Loading...
HomeMy WebLinkAboutCOM 1137.003 2006-2008 South Kohala Traffic Safety Committee P.O. Box 383375 PoM4rFaxNde 7871 A CD d'.i.:?22 Waikoloa, HI 96738 GOJDW April 21, 2008 ' Pho 6 pbm 0 RE: Resolution 596-08 F`" I~- FM# - Current Chair of South Kohala Traffic Safety Committee, an independent public forum for citizens to meet with government representatives to address traffic safety Issues and enhance setety and promote enhanced safety through education, enforcement and engineering. South Kohala Traffic Safety Committee supports implementin aFap ien. County DPW in 2004 wanted to extend Lalamilo Road from Its allo to -0 Kawnihae Road with the $10M. After public outcry and demand "iffffioa r study, a consultant was hired in 2004 or early 2005 at $400K to pefrmm trn EA for 1-alamllo Road. No results, on hold and added unspecified ogEts =D reported to date. PB was hired to perform traffic circulation study at'4prvar $250K to identify solutions. Study completed but no action slnc4-tAc tilllber~: 2006. County has added buses from East Hawaii (taking 800-900~odoplemut of individual vehicles) and is scheduled to start Waimea shuttle with of felateEP funding. SKTSC requests and Tom Brown's efforts are making a difference in this part of the solution. Why have other parts of the Walmsa Circulation Project been delayed? Arc the people of South Kohala being punished for requesting a traffic study and beat solution instead of supporting extending the existing Lalamllo Road? Recently private citizens brought a legal action against the County for not requiring a Developer to meet the terms of its binding bonding permit. The settlement has started the Parker Ranch Connector Road with construction in 2009 and 2010. This road is not a solution to congestion unless the County funds the Lindsey road extension and an East and connection to Marnalshon Hwy. M is reported that Lindsey extension will require an EA. This entire plan is found in Phase I of the PB study. Why do ditwm have to bring legal action to force the County to enforce ordinances? This resolution is needed and a start in moving the County in the right direction after a b year period of delays, changing priorities that have led to inaction In regards to Waimea Circulation Problems. Public comment has been ignored. Consequences to this current mode of operation have resulted in the following. Comm. No. Ref. To,Present Ref. DoteAPR 121108 Recently in South Kohala District, the County Highway Department started to repave Lalamilo Road. The work was halted when the public notified the County that the road Was schedwted for aut6ng W%d ditching for new v1 ft blues. The Mud Lane paving project was not announced with the entire contemplated work scope. Subsequently the project was interrupted and halted. The guard rail project on Spenser Road has resulted in a petition to remove the project as a result of no notice or opportunity for the public to comment. The County lack of effort to coordinate Its projects with other agencies, seek public comment and have a published plan was evident M these situations. South Kohala Traffic Safely Committee supports sale roads and solutions to Waimea traffic congestion. At the same time the membership supports keeping the rural character of the community and protecting the Lalamilo Farm lots with a 1000 That buffer. The connector roads are viewed as roads for local travel not major commuter traffic. Realistically the connector roads will need to handle both local and commuter traffic. The State Bypass should provide for major commuter traffic in the future. Many feel the County is ignoring the publids input, concerns and desires. This resolution should incorporate the following for this project and future projects; 1 _ That road projects be prioritized under a program similar to the State of Hawaii giving emphasis to motorist, cyclist and pedestrian safety; need and extent of deterioration; access by emergency response providers; and Civil Defense evacuation route needs as priorities. 2. That the Department Of Public Works provide a prioritized list of projects with estimated coet and schedule to the public annually for comment prior to the Incorporation In the Annual Budget The Mayor monitor and hold DPW accountable for timely planning, obtaining adequate funding and executing prioritized projects. 3. That the County Department of Public Works plan, coordinate and monitor these projects In a transparent manner to avoid waste, confusion and lack of confidence by the public. 4. That public notice of start, completion and traffic delays is announced by DPW through the media at least 2 weeks prior to a project and continually until completion. Recommended alternate routes and other actions to reduce traffic congestion are conveyed to the public. Mahalo for the Hawaii County Council's and your ration and support for these requests. 62 6'c t°-