Loading...
HomeMy WebLinkAboutCOM 1062.008 2006-2008 Print Page 1 of 2 From: Council Testimony (counciltestimony@co.hawaii.hi.us) To: hawaiicountycouncil@yahoo.com Date: Tuesday, March 11, 2008 4:14:50 PM Subject: FW: Executive Summary DGI International From: Gerna Benz [mairm:theamericangroup@msn.com) Sent: Tuesday, March 11, 2008 1:50 PM To: soffenbaker@co.hawaii.hi.us; counciltestimony@co.hawaii.hi.us; tedwards@co.hawaii.hi.us; Iswallow@co.hawaii.hi.us Cc: Kenneth Makuakane; Rocke Naeole Subject: Executive Summary DGI International Importance: High Dear Sir: My name is Gerna Hanu Manuia Benz and I represent Mr. Carlos Benitez, President of DGI International a leading corporation in the processing of Municipal Solid Waste. Our representative's Mr. Larry Chung of Hilo, Hawaii and Mr. Rothwell Naeole of Honolulu have submitted copies of our Executive Summary documents to the testimonial meetings which are to be held in Kona, Hawaii this date. In support to these testimonials I am also forwarding a copy of the FRRP Highlights for your review. The goals of DGI International and our Hawaiia associates are to assist in eliminating the large solid waste problem currently in our Hawaii-nei. As a native Hawaiian, born and raised on the beautiful island of Maui and like my many brothers and family members we are deeply concerned on the increasing accumulation of solid and industrial waste in each of our islands. DGI International, as stated in the attached highlight and summary is immediately available to discuss a solution and long term program for eliminating all of the solid waste problems affecting our islands. Please review the attached document and feel free to contact me directly in furthering an open idea of how we may be able to assist you and your local communities. Our major and immediate goals would be to; 1) Review all municipal waste of the city, county and island, 2) Respond within two weeks on a proposal to safely and effectively remove the municipal solid waste to include hazardous and medical waste and finally 3) Sit with the city and county officials to implement a time schedule and operational program. Our FRRP, Floating Resource Recovery Plant is built specifically for the needs of Hawaii . We are able to efficiently process 1000 tons of Municipal Solid Waste each day and producing 25 Megawatts of electricity per hour and 1,350,000 gallons of potable pure water each day. I and my associates in Oahu and Hawaii are available to you for any further support or assistance as may be required in efficiently and safely eliminating Hawaii 's solid waste problem. Respectfully, Gerna G. Benz President ,O 4t, The Hawaiian Group and Associate to Gomm. NO. V DGI International, Inc. Ref. To:g io Telephone; Office 253-301-2787, 253-238-5878, Cell; 253-906-5668 Ref. Date MAR 112008 - httD://us.mg2.mail.yahoo.com/de/launch?.rand=3ctapgulkiggv 3/11/2008 Print Page 2 of 2 . r ~r email; th_eamerican roup@msn.com cc: Mr. Rothwell Naeole and Mr. Larry Chung httn//us_mg2.mail.vahoo.com/de/launch?.rand-3ctavgulkiclgv 3/11/2008 DGI INTERNATIONAL, INC. Highlights of the Floating Resource Recovery System (FRRP) 1. The System uses one of the most widely installed technology in over 352 plants worldwide including Europe, United States and Japan, where 50°/B of the plants are located under a license agreement with Hitachi. Meeting the environmental standards of the European Union, United States and Japan. 2. Under the leadership of Litton Ship Systems, together with Kvaerner Masa Marine of Vancouver, British Columbia, Canada and VonRoll Inova of Zurich, Switzerland, the FRRPs were designed as a state-of-the-art waste to energy plants for a 40+ years of reliable, efficient, and environmentally sound operation. The plants will be built to the latest safety requirements including the hull, which will be of steel and will have a double bottom. These plants will be able to withstand major hurricane forces. 3. Ingalls Shipbuilding, VonRoll Inova and Foster Wheeler among others are available to provide up to full life cycle maintenance of the FRRP or support the designed maintenance company. The plants will be built to the standards of American Bureau of Shipbuilding (ABS), the hull and related primary systems will be classed in accordance with the 1991 ABS Steel Barge Rules. 4. These plants are designed to operate at over 1100° C, allowing for the safe processing of tires and medical waste in addition to the regular municipal and industrial waste. 5. Each plant will be capable of processing 960 tons of waste per day (seven days per week), produce 25 Megawatts of electricity for We and about 1 million gallons of potable water per day. 6. The Plants will be located on suitable ports where access roads are available and the interference with local neighborhoods will me minimized, the plants dimensions are: Length 134.0 in., Breadth 46.8 in., Depth 10.8 m, Draft (full load) 4.2 in. Municipal Solid Waste Incineration Plant Bergen, Norway r 1i F- { I irvee lAeoaebp Arne a Hem Feeav 15 Yetlc RaclOeela 22 Fniaebn AlerWmN1B 2 µyaW gfpre ft 9 Ydnma Oren 16 GuWw Wach 2 Ptak( 3 OvplteeA 6arie Ab palrWlAOn 18 MM SLTItIba 24 4 AKi ..Wrrloine gy 9yO® fan 10 Rh~ 4 Dane Opvabr FWpa 11 11 Aual A..Nh by 9nnma 18 9wn~bgie heat 6chanBer 25 Ash Malam 5 FeaC tletmv 12 tYel Hemirer% Beier 19 Ba911mM 26 Finwgwlr.Y Waffie Tinh 18 W'~ Aye Beaar tAUm 2 Flaucve Oran Pon a A a tASmrYig Hmtiea ~nwy Air Fen M FmAraler ianWOeeratm 21 1 Silencer 28 DrmL ' IIW?20111N A