HomeMy WebLinkAboutCOM 0453.013 2004-2006 Summary for June 1995
"Final Reaorh Documentation of Facilities for the Boatine Pro¢ram Transfer to the
Department of Land and Natural Resources -Master Plans Phase: Boatins Cauital
Imarovement ProEram (CII'1 Projects"
Pr~azed bv: Prepazed for:
RM. Towill Corporation State of Hawaii
420 Waiakamilo Road, Suite 411 Department of Transportation
Honolulu, Hawaii 96817 Harbors Division
Facilities by Island and 1995 Estimated CIP Costs:
Oahu Totals: $85300.000
Ala Wai Boat Hazbor 1) 52.47M Keehi Boat Hazbor 10.14 M
Heeia Kea Boat Hazbor 2.48 M Waianae Boat Hazbor (#2) 11.96 M
Maunalua Ramp 1.7] M Haleiwa Boat Hazbor 6.51 M
1) -Includes $25.5 M for repair of Ala Wai Canal Sea Wall
(#2) -Includes increase capacity, new catwalk ramps, loading dock
Maui Totals: $42,000.000
Kahului Boat Ramp Kihei Launching Ramp
Lahaina Boat Hazbor Hana Whazf and Ramp
Maalaea Boat Hazbor
Molokai Totals: (included in Maui's Totals) Lanai Totals: (Included in Maui's Totals)
Kaunakakai Boat Hazbor Manele Boat Hazbor
Kauai Totals: $11,000,000
Nawiliwili Boat Hazbor Port Allen Boat Hazbor
Waiakea Ramp
Hawaii Totals: $14,460.000
Honokohau Boat Hazbor 10.4 M Puako Boat Ramp 3.8 M
Kawaihae Boat Hazbor North .3 M
Hawau Totals: $19 607 760 Estimated 2005 Deferred CIP Cost
Comm. No. y_,
f3
'
~3
Ref. To:
Rif. Cotes
Wailoa Small Boat Harbor: (Not Included in R.M. Towill 1995 Report)
Dredging Project 1.0 M New Second Launch Ramp 1.0 M
Fendering System (Suisan) .3 M Replace Existing Ramp .8 M
Wailoa Small Boat Harbor 3.1 M
Summary:
State of Hawaii -Estimated 1995 CIP Costs - $152,780,000
Assumption:
1995 Estimated CIP Cost $152,780,000 plus (35.6% CPI (#3) or $54,389,700) _
$207,169,700 Estimated 2005 Deferred CIP Cost
(#3 -Consumer Price Index of for 1995 to 2004 provided by DoBOR admnilstrator of 32% for
nine yeazs or 35.6% for 1995 to 2005 for 10 years)