Loading...
HomeMy WebLinkAboutCOM 0400.110 2002-2004 To: Mayor Kim From: DIR Subject: Proposed Concurrency Policy Your proposed Concurrency Policy is certainly a bold step forward in trying to curb the congestion problems in West Hawaii. We agree that some significant measures must be taken to balance the proposed growth with the required infrastructure improvements, but are uncertain as to what would be a reasonable approach. We have a multifaceted problem, requiring a multifaceted solution. We need to address: • Existing congestion problems; o Identify and implement those projects that can be readily delivered. This would include those projects funded and underway, such as the Queen Kaahumanu Phase I; and those projects viewed as potentially viable but not yet funded or being aggressively pursued. • Future traffic growth; o Identify future requirements, including internal roads for connectivity; o Develop implementation strategies, including financial plans. This would include assessing effectiveness of projects; project selection and prioritization; and exploring and implementing funding strategies. • Partnerships with the private sector. ~EtV[~ o Explore phased implementation of development to allow infrastructure to catch up. By.._.._....._......... l1nt°-----F'fu`~ t, ~ ~ Y„~ Upfront fimding by developers for PLN/DES/CON work, the cost of poro ~~~;"~M;i which could be credited against their fair share contributions. This could substantially expedite the infrastructure delivery. Your proposed Concurrency Policy does propose certain specific requirements that could help to mitigate existing problems, but the overall longer term circulation plan to accommodate build out of the area could take a while to define. Concurrency as a general policy is good but it needs to be coupled with a reasonable financial strategy to ensure that the significant segments of the infrastructure, which can provide some independent utility, can be built upfront. We have the following thoughts: 1. Improvements to Queen Kaahumanu Highway, of and by itself, will not relieve the congestion along the corridor. The through traffic needs be to separated from the local circulation, requiring connectivity between the development projects to create roadways parallel to the state's principal arterial. 2. A total corridor study is needed to determine local roadway requirements for accessibility and local area circulation, and access management plans to the state facilities. 3. To this end, it would be most advantageous if developer participation is sought, that it be applied to the PLN/DES/CON on local mauka and makai connector roads parallel to the Queen Kaahumanu Highway. Phis is viewed as a requisite to improve the congestion problems along the con~idor, which will need to be (From Roy Takemoto) Comm. No. K00. ~ Q Ref. To: rr u' Rif. Uote implemented regardless of any other improvements, including the Queen Kaalntmanu widening. 4. The developers' participation in the Queen Kaahumatnt Highway widening will not necessarily accelerate the project. The project is planned for adesign-build contract, with CON to connnence in 2007 and be completed in 2009. The developers' contribution toward this contract would relieve the funding needs but not necessarily advance the project. In light of the above, we recommend that a prudent approach to partner with developers may be to set a level of monetary contribution, which would be credited against their required fair share contributions. Their contributions would be applied to specific work-in this case, the PLN/DES/CON of local connector roads; and if there are residual amounts, to be applied to the state's Queen Kaahumanu project. Work for the local connector roadway would be an agreement between the developer and the County; work toward the Queen Kaahumanu project should be directed to HDOT. We have been trying to secure some technical assistance through our federal resources to provide some gtudance to develop local connectivity standards and land use parameters to support your goals and objectives. Please be assured that we are striving to support your technical needs and to partner with you and your commtmity to arrive at the best resolution to the transportation issues before us.