HomeMy WebLinkAboutCOM 0816.000 2002-2004
_444
f JMY1Y Of yt~ JG~ yy. 7~ b
Harry Kim ~~Aristopher J. Yuen
Mavor / LUVi FUIJ 25 f~'r) 7 I
Dircrmr
~J Y
1T~ OF
Mf'~ • r .
L.
Coll Roy R. Takemoto
Drv.rr Do-rrrr,r
(n TUnfV of Raf raii
PLANNING DEPARTMENT
101 Pauahi Street, Suite 3 f Hilo, Hawaii 96720-3043
(808) 961-8288 - Fax(808)961-8742
August 24, 2004
Mr. Gene Yong, Senior Planner
Belt Collins Hawaii Ltd.
2153 North King Street, Suite 200
Honolulu, HI 96819
Dear Mr. Yong:
Change of Zone Ordinance No. 99 96 (REZ 922)
Applicant: Queen Liliuokalani Trust
Subject: Annual Progress Report
Tax May Key: 7-4-008:063
This is to acknowledge receipt of your letter dated August 17, 2004, containing an annual
progress report as required by Condition N of Ordinance No. 99 96 (REZ 922).
Thank you for complying with the annual progress report requirement. As a reminder, you are
required to comply with all conditions as stated in the above-referenced ordinance within the
appropriate timetables. Please note that your next annual progress report will be due on or
before August 19, 2005.
If you have any questions, please feel free to contact Jeff Darrow at 961-8288.
Sincerely,
i
CH TOPHER J. EN
Planning Director
JWD:smn
P:\WPWJN60\JEFF\Letters\Annual Reports\LYong-APR-REZ922(2).doc
cc w/letter: 4 Hawaii County Council
Planning Commission
Planning Department-Kona
Comm. No.
Ref. To: --~7~7.~--~-
!~j. Uate Uv1 =
ffawai `l County is an Equal Opportunity Provider and Employer
ReMolfins
u gAugust 17, 2004
2002.4-5.0800 / 04P-272
Mr. Christopher J. Yuen, Director
Planning Department
County of Hawaii
101 Pauahi Street, Suite 3
Hilo, HI 96720-3043
Dear Mr. Yuen:
Annual Progress Report
Ordinance No. 99-96
Queen Liliuokalani Trust
Makalapua Business Center
Keahuolu Lands, North Kona. Island of Hawaii Ho
Guem
On behalf of Liliuokalani Trust, please find attached an annual progress report t'°",
in compliance with Condition N of Hawaii County Ordinance No. 99-96. $z,°°"
~"gapp
If you have any questions or comments, please feel free to contact me at
(808) 521-5361.
With regards,
BELT COLLINS HAWAII LTD.
ci`~ - ~
Gene Yong
Project Planner
GY:If
cc: Bob Ozaki/Queen Liliuokalani Trust
9elt Collins Hawau Ltd
2153 North King St eel Swte 200 o Hisnol,plu Hawaii 96819-455a USA
Tt3C8 521 5361 a FI808 538 7819 o he abellcotl ns cam e www bellcolbns com
e st Coumg -jg qu is in Equal ~lgp0,iumly En,pl"rer
ANNUAL PROGRESS REPORT
ORDINANCE NO. 99-96
QUEEN LILIUOKALANI TRUST
Submitted to the Hawaii County Planning Department
By Belt Collins Hawaii on behalf of Liliuokalani Trust
August 19, 2004
Condition (A) The petitioner, its successors or assigns, shall be responsible for
complying with all conditions of the change of zone.
Compliance is ongoing
Condition (B) The applicant, its successors or assigns, shall be responsible for
complying with applicable conditions of the State Land Use
Boundary Amendment Decision and Order in Docket No. A94-705.
Compliance is ongoing. On June 1, 2004 and on behalf of
Liliuokalani Trust, Belt Collins submitted an annual progress
report to the County of Hawaii Planning Department for its
inclusion within the County's annual report to the State
(complying with Condition No. 13 of LUC Docket No. A94-
705).
Condition (C) The required water commitment be exercised or secured with the
Department of Water Supply in accordance with the prior agreement
and/or its "Water Commitment Guidelines Policy" within ninety (90)
days from the effective date of the Final Plan Approval.
At the time of development and in accordance with the time
frame specified, the Trust will comply, or ensure that the
developer is in compliance with this condition.
Condition (D) Prior to commencing construction, Final Plan Approval for the
proposed development shall be secured from the Planning Director
in accordance with Chapter 25-2-70 of the Zoning Code and
Planning Department's Rule 17, relating to Landscaping
Requirements. Plans shall identify the proposed structures, vehicular
traffic, paved driveway access and parking stalls associated with the
proposed use. Landscaping shall also be indicated on the plans and
be provided for the purpose of mitigating any adverse noise or visual
impacts to adjacent properties.
At the time of development and in accordance with the time
frame specified, the Trust will comply, or ensure that the
developer complies with this condition.
Condition (E) All roadways within the proposed development shall be Improved
with curbs, gutter and sidewalk improvements meeting with the
approval of the Department of Public Works.
At the time of development, the Trust will comply, or ensure
that the developer complies with this condition.
Condition (F) All accesses and intersection improvements, including traffic
Signalization, shall be constructed meeting with the approval of the
Department of Public Works.
At the time of development, the Trust will comply, or ensure
that the developer complies with this condition.
Condition (G) Install sewer lines to connect with the Kealakehe Wastewater
Treatment Plant, meeting with the approval of the Department of
Public Works, prior to occupancy of the development.
At the time of development and in accordance with the time
frame specified, the Trust will comply, or ensure that the
developer complies with this condition.
Condition (H) A Drainage Study, if required, shall be prepared and the drainage
system shall be installed meeting with the approval of the
Department of Public Works.
At the time of development, the Trust will comply, or ensure
that the developer complies with this condition.
Condition A Solid Waste Management Plan for the proposed Development
within the subject property shall be prepared and submitted for
approval to the Department of Public Works prior to securing Final
Plan Approval. A copy of the approved plan shall be submitted to the
Planning Department for its files.
At the time of development and in accordance with the time
frame specified, the Trust will comply, or ensure that the
developer complies with this condition.
Condition (1) Comply with all other applicable laws, rules, regulations and
requirements of the affected government agencies for the proposed
development.
The Trust will comply.
-2-
Condition (K) An Archaeological Data Recovery Plan for the seven Significant
historic sites and a Preservation Plan (including buffer zones, interim
protection measures, and a long-term preservation plan) for the
Kuakini Wall shall be submitted to and approved by the State
Department of Land and Natural Resources-Historic Preservation
Division (DLNR-HPD) and the Planning Department. The DLNR-
HPD shall verify in writing to the Planning Department when both
plans have been successfully executed. No land alteration may occur
in the vicinity of the site until the plans have been successfully
executed.
At the time of development and in accordance with the time
frame specified, the Trust will comply, or ensure that the
developer complies with this condition.
Condition (L) Should any remains of historic sites, such as rock walls, terraces,
platforms, marine shell concentrations or human burials be
encountered, work in the immediate area shall cease and the
Department of Land and Natural Resources-Historic Preservation
Division (DLNR-HPD) shall be immediately notified. Subsequent
work shall proceed upon an archaeological clearance from the
DLNR-HPD when it finds that sufficient mitigative measures have
been taken.
The Trust, or its developer, will comply.
Condition (M) Should the Council adopt a Unified Impact Fees Ordinance setting
forth criteria for the imposition of exactions or assessments of impact
fees, conditions included herein shall be credited towards the
requirements of the Unified Impact Fees Ordinance.
As of the date of this Annual Report, no such ordinance has
been adopted.
Condition (N) An annual progress report shall be submitted to the Planning Director
prior to each anniversary date of the approval of this change of zone.
The report shall address in detail the status of the development and
the compliance with the conditions of approval. This condition shall
remain in effect until all of the conditions of approval have been
complied with and the director acknowledges that further reports are
not required.
The next report will be due August 19, 2005.
Condition (O) An initial extension of time for the performance of conditions within
the ordinance may be granted by the Director upon the following
circumstances:
-3-
i
I . The non-performance is the result of conditions that could not
have been foreseen or are beyond the control of the applicant,
successors or assigns, and that are not the result of their fault or
negligence.
2. Granting of the time extension would not be contrary to the
General Plan or Zoning Code.
3. Granting of the time extension would not be contrary to the
original reasons for the granting of the change of zone.
4. The time extension shall be for a period not to exceed the period
originally granted for performance (i.e., a condition to be
performed within one year may be extended for up to one
additional year)
5. if the applicant should require an additional extension of time, the
Planning Director shall submit the applicants request to the
County Council for appropriate action.
In compliance; requests for extension will be submitted when
required.
Condition (P) Should any of the conditions not be met or substantially Complied
with in a timely fashion, the Director may initiate rezoning of the
subject area to its original or more appropriate designation.
The Trust intends to comply with the conditions within this
ordinance at the time of development and in accordance with
timeframes specified in each individual condition.
-4-