HomeMy WebLinkAboutCOM 0812.005 2006-2008
Al~
Recycling Station Replacement
Environmental Management
Committee Presentation
DDecember 2007
Agenda
Project •
County Project Manager
Beck, Project Description - Karl Hufnagel
• Question and Answers
Comm: Na 0012.5
Ref. To, t ~~042-
Rot Dote 1
Project Overview
Project Development and Prioritization
Island Wide Transfer Stations Repair and
Enhancement Plan
Volcano
Glenwood
Pahoa
.ohinu
Link to County goals for recycling and landfill diversion
Increased accessihIfty equals increased diversion
E3 Component Model to be implemented island-wide
Transfer Station
ry
.1
Idp
k
2
Volcano Transfer Station
t
1
Glenwood Transfer Station
r
3
Y
Wai'ohinu
Transfer Station
4no~::
Project Overview
Project Funding
Conceptual design is funded
Final • I construction are not funded
Project Schedule
Dependent • project funding
Public Input
meeting Public dates Y',^ features and services
Gather input/priorities on recycling station upgrade
4
Project Overview
Project Consultant - RA Beck, - 2007
• • with • Hilo-based and • - Honolulu-based
subcontractors
Scope includes conceptual design for:
•
Volcano Glenwood
Project Description
Work completed to-date
Facility programming
Site surveys
-Geotechnical borings
Initial conceptual layouts
Remaining • to complete
Public input meetin•
Incorporate comments
Finalize conceptual design and cost estimates
5
Proposed Recycling Station
Basic Elements
Refuse transfer area
Green waste transfer area
Two Bin recycling dropoff area
Redemption area
Improved landscaping
¦Perimeter fencing
• . • "
New
E ei.
Proposed Recycling Station
Optional Elements
Reuse White goods drop off area
Office and toilet room for site attendants
Power for site lighting
Informational kiosk
Covered table for educational use
Household Hazardous Waste Collection at
Wai'ohinu and Pahoa
6
• • 1 1 • . • •
sl: -
b. _ ~
7
Proposed Recycling- Station -
Conceptual Facility After Construction
El
:--Proposed Recycling • •
Conceptual Facility After Construction
dim
E3
8
Proposed Recycling Station -
Conceptual Facility After Construction
4w, *
Alio 14
IF 1-77
Pro-posed VVai'ohinu Recycling Station
Basic Elements - Entrance Sign
VIOVII WAIOHINU RECYCLING STATION
E Malama I Ka a
9
r
II I N
Y.'F., F1G
Propostid Volcano Recycling Station
Basic Elements - Entrance Sign
VOLCANO RECYCLING.STATION
E Malama I Ka ~Aina
10
• •
¦ °r if
-TA.
Proposed Glenwood Recycling Station
¦ • Elements - Entrance Sign
LENWOOD RECYCLING- STATION
E Malama I Ka ~Aina
a e•
11
_ L
~ III III
Maintaining Service During Construction
Continue use • existing Transfer Station at
Wai'ohinu while new station is constructed adjacent
• other three stations:
Temporary drop box for refuse near site entrance
Construction phasing so that a portion of site is available
• refuse disposal and other Current services as
construction progresses
Use • nearby transfer stations
include incentives for earl, com,letion of construction
12
u stions and Answers
Mahalo for your time