November 18, 2005
Stacy Higa, Chairman, and
Members of the Hawaii County Council
Hawaii County Council
25 Aupuni Street
Hilo, HI 96720
Subject: Bill for an Ordinance Authorizing the Issuance of General Obligation Bonds
Attached for your consideration is a bill authorizing the issuance of up to $50 million in general
obligation bonds of the County of Hawaii. The amount includes $25 million of bonds for the
Department of Water Supply ("DWS"). The DWS will reimburse the General Fund for its share
of the debt service on the bonds and the cost of issuance.
We currently have a number of projects that are ongoing or ready to initiate which require
funding to continue. These projects include construction to meet legal mandates, repairs to
facilities, expansion and replacement of facilities, new facilities, and road and traffic
improvements (see Exhibit A).
Projects included on Exhibit A have been determined to be of high priority and are expected to
need funds within the next six months. Project priorities sometimes change and factors beyond
our control may dictate which projects are ready to move forward and make use of funds at any
given time.
The Department of Finance is working with departments to insure that funding will be available
when needed, but not borrowed prematurely. The number of projects to be funded is limited by
prudent spending amounts and the capacity of the departments to manage the projects. Exhibits
B and C are debt service worksheets for your review.
(a'ue 185 r
Comm. No. .7 61+~
Hawaii County is an equal opportunity provider and employer. f. Tp. G
a.:f. L`ote IVUV I t3 t)q
Stacy Higa, Chairman and
Members of the Hawaii County Council
Page 2
November 18, 2005
Please contact departments directly for additional information on specific projects. If there are
any questions regarding the bonds, please do not hesitate to contact Mike Okumoto at 961-8303
or me at 961-8234. Thank you very much.
y~
William Ta ba
Director of Finance
APPROVED:
Harry Kim
Mayor
Attachments
Exhibit A
2006 Series A Bond Request
Planned Projects
Mandates/Environmental
ADA Compliance - P&R 2,250,000
Naalehu & Pahala LCC replacement 220,000
Honokaa LCC Replacement 600,000
3,070,000
Repair of Facilities
Central Police Station repairs 1,000,000
County Building repairs 5,500,000
Rural transfer stations 500,000
Repairs to facilities - P&R 1,255,000
Konawaena Swimming Pool 1,175,000
Kailua Park 850,000
10,280,000
Expansion/Replacement of Facilities
Alae Cemetery 1,000,000
Hilo Bayfront Beach Park master plan 300,000
Pahoa Fire Station 300,000
1,600,000
New Facilities
Fire Admin Complex 2,500,000
Kalaoa Fire Station 2,150,000
Microwave tower 460,000
5,110,000
Road and Traffic Improvements
Palani Road Safety Impr 1,359,000
1,359,000
Total Projects 21,419,000
Reimbursable Water Supply Bonds & Costs 25,000,000
County Bond Issuance Cost 500,000
Total Bond Authorization 46,919,000
EXHIBIT B
V OCOO Mt0 NMO N(D LO LON O W V LO aDN
-O O V O Lp O W m LO N V V O O r 0 00 V ~ (O r N M
C N N O r ~ r M V O Ln V O Ln N M M OD Q~ N r- OD O~ O
N U N N f0 M N N O O M M O OD r aD N W r M ~ LO
td N O r rn (O W (O (D Lp M N O N O 01 M M M O O (O LO m
N ~ N r 0 O~ O m 0 0 W M N N O O OD OD (O (O a0 (O O N
a` a` N N N N N N N N r r (O M M M m 0 m r r '7 N ~
r ~ ~ ~ ~ ~ M
O O N N N N N N N N N N N N N N N N N N (O
d 0 O O N N N N N N N N N N N N N N N N N N W
U O -O O O O m O m W W m Q~ O O m O m W m 0 0 0) ~
~Z O N to ~ l0 Lp Ln iA 10 ~ Ln LO Ln Ln L!') IA to LO Ln LO l!') 1n O
U O (p N N O Ln LO LO LO LO Ln LL) l0 M O ~ ~ Ln Ln Ln N ~ Ln
D o E o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o N
~ ~ ~ N N N N N N N N N N N N N N N N N N m
~ ~ m M
O N O1
~ EA
V O (O aD V O aD O O M M O r O~ (D N M (O LO
O V O N r (O r M O N N a0 N M W~ N m V t0 M
~ N O r N W V~ ~ Ln 11') O l0 N V M 01 O N N Q~ ' V
C f0 N O N (O (O V LO M r r V N ~ Ln N (D M r LO ~
N ~O r r M N 0 0 Q~ (O r (O N r V M OD r W V V 0 M
~ N CD Q~ O Q~ O O N r N N ~ 0 0 r r 'A O r CO O
~ Ln M M M M M M IA l0 V ~ ~ r r r LO LO N m
N N N N N N N N r' ~ ~ ~ ~ O
M
O~ LOO O~~~ O N O r v a~0 L~
j M a00 O O ~ W O
O LO r (O Q1 O O M LO Ln O N 'A ~ O r (O r r r ' W
~ LO O LO rn M W N ~ r V 0 (D M Ln O O m W r D7 m
O a0 W r (O (O Ln Ln ~ O O W r m Lb m 01 m N N_
M M M M M M M M V O Ln m r r N N
M M M M M M M M N ~ ~ (O
M
V1
C
O O O r V' LO r OD 00 W OD O LO O ~ (O O m M N l0
r LO N O W OJ O r N l!') Ln r t0 O LO Ol r rn O
N i0 f/1 L!) ~ M (O ~ M (O QO O O 00 r r v m V' Ln V M V ' M
v ~ Moi~~om~ai~co v of ri eo corrncoM m
C ~ N ~ LO O N Lj) r 0 ~ (O r m O r V N ~ (D
m0 O C O O OD 00 r (p (D 'O M N r' ~ ~
~ ~
O ~
w ~
N a0 0 V O LO N V V N O M V a0 O O M N M
C l0 N N M m N 0 0 T V c0 N M M a~ r rn LO O O c0 O
O D_ M V W O r V V V LO O r OJ (O r (D O N V N' to
N M h M ~ 0 O I~ O r m O M O O N V m O
A C r N W V OD LO N V M W O N (O r Q1 01 O N (O
M V V LI') O O r N 0 (O M r r r N N r
a a` NN NN NN NN N aD
O
m
V r O W 0 (D o0 O m 'O O 1n M rn m M 0 m O W (O r
W r V N LO 00 OD N r V M 07 W Ln r 01 (O r N
y N V Ln O m M '7 W 0 0 0 r (O N r r V in V ~ (O
U1 (U (O O M (D N (D M ~ O M V Ln r 0 a0 M N O (O V
~ N O (O Ln C V Q N r Ln ~ O Ln O O O N V V r O
~ F N N N Ln l!') Ln 'f) Ln M M r N N N V •S V LO O LO m
d to ON OOOOOOM MNOOOr rr'O LON N
~ C N N N N N N N N ~ ~ ~ ~ r
O N
C m
d
~ C r O W 0 (O W O m LO O t0 O O W M O m 0 0 0 r
~ O Q~ r V N Ln W 00 N r V' M Q1 O LO r O O r N
O in N O V o0 Ln N O N (O r Q~ r (O N r (O N of N' N
V ~ ~ C') ~ m N O (D V fD a0 c0 c o r N a0 r 0 Ln O W
O LO V W M r 00 V M (O r v u7 N a0 (O M V r r N
~ C V OD r (O O M (O O~ ~ (O ~ r M O~ V F W lp N LO
O - rnro cor r (O M V V MMNN 00
f0
O O O O O O O O O O O O O O O O O O O O O O
C O O O O O O O O O O O O O O O O O O O O O
N N O LO r 00 V ~ O~ (O V M 0 0 0 0 N V (O O' V
O O' M a0 V V 0 (O f0 r M V LO ~ r M 0 0 (O N M Oi CO
~U M V CO N M r LO r M M M N O M O N~ O r 0 r
C ~ ~ M QJ LO r OD LO N (O LO LO O M O (O O M ~ M
a` ~ M N N M V V to m W Q~ r r c0 (O (O (O Lp LO N N
~ r ~ ~ D)
(O r c0 m 0 r N M V Ln O r a~ m O ~ N M V 'n O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
W N N N N N N N N N N N N N N N N N N N N N
Il
EXHIBIT C
Debt Service Projection
Principal amount: 25,000,000
Interest rate: 4.5%
Year Payment Interest Principal Balance
25,000,000
1 1,125,000 1,125,000 - 25,000,000
2 1,125,000 1,125,000 - 25,000,000
3 2,055,922 1,125,000 930,922 24,069,078
4 2,055,922 1,083,108 972,814 23,096,264
5 2,055,922 1,039,332 1,016,591 22,079,673
6 2,055,922 993,585 1,062,337 21,017,336
7 2,055,922 945,780 1,110,142 19,907,194
8 2,055,922 895,824 1,160,099 18,747,095
9 2,055,922 843,619 1,212,303 17,534,792
10 2,055,922 789,066 1,266,857 16,267,935
11 2,055,922 732,057 1,323,865 14,944,069
12 2,055,922 672,483 1,383,439 13,560,630
13 2,055,922 610,228 1,445,694 12,114,936
14 2,055,922 545,172 1,510,750 10,604,186
15 2,055,922 477,188 1,578,734 9,025,452
16 2,055,922 406,145 1,649,777 7,375,675
17 2,055,922 331,905 1,724,017 5,651,657
18 2,055,922 254,325 1,801,598 3,850,060
19 2,055,922 173,253 1,882,670 1,967,390
20 2,055,922 88,533 1,967,390 (0)
39,256,604 14,256,604 25,000,000
HAWAII COUNTY PROJECT SUMMARIES
Compliance with court ordered and federal mandates is a very high priority. The.
first three projects will address mandated requirements. County funds are used in
conjunction with other sources, such as CDBG or EPA funding.
ADA Compliance - $2,250,000
The County is continuing with the on-going process of complying with the obligations as
set forth in the consent decree filed in Russell et al v. County of Hawaii. The primary
purpose is to ensure equal access to all parks and recreation facilities and sites through
the removal of architectural barriers. The funding will be used for construction of some
of the remaining Schedule 2 projects and design contracts for Schedule 3 projects.
Timeframe Cor encumbrance of the funds is within 6 months of the funds being in place
in order to bid construction projects and negotiate contracts. It will take approximately
one additional year to expend the funds based on performance of contractors and
consultants on their respective projects.
Honokaa Large Capacity Cesspool Replacement Project - $600,000
The Honokaa Large Capacity Cesspool Replacement Project was prompted by
regulations promulgated by the U.S. Environmental Protection Agency (USEPA) in 1999
that all existing large capacity cesspools be eliminated. The project entails installing a
collection system to serve County and state facilities and central Honokaa town. The
requested funds will be used for the project design and survey. Anticipated completion
of this phase of the project is September of 2006.
Naalehu &Pahala Large Capacitypool Replacement Project- $220,000
The Naalehu &Pahala Large Capacity Cesspool Replacement Project is also in response
to EPA requirements and involved the County partnering with C. Brewer and the
community to address the large LCCs used in former plantation camps. Funds are
required for the "pre-design" portion of the project, which consists of a topographic
survey, Preliminary Engineering Report detailing sewer system alternatives,
recommendations and engineering costs, and an Environmental Assessment Report. This
work is also expected to be completed in September of 2006. EPA funds will be utilized
for a portion of the construction work.
Facility maintenance was deferred Tor a number of years when funding was not
available. The following projects represent high priority projects that require funds
in the near future and have no designated source of funds at this time.
Central Police Station Repairs - $1,000,000
Funding is needed to repair the roof of the Public Safety Complex, Building B, in Hilo,
due to leaking causing extensive water damage. The Public Safety Complex, Building B,
on Kapiolani Street in Hilo houses the department's In-door Firing Range that consists of
four (4) firing lanes located on the third floor of the building. As a result of the water
problem, the range is periodically closed down and unavailable for use for safety reasons.
Funding will cover the cost of planning, design and construction. Additional funds will
be requested at a later date for roof work on Building A.
County Building Repairs - $5,500,000
The project will remove asbestos building materials and repair the leaking roof which
will entail the following improvements: 1) Remove and replace ceiling grids, lights,
soffits, AC air handlers/ducts, floor tiles, metal roof; gutters, downspouts, flat roofs; 2)
repair roof decking and canopy structure. Construction is expected to begin April 2006
with a projected completion date of March 2007.
Rural Transfer Station Enhancements - $500,000
This represents the cost of the design component of improvements to the County's 21
transfer stations. Transfer stations have been neglected for many years, and are currently
in a state of disrepair. Transfer stations are where the public interacts with the County
Solid Waste Division. Therefore, public health and safety risks must be addressed, and
we must ensure compliance with the State Department of Health regulations. Much of
the basic design work for improving transfer stations will be managed in house with the
Solid Waste Engineer. Specific structural work such as re-designing the rotten wooden
retaining walls will be contracted out to local engineering firms. Enhancements besides
repairing and replacing components also include improving the transfer stations to
provide for the collection and handling of green waste, white goods, and recyclable
materials, and HIS where appropriate. The construction of actual improvements will be
based on future multi-year funding and spread out over several years.
Repairs To Facilities - $1,255,000
This will address urgent maintenance and repair issues at park facilities that affect safety
and usability of the areas. For example, the presence of hazardous materials is at the
forefront of our safety concerns for our employees and the public, so one use of these
funds will be to ensure that parks facilities are assessed and any deficiencies or hazardous
materials dealt with appropriately. U is anticipated that these funds will be utilized within
9-12 months of being made available.
Konawaena Swimming Pool - $1,175,000
Current deficiencies at the pool render the pool barely functional at this time. The roof
leaks in many locations, the solar water heating system has been broken for several years,
the pool pump and filtration system has failed, and the pool is in general disrepair.
Improvements at the pool will provide an alternate swimming venue for the currently
overcrowded Kailua Community Aquatic Center at Kailua Park. The project includes
resurfacing of the pool basin, complete overhaul of the pool's pumps and filtration
system, re-roofing of the pool house building, installation of a new solar water heating
system at the deck, overhauling the electrical system, providing energy efficient lighting,
and other improvements that will make the pool functional and operational. The funding
will be applied immediately for the construction of the improvements at the pool as the
design will be completed by the end of December 2005. Construction is anticipated to
take 4-6 months.
Kailua Park - $850,000
This project will include improvements to the Old Terminal building which is in disrepair
with leaking roofs, rotting roof sheathing, fire damage, etc. The facility will be made
weather tight, with repairs of water damage and repainting. A small meeting room for
public use is planned, as well as improvements to provide an expanded and improved
work environment for the Kona District maintenance staff. It will also address the
degraded parking lot that has lost its structural integrity. Remaining funds will be applied
to the facilities adopted when the State Park is turned over to the County. Design is
anticipated to be completed in June 2006 and construction will take 6-9 months
thereafter.
In addition to repairs, the County faces urgent needs that require expansion of
existing facilities or construction of replacement facilities. The following three
projects have been initiated and are now in need of funding to continue.
Aloe Cemetery - $1,000,000
The current cemetery is near capacity with less than a dozen formal plots left, and
additional lands have been secured for its expansion. This project will involve the
grading and grassing of the expansion area to make it suitable for continuation of burials.
Department of Public Works, Engineering Division is currently preparing plans to
develop this entire addition. The project is anticipated to commence construction in June
2006
Hilo Bayfront Beach Park Master Plan - $300,000
The project will cover design of master plan for the entire Hilo Bayfront Beach Park and
include community input. It will address vehicle circulation, space planning of the site,
design of new canoe halau facilities and park amenities and everything needed to create a
functional and attractive beach park for canoe paddlers, picnickers, swimmers, water craft
and the general public. The funds would be used immediately following availability for a
consultant contract and the timeframe for expenditure would be 9-12 months thereafter.
Pahoa Fire Station (New) - $300,000
The total estimated cost to build the new Pahoa Fire Station is $4.3 million dollars. This
$300,000 represents the remaining funds needed for the project. The building plans are
almost complete and this project will go out to bid in early 2006, with construction
thereafter. The station will have three apparatus bays and will service the area for the
next thirty years.
New facilities to expand services and upgrade to modern standards are an essential
component of providing quality service to meet the expanding needs of the County.
Fire Administration Support Comdex - $2,500,000
The Fire Department is developing this complex to centralize all components of its
administration, provide a secure emergency dispatching facility, and provide much
needed training classrooms. The department has obtained afive-acre site (off the
Mohouli extension) from the State and will use these funds for design, subdivision,
environmental assessment, and related pre-construction cost.
Kalaoa Fire Station - $2,150,000
This fire station is planned to service the residents of North Kona along Mamalahoa
Highway (Hwy. l80). The funds are for construction of a station with two apparatus
bays and will also be the "Hazmat" (hazardous materials) response unit for West Hawaii.
The project is currently scheduled to go into construction before June 1, 2006.
Microwave Tower Project - $460,000
These funds will cover previously-approved additional costs to complete the microwave
system. This is an on-going project to upgrade communications island-wide. The project
will greatly improve our communication infrastructure and bring the County into
compliance with federal requirements to switch to a 6 GHz digital microwave system.
After approximately 2 1/2 years of planning, environmental assessment, site acquisition
and perniitting the new microwave system will become a reality in October, 2006. A
burn-out period of 60 days will ensure reliability and continuity of the new system, and
enable dispatching to be seamless and dependable.
TrafTic safety remains a high priority for the County. While 2004A bond proceeds
are funding a number of projects in the Kona area, there are additional projects
that were already in place. For the following project the prior funding lapsed and
we are asking that it be replaced with new bond proceeds.
Palani Road Safet~~rovements - $1,359,000
The project will increase traffic safety and improve traffic flow through a busy section of
Palani Road. After an exhaustive planning and design process the project is ready for
construction. The eastern terminus of Kealakaa Street to intersect Palani Road at
Palihiolo Street will be realigned to form a new intersection, and will include the
following improvements: 1) a fully signalized system with left-turn pockets, 2)
construction of a new 700 linear foot road segment of Kealakaa Street, 3) construction of
concrete curb/gutter/sidewalks, retaining walls and guardrails, drainage improvements,
utility relocation, and roadway signing and striping 4) necessary land acquisition.
Construction is expected to begin February 2006 with a projected completion date in
December 2006.
DEPARTMENT OF WATER SUPPLY
The Department of Water Supply is requesting a $25 million bond float for FY '06 to
finance critically needed projects that will improve the water quality in Kailua-Kona and
ensure ample water for development in South Hilo. The projects being considered, their
need, scope, and implementation schedule are as follow:
Palani Transmission Main & Appurtenances - $12,000,000
This project is a sorely needed to transmit water from the high level aquifers of
exceptional quality along Mamalahoa Highway to Kailua-Kona. Presently, overpumping
of the present sources at the Kahaluu Shaft and wells has compromised their water
quality resulting in unpleasant tasting water in Kailua-Kona. This delivery of this high
level water to Kailua Kona will reduce the dependence on the shaft and wells, thereby
improving the water quality.
Realizing the tremendous negative impact to the already congested Palani Road, this
project proposes a corridor to the south of Palani Road in mostly private undeveloped
property that extends from Mamalahoa Highway to the Liliuokalani Subdivision.
Improvements proposed include approximately 12,500 feet of pipeline and two(2) 1.0 mg
concrete reservoirs.
Construction is anticipated to begin in 2007 and take approximately 2 years to complete.
Waiaha Water System Improvements - $8,000,000
With the completion of the Waiaha Well, tapping the high level aquifer along Mamalahoa
Highway, and a 2.0 mg tank, provides another source that will assist in improving the
water quality in Kailua. This project, like the former one, is needed to convey water to
the Kailua area.
This project, along a private corridor adjacent and just to the south of Waiaha Stream,
extends from Mamalahoa Highway to Hienaloli Road. Proposed improvements include
approximately 11,000 feet of pipeline, and 0.3 and 1.0 mg concrete reservoirs.
Construction is anticipated to begin in the later part of 2006 and be completed by 2008.
Piihonua-Kukuau 2.0 m~ Reservoir & 16" Transmission Line - $5,000,000
This project is needed to upgrade the capacity of the water system serving the Sunrise
Subdivision, UH-Hilo, lower Kaumana, and lower Waiakea Uka areas. When completed,
it will provide water for further development in these areas.
This project, beginning at the terminus of Haleloke Street, along Hokulani Street, thence
cross country across the Alenaio Stream, and terminates at Kukuau Street. Improvements
include approximately 12,000 feet of l6-inch waterline and a 2.0 mg concrete reservoir.
Construction is scheduled to begin mid-2006 and take approximately one year to
complete.