Loading...
HomeMy WebLinkAboutCOM 0453.013 2004-2006 Summary for June 1995 "Final Reaorh Documentation of Facilities for the Boatine Pro¢ram Transfer to the Department of Land and Natural Resources -Master Plans Phase: Boatins Cauital Imarovement ProEram (CII'1 Projects" Pr~azed bv: Prepazed for: RM. Towill Corporation State of Hawaii 420 Waiakamilo Road, Suite 411 Department of Transportation Honolulu, Hawaii 96817 Harbors Division Facilities by Island and 1995 Estimated CIP Costs: Oahu Totals: $85300.000 Ala Wai Boat Hazbor 1) 52.47M Keehi Boat Hazbor 10.14 M Heeia Kea Boat Hazbor 2.48 M Waianae Boat Hazbor (#2) 11.96 M Maunalua Ramp 1.7] M Haleiwa Boat Hazbor 6.51 M 1) -Includes $25.5 M for repair of Ala Wai Canal Sea Wall (#2) -Includes increase capacity, new catwalk ramps, loading dock Maui Totals: $42,000.000 Kahului Boat Ramp Kihei Launching Ramp Lahaina Boat Hazbor Hana Whazf and Ramp Maalaea Boat Hazbor Molokai Totals: (included in Maui's Totals) Lanai Totals: (Included in Maui's Totals) Kaunakakai Boat Hazbor Manele Boat Hazbor Kauai Totals: $11,000,000 Nawiliwili Boat Hazbor Port Allen Boat Hazbor Waiakea Ramp Hawaii Totals: $14,460.000 Honokohau Boat Hazbor 10.4 M Puako Boat Ramp 3.8 M Kawaihae Boat Hazbor North .3 M Hawau Totals: $19 607 760 Estimated 2005 Deferred CIP Cost Comm. No. y_, f3 ' ~3 Ref. To: Rif. Cotes Wailoa Small Boat Harbor: (Not Included in R.M. Towill 1995 Report) Dredging Project 1.0 M New Second Launch Ramp 1.0 M Fendering System (Suisan) .3 M Replace Existing Ramp .8 M Wailoa Small Boat Harbor 3.1 M Summary: State of Hawaii -Estimated 1995 CIP Costs - $152,780,000 Assumption: 1995 Estimated CIP Cost $152,780,000 plus (35.6% CPI (#3) or $54,389,700) _ $207,169,700 Estimated 2005 Deferred CIP Cost (#3 -Consumer Price Index of for 1995 to 2004 provided by DoBOR admnilstrator of 32% for nine yeazs or 35.6% for 1995 to 2005 for 10 years) Prepared by: Glenn S. Shiroma 959-7682 gsbiromahi@botmaiLcom