Loading...
HomeMy WebLinkAboutREP PWIRC 013 05/31/2005 2004-2006 FiF,POFiT OF THE COMMITTEh, ON PUBLIC WOF:KS AND INTF;FiGOVF,FiNMF,NTAL FiF,LATIONS UAI~I{: Mac 31, 2005 R[':: Comm. No. 286/ Rcs. No. IOd-05 I'I.nCI~: Councilnxnn 11h11`: 9:05 a.m. Chair and htcmhcrs I Iawoi'i Counh Council I lilo. I lawai'i 96720 lour Conuniltca on Public Works and Intergo~~ernmental Relations, to which was referred Rcu,lulion I Od-U5. reports as follows: Kesolulion I Ud-05. h~ansmilted via Communication 286, dated May 10, 2005, from Gerald l~akasc nssistan~ Corporation Counsel, authorizes the acceptance of a donation of real properties situate at ~lhualoa. district of t Ifrm~kua. Island and County of l tawai'i, designated as'hax Map Ke}: ( ~1-1-6-U09:(108. from I[li~,ahcth I,. Rapozo. ~hrustcc. Council Members c~pressed support for Ibis resolu~irni. Council Manber I3oh Jacobson requested ghat maps he attached with the resolution in the future. Other Council Members expressed concern about the roads-in-limbo. For Mr. Jacobson, (he 500 miles Ihat the State turned over to the County is the most compelling issue, and he noted that there arc different concepts regarding what roads-in-limbo actually means. Forcxample, road straightening and roadways ancrouchingon samchody dse~s property arc not roads-in-limbo issues. Ile also stated that it seems like the County's policy is to wail for people to come in with road issues before acting on them. Finally, he cautioned ihai the Count} has to he verc careful in dealing with easement issues. Council Member h. ~~ngcl Pilago said that yre need to take care of these local County issues surrounding roads-in-limbo. ~fhis would demonstrate that the County is able to eflcctivcl} manage our human and malarial resources. ~fhis could mean that in the future, the County would he able to discuss the numagcment ofour harhois and roadways. Council ~Jcmhcr Ih. Fred Ilulschuh stated that he thought a survey of the roads-in-limbo was supposed to have hacn complded in July 2004, and the plan was to have community meetings to discuss the issue ~ti ith constituents. He said that he continues to receive requests from constituents reyucsling That niorc roadways be added to the list ofroads-in-limbo, and asked when the survey ~undd he complded. I Ia also brought up the issue of casements, because some roads cross through pri~atc propcrh. Council Member Gary tialurik also questioned whc the roads-in-limbo study was not completed. and asked if it ~+as because ol~personnel issues. I Ie stated that this is an important issue as it impacts people in all districts. In addition. he staled that it was important to identity these roads so that work can he done on Ihcm. I Ie also noted ghat there were prior discussions and an agreement That (his was a high priority issue and that Mayor Kim had tried to gel an appropriation Isom the Lcgisla~ure to help address the roads-inJimho issue. PWIKC RI-:POR~h NO. 13 Director of Puhlic Works. Bruce McClure, responded that his Department is working on the survey, and that Mr. Ronnie Malsumura Baas hired on a 90-day contract to knish up Uie roads-in-limbo study. fhc reason ~br the delay in completing dte stuck was that the engineer working on the study Icft Coun~}~ cnyilo~ mcnl in December ?004. I Ic further stated that there is no written policy, hul the do I~rcto policy is Ibr the Count} to wait until the residents brought road issues to their attention. Lasth. in response to comments about easements. Mr. McClure stated that the County does have prescrip~ivc rights. four Connni~tec on Public Works and Intergovernmental Relations is in accord with the intent and purpose of IZcsolulion l Od-US and recommends its adoption. AYES Nl)I~:S A & F; EX ARAhARI x COMMI"I"I~F.1',ON PU[3IJC WORKS AND IIIG~ X IMCI?RGOV1?RNM1~;N"I~AI. RI?LA"I~IUNS IIOI~I~MnNN X 11O1.~5C'Illill X LSRI.I-f. X Donald Ikeda. Chair incORSON x PWIRC RIiPOR~~~ NO. 13 I'l1.AU(> X ~nrnizik - x ADOP~rr,D: JUN 1 5 2005