June 19, 2007 'r? _ c
4-~
Ms. Michele L. D'Amico
Director of Development
Wyndham Vacation Ownership
2222 Kalakaua Ave, Suite 1200 ~ ~
Honolulu, HI 96815
Dear Ms. D'Amico:
Change of Zone Ordinance No. 96 61 (REZ 436)
Applicant: Kona Hawaiian Village (formerly Towne-Kona Limited Partnership)
Subject: 2006/2007 Annual Progress Report
TMK: 7-5-19: 5.38, 40, 47 & 48
This is to acknowledge receipt of your letter dated June 4, 2007 with the submittal of a
copy of the Archaeological Inventory Survey and the letter from FEMA dated
December 22, 2006. We understand that you will be submitting the annual progress
report for Change of Zone Ordinance No. 96 61 by June 30, 2007. By copy of this letter,
we will be forwarding the report to the Planning Commission and the Hawaii County
Council for their information.
The next annual progress report is due on or before March 20, 2008. If you have any
questions, please feel free to contact Jeff Darrow at 961-8288, ext 259.
Sincerer
i
CH OPHERJ.YUEN
Planning Director
JWD:smn
P:\public\wpwin60Veft\Lette~r
\Annual Repor[s\LDAmico-APR2006-REZA36.doc
cc w/copy of letter: sFlawaii County Council
Planning Commission
Kona Planning Department
Comm. No. ~
Ref. To• I
Ref. Date I IN 2 2 7nn~
Hawaii County is an Egual Opportunity Provider and Employer.
_ '~Y 4 I t
Y _
~ J
2222 Kalakua Ave, Suite 1200
. Honolulu, Hawaii 96815
P: (808) 921-1040
F: (808) 921-9932 . .
Transmittal
Date: June 4, 2007
To: Christopher Yuen
Planning Director
County of Hawaii
101 Pauahi Street, Suite 3
Hilo, Hawaii 96720
From: Michele L. D'Amico
Director of Development -Hawaii
Project: Kona Hawaiian Resorts Phase 2B
TMK: 7-5-019: 5, 38, 40, 47 & 48
# of # of DATE DESCRIPTION
COPIES PAGES
1 9/1998 Archeological Inventory Survey
1 2 12/22/06 FEMA Letter for CLOMR
1 1 6/4/07 Cover Letter to Chris Yuen
02947
---r
i.
a e . '~'lf~ !ItAI fi r, `~i ' `r`
2222 Kalakaua Ave, Suite 1200 { l:.l ~
Honolulu, Hawaii 96815
(808) 921-1040 -
(808)921-9932 '
June 4, 2007
County of Hawaii
Planning Department
101 Pauahi Street Ste 3
Hilo, Hawaii 96720
Attn: Christopher Yuen
Dear Mr. Yuen,
CHANGE OF ZONE ORDINANCE N0.96-61 (REZ 436)
SPECIAL MANAGEMENT AREA USE PERMIT N0.374 (SMA 374)
Applicant: Kona Hawaiian Village (formerly Towne-KOna Limited Partnership)
Subject: 2006/2007 Annual Progress Report
TMK: 7-5-019: 5.38, 40, 47 & 48
This to acknowledge receipt of your letter dated April 20th to Bob Bethea. Wyndham Vacation
Ownership (WVO) is submitting the following documents:
Change Of Zone Ordinance No. 96-61(REZ 436)
A. FEMA Letter dated December 22, 2006
B. Archeological Inventory Survey Report for Condition I dated September 1998.
Saecial Mana¢ement Area Use Permit No. 374 (SMA 3741
Wyndham Vacation Owner is preparing the Annual Report and will submit by June 30, 2007.
Should you have any questions, please feel free to contact me at (808) 921-1040 x32 or (808)
352-0748.
Si cerely,
Michele L. D'Amico
Director of Development -Hawaii
Encl: County of Hawaii Letter dated Apri120, 2007 ~
%""f7
n~~,
~rendwest
~ i
. GEQ/'~F
T
Federal Emergency Management Agency
Washington, D.C. 20472
6~rND SE~
DEC 2 2 2~6
CERI7FIED MAIL IN REPLY REFER TO:
RETURN RECEIPT' REQUESTED Case No.: 06-09-B343R
The Honorable Harry Kim Community: Hawaii County, HI
Mayor, County of Hawaii Community No.: 155166
25 Aupuni Street, Room 215
Hilo, HI 96720 104
Dear Mayor Kim:
This responds to a request that the Department of Homeland Security's Federal Emergency Management
Agency (FEMA) comment on the effects that a proposed project would have on the effadive Flood
Insurance Rate Map (FIRM) for your community, in accordance with Part 65 of the National Flood
Insurance Program (NFII') regulations. In a letter dated January 9, 2006, Mr. Galen M. Kuba, Division
Chief, Engineering Division, Department of Public Works, Hawaii County, requested that FEMA evaluate
the effects that updated topographic information and improvements to Waiaha Drainageway and Waiaha
Drainageway Splitflow No. 3 would have on the flood hazard information shown on the effective FIRM.
The improvements for Waiaha Drainageway will consist of excavation and channel modifications to
reduce the flow into Waiaha Drainageway Splitflow No. 3. The improvements for Waiaha Drainageway
Splitflow No. 3 will consist of channel modification, placement of fill, and grading. 'The effective Special
Flood Hazard Area (SFHA), the area that would be inundated by the flood having a 1 percent chance of
being equaled or exceeded in any given year (base flood), along W aiaba Drainageway is designated
Zone AE, an area of detailed study with Base Flood Elevations (BFEs) determined and with a regulatory
floodway. 1'he effective SFHA along Waiaha Drainageway Splitflow No. 3 is designated Zone AE, with
BFEs detem»ned but without a floodway.
All data required to complete our review of this request for a Conditional Letter of Map Revision
(CLOMR) were submitted with letters from Mr. Geoffrey L. Casbum, P.E., CMF Engineers, and
Mr. Kuba.
We reviewed the submitted data and the data used to prepare the effective FIRM for your community and
determined that the proposed project meets the minimum floodplain management criteria of the NFII'. The
submitted existing conditions HEC-RAS hydraulic computer model, dated May 8, 2006, based on updated
topographic information, was used as the base conditions model in our review of the proposed conditions
model for this CLOMR request. We believe that, if the proposed project is conshucted as shown on the
work map entitled "Kona Hawaiian Resort Phase 2B Working Topo Waiaha Drainageway and Splitflow
No. 3 Hawaii County," prepared by CMF Engineers, dated August 24, 2006, and the data listed below are
received, the floodplain boundaries of the base flood and Ute flood having a 0.2-percent chance of being
equaled or exceeded in any given year will be delineated as shown on the above-referenced work map.
Waiaha Drainageway
Our comparison of the corrected effective model to the effective flood hazard information revealed that the
BFEs increased in some areas and decreased in other areas throughout the revised reach of Waiaha
Drainageway. The maximum increase in BFE, 0.9 foot, occurred approximately 810 feet downstream of
~ I
2
the confluence with Waiaha Drainageway Splitflow No. 3 (confluence). The maximum decrease in BFE,
• 2.3 feet, occurred approximately 90 Feet upstream of the confluence.
Our comparison of existing conditions to the effective flood hazard information revealed that as a result of
the updated topographic information, the BFEs decreased in some areas and increased in other areas
throughout the revised reach of Waiaha Dtainageway. The maximum increase in BFE, 1.9 feet, occutred
approximately 130 feet downstream of the confluence. The maximum decrease•in BFE, 0.2 foot, occurred
approximately 1,270 feet downstream of the confluence.
As a result of the proposed project, the BFEs will decrease compared to the existing conditions BFEs for
Waiaha Drainageway. The maximum decrease in BFE, 4.2 feet, will occur approximately 220 feet
downstream of the confluence.
As a result of the updated topographic information and proposed project, the BFEs will decrease in some
areas compared to the effective BFEs throughout the revised teach of Waiaha Drainageway. The
maximum decrease in BFE, 2.6 feet, will occur approximately 300 feet downstream of the confluence.
The width of the SFHA will increase in some areas and decrease in outer areas compared to the effective
SFHA width throughout the revised reach of Waiaha Drainageway. The maximum increase in SFH.4
width, approximately 110 feet, will occur approximately 690 feet downstream of the confluence. The
maximum decrease in SFI-IA width, approximately 200 feet, will occur approximately 1,130 feet
downstream of the confluence.
As a result of the updated topographic information and proposed project, dre width of the regulatory
floodway will increase in some areas and decrease in other areas compared to the effective floodway width
throughout the revised reach of Waiaha Drainageway. The maximum increase in floodway width,
approximately 110 feet, will occur approximately 1,360 fcet downstream of the confluence. The
maximum decrease in floodway width, approximately 100 feet, will occur approximately 1,580 feet
downstream of the confluence.
Waiaha Draiaageway Splitflow No. 3
Our comparison of existing conditions to the effective flood hazard information revealed that as a result of
the updated topographic information, the BFEs decreased throughout Ore revised reach of Waiaha
Drainageway Splitflow No. 3. The maximum decrease in BFE, 1.6 feet, occurred approximately 170 feet
downstream of the confluence.
As a result of the proposed project, the BFEs will decrease compared to the existing conditions BFEs for
Waiaha Drainageway Splitflow No. 3. The maximum decrease in BFE, 4.8 feet, will occur approximately
840 feet dowmstream of the confluence.
As a result of the updated topographic information and proposed project, the BFEs and the width of the
SFH.A will decrease in some areas compared to the effective BFEs and SFHA width throughout the revised
reach of Waiaha Drainageway Splitflow No. 3. The maximum decrease in BFE, 6.3 feet, will occur
approximately 840 feet downstream of the confluence. The maximum decrease in SFI-IA width,
approximately 160 feet, will occur approximately 1,600 feet downstream of the confluence.
3
Upon completion of the project, your community may submit the data listed below and request that we
make a f'mal determination on revising the effective FIRM.
• Detailed application and certification forms, which were used in processing this request, must be ,
used for requesting final revisions to the maps. Therefore, when the map revision request for the
area covered by this letter is submitted, Form 1, entitled "Overview & Concurrence Fotm," must
be included. (A copy of this form is enclosed)
• The detailed application and certification forms listed below maybe required if as-built conditions
differ from the preliminary plans. If required, please submit new forms (copies of which arc
enclosed) or annotated copies of the previously submitted forms showing the revised information.
Form 2, entitled "Riverine Hydrology & Hydraulics Form"
Form 3, entitled "Riverine Structures Fornt"
Hydraulic analyses, for as-built conditions, of the base flood; the floods having a 10-, 2-, and
0.2-percent chance of being equaled or exceeded in any given year, and the regulatory floodway,
together with a topographic work map showing the revised floodplain and floodway boundaries,
must be submitted with Form 2.
• Effective October 30, 2005, FEMA revised the fee schedule for reviewing and processing requests
for conditional and final modifications to published flood information and maps. In acwrdance
with this schedule, the current fee for this map revision request is $4,000 and must be received
before we can begin processing the request. Please note, however, that the fee schedule is subject
to change, and requesters are required to submit the fee in effect at the time of the submittal.
Payment of this fee shall be made in the form of a check or money order, made payable is U.S.
funds to the National Flood Insurance Pro~am, or by credit card. The payment must be forwarded
to the following address:
Federal Emergency Management Agency
Fee-Charge System Administrator
P.O. Box 22787
Alexandria, VA 22304
• As-built plans, certified by a registered professional engineer, of all proposed project elements
• Community acknowledgment of the map revision request
• A copy of the public notice distributed by your community stating its intent to revise the regulatory
floodway, or a statement by your community that it has notified all affected property owners and
affected adjacent jurisdictions
• Documentation of the individual legal notices that were sent to property owners who will be
adversely affected by any shift or widening of the SFHA or increase in BFE
After receiving appropriate documentation to show that the project has been completed, FEMA will initiate
a revision to the FBtM. Because the BFEs would change as a result of the project, a 90-0ay appeal period
4 ~ .
would be initiated, during which community officials and interested persons may appeal the revised BFEs
based on scientific or technical data.
The basis of this CLOMR is, in whole or in part, achannel-modification project. IdFIP regulations, as
cited in Paragraph 60.3(6)(7), require that communities assure that the flood~arrying capacity within the' '
altered or relocated portion of any watercourse is maintained. This provision is incorporated into your
community's existing floodplain management regulations. Consequently, the ultimate responsibility for
maintenance of the modified channel rests witfi your community.
This CLOMR is based on minimum floodplain management criteria established under the NFIP. Your
community is responsible for approving all floodplain development and for ensuring all necessary permits
required by Federal or State law have been received. State, county, and community officials, based on
knowledge of local conditions and in the interest of safety, may set higher standards for construction in the
SFIIA. If the State, county, or community has adopted more restrictive or comprehensive floodplain
management criteria, these criteria take precedence over the minimum IVFIP criteria
If you have any questions regarding floodplain management regulations for your community or the 1VFIP in
general, please contact the Consultation Coordination Officer (CCO) for your community. Information on
the CCO for your community maybe obtained by calling the Director, Federal Insurance and Mitigation
Division of FEMA in Oakland, California, at (510) 627-7175. If you Gave any questions regarding this
CLOMR, please call our Map Assistance Center, toll free, at 1-877-FEMA MAP (1-877-336-2627).
Sincerely,
Kevin C. Long, CFM, Project Engineer For. William R. Blanton Jr., CFM, Chief
Engineering Management Section Engineering Management Section
Mitigation Division Mitigation Division
Enclosures
cc: Mr. Bmce C. McClure, P.E.
Director of Public Works
Department of Public Works
Hawaii County
Mr. Galen M. Kuba
Division thief
Engineering Division
Department of Public Works
Hawaii County
Mr. Geoffiey L. Casbum, P.E.
CMF Engineers
Mr. Jack Paauw
Cendant Timeshare Resort Group