Oceanside 1250 & Hawaii County - Development Agreement RECEIVED 14
Summary of Development Agreement Provisions a
Relation to Conditions of Approval pate
March 1998 County Council
Title Conditions of Approval No. Development Agreement Provision
Administration 1. Incorporated recitals by reference.
2. Defines terms.
Term 3 Development Agreement shall be for a term of 30
years.
Affected Land 4. Describes the Project Area.
Permitted Ord. 96-7 B: S.' Permitted uses are those established by Chapter 205,
Uses Oceanside is responsible for complying with HRS (Land Use) and the Zoning Code (Chapter 25,
all requirements of Chapter 205. HCC).
Density of Use Ord. 96-8 Q: 6.
Permits one dwelling unit per building site. Permits one dwelling unit per building site.
Maximum 7. Maximum height shall that allowed by the Zoning
Height Code.
Maximum Size 8. Size of buildings shall be limited by the restriction of
of Buildings the Zoning Code.
Benefits 9. County acknowledges that Oceanside is providing
Benefits to the County and Community.
Bypass Ord. 96-8 L Ord 96-7 M. Ord 97-36 K: 10. Establishes requirement that Oceanside acquire ROW
Right of Way Requires require acquisition of ROW for the for Bypass. Sets procedures and conditions when
Bypass, condemnation of ROW would be required.
Provides that in lieu of Oceanside acquiring 11. Establishes responsibility of and procedures for
ROW, County shall agree to condemn those condemnation of ROW by the County & Oceanside's
segments, provided Oceanside reimburses the reimbursement to County for cost of condemnation.
County for the costs of condemnation. Creates incentives for the donation of ROW for the
12. Bypass.
Bypass Ord. 96-81., Ord 96-7 M, Ord 97-36 K: 13. Requires construction of the entire Bypass.
Construction Requires construct the Bypass, consisting of
2 lanes with ROW for 4 lanes. a. Requires 2-lane Bypass to be constructed in
accordance with requirements of DPW, including
Requires Bypass between Keauhou and provision of landscape buffers.
Halekii Street to be completed prior to b. Requires posting of bond, acquisition of ROW for
occupancy of any dwelling unit. 4 lanes.
c. Prior to occupancy of lodge or first dwelling, -
Provide a landscape buffer along Bypass requires complete construction of Bypass section
within 500 feet of any dwelling as required by from Keauhou to Halekii Street extension.
DPW. d. Requires completion of entire Bypass within 5
years.
Dedication 14. Requires that Oceanside will dedicate Bypass upon
completion (may be in phases) and that County shall
accept dedication if all requirements are met.
n '
u /o15v
-
argss~t pc
• , fi~f~R:.'E .1998 .
Oceanside 1250 & Hawaii County - Development Agreement
Summary of Development Agreement Provisions
Relation to Conditions of Approval
March 1998
Title Conditions of Approval No. Development Agreement Provision
Reimbursement Ord. 96-81., and Ord 96-7 M: 15. a. Provides that Oceanside will be responsible for
of Construction entire cost of developing Bypass. Establishes
cost of Bypass Oceanside shall enter a reimbursement that Oceanside pro rata share is 38% of project
agreement with the County which sets forth cost.
the terms and conditions of reimbursement.
Provides that the amount of reimbursement shall
County shall reimburse Oceanside for costs be balance of total cost after deducting
incurred for the construction, land acquisition Oceanside's pro rata share and Kealakekua
and design of the Bypass. Development Corporation share.
Reimbursements funds shall be from funds b. Provides that should an Impact fee ordinance be
paid by other developers/land owners who the adopted, Oceanside shall receive credit for
county may determine benefits from Bypass. roadway improvement costs.
The total amount of reimbursement shall not c. Provides that funds for reimbursement shall be
exceed the total project cost less the pro rata from the following sources:
portion attributed to the Hokukano Project.
o Fair share contributions.
o Road impact fees, should an Impact Fee
Ordinance be adopted.
o Other monetary contributions paid to the
County to address potential regional road
impacts.
o KDC's fair share contribution less S 1.3
million for Mamalahoa Highway
improvements and improvements to
Greenwell Park. r
d. Determines that the benefit district for the Bypass Q'7' 7
extends from Keauhou to Hawaiian Ocean Yew
Estates. Provides that reimbursement shall be a
percentage of those income sources received
from each geographic district:
o Keauhou 25%
o Honalo-Capt. Cook (Mam. Hwy.) 80%
o Honalo-Capt. Cook Mauka 1000/0
o Honalo-Capt. Cook Makai 1000/0
o Capt.Cook-Milolii 65%
Other Roads Ord. 97-8 L, O, Ord 96-7 M, N &
Ord 97-36 K, L:
Requires Construction or Bonding of 13 U Requires bonding of Mamalahoa Highway-Halekii
Mamalahoa Highway-Halekii Street Street intersection prior to first small lot subdivision
Intersection. approval.
Requires extension of Halekii Street, in phases Requires bonding of phases of extension of Halekii
and other provisions allow for bonding of 13 b.3 Street.
improvements.
Requires stub-outs to the northern boundary Requires that Oceanside will provide road stub outs
as well as southern project boundary. 16' to the north and south project boundaries.
Public Access Ord. 96-8 J, Ord 96-7 K, SMA 345 (9): 17.
Plan Requires that Oceanside develop a public Requires that Oceanside develop a public access plan
access plan prior to final subdivision approval prior to final subdivision approval of the first small
of the first small lot subdivision. lot subdivision.
o Plan shall be developed in consultation a. Plan shall be developed in consultation with
with DLNR and include mauka-makai and DLNR and include mauka-makai and shoreline
shoreline accesses, parking, restrooms and accesses, parking, restrooms and other
other improvements. improvements.
o Plan shall be a roved b Director. b. Plan shall be approved b Director.
Oceanside 1250 & Hawaii County - Development Agreement
Summary of Development Agreement Provisions
Relation to Conditions of Approval
March 1998
Title Conditions of Approval No. Development Agreement Provision
Coastline Park Ord. 97-8 H,1; Ord 967 K, L; 18.
SMA 345 (10):
Requires development of coastline park. Requires development of coastline park.
o Oceanside shall be responsible for all costs a. Oceanside shall be responsible for all costs
associated with construction and associated with construction and operation of the
operation of the park. park.
o Construction of the park shall be b. Construction of the park shall be completed
completed phases roughly proportional to phases roughly proportional to the Project's
the Project's development. Initial phase development. Initial phase shall comprise of
shall comprise of 25% of park area and 25% of park area and shall be developed within 5
shall be developed within 5 years of final years of final subdivision approval of first small
subdivision approval of first small lot lot subdivision.
subdivision. c. Draft covenants shall be submitted to the
o Draft covenants shall be submitted to the Planning Director for approval and recordation.
Planning Director for approval and d. Perpetual easement to county for recreation shall
recordation. be granted.
o Perpetual easement to county for e. Oceanside or Assigns shall retain fee ownership
recreation shall be granted. of park.
o Oceanside or Assign shall retain fee
ownership of park.
Guest Houses Ord. 968 Q: 19.
The Condition does not preclude the The Development Agreement does not prohibit
construction of a guest house in accordance construction of a guest house in accordance with
with requirements of the Zoning Code. requirements of the Zoning Code.
General 20. Oceanside has right to develop project, Bypass and
Development Coastline park in accordance with terms and
of Project conditions.
Subsequent 21. Provides that subsequent land use changes which
Land Use alters or amends Land Use Regulations shall not
Changes apply to the property, subject to certain limitations.
Necessary 22. With respect to required County approvals, the
County County shall expeditiously process such applications.
Approvals The County further agrees to not impact with further
exactions or requirements.
Conformance 23. Determines that the Development Agreement is
with General consistent with the County General Plan, as amended.
Plan
Annual Ord 968 V; Ord. 967 R; 24.
Review SMA 345 (15); SMA 356 (13):
Provides for an annual review of compliance Provides for an annual review of compliance with
with conditions of approval. terms and conditions of the Development Agreement.
Various 25- Various provisions to provide clarification and
57, enforcement of the terms and conditions of the
Development Agreement.