Loading...
HomeMy WebLinkAboutCOM 0176.031 2006-2008 f/,~ t,:.~ .H COUNTY OF HAWAII STATE OF HAWAII M'Y BILL NO. ORDINANCE NO. AN ORDINANCE AMENDING CHAPTER 27, FLOOD CONTROL, HAWAII COUNTY CODE 1983 (2005 EDITION), AS AMENDED, RELATING TO STORMWATER MANAGEMENT. BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAI`L• SECTION 1. The purpose of this ordinance is to revise Chapter 27 to comply with current National Flood Insurance Program regulations found in the Code of Federal Regulations, Title 44, Parts 59 through 79; establish drainage improvement standazds to control stormwater quality and runoff qualifies generated by developments; establish requirements for structures that suffer repetitive losses due to flooding; clarify and restrict substantial improvements; and correct various inconsistencies found in the chapter. SECTION 2. Chapter 27, Hawaii County Code 1983 (2005 edifion), is amended, by amending the title to read: Chapter 27 [ ] FLOODPLAIN MANAGEMENT SECTION 3. Chapter 27, article 1, section 27-1, Hawaii County Code 1983 (2005 edition), as amended, is amended to read as follows: Section 27-1. Statutory authority. This chapter is enacted pursuant to the U.S. National Flood Insurance Act of 1968 (Public Laws 90-418 and 91-152), as amended, and the U.S. Flood Disaster Protection Act of 1973 (Public Law 93-234), as amended. In addition, the Legislature of the State of Hawaii has in Hawaii Revised Statutes 62-34f1$}~8--109;} 46-1.5(5). 46-1.5(141. 46-11, 46-11.5 and 46-12 conferred upon the various counties the authority to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. SECTION 4. Chapter 27, article 2, section 27-5, Hawaii County Code 1983 (2005 edition), as amended, is amended to read as follows: Section 27-5. Applicability. (a) This chapter shall apply to all areas of special flood hazards identified by the Federal Insurance Administration in a scientific and engineering report entitled "Flood Insurance Study," dated ' ~ ' April 2, 2004, Comm. N~teaarwi W ! Ref. Tot _.x__---- Ref. Uate APR~(1(]L ~r~, TL_ AA,.. t~ Innn J,..va cl,.,.,J I„,.,,.,,..,.., a. .ate, TI rDAA „ „oi~ nlcoc nil?n nn~~n ..„a nA,.„ r„,J,,,. „ol a 6e.o6.. ,.,J,.„.o,J £mcrvc-c-mtcc.--a T6o TA.,.. 1 ~ Inn 1 7: 1,.,.,J 1„.....,.„,..~ C...,J. ,.6..11 ~ „I,+.....„. r6.. L,L, 1 ~ 1 nnn L'I,.,.,J I„~....,„,.,. C...,J., !71 T6v L'IDAA „ „ol~ n1 ~Q77 n91?n ,.„,J nn7~n ~6., 11 .o„L.,.o t=7 ?60 1:TDAA „ ~1~ nl~4n n'71?!` „,J nn'1~!` ol. The AA... 1~ tnnA 7. A..„ i„.Jo., „,.1 ..M., 11 ..„L,,.o .60 r-T7 , lu6 l~ Innn AA.,„ t„,J o., ..~„ol /6\ T6„ I..„„ 7 InnG „,J~. ~a L'I,.,.,J 7„.......,„ C.,.a., 1;iDAA D~„el,. ~~c nm~n ,.„a nA..„ 1„,Je... „ „.,I „ 6,...,.6.~ .r_~2Q-a:,a tI~ .rr ic° ~r-'a'~«,• ~ loot RI,.,..J 1„~.;ivRvi cvr«vr,J• pia lrr~•riicm°ciii 1 - .~R,... 1 ! 1 nn J ..„a 1_~~~_ Innn L'I,.,.,J r„,....,.„,.e c' T6~ cIDnA „ „ol.. nm~? „„a nn~~n ~6„II _,.„1.,,,,. .tie I:roAA ....„„1.. nn~~n „„a now` e,.«:. „1., T`~,.r,~r,,~„c~ Inns nA..„ 1„,1~., „ „.,1 ,.6.,n .e„I..,.o ?6e TA,... I~ inn AA.,„ r„,Je., „ „ot,j SECTION 6. Chapter 27, article 2, section 27-8, Hawaii County Code 1983 (2005 edition), as amended, is hereby amended to read as follows: Section 27-8.Other laws and regulations. All construction and improvements subject to this chapter shall comply with other applicable laws and regulations including, but not limited to, the zoning, building, electricity, plumbing, subdivision, erosion and sedimentation control chapters of the Hawaii County Code, and the storm drainage standards, October 1970 edition, or later revisions of the County of Hawaii. This chapter, designed to reduce flood losses, shall take precedence over any less restrictive, conflicting laws, ordinances, and regulations. This chapter is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this chapter and another chapter, easement, covenant, or deed restriction conflict or overlap, whichever imposes the more stringent restrictions shall prevail. In the event of a conflict between this chapter and the National Flood Insurance Program and Related Regulations (NFIP), as amended, the mr~] more restrictive arovision will govern. SECTION 7. Chapter 27, article 2, section 27-12, Hawaii County Code 1983 (2005 edition), as amended, is hereby amended to read as follows: Section 27-12. DeTmitions. [(a-)J Unless specifically defined below, words or phrases used in this chapter shall be interpreted so as to give them the meaning they have in common usage and to give this chapter its most reasonable application. 3 [N ~I-}~ "Existing manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes aze to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before May 5, 1982. [(-t-~}] "Fill" is the placement of fill material at a specified location to bring the ground surface up to a desired elevation. IFi)] "Fill material" can be natural sand, dirt, soil or rock. For the purposes of floodplain management, fill material may include concrete, cement, soil cement, brick, or similaz material as approved on a case-by-case basis. [(d-~] "Flood, flooding, or [f'~~,~n~] tlood~ater" means (A) a general and temporary condition of partial or complete inundation of normally dry land areas from (i) the overflow of inland or tidal waters, (ii) the unusual and rapid accumulation of runoff or surface waters from any source which are approximately caused by flooding as defined in paragraph (A)(ii) of this defimition and aze akin to a river of water on the surfaces of normally dry land areas, as when earth is tamed by a current of water and deposited along the path of the current; and (B) the collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in flooding as defined in paragraph (A)(i) of this definition. [(-1-8}] "Flood elevation determination" means a determination by the Federal Insurance Administrator of the water surface elevations of the base flood, that is, the flood level that has a one percent or greater chance of occurrence in any given yeaz. [(-1~] "Flood elevation study" or "flood study" means an examination, evaluation, and determination of flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation, and detemunation of flood-related erosion hazards. [{?{tj] "Flood Insurance Rate Map (FIRM)" means the official map on which the Federal Emergency Management Agency or Federal Insurance Administration has delineated both the areas of special flood hazards and the risk premium zones applicable to the community. "Flood Insurance Study" means the official report provided by the Federal Insurance Administration that includes flood profiles, the Flood Insurance Rate Map, and the water surface elevation of the base flood. [(?2-i] "Floodplain or flood-prone area" means any land azea susceptible to being inundated by water from any source (see definition of "flooding"). [(-23)] "Floodplain administrator" is the individual appointed to administer and enforce the floodplain management regulafions. This person shall be the director of public works of the County of Hawaii or the director's duly authorized representative. 5 facilities, but does not include long-term storage or related manufacturing facilities. [(33)] "General floodplain" -See "Zone A." ((34l] "Hardship" as related to article 5, variances, of this chapter means the hazdship that would result from a failure to grant the requested variance. The director of public works requires that the variance be exceptional, unusual, and peculiaz to the property involved. Mere economic or financial hazdship alone is not exceptional. Inconvenience, aesthetic considerations, physical handicaps, personal preferences, or the disapproval of one's neighbors likewise cannot, as a rule, qualify as exceptional hardships. All of these problems can be resolved through other means, without granting a variance. This is so even if the alternative means are more expensive or complicated than building with a variance, or if they require the property owner to put the parcel to a different use than originally intended, or to build elsewhere. [(33i] "Highest adjacent grade" means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. [{36~] "Historic structure" means any structure that is: (A) listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (B) certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district registered historic district; (C) individually listed on a State of Hawaii inventory of historic places[;] where the historic preservation program has been approved bathe Secretary of the Interior; or (D) individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either: (i) by an approved State program as determined by the Secretary of the Interior, or (ii) directly by the Secretary of the Interior in states with approved programs. [(3~}] "Levee" means aman-made structure, usually an earthen embankrrrent, designed and constructed in accordance with sound engineering practices to contain, control, or divert the flow of water so as to provide protection from temporary flooding. [(-3&)] "Levee system" means a flood protection system which consists of a levee, or levees, and associated structures, such as closure and drainage devices, which are constructed and operated in accord with sound engineering practices. [(~39~] "Lowest floor" means the lowest floor of the lowest enclosed azea (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access, or storage in an azea other than a basement area is not considered a building's lowest floor provided that such enclosure is not built so as to render the structure in violation of the applicable nonelevation design requirements of this chapter. [(49l] "Manufactured home" means a structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when attached to the required utilities. The term 7 [E4€rj] "New manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facili$es for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after May 5, 1982. "Obstruction" includes but is not limited to any dam, wall, wharf, embankment, levee, dike, pile, abutment, protection, excavation, channelization, bridge, conduit, culvert, building, wire, fence, rock, gravel, refuse, fill, structure, vegetation, or other material in, along, across, or projecting into any watercourse which may alter, impede, retard, or change the direction and/or velocity of the flow of water, or due to its location, its propensity to snaze or collect debris carried by the flow of water or its likelihood of being carried downstream. [(-481] "One-hundred-yeaz flood" means a flood which has a one percent annual probability of being equalled or exceeded. It is identical to the "base flood." [(~9j] "One-hundred-year floodplain" means any area of land susceptible to being inundated by water from any source generated by the one-hundred-year flood. [(-SA}] "Primary frontal dune" means a continuous or neazly continuous mound or ridge of sand with relatively steep seawazd and landwazd slopes immediately landwazd and adjacent to the beach and subject to erosion and overtopping from high tides and waves during major coastal storms. The inland limit of the primary frontal dune occurs at the point where there is a distinct change from a relatively mild slope. "Principal structure" means a structure used for the principal use of the property as distinguished from an accessory use. "Recreational vehicle" means a vehicle which is: (a) built on a single chassis: (b) 400 square feet or less when rneasured at the largest horizontal projection: (c) designed to be self-propelled or permanently towable by a light duty truck; and (d) designed primarily not for use as a permanent dwellin bg ut as tem orar l~ving~uarters for recreational, camping, travel, or seasonal use. [(32-1] "Regulatory floodway" means the channel of a river or other watercourse and the adjacent land azeas that must be reserved in order to dischazge the base flood o ...r,o . ,.F eye..,..:,.., ,.tea "Repetitive loss structure" means home or business that was damaged by flood two times in the past ten years, where the cost of fully repairing the flood damage to the buildine, on the average, equaled or exceeded twenty-five percent of its market value at the time of each flood. [(331] "Riverine" means relating to, formed by, or resembling a river (including tributaries), stream, brook, etc. [(34~] "Sand dunes" means naturally occurring accumulations of sand in ridges or mounds landward of the beach. [(33 "Sheet flow azea" -See "azea of shallow flooding." [(3Hl] "Special flood hazard azea" means an area having special flood, mudslide (i.e. mudflow) and/or flood-related erosion hazards, and shown on the Flood Insurance Rate Maps as Zones A, AO; AE, A99, AH, VE or V. 9 "Violatio~i' means the failure of a structure or otrier decetopment to he fiill~~ compliant with the conunwiitv~s tloodplain management regulations. A structure or other development ~iithout the elevation certiticate, other certifications. or other evidence of compliance with this chapter is presumed to he h~ violation until such time as that documentation is pro~•ided. [(-6?IJ "Water surface elevation" means the height, in relation to the National Geodetic Vertical Datum of 1929, (or other datum, where specified) of floods of various magnitudes and frequencies in the floodplains of coastal or riverine azeas. "Watercourse" means a lake, river, creek, stream, wash, arroyo, channel, or other topographic feature on or over which waters flow at least periodically. Watercourse includes specifically designated azeas in which substantial damage may occur. [(-64-1] "Zone A" is the special flood hazard area that conresponds to the one-hundred-year floodplains that are determined in the Flood Insurance Study by approximate methods. Because detailed hydraulic analyses are not performed for such areas, base flood elevations or depths have not been determined within this zone. [(63-1] "Zone AE" is the special flood hazard area that corresponds to the one-hundred-year floodplains that are determined in the Flood Insurance Study by detailed methods. Whole-foot base flood elevations derived from the detailed hydraulic analyses have been determined at selected intervals within this zone. L4661] "Zone AH" is the special flood hazard area that corresponds to the azeas of one-hundred-year shallow flooding (usually areas of ponding) where average depths are between one and three feet. Whole-foot base flood elevations derived from the detailed hydraulic analyses have been determined at selected intervals within this zone. [E6~11 "Zone AO" is the special flood hazazd azea that corresponds to the areas of one-hundred-year shallow flooding (usually sheet flow on sloping terrain) where average depths are between one and three feet. Average whole-foot depths derived from the detailed hydraulic analyses have been determined within this zone. [(6511 "Zone A99" is the special flood hazard azea where enough progress has been made on a protective system, such as dikes, dams, and levees, to consider it complete for insurance rating purposes. Base flood elevations have not been determined for azeas designated as Zone A99. [(69}] "Zone V" is the special flood hazard area that corresponds to the one-hundred-yeaz coastal floodplains extending from offshore to the inland limit of a primary frontal dune along an open coast and any other area subject to high velocity wave action from storms or seismic sources. It is an area subject to high velocity waters, including coastal and tidal inundation or tsunamis. Base flood elevations have not been determined for azeas designated as Zone V. [(~91] "Zone VE" is the special flood hazard area that corresponds to the one-hundred-year coastal floodplains extending from offshore to the inland limit of a primary frontal dune along an open coast and any other azea subject to high velocity wave action from storms or seismic sources. It is an area subject to high velocity waters, including coastal and tidal inundation or tsunamis. Whole-foot 11 t.~ Designed and ndeguatel~ anchored to pre~~ent flotation. collapse, or lateral nrovemenC f~ Constructed offlood-resistant materials: ICS Constructed bti methods and practices that minimize flood dama:e: and 1D1 Constructed w~ilh alecu'ical. healing. ~~entilation, pluurbiue, and air couditiuning e ui ment and other sen~iee facilities that are designed andior located so as to prevent water from emering a accumulative within the components during conditions oftloodine; (4) All permits shall be reviewed to determine that the proposed development [ a,.°° ..°...'..°-...I. ,.FF°,...h° , °F ,l I. FF° ~H°v 1 ~6° ~Ter,,er.--a,-.~ets~~--.,R,~tbe e-~~;,~. e effc~t--ef~..~ °°°a ~'°•~°'°^•r°°~J when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood [:~~~~~°~R",e.,°T~-'~°t] at any point[.] Ensure all State and Federal permits are obtained. (b) Information to be maintained. (1) The Flood Insurance Study and Flood Insurance Rate Maps for the County of Hawaii; (2) The certification of lowest floor elevation; (3) The certification of floodproofing for spaces below the base flood elevation; (4) The certification of final pad elevation where a site is filled above the base flood elevation; (5) The certification that an encroachment in the floodway will not result in any increase in flood levels during base flood discharge; and (6) The certification of elevation and structural support for structures in the coastal high hazard area. (c) Interpretation of maps. The d'uector of public works shall make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazards (for example, where there appears to be a conflict between a mapped boundary and actual field conditions). A person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in article 5. Chance in base flood elevations. R'henever base flood elevations increase or decrease as a result of physical changes affecting flooding conditions, as soon as practical, but no later than six months after the date such information becanes available, the floodplain administrator shall notify the Federal Insurance Administration of the changes by submitting technical or scientific data through the Letter of Map Revision rocess. Such a submission is necessar~• so that upon confirmation of those 13 (4) Floodproofing certification. For all new nonresidential construction and substantial improvement with enclosed azeas below the base flood elevation, the Federal Emergency Management Agency "Floodproofing Certificate" form, as amended, shall be completed and certified by an engineer or architect currently [registered) licensed in the State of Hawaii and shall be submitted for approval with the building plans. The director of public works may require additional information regazding the floodproofing design from the permit applicant and the applicant shall provide it. The information required may include the design data and calculations used in the floodproofmg design, a detailed flood elevation study, a drainage report, and other information as determined necessary by the director of public works to establish compliance with the provisions of this chapter and to promote public welfare and safety. (b) Post-construction certification. Requirements for approval of the certificate of occupancy shall include the following items, as applicable, and any additional items as required by the director of public works to promote public welfare and safety: (1) Elevation certification. The Federal Emergency Management Agency "Elevation Certificate," as amended, shall be completed and certified by a land surveyor, civil engineer, or architect currently [registered) licensed in the State of Hawaii and submitted for approval with the application for the certificate of occupancy. The information certified within the "Elevation Certificate" shall be based on actual construction. (2) Compliance with other requirements of this chapter. SECTION 11. Chapter 27, article 4, section 27-18, Hawaii County Code 1983 (2005 edition), as amended, is hereby amended to read as follows: Section 27-18. Standards for construction. Standards for construction within areas of special flood hazards are established as follows: (a) Anchoring. (1) New construction, improvements to repetitive loss structures, and substantial improvements shall be adequately anchored to resist flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (2) All manufactured homes, including mobile homes, shall meet all standards for structures. (b) Construction materials and methods. (1) New construction, i~rovements to reuetitive loss structures, and substantial improvement shall be constructed with materials and utility equipment resistant to flood damage. 15 (B) Has structural components capable of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy. [(<l-)] ~ In Zones V and VE, filling and the use of fill material for structural support of buildings shall be prohibited. (d) Elevation and floodproofing. (1) Within Zones AE and AH: (A) For residential new construction, improvements to repetitive loss structures, and substantial improvements: The lowest floor shall be elevated to or above the base flood elevation. (B) For nonresidential new construction, improvements to repetitive loss structures, and substantial improvements: The lowest floor shall be elevated or flood roofed to or above the base flood elevation. If the lowest floor is below the base flood elevation, then the structure together with attendant utility and sanitary facilities shalt be designed, [axd] constructed, and certified by a licensed professional engineer or architect such that: (i) The structure is watertight below the base flood elevation. (ii) The walls are substantially impermeable to the passage of water. (iii) The structural components are capable of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy. (C) Within Zone AH, new construction, improvements to repetitive loss structures, and substantial improvement shall be required to provide adequate drainage paths around structures on slopes to guide [€lesd--wets] floodwaters around and away from proposed structures. Fully enclosed areas below the lowest floor that are useable solely for parking of vehicles. buildine access, or storaue in an area other than a basement and which ace subject to floodine. shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a licensed professional engineer or architect or meet or exceed the following criteria: A minimum of two o e~nin~s having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. Each opening must be on different sides of the enclosed area. The bottom of al] openings shall be no higher than one foot above rg ade" Openings may be equipped with screens, louvers. valves. 17 SECTION 12. Chapter 27, article 4, section 27-20, Hawaii County Code 1983 (2005 edition), as amended, is hereby amended to read as follows: Section 27-20. Standards for subdivisions[.-] and other developments. (a) All subdivisions and other decelu nnents within areas of special flood hazards and flood-gone areas shall: (1) Be consistent with the need to minimize flood damage; (2) Have public utilities and facilities, such as sewer, gas, electrical, and water systems, located and constructed to minimize flood damage; and (3) Have adequate drainage provided to reduce exposure to flood damage. (b) All subdivision and other develo nU lent applications shall identify the areas of special flood hazards and base flood elevations on the proposed site. If such infonnation is not provided by the Flood Insurance Rate Maps, the director of public works may request and the applicant shall provide such information. (c) Finally approved subdivision plans for subdivisions within areas of special flood hazards shall provide base flood elevations within the lots. (d) ~II)1...« al.o Fl,.,.A«i..:« A..,.,: «:..a....a,.- I,,,.. Ao..:..«..,o.l o ,.F ~«e,.:..1 a,.,,a L...r 1..,.. «e: al.e. ««,.A....aA . ,..ate,- ~ ..F,.,..~ of o...,a:..« ,lea., « .:Ao«a:C. e.l Fl....A.. ~a..l I.: ,.L, 1, ,-,,....1 al.e Fl,.,.,J..1.,:« .,,J...:..: ~.a«.,a,.- ~I,..I1. .Te. el,.«„.,o«a,. «..I..,J:«.. al.o «I..,.,,...,.«a ..F w,.. «..{:.,.a«....A 4.,.«..~.. . :al.;« 7,.«,. A al.o t. CLD~A I.. T:iD 1\A• I'7\ Do..: o.,, «...«,.~o.J (I e.,,.I,.«.«e«a a,.., a a6.,a „Il ~ e-,...: n. ,..1 .vA 1..., FoA o....i Qa,.ae L..., ;«,.L.A:«.. ~e,.a:,.« Af1A ~.F ai.o T7vAo....1 II7..a„« D..1l..ti,.« f`,.«a.,.l A,.a A.«e«A.«o«a.. ,.F 109'1 2Z T1 C 121A• Troa.~-rs.~r. 13J~Pc@~air°c-sum-¢n-nc'n Svvvrr'}316~i-r-prvpv~s~ivvnxcr F~rvpoSc'v ,1,...01,..,.,..,.«a.. o- al..... N.v- CG. L.a.. F.. -.,.1„A.. Subdivisions and other developments within areas desi>?nated as Zone A or general flood plain shall comply with the following: Obtain all required permits, together with those reculated by other governmental agencies authorized by Federal or State law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334, for all proposed construction, other developments, and theplacement of manufactured homes. For all proposed developments and/or subdivisions greater than either fifty lots or five acres, the developer and/or subdivider shall include base flood elevation data within their proposal. Contph~ with the requirements of section 37-?4. 19 (c) The following uses, not involving fill, shall be evaluated on a case-by-case basis to establish that the use does not cause any increase in base flood elevations: (1) Public and private outdoor nonstructural recreational facilities, lawn, garden, and play areas; (2) Agricultural uses, including farm, grazing, pasture, and outdoor plant nurseries; and (3) Drainage improvements, such as channels and stream crossings. SECTION 14. Chapter 27, article 4, section 27-23, Hawaii County Code 1983 (2005 edition), as amended, is hereby amended to read as follows: Section 27-23. Standards for coastal high hazard areas. Coastal high hazard areas, more commonly known as tsunami inundation areas, aze identified as Zone V or Zone VE on the Flood Insurance Rate Maps. Within coastal high hazard azeas, the following standards shall apply: (a) All new construction, improvements to repetitive loss stn~ctures, and substantial improvements in a coastal high hazard area. shall be constructed with materials and utility equipment resistant to flood damage and using methods and practices that minimize flood damage. (b) New construction, improvements to repetitive loss structures, and substantial improvement shall be elevated on adequately anchored pilings or columns and securely anchored to such pilings or columns so that the lowest horizontal portion of the structural members of the lowest floor, excluding the pilings and columns, is elevated to or above the base flood level. The pile or column foundation and structure attached thereto shall be anchored to resist flotation, collapse, and lateral movement due to the effects of wind and water loads acting simultaneously on all building components. The wind and water loading values shall each have a one percent chance of being equaled or exceeded in any given yeaz. (c) New construction, improvements to repetitive loss structures, and other development shall be located on the landwazd side of the reach of mean high tide. (d) New construction improvements to repetitive loss structures, and substantial improvement shall have the enclosed space, if any, below the lowest floor free of obstructions and constructed with breakaway walls as defined in section 27-12. Such enclosed space shall not be used for human habitation and will be useable solely for pazking of vehicles, building access, or storage. Machinery and equipment which service the building, such as furnaces, air conditioners, heat pumps, hot water heaters, washers, dryers, elevator lift equipment, electrical junction and circuit boxes, and food freezers aze not permitted in such enclosed spaces. The enclosed space must only be achieved with breakaway walls, open wood latticework, or insect screening intended to collapse under wind and water loads without causing collapse, displacement, or other structural damage to the elevated portion of the building or supporting foundation system. A 21 (1) Project location and site plan showing dimensions. (2) Relationship to floodway and floodway fringes as determined by flood elevation study. (3) Contour map showing the topography of existing ground based on elevation reference mazks on flood maps. The scale and contours are to be appropriate to the work in question. (4) Existing and proposed base flood elevations. (5) Existing and proposed floodpmofing and flood control measures. (d) New construction, improvements to repetitive loss structures. and substantial improvements within the general floodplain shall satisfy the requirements set forth for Zones AE, AH, AO, or VE as is determined to be applicable by the director of public works based on base flood information and floodway data obtained through subsections 27-24(a) and 27-24(b). (e) The director of public works may waive informational requirements if the director of public works has sufficient information to make an evaluation and determination regarding flood elevation or may request further information, including a detailed flood elevation study and a drainage report, to evaluate flood risks and determine the applicability of flood construction and development standazds. (f) All new construction, improvements to repetitive loss structures, development, and substantial improvement within the general floodplain shall be certified as required by section 27-17. ~ All manufactured homes shall be elevated and anchored to resist flotation, collapse, or lateral movement. SECTION 16. Chapter 27, article 4, section 27-25, Hawaii County Code 1983 (2005 edition), as amended, is hereby amended to read as follows: Section 27-25. Standards for development adjacent to drainage facilities. New construction, improvements to repetitive loss structures, and substantial improvements proposed adjacent to drainage facilities outside of the special flood hazard azeas identified on the Flood Insurance Rate Maps shall be subject to review and approval of the director of public works. (a) Upon request by the director of public works, further information concerning base flood elevation, floodways, surface water runoff, existing and proposed drainage patterns, and other information, including a detailed flood elevation study, drainage report, and fmdings and opinions by a [fegistered] licensed professional civil engineer, shall be provided to evaluate potential flooding. (b) The director of public works shall detemvne the applicability of the various development and construction standards provided in this chapter based upon information available from a Federal, State, or other source, including information provided by the pernut applicant. (c) A drainage facility shall not be modified, constructed, lined, or altered in any way without the approval of the director of public works. 23 (c) Variances shall only be issued upon: (1) A showing of good and sufficient cause. Under this [eriteeia] criterion, the applicant must demonstrate that the variance request is for land which has physical characteristics so unusual that complying to flood requirements will create exceptional hazdship to the applicant or surrounding landowners. The unique characteristic must pertain to the land itself and not the structure, its inhabitants, or the property owner. Under this [c~tteria] criterion, only exceptional instances should arise where the physical characteristics of properties create a hardship sufficient to justify granting a variance. Even in a fairly common situation where an undeveloped lot is surrounded by properties with structures built at grade and/or below flood levels, a variance cazmot be justified since an applicant can erect the concerned structure on pilings, etc.; (2) A determination that failure to grant the variance would result in exceptional "hardship" (as defined in section 27-12) to the applicant. Under this [eftteria] criterion, the hardship that would result from failure to grant a requested variance must be exceptional, unusual, and peculiaz to the property involved. Economic or financial hardship alone is not exceptional. Inconvenience, aesthetic considerations, physical handicaps, personal preferences, or the disapproval of one's neighbors cannot, generally, qualify as exceptional hazdship. Under this [c-r-iteria] criterion, for example, a member of a household is physically handicapped and wants a variance to build the dwelling at grade or at a lower level for access purposes. A variance should not be issued because the owner can construct a ramp or elevator to meet flood requirements. Elevation will allow the infirm or handicapped person to be evacuated in the eazly stage of flooding, and, if there is insufficient warning or help in evacuating that person, then, in all likelihood, he can survive the flood by simply remaining in the home safely above the levels of [Heed-waters;] floodwaters: (3) A determination that the variance is the "minimum necessary" (as defined in section 27-12), considering the flood hazard, to afford relief. Under this [eriteria] criterion, the variance that is granted should be for the minimum deviation from the flood requirements that will still alleviate the hazdship. In the case of variance to an elevation requirement, this does not mean approval to build at grade level or to whatever elevation an applicant proposes, but rather to a level that the director of public works determines will provide relief and preserve the integrity of the flood ordinance; and (4) A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause "fraud or victimization" (as defined in section 27-12) of the public, or 25 (b) Cross-sections and profile of the area and the regulatory flood elevations and profile based on elevation reference marks on flood maps. (c) Flood study and drainage report in areas where a study and report have not been reviewed and accepted by the County of Hawal`i. (d) Description of surrounding properties and existing structures and uses and the effect of the regulatory flood on them caused by the variance. (e) Evaluation and supporting information for the variance with respect to the factors to be considered by the director of public works as listed in paragraphs 27-27(a) through 27-27(f). (f) An agreement that a covenant will be inserted in the deed and other conveyance documents of the property and recorded with the bureau of conveyances of the State of Hawal`i, stating that the property is located in a flood hazard area subject to flooding and flood damage; that a flood hazard variance to construct a structure below the base flood elevation will result in increased flood insurance rates and increases flood risks to life and property; that the property owners will not file any lawsuit or action against the County of Hawaii for costs or damages or any claim; that the property owners will indemnify and hold harmless the County of Hawaii from liability when such loss, damage, injury, or death results due to any flood hazard variance and flooding of the property; and that upon approval of the variance, the covenants shall be fully executed and proof of recording with the bureau of conveyances shall be submitted to the director of public works prior to the issuance of a building permit. (g) Such other information as may be relevant and requested by the director of public works. SECTION 20. Chapter 27, article 5, section 27-30, Hawal`i County Code 1983 (2005 edition), as amended, is hereby amended to read as follows: Section 27-30. Recording and reporting of variances. (a) Any applicant to whom a variance is granted shall be given written notice over the signature of the director of public works that: (1) The issuance of a variance to construct a structure at elevations below the base flood level will result in increased premium rates for flood insurance[,] up to amounts as high as $2~ for $100 of insurance coverage: (2) Such construction below the base flood level increases risks to life and property; and (3) A copy of the notice shall be recorded with the State of Hawaii bureau of conveyances and shall be recorded in a manner so that it appears in the chain of title of the affected parcel of land. (b) A record of all variance actions, including justifications for issuance of any variance[,] and written notices, shall be maintained by the director of public works. A report of the variances issued shall be included in the biennial report submitted to the Federal Insurance Administration, Federal Emergency Management Agency. 27 give notice to the owner to remove the encroachment and/or obstruction in the manner provided in this [ °r] article. SECTION 23. Material to be repealed is bracketed and stricken. New material is underscored. In printing this ordinance, the brackets, bracketed and stricken material and underscoring need not be included. SECTION 24. If any provision of this ordinance, or the application thereof to any person or circumstance, is held invalid, such invalidity shall not affect other provisions or applications of the ordinance which can be given effect without the invalid provision or application, and to this end, the provisions of this ordinance are declared to be severable. SECTION 25. This ordinance shall take effect upon its approval. INTRODUCED BY: COUNCIL MEMBER, COUNTY OF HAWAII Hilo, Hawaii Date of Introduction: Date of 1st Reading: Date of 2nd Reading: Effective Date: 29