HomeMy WebLinkAboutCOM 0669.000 2004-2006 SSFM INTERNATIONAL, INC.
501 Sumner Street, Suite 620
Honolulu, Hawaii 96617
I N TER N A T I O N A L Phone: (808) 531-1308
Fax: (808)521-7348
Project Managers, Planners. & Engineers
~ American Counctl of Engineering Companies. Member
January 30, 2006 SSrM X005 os~.ooo
I lonorablc Stacy f liga, Chairman
Hawaii County Council
County of Hawaii
ZS Aupuni Street, Koom 209
I lilo. llawaii 96730
Suh_jccL Acyuisitiou of Land for Existing Drainageway Prgject
Pro-Asscssmcnt Consultation for Draft I[mironmental Assessment
Kitkfiau, South Hilo, Hawaii
the County of Hawaii, Ueparnnent of Public Works (DPW), Engineering Division, has initiated the
Acquisition oI Land lur Existing Drainageway Pruject located within the Kukuau, South Hilo District, of
the Island of Hawaii.
The purpose of this project is to acquire private property presently serving as au existing unlined drainage
channel and detention basin tier nmotf from the existing Mohouli subdivision area. The acquisition
would consist of both easements and private property associated with this unlined drainageway and
detention area. A project suuunary and accompanying location map showing this project area are
enclosed for vour inlbnuation_
A Draft Environmcutal Assessment (Draft En) is now being prepared for this project under Chapter 343,
Hawaii Revised Statutes, and Title ll, Chapter 200, Department of Ileahh, [lawai'i Administrative
Rules. l~hercforc, this letter and attachments are being provided to solicit any comments, concerns, or
regulatory requirements you may have so that it may he addressed in the: Draft I[A.
We would greatly appreciate your cooperation in providing us with any written comments within 31 days
f}om the date of this letter. if you have any questions on this matter, please call me at (808) 531-1308.
~ hank yOU.
Sincerely,
Ronald A. Sato, AI('P
Senior Project Planner
Email: rsato u ssfm.com
Endosures: Prujcel Summary ~ Location Mxp
Comm. No.~__
Ref. To:
Ref. Uate 3
"1=, SSFM INTERNATIONAL, INC.
501 Sumner Street, Suite 62C
Honolulu. Hawaii 96817
N T E H N A T I O N A L Phone: (808) 531-1308
Fax' (808) 521-7348
Protect Managers, Planners. & Engineer=
American Council of Engineenng Companies, Member
Acquisition of Land for Existing Drainageway Project
Project Summary
January 30,2006
The County of Hawaii, Department of Puhlie Works (DFW), Engineering Division, is proposing
the Acquisition of Land for Existing Drainageway Project located within the South Flilo District
of the Island of Hawaii.
I~he County DPW is proposing to acquire private property and casements that presently serve an
unlined drainageway and detention area fr1r storm water runoff from the Mohouli subdivision
area. That housing project previously installed a 54-inch culvert within a drainageway,
discharging runoft~ from Ho opuni Way across Popolo Street and into a depressed area situated
inland (mauka or west) of Kapiblani Street. This drainage system was established as a
temporary solution since drywalls could not be utilized for the subdivision development.
A Kuk~tau Street extension project, including drainage improvements, was proposed in 1973 to
provide a pcmlancnt solution for collecting storm runoff icom this subdivision. That drainage
system ~~~ould have redirected flows from the Mohouli subdivision along Kukuau Street, through
Kapi'olani Street, and eventually discharging near the Alenaio Stream Bridge. However, that
roadway extension project ~tias never constructed, and thus the drainage improvements were not
completed.
fhe County is now planning to acquire some private properties and casements for drainage
purposes to formally establish this existing drainageway and detention area. A project location
map is enclosed showing this drainage path and affected properties by Tax Map Key number.
As such, a Draft Environmental Assessment (Draft EA) is currently being prepared for this
project to allow ftrr the acquisition of private property using County funds. The Draft EA will
include detailed descriptions of the proposed use, and analyze the probable environmental
impacts of the pn>jcct as ~+~ell as the associated mitigation measures to ensure that potential
adverse impacts arc minimized or mitigated. Any comments, concerns, or regulatory
requirements in regards to this project will he addressed in the Draft EA.
~y w",.
,,•~~r' \ ,
` ~ ~ `
".r-
' !
Approxl '
Ploodway ~ day° ~
(CMF F.~IheBrg 2004} 54 ,
j
' 53 i,
.f//(//~
~ !b { f
®p 0 ~
3b1"
49
9 80 48 1. -
10
ti
A ,
t.
` oo 1(l
`0`°f 108 ~
ee~ .
104. S~ l
110 ~a\e ~ r~ f,."
131.
~
115 23\
12s Approximate
DrainB'ge Easement
78 ` ~a ' " " Route ° " ~e
s~
- ~ ~ .
• ,
LEGEND
106 Parcels under TMK 2-04-25
` ~ Parcels under TMK 2-04-59
106 Parcels under TMK 2-04-55
APPROXIMATE URAINACEWAY BOUNDARY EXHIBIT 1
AIVD AFFECTED PARCELS
Ar melllmro Land r-~rie~tin Urama~ loume Srnre OfJiae of Planning
q / /o g Ae~~,rv Pm~rc~ (C/S'TMAU t.q
Department n/Public Wurkr, CuvnN of Have,il CMF £nK~neer'ing (Ap>i12004J