• Minimize everything that goes into any
landfill;
• Prevent or minimize long hauling of trash;
• Provide cost-effective services;
• Increase recycling;
• Improve convenience to public;
• Meet our legal requirements.
6/14/04 2
• No big trucks in our neighborhoods;
• No old appliances or cars on the sides of our
country roads;
• Children are educated about recycling and
helping the rest of us.
6/14/04 3
• Hilo Landfill is reaching capacity and will be
unusable by mid -2005 to mid -2006:
— Rubbish is increasing (4% in previous years, 13.9% this
year --18.2% in West HI, 6.7% in East HI)
— Permit allows maximum height of 196, we are at 165';
• There are strict requirements regarding landfill
closure;
• Building a new landfill in Hilo is neither cost-
effective nor practical due mainly to high rainfall.
6/14/04
• Long hauling has never been a popular solution
due to concerns related to roads, traffic, and
fairness;
• Costs for solid waste disposal have risen
dramatically due to federal mandates;
• 2 previous Hawaii County RFPs for solid waste
solutions did not result in a contract award.
— Lack of recycling incentives (long haul contract)
— Excessive costs
— Insufficient application of high technology
6/14/04
4
• Prepare for and close Hilo Landfill:
— Revise existing closure plan
— Secure $12 - $14 million in FY 2005-06;
• Increase landfill diversion rate to conserve landfill
airspace and delay/avoid long hauling of rubbish;
• Seek and implement cost-effective solution(s) for
East Hawai'i's rubbish:
— Low Tech (recycling/source separation, compaction)
— High Tech (incineration, anaerobic digestion, thermal
gassification);
6/14/04 6
Activity 2004 Diversion
2009 Diversion
C & D Diversion
0.5%
8.77%
Cooking & Motor Oil
0.1%
0.5%
Glass
0.7%
2.0%
Household Hazardous Waste
0.02%
0.03%
Organics Diversion
7.7%
13.5%
Paper & Plastics
2.01%
9.5%
Reuse Exchanges
0.1%
0.5%
Tires
0.0%
1.2%
Scrap metal
6.0%
9.0%
TOTAL DIVERSION
17.3%
45.0%
6/14/04
g
• Immediately implement aggressive recycling;conserving
landfill air space and delaying/avoiding long hauling;
• Build materials recovery facility (Sort Station) to be
operational by May 2005;
Phase I Components ($5 Million bud eg ted):
— Design of facilities/EIS
— Roads, utilities, signage, fencing
— Scale house
— Residential and commercial recycling and processing centers
(initial estimate 25% landfill diversion)
— Trash reload building (5% estimated diversion)
6/14/04 9
Phase II Components ($3.5 Million budgeted):
— Right of way/Public access
— Re -use and Educational center
— Resource recovery yards expanded (including organics)
— Abandoned vehicle impound yard developed
Phase III Components ($3 Million budgeted):
— Construction & Demolition facility
— Reload building upgrades as needed
— Contingencies
6/14/04
10
• Procure high tech waste reduction facility to be operational
as soon as possible;
• Provide for 80% diversion from landfill from a
combination of waste reduction technology and recycling;
• Ensure ongoing regulatory compliance.
6/14/04
i
Projected iWaste Stream
Landfill
20%
Waste
Reduction
Technology
Recyclables
45%
6/14/04 35% 12
a Acc z� d
Whatn .w __. e. _v � r Z 9r .
• Completed an Updated SW Management Plan;
• Secured $1 Million in CIP from the State;
• Secured EPA's help on cleaning up our old dump
sites;
• Secured 3 EPA grants for recycling pilot projects
at the Kea' au, Kealekehe & Waimea TS's;
• Restructured the scrap metal recycling program to
eliminate decade -old backlog;
6/14/04 13
• Restructured the scrap tire program to eliminate 200
tons/year from the landfills;
• Raised the landfill tipping fees;
• Completed Sort EIS, providing economic feasibility
study; no legal challenges;
• Request for Information (RFI) disseminated for a
Waste Reduction Technology (WRT) —.May 2004.
6/14/04 14
Requests for Proposals (RFPs) prepared, and on
hold, for:
— Recycling services at all island transfer stations
and MRF/Sort Station;
— Bottle Bill Redemption Center(s) at 4 Transfer
Stations and MRF/Sort Station;
— Re -use Center(s) at 3 Transfer Stations and the
MRF/Sort Station;
— C&D operations at MRF/Sort Station;
6/14/04 15
• 1994: Original solid waste
Council;
• 1996: RFP for solid waste management solutions
published. None accepted;
• 11/2000: Proposal for solid waste management
solutions was submitted but later withdrawn;
• 12/2002: Updated ISWMP adopted by Council;
• 3/2003: Bond authorized by Council included $4
million for Sort Station construction;
6/14/04
17
• 4/2003: Sort Station facility and Waste Reduction
Technology procurements separated for timeliness
and operational issues;
• 5/2004: IFB for Sort Station prepared, RFI
disseminated for Waste Reduction Technology;
• 6/2004: Council approves FY 2004-05 budget
without Sort Station funding.
6/14/04
• Allow IFB for Sort Station construction;
• Restore operational budget for Sort
Station;
• Continue RFI/RFP process for Waste
Reduction Technology.
IS
6/14/04 19
• Proceeding with the Sort Station IFB for
construction now will minimize the threat
of early long hauling:
— Saves approximately 2 months landfill life each
year;
— Saves long hauling costs, about $90,000/month
(@150 tons/day);
• Saves about one year in completion of the
facility (10-17.5 months).
6/14/04 20
• Combining low and high tech in one RFP
requires long-term commitment with same
vendor. Conflicting interests inevitable:
— Profit for vendor is in operating the high tech
facility. Vendor subject to no profit waiting for
permit and environmental assessment;
— Profit responsibilities provides disincentive to
divert from landfill. Where will marginal
tonnage be directed? At what costs to County?
6/14/04 22
• Proceeding as recommended is consistent
with our goals:
— minimizing long hauling
— providing cost-effective services
— increasing recycling
— improving convenience to public
— meeting legal requirements
6/14/044 23
TIME IS OF THE ESSENCE!
Moving forward to implement the
plan endorsed by the County Council, the
Environmental Management Commission,
and the Administration will help the county
to meet its legal mandate and prevent
unnecessary long hauling of trash to
West Hawai i.
W14/04 24
\
\
/
/
�
/
\!)
`
m
!t)!
!)ƒ
(�*
z
!
/
/
�
/
�
7
(
/
/
�
/
z
/
/
�
/
Timeline Of DEM Solid Waste Division Actions
Jan -01 I Jan -02 Jan -03 Jan -04
Nov -00
DEM Created by
Charter Amendment
Apr -01
E HI LF Found in
Violation by DOH'
May -01
EMC Established
FY2001
13% Diversion Rate
Sept -01
DEM Acting Director
Galen Kuba
Appointed
Feb -02
County Receives EPA
Grant for Reduction &
Recycling
FY2002
13% Diversion Rate
Aug -02
DEM Director
Barbara Bell
Appointed
Sept -02
DOH Issues Consent
Agreement on'01
Violations @ E HI LF
Nov -02
Update to ISWMP
Approved by Council
Nov -02
State CIP Approved
for $1 Million
Dec -02
EPA Confirms
Assistance @ Hilo &
Kailua TS
Mar -03
03
Kea'au Recycling & Jul -
Re -use Center Opens Tip Fee Increase
Apr -03
o
Council Approves $4 Sept -
Million For Sort Draft EIS for Sort
Station Published
Construction
Apr -03 Sept -03
DOH Approves SWI) Chief L. Tyson
Updated ISWMP Hired
Apr -03
DEM Contracts URS Oct -03
For Sort Design, EIS & Second EPA Grant for
TS Enhancement Plan Reduction &
Recycling Approved
May -03
DEM Recycling
Coordinator Hired
June -03 Nov -03
Automobile Disposal E HI LF Closure
Fee Increase Estimated in FY06
FY2003
15% Diversion Rate
June -04
Kealakehe TS
Enhancement
June -04
Mar -04
Final EIS for Sort
Station Accepted
May -04
RFI for Waste
Reduction
Disseminated
June -04
Kealakehe TS
Enhancement
June -04
Council Removes
Operational Funding
for Sort from Budget
FY2004
17% Diversion Rate
Timeline Of Future DEM Solid Waste Division Actions
Jan -05 Jan -06 Jan -07 Jan -08 Jan -09 Jan -10 Jan -11 Jan -12
2005 TS 2006 TS 2007 TS 2008 TS
Enhancements Enhancements Enhancements Enhancements
Hilo, Waimea, Keauhou, HaNvi,
Papnw000d,, Waiea Honoka'a & Puako, Volcano, Honomu,
Glenwood,
, Ke'ei, Pa'auilo & Laupahoehoe &
Glen
Waiohinu & Pahala Miloli'i
Kalapana July -05
P
y 2005
If Kahuku TS
Operational
FY04-05
Proposed Upgrade
Kona Scrap Metal
Facility
Jan -05
Beverage Deposit
Redemption
Begins
Apr -05
RFP for Waste
Reduction
Disseminated
May -05
lei Sort Operational
roposed
Greenwaste Tip
Fee -
Organics
Composting
Begins
2006
Site Selection &
EIS for Waste
Reduction
FY05-06
Upgrade Hilo
Scrap Metal
Facility
Dec -05
Hilo TS Scrap
Metal Backlog
Removed
Mar -06
Kealakehe TS
Scrap Metal
Backlog Removed
June -06
E HI LF Closure
Begins
2008
Waikoloa TS
Planned
2007
EIS & Contracting
for Waste
Reduction Faciliri
2008
Permitting for
Waste Reduction
2008
2009
Permitting for
Waste Reduction
2008
2010
Construction of
Waste Reduction
Facility
2009
2011
Waste Reduction
Facility
Operational
Dec -06
E HI LF Closure
W HI Sort
W HI Sort
W HI Sort
Completed.
Planning & Design
ConstructionBegins
Operational
FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012
22% Diversion Rate 28% Diversion Rate 35% Diversion Rate 40% Diversion Rate 45% Diversion Rate 45% Diversion Rate 80% Diversion Rate 80% Diversion F