January 3, 2006
The Honorable Stacy Higa, Chair
and Members of the Hawaii County Council
25 Aupuni Street
Hilo, HI 96720
Rc: East Hawaii Reload Facility
The bids for the East Hawaii Reload Facility have been received, and as indicated below, the
lowest bidder was determined to be Isemoto Contracting Co. Ltd. Their bid of $9,338,285 was
the lowest cost for the basic bid elements. In addition, their price of $8,838,048, representing the
basic bid minus all eight of the deductive alternates, was also the lowest of the three bidders for
this project.
Isemoto Taisei San Juan
Basic bid $9,338,255 $9,58],542 $10,773,1]7
Deductive alternates (500,237) (735,072) (1,008,879)
Net bid after deductives ~ 8 846 470 9 764.238
The present $6.2 million appropriation is significantly less than the lowest bid. Given the
funding shortfall, we have entered into negotiations with the lowest bidder to determine if there
are areas where costs can he cut without impacting the functionality of the badly-needed Reload
Facility. We are exploring every possible option for cost savings. So far Isemoto Contracting
Co. Ltd. has agreed to an extension of their bid prices until March 7, 2006, while we continue
discussions with them. It is expected that negotiations on a final contract amount will be
completed in about two weeks.
We respectfully request that you approve Bill 190 at your Finance Committee meeting on
January 4, 2006 for the following reasons:
Comm. Nom^Z_
Ref. To: Pt FG
Counry of Hawai `i is an Cyual Opportunity Pruvidcr and Employer. Ref, lipfe ~ ~ ~ ~ L
The Honorable Stacy Higa Chair
January 3, 2006
Page 2
• We do not have a firm bid price past March 7, 2006. There is no guarantee that the
contractor will be able to agree to additional extensions due to the various subcontractors
involved in the project and changes in material costs. (See enclosed January 3, 20061etter
from Isemoto Contracting Co., Ltd.) To enter into a contract, funding of the full contract
amount must be available. If not approved at committee on January 4, the earliest the
funding could be approved would be February 15, which allows approximately 3 weeks for
the appropriation bill to be signed into law and a contract to be executed.
• The appropriation amount can be amended at first reading before the full Council.
After completion of negotiations with Isemoto Contracting Co. Ltd., if there is a reduction in
cost, the amount requested can be amended at the time of first reading before the full
council.
• Landfill expansion plans require the Reload Facility. As the present permitted capacity
of the South Hilo Sanitary Landfill approaches, it is more critical than ever to get the Reload
Facility operational as soon as possible. It is anticipated that the Department of Health will
approve the Count} s request to modify the slope profile of the landfill to expand its
capacity. Upon approval and implementation of this change, it will be necessary at times to
restrict commercial haulers from dumping directly at the landfill (as they presently do)
because of the strict operational guidelines that must be followed to implement the steeper
slopes. The reload building is where the commercial haulers will deposit their loads for
compaction and deposit in the landfill by trained County employees.
For further information, we have attached some additional questions and answers, and a
summary of the bid cost elements, by category. The Finance Directot s previous communication
of December 9, 2005 (Council Communication # 597) also provided background information on
this project, using a question and answer format.
If you have any questions or require further clarification, please dod thesitate to contact me or
the Mayof suffice.
AP O
Bruce C. McClure, P.E. y Ki a
Director County o Iawai'i
enclosures
cc: Department of Environmental Management
Department of Finance
County of Hawaf i is an Equal Opportunity Provider and Employer.
ISEMOTO ~ MAIN OFFICE: 648 PIILANI STREET, P O BOX 4669, HILO, HAWAII 96720
PHONE 18061935-7194 FAX (6061 961-641 7
CONTRACTING CO. LTD. ? KONA BRANCH: 7/-50398 QUEEN KAAHUMANU HWV., P.O. BOX 3169, KAILUA-KONA, HI 96710
General CQIItra Ct Ol PHONE 160813299051 FAX 16061329-3261
Contractor's License No ABC1036 ESTABLISHED 1926 An Equal Opponuniry Employer
Januazy 3, 2006
Mr. Bruce C. McClure
Director, DPW
County of Hawaii
101 Pauahi Street, Suite 7
Hilo, HI 96720-4224
SUBJECT: FAST HAWAII REGIONAL SORT STATION
Job No. 5-3722
Deaz Mr. McClure:
Pursuant to your letter dated December 30, 2005, and meeting held on the same date, we understand the
County desires to negotiate an adjusted bid price for the above subject project. We acknowledge the
available funds for this project is not sufficient to cover the cost of a functional facility based on our
Base Bid price and Deductive Alternates, and that the County will require additional time to secure the
funds for the Project. Based on our preliminazy discussions, we are confident our negotiated cost will
not exceed our base bid cost of $9,338,215.00.
Isemoto Contracting is agreeable to negotiate an adjusted contract amount under the condition that the
project will be awazded by March 7, 2006. An extension beyond Mazch 7, may be considered, provided
we will have the opportunity to add cost increases for labor and materials, if any, due to the delay of
Award.
I cannot over emphasis the urgency to negotiate and awazd this contract. The Island's construction
boom, compounded by hurricane disasters of the Gulf States, has created material shortages and price
increase throughout the United States. This trend is expected to continue during 200b and possible level
off in the first quarter of 2007. If this project is re-bid, the County should expect a 12°/e minimum
increase over our bid price of December 6, 2005.
We look forward to meeting with your staff to discuss negotiations at your earliest convenience.
Sincerely,
Leslie Isemoto,
President
copy: Bryan Tomiyoshi, V.P., ICC
Diane Shiro, Business Manager, DPW
Barbara Bell, Director, DEM
Dora Beck, P.E., Technical Services Chief, DEM
QUESTIONS & ANSWERS
East Hawaii Regional Sort Station Procurement
Department of Public Works Job No. 5-3722
January 3, 2006
1. Why does the supplemental appropriation request ask for funding of the entire basic bid and
not utilizing any of the deductive alternates?
We prepared the supplemental appropriation request as the best solution. All of the deductive
alternates were carefully reviewed to assess both the short-term and long-term impacts to the
operation of the Reload building. Based on this, it appeared that award of the entire basic bid would
offer the best long-term value to the County and the Public in that it minimizes future operational
costs associated with the Reload building. However, we are also currently negotiating with the
lowest bidder to look at all possibilities for cost savings, not just the previously identified deductive
alternates.
2. What can we build with $6.2 Million?
Assuming we were only constructing specific elements, and not a full project, we could afford the
Reload building, the scale house (with one scale), roads, fencing, signage and sanitary sewer system.
There would be no electricity, fire hydrants, potable water source or fire alarm system, and roads
would be 2-1/2 inch thick instead of 4-inch, all of which would need to be negotiated since most of
these items were part of the basic bid. We would still need approximately $1 million For construction
management services and for change orders resulting from unforeseen field conditions. In short, we
cannot build a fully functional facility with this funding.
3. What is the impact of constructing a $6.2 Million Reload Facility?
There would be a need for a portable generator for electricity which will require onsite fuel tanks.
Lack of fire hydrants will require a large catchment tank for the purposes offire-fighting. Lack of a
fire alarm system will leave the Reload building unmonitored for fire during non-business hours.
Having a commercial entry-only scale would result in doubling the commercial vehicular traffic
through the entry scale. The use of a thinner asphalt road will result in more frequent roadway
maintenance and repair activities. Absence of a potable water source is a major compromise to
having an infinite source of water under pressure for fire-fighting capabilities. County water is
considered a necessity for this project. Absence of dedicated construction management services
means lack of project monitoring and documentation which will lead to ongoing problems.
4. What is the cost for construction of the Reload building?
$1.686 Million represents the cost of the shell of the building
$1.466 Million represents structural work
$125,322 represents plumbing and ventilation
$256,340 represents electrical and an emergency alarm & fire detection system
$133,279 represents miscellaneous
$3,666,619.41 is the total of these items.
General site work is not included in these bid amounts, as it was included in the work for the whole
site. General site work For the Reload building is estimated at $300,000 - $600,000 out of the total of
$2.4 Million. Please see attached table.
5. What is the deadline for award of the project?
The General Requirements and Covenants, County of Hawaii, Department of Public Works,
requires that the contract be awarded within sixty (60) consecutive calendar days after the bid
opening which would be January 20, 200b, unless a bid award extension date has been mutually
agreed upon by the contractors and the County. Currently, the lowest bidder has offered to hold their
price as long as the project is awarded by March 7, 2006.
6. What would happen if award of the bid is delayed past March 7?
Due to the amount of construction work currently available in Hawaii, the Contractor may withdraw
its bid. This situation affects the general contractor and their subcontractors, who may find it
impossible to maintain their bid commitment after a set date.
7. When will the County be requesting the extension of the bid award date?
The request For the extension will be made in writing prior to January 20, 2006.
8. What is an immediate consequence to the County if the bid were not awarded?
One of the planned uses of the Reload building is to provide adrop-off area for the commercial
haulers. It is anticipated that extension of the Hilo Landfill will take place soon. For safety reasons,
during most of 2006, we will be intermittently restricting access bynon-County vehicles to the
landfill It is important to be able to re-route the commercial haulers to the Reload building as soon
as possible.
9. What are we doing now to implement landfill diversion before waste arrives at the landfills, or
eventually at a Reload Facility?
This fall, we began contracting with a vendor to place collection bins at many of our 2] transfer
stations for various recycling services. We now have non HIS glass collection at fifteen transfer
stations (Hilo, Papaikou, Honomu, Laupahoehoe, Paauilo, Honokaa, Waimea, Hawi, Puako,
Kealakehe, Keauhou, Volcano, Glenwood, Keaau, and Pahoa). At eight of our transfer stations
(Hilo,Waimea, Hawi, Puako, Kealakehe, Keauhou, Keaau, and Pahoa), there is collection for mixed
traditional recyclables of cardboard, paper fiber, newspaper, magazines, plastic, and tin cans. HIS
redemption is at nine transfer stations (Hilo, Waimea, Hawi, Puako, Kealakehe, Keauhou, Waiohinu,
Keaau, and Pahoa).
10. What do you mean when you say the "Reload building", "Reload Facility", and "Sort Station
Complex"?
We call the actual building, with the tipping floor, where residents and businesses would take their
trash, the Reload building. We call that building, and the infrastructure needed to make it functional,
the Reload Facility. We call the whole facility design, with greenwaste diversion, scrap metal
recycling, and bottle bill redemption, and any other activities that could reasonably be located at this
site, the Sort Station Complex. Formally, this project is named "The East Hawaii Regional Sort
Station".
0 0 0 0 0 0 0 0 0 0
:O OD 00 I~ h M ~ N O) O O
m t17 r (D I~ M~ O O r OO
N r
r ~ •m r-
l0 ~ 10
vam
°o v rn o ~ o 0 0 0 0
v ~ o 0 0 0
p ~ M ~ N ~ ~ O) OrD V' O 00
CO N O ~ O N
d~ ~ O O CO N O~ O OD
~ 7~ O (NO ^ O O ~ O W M
fn V3 ER O ~ V3 ER ~ M
V N r
M 4H Ef3 fR
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
y„ 'O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
00 M V' O M I~ ~ n M h V' V~ O O O
N~~ m N ~ V N O M CO f~ OD ate- CV X 0 0 G
3
t6 d
vam
ooornooN aoo~ooooo000
a o 0 o v o o rn o o v o 0 0 ~ o 0 0 0
o ri co M o co v ri o ao ~i o Oi Sri r~ ui o vi
m N N N CD O M M M O I~ N V h 01 00 V O OD
c w M N~ (O O O N O O (p M M N N O t0 O N
~ C
N~ O M N 00 CO cr CO N~ O M N O~ O OD
o~ ~ ~ N O 00 M~ N ~ 00 (O N N M O~ 00 00 C7
V ~ V 69 M CO I~ O ~ N to V3 ER ~ M
~ r £ N M• Vi ER fR b9 69 ~ ~ V3 EA ER EA fPr
(0 ~ Q ffl fR 69 ~
U N
T ~ ~ ~
~ o M J o
_ Q
m N ~ N ~
O ~ ~
E ~ ~ .N. ~ ~ fD ~ ~ d
~ ~ C O O O f6 F"
cn~ m c py
m= ~,~L ~ o>~ ~
w ani m~O~ ~ aoi c
o v a~ m e rn o
O LL C QI N v 3 C U f6 C N
~ 'C d
ad+ ,w0. US L 'O C O m U N ~ , N
~ ~ O C ~ N - (n d W ~ 'O "O f6 O
E v`~ .c~ a m m m m m rn 'S ~ m~
(A ~ i0+ c v 'O ~ G U U C C C C m J (n ~
Cn (n J ~ ~ N (6 fn .N a "p 'O 'O ~ 'O C
N Z' N N U N ~ ~ -O -O -O 'C7 U .f0 O) O~ f6
f4 > ~ 'C ~ ~ LL C C ,N
v .J ~ o 0 0 0 0~ :a a
iv c o v v v m v v v o
c~ cn ~ O W O ~ ~ ~ ~ ~ [C ~ to ~ cn ~
as
c
~ 'a y
c ~
Z' p ~ ai ~
~3 a ~
_ in ~
U N ~ .v o!S o~ ~
co v
ayi 3 'a ti c c
e ~ o ~ •a
N k N ~