Subject: Kealakehe Wastewater Treatment Plant
Attached for your information and use is our operation and maintenance
inspection report for the subject facility. The facility is presently being
operated and maintained satisfactorily. However, a "Conditional Acceptance"
rating is given as the effluent reuse system has not yet been implemented.
Per a Consent Order dated March 13, I997, for Department of Health v. County
of Hawaii, Docket No. 90-WW-EO-10, the County agreed to construct a system to
reuse effluent from the treatment plant. The system will be used to irrigate
landscaping at Honokohau Harbor and along the access road between Kaahumanu
Highway and Honokohau Harbor. Also, the project is to be completed by
October 31, 1998. Please inform us of the current status of this project as
well as other projects to reuse the plant's effluent.
If you have any questions, please call Sanford Nakamura of our Wastewater
Branch at 586-4294.
f.~, /~yy'
THOMAS E. ARIZUMI, P.~., Chief
Environmental Management Division
SN:mt
Attachment
c: ?County Council Public Works Chairperson (w/report)
EPA Region IX (w/report)
Attn: Dan Meer
(;~,m®. DIA. 514
I~!P 1(n. S
r. ~ro: 'PW Yl.
rm n ,
OPERATION AND MAINTENANCE INSPECTION REPORT
INTRODUCTION
Facility: Kealakehe WWTP
Date(s) of Inspection: July 18, 1997
Inspector(s): Sanford Nakamura
Facility Representative(s)/Job Title:
Napua Springer/WWTP Supervisor
BACKGROUND
1. Current status of deficiencies cited in previous inspection reports:
Deficiency: There were no deficiencies cited in the previous
inspection.
Status:
2. NPDES Permit Status:
Not applicable.
3. Enforcement Action:
The County is presently under a Consent Order for enforcement case,
Department of Health v. County of Hawaii, Docket No. 90-WW-EO-10. Under
the terms of the Consent Order the County shall construct a system to
use properly treated effluent to irrigate landscaping at Honokohau
Harbor and along the access road between Kaahumanu Highway and Honokohau
Harbor. The project shall be completed by October 31, 1998.
4. Capacity Analysis:
Average flow: 1.04 MGD (For the period 07/1/96 to 6/31/97)
Design flow: 5_31 MGD; Percent of design capacity: 19.6%
Previous year's comparison: Flow has increased by 0.11 MGD from last
year.
5. Modifications/Additions - Planned/Present Construction Status:
None.
CURRENT INSPECTION
1. Maintenance: Check either:
Preventive Maintenance: X Current i Backlogged
Corrective Maintenance: X Satisfactory Excessive
Major (or a11) items requiring repair/replacement:
None
2. Reuse:
The facility has a DOH approved effluent irrigation plan:
Yes No X Not applicable
Effluent is not being reused at this time.
3. NPDES or Chapter 62 violations (effluent limitations, spills, etc.):
No spills occurred within the treatment plant within the last 12 months.
One overflow of untreated sewage occurred within the collection system.
4. Visual quality of effluent on date of inspection (inspector's
judgement):
The effluent appeared clear and slightly green.
5. Facility's Present Deficiencies:
There were no deficiencies that were cited from this inspection.
SUMMARY
1. General Rating:
ACCEPTABLE X CONDITIONAL ACCEPTANCE _ UNACCEPTABLE
Explanation: The operation and maintenance of the facility is
satisfactory. There were no deficiencies that were noted in this
inspection. However, the County has not constructed or implemented an
effluent reuse system yet. The effluent BOD has averaged 14.0 mg/1 and
the TSS 19.6 mg/1 for the past three months. The plant appeared clean
and orderly and all unit processes were satisfactory.
2. General Comments/Recommendations:
The plant is relatively new and all unit processes are operating
satisfactorily. The odor control system is used as needed. The plant
is in an isolated location and odors have not been a problem. The
recommended operation manual maintenance schedule has been implemented
and the maintenance is satisfactory. Continued maintenance is
recommended to extend the life of the equipment.
We recommend that a copy of the plant's as-built plans be stored at the
treatment plant for reference purposes.