March 24, 2009 g
Q
C };1
Mr. Peter Okino v'
Automotive Supply Center, Ltd. „
411 E. Kawili Street J
f-z
Hilo, HI 96720 co r
tr
Dear Mr. Okino: 7
Change of Zone Ordinance No. 05 1 (REZ 1061)
Applicant: Automotive Supply Center
Request: RS-10 to MCX-20
Subject: Annual Progress Report (2009)
TMK: 2-2-49: 26
This is to acknowledge receipt of the annual progress report dated January 9, 2009 in
compliance with Condition N of Change of Zone Ordinance No. 05 1. We appreciate the
thoroughness of your report. The next annual progress report is due on or before
January 11, 2010. Please keep in mind that Condition C requires that construction be
completed by January 11, 2010.
Thank you for your attention in this matter. To discuss any questions on the above
comments, please contact Earl Lucero (ph: 961-8288, ext 262).
Sincerely,
Kf;~ .
r BJ LEITHEAD-TODD
T Planning Director
EML/JWD:smn
P:\public\wpwin60\EARL\L/etters\LREZ 1061 APR2008Auto SupplyCtr(2).doc
cc w/copy of report: ?tlawaii County Council
Planning Commission Comm No. a t
Z.
Ref. To..
Ref. Dote( t2 2~p
Hmvai 'i Couwy is an Equal Opportzuzily Provider and Employer
PHONE (808) 935-3767
GANNHUG5 na y
AK AUTOdVI t", E SUPPLY CENTER,, LTD.
Kanoelehua Industrial Park 411 E. Kawili Street Hilo, Hawaii 96720
January 9, 2009
Mr. Christopher Yuen, Director
Planning Department
County Of Hawaii
101 Pauahi Street
Hilo, Hawaii 96720
Dear Mr. Yuen:
Subject: Annual Report Requirement-Ord. No. 05-01
Applicant-Automotive Supply Center, Ltd., TMK:2-2-49:26
Attached to this letter is our Annual progress report dated
January 9, 2009 in compliance with Condition N of Change of Zone
Ordinance No. 05-01.
Please feel free to contact me or Dave Haraguchi who is in charge
of this project at Isemoto Construction Company.
Sincerely your , -
ETER OKINO
President
f 'S 41~
January 9, 2009
Mr. Christopher Yuen, Director
Planning Department
COUNTY OF HAWAII
101 Pauahi Street
Hilo, HI 96720
Dear Mr. Yuen:
Subject: Annual Report Requirement - Ord. No. 05-01
Applicant - Automotive Supply Center, Ltd., TMK: 2-2-49.26
On January 5, 2005, the County Council approved the subject ordinance, which
became effective on January 11, 2005. The subject rezoning ordinance allowed the
development of an automotive supply building.
The conditions (some of which will be summarized) of Ordinance No. 03-84 and
responses (in italics) thereto follow:
(A) The applicant, successors or assigns shall be responsible for complying with all
stated conditions of approval.
Please be informed that the subject property is still owned by the then applicant,
who intends to develop the property. As such, it will be responsible for complying
with all conditions of approval.
(B) Prior to the issuance of a water commitment by the Department of Water Supply,
the applicant shall submit the anticipated maximum daily water usage calculations
as recommended by a registered engineer, and a water commitment deposit in
accordance with the "Water Commitment Guidelines Policy" to the Department
of Water Supply within ninety days from the effective date of this ordinance.
The two existing 518-inch meters will be replaced by one 518-inch meter along
Lanikaula Street.
(C) Construction of the proposed development shall be completed within five (5)
years from the effective date of this ordinance. Final Plan Approval by the
Planning Director in accordance with the Zoning Code shall be secured by the
applicant prior to commencement of construction. Development plans shall
identify existing and proposed structures, fire protection measures, paved
Mr. Christopher Yuen, Director
January 9, 2009
Page 2
driveway access and parking stalls, and other improvements associated with the
proposed development. Landscaping shall be included in the development plans
to mitigate any potential adverse noise or visual impacts to adjacent properties in
accordance with Planning Department's Rule No. 17
Isemoto Construction Company has started construction and will be finished
before the first half of 2009.
(D) Access to the subject property from Lanikaula Street shall meet with the approval
of the Department of Public Works.
This is reflected in the plans for Plan Approval and building plans.
(E) All driveway connections to Lanikaula Street shall conform to Chapter 22, Streets
and Sidewalks, of the Hawaii County Code.
This will be done in conjunction with the processing of the driveway permit.
(F) Provide improvements to the entire frontage of Lanikaula Street consisting of, but
not limited to, pavement widening with curb, gutter and sidewalk, drainage
improvements and any required utility relocation, meeting with the approval of
the Department of Public works. The improvements shall be located within a
five-foot widening strip along Lanikaula Street frontage and be dedicated to the
County of Hawaii prior to the issuance of a Certificate of Occupancy.
This is reflected in the project civil plans.
(G) Streetlights and traffic control devices shall be. installed as required by the Traffic
Division, Department of Public Works.
Relocated street light and telephone pole is reflected in the project civil plans.
(H) A drainage study of the subject property shall be prepared and submitted to the
Department of Public Works for review and approval, prior to submittal of plans
for Plan Approval review. Drainage improvements, if required, shall be
constructed, meeting with the approval of the Department of Public Works prior
to the issuance of a Certificate of Occupancy Permit.
The plans for the building permit will include civil drawings that reflect the
needed drainage improvements.
Mr. Christopher Yuen, Director
January 9, 2009
Page 3
(I) All development generated runoff shall be disposed of on site and shall not be
directed toward any adjacent properties. A drainage study shall be prepared and
submitted to the Department of Public Works prior to the issuance of Final Plan
Approval. Any drainage improvements shall be constructed, meeting with the
approval of the Department of Public Works prior to the issuance of a Certificate
of Occupancy.
The study was completed, and the required improvements will be done in
conjunction with the construction of the project.
(J) A Solid Waste Management Plan shall be submitted to the Department of
Environmental Management for review and approval prior to the issuance of
Certificate of Occupancy.
The applicant will be working on this with its engineering consultant.
(K) Should any remains of historic sites, such as rock walls, terraces, platforms,
marine shell concentrations or human burials be encountered, work in the
immediate area shall cease and the Department of Land and Natural Resources -
State Historic Preservation Division (DLNR-HPD) shall be immediately notified.
Subsequent work shall proceed upon an archaeological clearance from DLNR-
HPD when it finds that sufficient mitigation measures have been taken.
This will be adhered to during the construction phase.
(L) Should the Council adopt a Unified Impact Fees ordinance setting forth criteria
for the imposition of exactions or the assessment of impact fees, conditions
included herein may, at the developer's election, be satisfied by performance in
accordance with the requirements of the Unified Impact Fees Ordinance.
The Council has not adopted such an ordinance, as such, the applicant is not in a
position to evaluate the alternatives and iffeasible, avail itself to this option.
(M) The applicant shall comply with all applicable County, State, and Federal laws,
rules, regulations and requirements.
This is on going and will be complied with during the permitting and construction
phases of this project.
Mr. Christopher Yuen, Director
January 9, 2009
Page 4
(N) An annual progress report shall be submitted to the Planning Director prior to the
anniversary date of enactment of the ordinance. The annual report shall include,
but not be limited to, the status of the development and to what extent the
conditions of approval are being complied with. This condition shall remain in
effect until all of the conditions of approval have been complied with and the
Planning Director acknowledges that further reports are not required.
This report is for January 2009.
(O) An initial extension of time for the performance of conditions within the
ordinance may be granted by the Planning Director....
The applicant believes that it can develop the project without having to go
through a time extension.
(P) Should any of the conditions not be met or substantially complied with in a timely
fashion, the Director may initiate rezoning of the subject area to its original or
more appropriate designation.
We trust that you can determine that the applicant has made a good faith effort in
complying with the various conditions of approval and, as such, find no need for
any zoning initiation.
We trust that the aforementioned adequately addresses the annual report
requirement. If not, please feel free to contact me or Dave Haraguchi who is in charge of
this project at Isemoto Construction Company. Thank you very much.
Sincerely,
PET OKINO
President