" 434;280 $ 350,400 ;� 83;8$0$3:$?/a SOUIhKOnaz 22.2 139% 30.9 3.96% $ 97,404 $ 16,556 $ 143,560. $ 92,100 $ 21,Sfi5: ',.23,770 Ka'u' 60.6 108% 65.4 8.40% $ 206,589 $ 45,193 $ 251491'..' 251,7$0 $ 251,100 "$ 880;, ' . "Q -3%a Total 724.1 n/a 779.3 100.00% $ 2,460,000 $ 540,000 # 3`881!;000: `$": "3;000,000 $ 3,000,000 'AC cost factor is (139% x 25% i 100% x 75%), since 25% of AC for district comes from higher priced Kona sources 2 A cost factor is 139%, representing cost differential in Kona vs Hilo AC price DEPARTMENT OF PUBLIC WORKS HIGHWAY MAINTENANCE DIVISION BUDGET NARRATIVE FOR FY 2004-05 HIGHWAY MAINTENANCE Over the course of many years, the Highway Maintenance Division has increased its road mileage with the dedication of new subdivisions and roads, the maintenance of additional existing roads, and the addition of Hawaiian Homes subdivisions and roads. Along with the responsibility for these additional roads are the drainage structures and sidewalks. Prior to 1995, our Division did very limited resurfacing of County -maintained roadways. We did a lot of patching which resulted in patches over patches and caused the roadways to be uncomfortable to travel on. This resulted in numerous complaints from the public. When resurfacing projects are scheduled, several districts assist each other in completing a specified project. By doing this, other programs in the districts fall behind schedule or are completely stopped while the resurfacing projects are in progress. For example, our grass cutting programs are halted since these same operators are needed to operate rollers for the resurfacing projects. Road shoulder repairs, pothole patching, overhang trimming, drainage system improvements, etc., as well as responding to complaints from the public are also affected during this period. The resurfacing program is very beneficial and if possible, should continue for the public's safety. At the present rate, all remaining roads should be resurfaced within the next 13 years, then the 20 -year cycle should start again. The continuation of our Division's other programs is just as important for the safety of our citizens - road shoulders should be maintained to provide a safe area for motorists to utilize if the need arises, trees should be trimmed to prevent branches from hitting vehicles, and complaints should be addressed in a timely manner. Our goal is to keep all programs in active operation, be more proactive in planning, and achieve efficient and effective management of resources. Division's Core Responsibilities Our Division's core responsibilities include tree trimming; grass cutting; herbiciding; litter pickup; repairing and patching potholes; manually cutting overhangs; maintaining road shoulders; investigating complaints; maintaining paved/unpaved roads; cleaning and maintaining culverts, ditches and other flood prone areas; maintaining guardrails including replacement, repair, new installations; repairing and maintaining bridges; constructing sidewalks, retaining walls and headwalls; establishing safety programs and conducting training; responding to emergencies, flooding, high winds, earthquakes, volcanic eruptions, evacuations, etc.; providing assistance to Police, Fire, Solid Waste, P&R and other departments/agencies as needed; and other related responsibilities. Tree Trimming Program A used boom truck was purchased around 1990 in an effort to improve our tree trimming program for the entire island- Each district was to use the boom truck for two months out of the year. A smaller boom truck was purchased in 1997 to improve our program's effectiveness and efficiency. These two boom trucks are rotated islandwide and our program has improved. 04 -05 -Budget Narrative with 5 to 1 Prop (2-Yrtdoc Page 1 03/24/04, 12:01 PM Grass Cutting Operation Prior to 1996, our grass cutting operation was that of having one machine with one cutting unit, either a side cutter for shoulder work or a cutting unit to cut the grass on the shoulders. There were two machines following each other for this operation. During 1996, we did research and purchased new cutting machines where one machine had two cutting units. This way, one operator could do both jobs at one time or separately when the need required. We are continually doing research to improve this operation and are looking for better equipment to be more productive and efficient. In fact, in FY 2003-04, we are requesting new truck -mounted boom mowers. These mowers can be driven from the left and operated from the right for visibility and safety. Other major benefits include increased productivity because the mowers can travel to and from work sites at the speed limit; improved safety because of its narrow width and regular traffic speeds, reduced threat of theft or vandalism because it can be brought back to a secure baseyard each night, and it consumes less fuel per mile. Resurfacing Program The resurfacing program started in 1995. Many roads had not been resurfaced for over 50 years. Major portions of County -maintained roads showed signs that resurfacing needed to be done soon; if it was not done, the base of the road would require major repairs resulting in major costs. Our Division requested the use of 50% of the Fuel Tax Increase revenues to address this concern. This request was approved and our resurfacing program began to develop. Inventory of roads, developing a condition standard for each road, developing a contract for the rental of pavers, rollers and trucks were initiated. Equipment was rented from vendors within the district where the resurfacing was done. Computers were also purchased for data storage and recordkeeping. It took our Division five years to reach our goal of 30-35 miles of resurfacing per year. Year Miles Comments 1995 4.40 1996 10.06 1997 13 03 1998 24.82 Projects were on hold due to possible 1999 9.32 fuel tax funding of Mohouli St. FY 99-00 35.16 FY 00-01 23.89 Projects were on hold due to possible FY 01-02 6.45 fuel tax funding of Puainako St. FY 02-03 39.63 Total 166.76 04 -05 -Budget Narrative with 5 to 1 Prop (2-Yr).doc Page 2 03/24/04, 12:01 PM Road Conditions - Islandwide (as of June 2003): Condition Description Miles 1 Excellent 524.46 2 Good 170.56 3 Fair 151.63 4 Poor 39.28 5 Unpaved - Gravel 17_54 Gravel Total 903.47 Road Conditions - Breakdown by Districts (as of June 2003): Condition 3-4-5: 208.45 miles at 30 miles per year = 6.9 years to complete 208.45 miles at 35 miles per year = 6.0 years to complete After 6.0 - 6.9 years, Condition 2 roads will need resurfacing: 170.56 miles at 30 miles per year = 5.7 years to complete After approximately 12 years, Condition 1 roads will need resurfacing: 524.46 miles at 30 miles per year = 17.5 years to complete Then the cycle starts again. 04 -05 -Budget Narrative with 5 to 1 Prop (2-Yr).doc Page 3 03/24/04, 12:01 PM Condition 5 Condition 1 Condition 2 Condition 3 Condition 4 i Un aved- District Excellent Good Fair Poor Gravel Totals So Hilo 181.75 48.98 40.55 80 4.25 276.33 No Hilo 4.85 4.34 17.85 6.6b .30 33.94 Hamakua 14.77 12.11 23.15 1180 5.51 67.34 No Kohala 24.46 1.5085 -- 1.05 27.86 So Kohala 50.71 24.47 23.30 1.08 30 99.86 No Kona 89.71 19.46 13.40 35 122.92 So Kona 13.37 6.10 7.16 26.63 Kau 36.721, 8.03 2.50 12.35 1.00 60.60 Puna 108.1245_57 22.87 6.65 4.78 187.99 Totals 524.46 170.56 151.63 39.28 17.54 903.47 Condition 3-4-5: 208.45 miles at 30 miles per year = 6.9 years to complete 208.45 miles at 35 miles per year = 6.0 years to complete After 6.0 - 6.9 years, Condition 2 roads will need resurfacing: 170.56 miles at 30 miles per year = 5.7 years to complete After approximately 12 years, Condition 1 roads will need resurfacing: 524.46 miles at 30 miles per year = 17.5 years to complete Then the cycle starts again. 04 -05 -Budget Narrative with 5 to 1 Prop (2-Yr).doc Page 3 03/24/04, 12:01 PM Our Division also compared other road maintenance entities within the State and found the following: Entity Resurfacino of Roads Done By State (Island of Hawaii) All work contracted out City/County of Honolulu All work contracted out County of Kauai All work contracted out County of Maui Work contracted out; assist in hauling materials only when County trucks are available County of Hawaii Work done by County employees In FY 2002-03, we purchased a Caterpillar Asphalt Paver. We received it in October 2003 and it will be shared among our districts for use on resurfacing projects. Paver rental costs will then be reduced significantly. Additional Roads From 1997 to 2003, over 58 miles of roads (including drainage facilities) were dedicated to the County with no additional personnel. At the present time, Hawaiian Homes is developing subdivisions throughout the entire island. Upon completion, these roads and drainage structures will also be turned over to our Division for maintenance. Remaining Status Quo With no increase in funding, our Division will need to concentrate on our core responsibilities throughout the island. We will do resurfacing only when the districts have achieved their core responsibilities and resurfacing will be very minimal or not at all. We may have to go back to the old system of patching upon patching. Another alternative may involve overtime, which would include working on Saturdays. Proposed Prooram - 5 to 1 Ratio To address the maintenance of our existing 903.47 miles of roadway, to keep up with our core responsibilities and the yearly addition of roads and drainage structures, the Highway Maintenance Division assessed its programs and determined that 5 miles per employee is a reasonable beginning in addressing this goal. The 5 to 1 Proposal would allow our Division to keep all programs active and to maintain and continually make improvements to the County's roadway transportation system to permit the safe and efficient movement of people and goods around the island. Our Division evaluated the six road districts and found the following (as of June 2003) District Milea4e Employees Ratio (Mi/Emp) S Hilo 276.33 45 6.14 N Hilo/Hamakua 101.78 20 5.09 N/S Kohala 127.72 19 6.72 N/S Kona 149.55 20 7.48 Ka'u 60.60 10 6.06 Puna 187.99 22 8.55 Totals 903.47 136 6.64 04 -05 -Budget Narrative with 5 to 1 Prop (2-Yr).doc Page 4 03/24/04, 12:01 PM Our Division also compared other road maintenance entities within the State and found the following (as of June 2003): Entity Mileage Employees Ratio (Mi/Emp) State (Island of Hawaii) 335.00 109 3.07 City/County of Honolulu 1,156.00 400 2.89 County of Kauai 220.00 70 3.14 County of Maui 607.00 130 4.67 County of Hawaii 903.47 136 6.64 In this proposal, we are requesting thirty-five (35) employees and thirteen (13) pieces of equipment to update our present workforce. This includes twenty-nine (29) Laborer IIs, six (6) Equipment Operator Is, seven (7) 6 -Passenger Dump Trucks and six (6) Truck -Mounted Boom Mowers. We feel a ratio of 5 to 1 is the best workable ratio for the maintenance of roads within our County. Our plan is to budget this over a two-year period, with positions, equipment and associated costs to be requested incrementally. Our 5 to 1 Proposal commenced in FY 2002-03 by establishing eleven (11) new positions. However, due to budgetary constraints, these positions remain unfilled. We now request funding for FY 2004-05 and a fuel tax rate increase may be necessary to fund this proposal. The proposal would accomplish the following: Present 04 -05 -Budget Narrative with 5 to 1 Prop (2-Yr).doc Page 5 03/24/04, 12:01 PM Present Ratio Proposed Employees Mi/Em Add New Proposed Ratio District Mileage (as of June 02) (as of June 02) Positions Employees Mi/Em S Hilo 276.33 45 6.14 6 51 I 5.42 N Hilo/Hamakua 101.78 20 5.09 20 5.09 N/S Kohala 127.72 19 6.72 3 22 5.81 N/S Kona 149.55 20 7.48 9 29 5.16 Ka'u 60.60 10 6.66 2 12 5.05 . Puna 187.99 22 8.55 15 37 5.08 Totals 903.47 136 6.64 35 171 5.28 04 -05 -Budget Narrative with 5 to 1 Prop (2-Yr).doc Page 5 03/24/04, 12:01 PM The breakdown by fiscal year follows: Fiscal Year District Position Cost Equipment Cost 2004-05 S Hilo (5) Lab II $115,885 (1) 6 -Pass $ 40,000 (2) EO 1 52,778 Puna (1) Mower : 110,000 N/S Kohala (2) Lab 11 46,354 (1) 6 -Pass 40,000 $139,062 (1) 6 -Pass (1)Mower 110,000 N/S Kona (7) Lab II 162,239 (1) 6 -Pass 40,000 (2) Mower 220,000 Ka'u (2) Lab II 46,354 (1) 6 -Pass 40,000 Puna 7 Lab II 162,239 (3)6 -Pass 120,000 2 Mower 220.000 Totals (23) Lab II $533,071 (7) 6 -Pass $280,000 (6) Mower $660,000 (New positions budgeted at an 11 -month salary.) Fiscal Year District Position Cost Equipment Cost 2005-06 S Hilo (1) EO 1 $26,389 N/S Kohala (1) EO 1 ;.. 26,389 N/S Kona (2) EO 1 52,778 Puna (2) EO I 52,778 (2) EO 1 6 Lab II 139.062 Totals (6) Lab II $139,062 (6) EO 1 $158,334 (New positions budgeted at an 11 -month salary only. Add positions & associated costs as requested in FY 2004-05.) Fiscal Year District Position Cost Equipment Cost 2006-07 (Add positions & associated costs as requested in FY 2004-05 & 2005-06.) The breakdown by district follows: District Position Equipment S Hilo (5) Lab II (1) EO 1 (1) 6 -Pass (1) Mower N/S Kohala (2) Lab II (1) EO 1 (1) 6 -Pass (1) Mower N/S Kona (7) Lab II (2) EO 1 (1) 6 -Pass (2) Mower Ka'u (2) Lab II (1) 6 -Pass Puna (13) Lab 11 (2) EO 1 (3) 6 -Pass 2 Mower Totals (29) Lab II (6) EO 1 (7) 6 -Pass (6) Mower 04 -05 -Budget Narrative with 5 to 1 Prop (2-Yr).doc Page 6 03/24/04, 12:01 PM Projected additional associated costs include: Fringe Benefits: Current fringe benefit rate is 59.34%. Safety Equipment: Laborer II: $300 per employee for first year $200 per employee for subsequent years Equipment Operator I: $300 per employee for first year $200 per employee for subsequent years Small Tools: Laborer Il: $100 per employee for first year $100 per employee for subsequent years Equipment Operator I: $200 per employee for first year only Equipment Repairs: $1,000 per equipment for first year (year acquired) $1,000 per equipment for subsequent years Fuel/Lubricants: $2,000 per equipment for first year (year acquired) $2,000 per equipment for subsequent years Equipment Parts: $1,000 per equipment for first year (year acquired) $1,000 per equipment for subsequent years Misc Equipment: Mobile Radio: $2,600 per 6 -Passenger Dump Truck Hamakua Basevard - $700.000 (Account No. 5301.02-115 Construction of a new baseyard facility is requested due to the condition of the present facility. The present warehouse is an old military quonset but building that has a leaking roof, electrical problems and requires high maintenance. It has become too small for the storage of our current equipment and supplies. Also, the present facility is not on County property. A possible site (on County property) has been located in the Paauilo area. This would centralize operations for the North Hilo/Hamakua districts and make operations more efficient. Hamakua Road's Office/Misc Equipment - $8,860 (Account Nos. 5301.06-450 and 5301.06-480) Various office and miscellaneous equipment purchases are requested for the new Hamakua Road Baseyard. Roadside Maintenance - Fencing - $190,000 (Account No. 5301.76-115) Fencing installation is requested for new buildings at Hamakua, Kona, Kau and Puna Baseyards. This will protect our equipment/facilities and deter vandalism. 04 -05 -Budget Narrative with 5 to 1 Prop (2-Yr).doc Page 7 03/24/04, 12:01 PM Kohala/Kona Road's Construction & Repair Equipment - $250,000 (Account No. 5301.06-456) Our B -202s will be submitted as: One (1) Tractor Mower w/Rear Mounted Flail Kohala $ 50,000 Two (2) Tractor Mower w/Sickle Bar & Rear Mounted Flail Kohala $115,000 One (1) Extension Tractor Mower Kona $ 85,000 However, we are in the process of purchasing a new type of cutting unit called a Truckat. We anticipate receiving this equipment within a year. If this unit turns out to be more efficient and productive than our current units, then we would like to make a gradual change to these new units. FLOOD CONTROL: The Flood Control's funding request is not more than the current year's budget amount. However, we are asking for an additional $29,062, as submitted in our Supplemental Budget Request. 04 -05 -Budget Narrative with 5 to 1 Prop (2-Vr).doc Page 8 03/24/04, 12:01 PM WHAT I. Normal overhead increases due to inflation. (Basic required needs to operate.) 1. Salaries & Wages 2. Material Costs 3. Electricity Costs 4. Fuel Costs 5. Overhead for New Facilities II. Personnel 1. Administration a. Account Clerk b. Clerk II c. Violations Clerk 2. Engineering Design Team a. Civil Engineer V b. Civil Engineer III TRAFFIC BUDGET NEEDS FOR FY 04-05 JUSTIFICATION FOR FUEL TAX INCREASE WHY (Justification) Cost of salaries, wages and fringe benefits increases. Cost of necessary materials; i.e., poles, fixtures, signal heads, striping, paint, signage, etc. Energy (Power) operating costs for signals, street lights, and facilities. Costs for vehicle fuels. Facility addition in Hilo and new facility in Kona. Office and sensitive electrical equipment housing. Inventory personnel and accounting assistance. Office assistance in administration. Assist the police in nonmoving violations throughout the county. To address traffic engineering problems, concerns, and project designing. Designing and redesigning of roadways, with assistance from CE III. Designing and redesigning of roadways. BENEFITS (Necessary and required item.) (Necessary and required item.) (Necessary and required item.) (Necessary and required item.) (Necessary and required item.) Will address the failed inventory audit. Enable cost savings in more efficient purchasing of materials. Enabling prompt response to all maintenance requests. Allow for accurate control of information received and disseminated. Insures all matters be addressed in a timely manner. Remove parking and other nonmoving vehicle violations that are causing traffic problems. Allows us to be proactive and promptly address safety issues, and improve emergency response. Provides the the expertise needed to help address traffic engineering concerns and safety problems, finding solutions to relieve traffic congestion, manage growth and long term visions, assuring compliance with design and safety requirements. To proactively bring about needed changes. Assists CE V to bring about needed changes. c. Electrical Engineer IV Designing and redesigning of traffic signal systems and street lights, with assistance from EE III. d. Electrical Engineer III Designing and redesigning of traffic signal systems and street lights. e. Drafting Technician Drafting and technician assistance to engineers. f. Construction Inspector (unfunded position) Construction inspection of all traffic engineered roadway facilities. 3. Maintenance Crew a. Electrical Maintenance Supervisor Provide direct supervision of all electrical maintenance crew activities. b. Electrical Helper (East Hawaii) c. Electrical Helper (West Hawaii) d. Lead T/S/M Installer (West Hawaii) e. T/S/M Installer (West Hawaii) f. T/S/M Installer (West Hawaii) g. T/S/M Helper (West Hawaii) h. T/S/M Helper (West Hawaii) Assist the traffic electricians, in Hilo, on all types of work. Assist the traffic electricians, in Kona, on all types of work. Build-up of the Kona signs and markings crew for West Hawaii maintenance work. Build-up of the Kona signs and markings crew for West Hawaii maintenance work. Build-up of the Kona signs and markings crew for West Hawaii maintenance work. Build-up of the Kona signs and markings crew for West Hawaii maintenance work. Build-up of the Kona signs and markings crew for West Hawaii maintenance work. Will provide the expertise needed in the planning and design of new traffic related electrical systems. Also provide assistance in the redesign and upgrade of current signal and street systems. To proactively bring about needed changes. Assist EE IV to bring about needed changes.. Drafting work is to be done in-house to enable construction without delays. Will assure that all traffic projects measure up to county standards. Will make certain thatjobs are done in a timely and efficient manner, planning all work according prior. With public safety being of primary concern. Enable assistance to Traffic Electrician to provide safe and prompt maintenance for all signals and street lights for East Hawaii. Also needed comply with OSHA safety standards. Enable assistance to Traffic Electrician to provide safe and prompt maintenance for all signals and street lights for West Hawaii. Also needed comply with OSHA safety standards. Enable more efficient maintenance work and quick response time for traffic emergencies in West Hawaii. West Hawaii will have improved services in installation and maintenance of traffic control devices. West Hawaii will have improved services in installation and maintenance of traffic control devices. Will assist installers to do the installation and maintenance field work to fulfill the goal of providing improved services for West Hawaii. Will assist installers to do the installation and maintenance field work to fulfill the goal of providing improved services for West Hawaii. III. Miscellaneous Contractual Services a. Underground street light circuit upgrades. Address direct burial safety issues and add underground Provides safety and enhance street light street light circuits in various areas. placement and aesthetics. b. Underground traffic signal circuit upgrades. c. Embedded flashing crosswalk lights. d. Signs and markings catch-up work. IV. Equipment a. 4X2 pickup b. 4X4 diesel pickup Upgrade traffic signal systems and cover unforeseen construction upgrade overruns (underground work). Public safety need oriented projects. Allows the catching -up of backlog work orders. Replace old and high maintenance vehicle. Replace old and high maintenance vehicle. c. Cargo Van New van for Kona electrical maintenance and call -out services. d. 1 -ton diesel pickup Pickup for signs & markings inspections and material hauling for Kona operations. e. Sedan For violations clerk use. f. Miscellaneous Office Equipment For all new Kona and Hilo personnel. g. Computer & AutoCad software Basically the standard drafting program for all engineers, nationwide. h. Computer & software For violations clerk, for ticket, registration and background vehicle searches. i. Computer & software For account clerk inventory and general accounting work. j. Speed Board Motorist education. k. Variable Message Board Motorist education and directions. I. Fork Lift Loading and unloading of heavy supply materials Provides motorist and pedestrian safety. Enhance pedestrian safety. Reduce backlog work orders, for motorist safety. Safer, more efficient, and less maintenance costs of vehicle. Safer, more efficient, and less maintenance costs of vehicle. Enhance Kona operations for electrical maintenance call -outs. Vehicle build-up for Kona operations & maintenance signs & markings crew. Island wide coverage and required vehicle to do job. Required equipment for job function and safety. Keeping with the standard drafting software for engineered drawings. Able to assist in the planning, design and maintenance of traffic facilities. To retrieve vital motorist data from State and Police networks. For computer inventorying and accounting work. Motorist safety and awareness, and to help Police in enforcement of speeding. Road crew safety, public education, and Civil Defense emergency traffic safety. Reduces personnel back and other related injuries. Summary of Fuel Tax Resurfacing Projects Contracted vs. Inhouse Total 337 244.84 $7,790,657.19 $2,297,107.99 $1,470,797.25 $3,679.25 $23,886,726.19 Year Projects Miles Cost Cost / Mile Materials Labor Equipment Misc Total 1988 4 1.93 $223,461.40 $115,783.11 1989 7 8.93 $1,102,179.50 $123,424.36 1990 16 17.51 $2,009,699.19 $114,774.37 1991 6 3.89 $916,915.27 $235,710.87 1992 10 5.57 $1,431,376.42 $256,979.61 `may° 1993 12 9.13 $1,506,361.88 $164,990.35 0 1994 6 5.04 $878,105.94 $174,227.37 1995 5 3.64 $982,404.50 $269,891.35 1996 12 22.44 $3,273,980.41 $145,899.31 Average 8.7 8.7 ( 720 miles at 9 miles per year will take 80 years to do all roads) $177,984.52 1995 2 4.4 $287,496.00 $130,082.56 $77,421.00 $494,999.56 $112,499.90 1996 15 10.06 $551,145.30 $169,686.05 $95,038.89 $815,870.24 $81,100.42 1997 33 13.03 $663,488.05 $217,887.14 $120,541.42 $1,001,916.61 $76,893.06 1998 32 24.82 $931,215.43 $302,632.51 $219,516.71 $1,453,364.65 $58,556.19 1999 19 9.32 $406,101.06 $100,631.10 $92,961.90 $599,694.06 $64,344.86 o 1999-2000 35 35.16 $1,546,731.35 $513,050.90 $371,485.66 $876.00 $2,432,143.91 $69,173.60 c 2000-2001 37 23.89 $1,068,970.00 $231,776.52 $129,285.43 $639.00 $1,430,670.95 $59,885.77 2001-2002 12 6.45 $448,580.00 $129,326.27 $70,227.08 $408.00 $648,541.35 $100,549.05 2002-2003 74 39.63 $1,886,930.00 $502,034.94 $294,319.16 $1,756.25 $2,685,040.35 $67,752.72 Average 28.8 18.5 (720 miles at 19 miles per year will take 40 years to do all roads) $76,750.62 Total 337 244.84 $7,790,657.19 $2,297,107.99 $1,470,797.25 $3,679.25 $23,886,726.19