1. Kaapoko Hmstd Rd. sewer extension was not included in the original bid to install sewer
piping, and other than an old report this had not been mentioned until the County had bids which
were lower than they estimated.
A. All meetings were with the housing area located in the town proper and are on small lots
and the addition of the sewer piping solved a problem.
2. County reference to EPA impact statement of 1972
A. Was this done at that time with the plans that C Brewer bring their flow to the ocean up to
standards with the housing being part of that project.
3. Kaapoko Hmstd. Rd. homes which is a dead end street, have larger lots than those of the
Papaikou proper and in fact a few of the homes located there now have new operating systems
approved by the county with-in the last 4 to 5 years.
A. The remainder of the residences have never experienced the to need to have their
systems pumped, where as the county rumors lead people to believe the opposite. Part of this
might be explained by most have larger pieces of property.
B. Many of the homes located on larger properties would have to provide extended pumping
systems just to connect to the proposed piping system.
4. If the County is concerned about increasing plant use and keeping run off from the ocean,
than it should look at the area below the Belt highway and along Mamaaloa Highway. There is a
greater density of people and being closer to the ocean would increase the possibility of proposed
pollution.
5. Addressing revenues by the County is another matter to not put this plan up Kaapoko Hmstd.
Rd.
A. The small amount of homes located here will never make up even a small portion of the
cost of installing the extra piping. The only added thing it will do is force those living on fixed
incomes the added cost of paying for something that is not needed.
6. Reference to EPA by states that only a percent is required which will be met by the added
systems already being put on line, and now the county wants to spend unnecessary money at this
point when they realized that the bids are less than expected, and that they have not considered
the cost of putting the road back to the condition prior this project starting.
7. There is nothing wrong with returning federal funds when they do not benefit the people they
serve and will cost the county added cost owed when they can not show it will pay for itself.
~0. / 2 O 3
Etta no, sEw
Prasentad ~ ~ ~ ti ~ ~
Ref. 2b~
Ret. Date fF9 7 1997
8. Dept. of Public works let stated that the contractor is demo. .zing his equipment would
cost the county extra money should they decide to include Kaapoko Hmstd. Rd. at a later date. This
is a dead end road "Mauka" which should never be a pollution source.
A. Cost effective bids never bid their cost of equipment into this discussion as it is part of their
portion of the business.
9. It would be to the benefit of the County to set this aside to look at this for the long term and do
their own cost analysis which would have more merit and could be discussed and an intelligent
solution could best serve the population.
10. It would better serve the County to:
1. Insure that adequate funds currently available replace the roads torn up are properly
replaced.
2. Extend the lines further either makai of the belt road to prevent further ocean pollution or
along the belt road toward Onamea to serve the newly approved subdivisions.