HomeMy WebLinkAboutCOM 0438.038 2002-2004
05/21/2004 17:57 808-327-1277 BARBARA SCOTT PAGE 01
r
~
2004 ~iNY 2~; A(9 7 44
G,: .
75-5782 ~r;~,i
KaYaa-KOaa,H198740
327.1277
Send tA: NawaH Gmrty Csuadl From: lamas Swl
Atlaitlan: James Arokaki, Council Chaimiaa Date: May 21, 2004
081ce laceloa: Hlb
FaxNum4ec 961.8912
1 Wgani
J RepIY 45AP
Publir.rn~o~;,r~„
iJ PIegSP, rvs~ipa.
'J FOn•pui n;trnpa;t ~.l
tool pages, induding cover. 3
Geslmeab:
Re: Naal Koaa Aina, LLC
15LU 03.007/R¢ 03.018)
Comm. No. 3g• 3g
Ref. To:
Ref. Uata L
05/21/2004 17:57 808-327-1277 BARBARA SCOTT PAGE 02
2i;0'I f
~fiY 2tj ~('1 7 4'i
Barbara srAa
73-3782 Lopeka Place
Kailas-Kona. HI 967.{tl
~i ,
May zJ, zotw
lames Arakaki. Chairman
Hawaii Couny Council
23 Ar;ouni Slrtxa. Suite 209
Hilo, HI 96720
SUBJECT: NANI KONA AINA, LLC
(SI.U 03-007/REZ o3-018)
TM1C: 7-;5.010:066
Based on insufficient infraslntcturc to support this development, 1 reiurate my opposition to the al-lot subdivision
proposed in thAs action
This subdivision. as wc:u us the anbdA~'IaAena An TMK: 7-S-0IO:O87 and TMK: 7-S-ItIO:OSZ BL OG.g. plggybaCk9 IO
the traffic infrastructure provided in Kailas Heights/Kailua View Berates Subdivisions. The subdivision will use
the Nani Kailua DnvaQuccn Ka'ahumenu Highway ExtonslnR intersection for residrntial access to and fmm the
proposed subdn Asutn. Mayor Kim's comments, at the May 4th County Council Meeting, alroady established that
Queen Ka'alutnAanu H ighwa} has reached capacity. Additional residential subdivision approvals, before meeting
current traffic Anfrnstroclure nceds, will further restrict IraJ~c mobility in the North and South Kona districts.
The proposed subdivision has no available potable water. Theoretically, the private agreement the belwcen the
developer and the Dqutrtmcnt of Water Supply addresses the water issue. This alleged agreement has yet to be
presented for public mmmrnt in the dlstria affected - and as far as it appears -them is no actual definitive plan.
'Ilia idea of"appro~~nf~. Abe ~ulxiivision on supposition, that potable water will someday become available. is
irrcsponsiblc.
The subdivision i. u: a drantageway and susceptible to hooding. The ncwl}• drawn FEMA map did not take imo
canstdaration the tJ.S Anm r, ores of Engincers Keopu-Hienaloli Watersheds Feasibility Study that commenced in
2<NJ2 at a total (booty unpaycr cost of 5311,730. The Flood ConU01 project will alter the watershed areas, but the
alteration cstem u i II not be known until the Study has been completed, which is scheduled for no wooer than
January 2(NU;, This. and all slier subdivisions in the Hienaloli 5txtion, should not proceed before an appropriate
assessment of the ahcn;d watershed dynamics is completed.
The subdivision is located in an endangered species flyway, which prm•ides critical habitat. The U.S. Fish &
Wildlife e.peA's request for compromise and cooperation met a declaration, made during the April 2t>th Planning
Committx Meeting. that the species can use the Sfatc parcel to the north of the subject Properly. QtudiSod c~pcrts
generate reconuncnda0onsIor endangered species preservation, not developers or development supporting council
members. The entire Assoc is wvered under Federal Lew, as was pointed out during the Public Hearing on March
Rth, where the U 5 Fish & Wildlife expett read the law in testimony for the public record. SubdAVision
developmem in critical habitat is unaccaptxble without a plan that respxts endangered species preservation.
The proposal to rcmcdy Uaffic infrasttuatve problems, by developing a portion of the Hienaloli-Kahului connector
road project southtxnmd, vvdl create more problems for the current area residrnts than it will whe. Developmem
of the connector road northbound rntdd aaually offer soma traffic relief to the subdivision arcs and Quart
Ka'ahumanu Highvva} Since the County road project is still in the conceptual stage in bah directions, them is tw
reason to consider it ~,;nMe wluGon w the trallic irAflastructtixe problems the proposed subdivision wilt creFne.
05/21/2004 17:57 808-327-1277 BARBARA SCOTT PAGE 03
NANI KONA AINA, L,LC
MAY 21, 2(x).t
Page 2
We already hour enough problems in North Kona witlt the rystematlrally aborted community road nclwork and
substandard highways. subdivsions Iocatod in flood zones. subdivisions occupying environmentally and/or
culturally sensitive arcnis• and subdivisions receiving water from the salinity compromised well system.
Common sense dictates Thal we solve our current problems and not add mote development to the imdoquale
infrastructure and lay cnrironmental standards that cttrrenUy exist in North Kona.
1 respectfull. rcx~uasi that > nu deny the Nani Kona Alna, LLC (SLU 03.0117/REL U3-U 181 application
Sincerely,
`Y-
G~, : ..:~f
Barbara Srntt
a: J. Curtis "fvlcr. II I