Loading...
HomeMy WebLinkAboutCOM 0121.010 1996-1998 oJNtr or N~~. U6C• Donna Fay K. Kiyosaki Stephen K. Yamashiro Chief Engines. Mnyor Jiro A. Sumach ~r~rEO N~.N~ Deputy CPo'efEngineer ~LOLTTit~i 0~ ~tI~SltItt DEPARTMENT OF PUBLIC WORKS 25 Aupuni Street, Room 202 Hilo, Hawaii 96720-4252 (ROR) 961-8321 Fax (808) 961-8630 April 23, 1997 c>^ ~J HONORABLE CHAIRMAN AND MEMBERS n ~ HAWAII COUNTY COUNCIL O ~ ~ -1~ 25 AUPUNI STREET LC: r\~ ~ ~ HILO HI 96720 s r C ~ ~ =1 SUBJECT: KAAPOKO HOMESTEAD ROAD SEWER EXTENSION 7_' PAPAIKOU SEWERAGE SYSTEM ~ ~ D • rv = o Pursuant to Section 3 of Ordinance No. 96-51, we are resubmitting the attached resolution for your consideration. To assist you in your decision making and to address questions which were previously raised regarding this project, we are also attaching the following information: • Tables which summarize the existing and projected connections and flow rates and the percent compliance based on the various sewer projects • A letter from Linda Reeves, Audits Resolution Coordinator for EPA, warning the County of possible ramifications should the County fail to fully utilize the plant In discussions held with both the State Department of Health and Linda Reeves of EPA, Ms. Reeves stated that by completing the Kaapoko Extension as proposed, the County would be showing a good faith effort to meet compliance requirements and that she would consider the audit closed. However, should the County fail to utilize the available Federal monies and construct the extension, this matter could very well be turned over to the U.S. Attorney for enforcement action. Therefore, we recommend that the Council seriously reconsider the resolution and the possible financial impacts it could place on the County. The Council should also be aware that an expeditious review is critical as the Farmers Home Administration is requesting that the County move to finalize and close out the Pap aikou Phase II project. Should this occur, the County will lose the over $500,000 in federal monies and will not be able to do any additional sewer extensions under this project. kgie lWo.__ Sr'i1~o^- itef. Toi~1.5G...-. 1~79i k~e~. [>ate._. APR 2 Letter to County Council Page 2 April 23, 1997 Under separate cover, we are transmitting the proposed resolution to the Public Works Committee Chair for introduction. Also, because this resolution has previously been discussed at great length, we request that you waive the committee meeting and agendize the resolution for the next full Council meeting. Your favorable consideration of this request would be greatly appreciated. We will be available at the Council meeting to answe any dditional concerns you may have. DONNA FAY KIYOSAKI, .E. APPRO D: Chief Engineer 1~~~ STEPHEN K. YAMASHIRO MAYOR cc: Public Works Committee Chair (w/attach) WWD /~QS_ 7~ 4/15/97 Page 1 PAPAIKOU WASTEWATER SYSTEM CONNECTION COMPLIANCE SUMMARY EPA REQUIRES 75% OF TOTAL UNITS TO BE CONNECTED z r w 1`' , ~ ~ ~x ~}rrva ~ ~ r ~ , art' 1 PROJECTION INCLUDING KAAPOKO EXTENSION Actual Papaikou Existing 166 Actual Paukaa Existing 60 Papaikou Phase II 38 Paukaa Phase II 123 Kaa oko Extension 24 TOTAL PROJECTION: 411 ,~~ai PROJECTION WITHOUT KAAPOKO EXTENSION Actual Papaikou Existing 166 Actual Paukaa Existing 60 Papaikou Phase II 38 Paukaa Phase II 123 Kaa oko Extension 0 TOTAL PROJECTION: 387 ii ~ ~ ~ ~~7i°~a, % Connection is based on 578 total units per the EPA Final Determination Letter Revised Kaapoko 4/15/97 Page 2 PAPAIKOU WASTEWATER SYSTEM FLOW COMPLIANCE SUMMARY EPA REQUIRES TOTAL FLOW OF 75% DESIGN FLOW (t,~( y~!~ry y~~ ~ ~77~ a ~i 9 i." i" , ~ ran~,~., ~...3. ~ Leo e, r .'t"'e;.. r^ne"... ~ PROJECTION INCLUDING KAAPOKO EXTENSION AcWal Existing 226 442 0.10 Papaikou Phase II 38 442 0.02 PaukaaPhaseII 123 442 0.05 Kaapoko Extension 24 442 0.01 TOTAL PROJECTION: aI i 442 015= ~ PROJECTION WITHOUT KAAPOKO EXTENSION Actual Existing 226 442 0.10 Papaikou Phase II 38 442 0.02 Paukaa Phase Ii 123 442 0.05 Kaapoko Extension 0 442 0.00 TOTAL PROJECTION: 3s~ aa2 0.17: '~j`~'1% Average Flow (442 gpd/unit) is based on Existing Flow (0.10 mgd) divided by Existing Connections (226) Revised Kaapoko JH,tco s r9rFs ~m A ~ UNITED STATES ENVIRONMENTAL PROTECTION AGENCY ~F,ij `~,o~ REGION IX 9` `ROSE 75 Hawthorne Street San Francisco, CA 94105-3901 February 18, 1997 Mr. Dominic Yagong Council member Hawaii County Council 25 Aupuni Street Hilo, HI 96720 Subject: Mandatory Sewer Construction Projects Dear Mr. Yagong: This letter is in reply to your inquiry of last week regarding the EPA-mandated sewer construction projects in the Papaikou wastewater treatment plant sewer service area. On March 23, 1993, EPA issued a Final Determination Letter (FDL) which states that $6,891,902 to construct the Papaikou wastewater treatment plant will be eligible for EPA grant funding once the plant is fully utilized. To fully utilize the wastewater treatment plant, the FDL noted that the County must construct sewers to connect at least 75% of the homes and structures in Papaikou and Paukaa to the sewer system, and the treatment plant must receive at least 75% of the design capacity after a reasonable and necessary adjustment due to unrealized population growth in the area. Based on information provided by the County of Hawaii, the FDL noted that construction of the Papaikou Phase II and Paukaa Phase II sewers would fully utilize the treatment plant. However, the County of Hawaii recently informed EPA that construction of these sewer projects will sewer fewer homes than indicated in the FDL, and may not result in full utilization of the Papaikou wastewater treatment plant. Should the County fail to achieve full utilization of the Panaiknu wastewater tre~tm?nt plant EPA will reconsider the eligibility of the $6,891,902 'o construct the plant. We urge the County to construct all sewer projects necessary to fully utilize the treatment plant. If you have any questions, please call me at (415) 744-1944. Sincerely, Linda Reeves Audits Resolution Coordinator cc: Donna Faye K. Kiyosaki, County of Hawaii Dennis Tulang, Hawaii Department of Health