HomeMy WebLinkAboutORD 1960-034COUNTY OF HAWAII - STATE OF HAWAII
ORDINANCE NO. 34
AN ORDINANCE RELATING TO THE CONSTRUCTION AND MAINTENANCE OF
SIDEWALKS IN THE CITY OF HILO, COUNTY OH' HAWAII, STATE OF HAWAII.
BE IT ORDAINED BY THE BOARD OF SUYEKVISORS OF THE COUNTY OF
HAWAII:
Curbing
Section 1. That every owner of land abutting on or
adjoining any public highway or street in the City of Hilo,
County of Hawaii, State of Hawaii, upon being required by the
Board of Supervisors of the County of Hawaii, and being notiLi.ed
of such reyuiremen±, as lrereir. provided, shall curb the sidewalk
adjacent ?;c> >uch land, on the established lines, with substant-ial
curbing of stone or concrete, which curbing shall conform to tine
following specifications.:
Specifications
Stone Curbing: The curb stones shall be of a good
quality lava rock, or be of cast concrete, in rectangular blocks
of which not less than fifty (50) per centum shall be at least
thirty-six (36) inches in length, and the remaining fifty (SU)
per centum shall be at least thirty (30) inches in length, except
for proper closure pieces, and shall not be less than sixteen
(16) inches in depth, and of a matched width of six (6) inches
on top with an upward bevel from the face of one-eight (1/8) inch
in the six (6) inches.
The top of natural lava stone curbing shall be axed
hammer dressed to a smooth surface.
The face of natural stone curbing shall be wind and brush
hammer dressed to a depth of ten (10) inches below the top. The
remainder of the face shall be point dressed. The back shall be
point dressed to a uniform thickness of six (6) inches for at
least three (3) inches from the top and shall be free of projections
of more than two (2) inches.
The ends must be square with the top and permit of a joint
not exceeding one-half (2) inch for the full thickness of the
stone to a depth of at least 10 inches from the top.
Blocks shall be well bedded, set true to line and grade and
the joints between blocks filled with a cement grout composed of
one part cement to two parts sand and the mixture to be darkened
with lamp black.
_ tl
At street intersections when the curb 's carried around on
Oc.d. ~10 . .............................r
a curve the radius of such a curve shall b tt~t of the lesser
sidewalk width. File o. _ ................._-......
yA. B. No. ---•-'-------•---------------
Date: .-....-..^---.__--- ----'...-.
Concrete Curbing; Concrete curb shall be constructed of
concrete of net less than 1;2~: 5 mix, as hereinafter specified
for the base course of concrete sidewalks and shall be of the
same dimensions as specified for natural stone curbing, and all
exposed surfaces shall show a smooth finish.
All curbing laid under provisions of this Ordinance shall
be set true to the established lines and grades and shall be
laid, jointed and set in a good, substantial, workmanlike manner.
Section 2. Back Filling, Sub-grade and Retaining Walls:
That every owner of land abutting on and adjoining any
public highway or street in the City of Hilo, after curbing has
been laid, as hereinbefore provided for, upon being required
by the Board of Supervisors of the County of Hawaii, and being
notified of such requirement, as hereinafter provided, shall
back fill, sub-grade and retain same in the space between the
established sidewalk lines adjacent to such land.
Sub-Grade, Depth Below Grade of Walk' Slope; When sub-base
is required, the sub-grade shall not be less than twelve and
three-quarter (12 3/L}) inches below the finished surface of the
walk and shall have a slope toward the curb of not less than.
one-half (~-) inch per foot.
Depth of Layers; All soft or spongy places shall be dug
out and all depressions filled with suitable filling material,
which shall be thoroughly compacted by flooding with water and
tamping in layers not exceeding six (6) inches in thickness.
Deep Fills; When, to bring the walk to grade, a fill
exceeding one (1) foot in thickness is required, it shall be
made in a manner satisfactory to the engineer and inspector. The
top of all fills shall extend beyond the sidewalk line at least
two (2) feet and shall have a slope of not less than 1Z;1.
After completion to grade the f+tl shall be allowed to
settle for a period of not less than ten (10) days and no concrete
for sidewalk shall be placed on same until permission has been
obtained from the engineer and inspector.
Drainage; When required by the engineer and inspector a
suitable drainage system shall be installed and connected with
gutter or sewer drains.
In side hill section, where sell waters are encountered
and at driveways or other crossings a trench twelve (12) inches
by twelve (12) inches, immediately below the sub-base, in which
shall be laid a four (1i) inch t he surrounded by material similar
to that used in the foundation shall be provided for a satis-
factory drain. Broken stone drains of one (1) square foot end
area shall be provided every twenty-five (25) feet.
Retaining Walls; In all cases where the fill under the
sidewalk along the property is two (2) feet or more above the
adjoining property, such fill shall be properly retained by
-2-
o. a. r; ~. -- -- ~ ~ ----------•--~
Filo LIo. -.-...--------
M. II. No. -------~-----------°---
n..~-.
i
means of a substantial, tight retaining wall constructed of stone
laid and bedded in cement and lime mortar or of concrete. The
design of such retaining walls shall be subject to the approval
of the engineer and inspector, and furthermore, they may ore9er
the construction of a retaining wall across either or both ends
of such walk where, in their discretion, the height of fill demands
such construction.
Section 3. Sidewalks. That every owner of land abutting
on or adjoining any public highway or street in the City of
Hilo, upon being required by the Board of Supervisors of the
County of Hawaii and being notified of such requirement, as
hereinafter provided, shall curb, as provided in Section i
hereof, and grade, as provided in Section 2 hereof, and shall con-
struct and maintain in good condition between the establishE;d
sidewalk lines a sidewalk on such highway or street adjacent, to
such property to conform to the following specifications;
SPECIFICATIONS
Portland Cement: The cement shall conform in every detail
to the Standard Specifications of Portland Cement adopted by
the American Society for Testing Materials. The unit of measure
for cement shall be the bag received from the manufacturers,
having a gross weight of not less than ninety-five (y 5) pounds
or a net weight of not less than ninety-four (9t~) pounds. Such
a packed, unopened bay shall be considered as equal to one cubic
foot of cement, and one cubic foot of cement shall weigh not less
than ninety-four (y4) pounds.
A packed barrel of cement shall weigh not less than three
hundred and seventy-six (370) pounds, net, and shall be con-
sidered equivalent to four (1•) bags of cement, or four (){) cubic
feet.
Sand: The sand shall pass a No. )# screen of which not more
than forty (1i0) per centum may be retained on a No. 10 screen
and shall be free frem ali foreign matter, excepting loam or
clay which will be permitted if the quantity does not exceed
five (j) per centum and when these ingredients do not occur as
a coating on the sand grains.
Stone and Rock. Stone shall be crushed from clean, sound,
hard, durable lava rocks and shall be screened dry through a
two (2) inch ring and be retained on a quarter (~) inch mesh.
Screenings through a quarter (~) inch mesh, from the crushed
stone above specified, may be substituted for sand if approved
by the engineer and inspector. The same shall be clean, dry,
well graded, and free from excessive dust which shall not occur
as a coating on the particles of stone.
River Gravel: Gravel shall be clean and hard and shall
vary in size from that retained on a quarter (~) inch mesh to
the largest particles passing a one and a quarter (1~) inch mesh.
-3-
Ocd. Ne. __._..__. ~_. / ..............
M. B. 1~l0.
Pate:
Unscreened Gravel: Unscreened gravel shall be clean and
hard, and shall contain no particles larger than one and a
quarter (1~) inches. The proportion of fine and coarse particie:s
must be determined and corrected to agree with the requirements
hereinafter specified for Concrete in Base and Proportioning
Foundation;
When a sub-base is required, only clean, hard cinders,
slag lava, gravel, crushed stone or broken brick shall be used.
The material shall not be smaller than one-half (~) inch or
exceed four (~) inches in the largest dimension.
Water; Water shall be reasonably clean, practically free
from any oil, acid, salines and other deteriorating substances.
PAVEMENT: The pavement shall be artificial stoneflagginy
composed of cement concrete, constructed in alternate slabs in
place not over three (3) feet in width. It shall consist of
two (2) parts; First, a base course three and a half (jz) inches
thick; second, a finishing or wearing course three-quarters (?/L~)
of an inch thick.
Grade: Unless otherwise especially provided for, the
finished surface shall be a true plane rising from the curb
grade at the curb line at the rate of one-fourth (~q) inch to
one (1} foot to the property line.
Preparing Sub-Grade; The space to be occupied by the walk
shall be properly graded to a depth of four and a quarter (l,~)
inches below top of finished walk, Any soft, loose or unsuitable
material found in the sub-grade shall be removed and the space
filled with fine broken stone, cinders, or other foundation
material before mentioned, after which the whole surface shall
be thoroughly compacted by ramming or rolling and finished to
required grade and cross section.
Forms: When wooden f'orrns are used, they shall be free
from warp and not less than one and a half (lZ) inches thick,
except bends for curved curbs. All mortar and dirt shall be
removed from forms before being used.
Setting; The forms shall be well staked to the line and
grades given by the engineer, and their upper edges shall
conform with finished grade of the walk which shall have suf-
ficient rise from the curb to provide the proper drainage of
one quarter (4) inch per foot except where such rise shall
parallel the length of the walk.
Cross Forms: At each slab division cross forms shall be
put in the full width of the walk and at right angles to the
side forms.
Site of Slabs: Cross forms shall be spaced three (?,) feet
apart, and in turning corners no slab shall contain more than
thirty-six (3~) square feet.
Expansion Joint: A metal parting strip one-half (~)
inch thick shall take the place of the cross forms at least
-4 - Ocd. No. .._.-.~--~ ...............
File No. __--------.-...--'---~--^_
M. B. No. ° ----°-- --
Pate:..--.-.
once every fifty (50) lineal feet on long stretches of walk.
When the walk has become sufficiently hard, this parting strip
shall be removed and the joint filled with suitable material
prior to opening the walk to traffic. Similar joints shall be
provided where new walk abuts curbing or other cement or stone
walk.
Forms, Wet; All forms shall be thoroughly wetted before
any material is deposited against them.
Base Course: The concrete for the base course shall be
composed of 1;2~; 5 mixture, consisting of three (5) parts of
clean, crushed blue-lava rock of a size not larger than will
pass through a two (2) inch rin , and not smaller than will be
retained by a three-fourths (3/~j) inch ring; two (?_) parts
crushed blue lava-rock of a size that will pass through a thr•ee-
fourths (3/~) inch ring, and not smaller than will be retained
by a one-fourth (y) inch ring; two and a half (2~) parts of clean,
sharp sand; and one (1) part Portland Cement. Sufficient water
shall be added to make a plastic mixture which shall be immediately
deposited in place in such a manner that the larger 'st.ones shall
not become separated from the grout, and •s hall be thoroughly
rammed until the water flushes to the top.
Proportioning: When the voids are to be determined, the
concrete shall be so proportioned that the cement shall overfill
the voids in the stone by at least five (5) per centum, and the
mortar shall overfill the voids in the stone or grout by at
least ten (10) per centum.
The following method shall be used to determine voids in
sand; Fill a vessel with sand and let net weight of sand equal
B; fill same vessel with water and let net weight of water
equal A.
Formula; (A x 2.05) -- B 100
Per cen. Voids A x 2.05
The following method shall be used to determine voids in
crushed stone and aggregate; Fill a vessel level full with
water and let net weight of the water equal C; remove the water,
dry the vessel and fill it with aggregate and let net weight
of the aggregate equal B; add water slowly until it just appears
on the surface and weight of the aggregate and water equal A.
Formula; A--B--100
Per Cent. Voids C
The vessel to be used for above results shall not be less
than one (1) cubic foot capacity.
Mixing; The material used in the concrete for base course
must be proportioned by exact measurement, and for this purpose
contractors will be required to provide themselves with rectangular
boxes for measuring materials and water-tight platform for mixing.
No mixing of materials on pavements will be permitted.
- 5-
Ord. No. .----' ~~ ~ ...............
Fila too.."---------- ................
M. B. too. °------
Date:.___...___.
When the measuring box is removed, the materials shall be
thoroughly mixed dry to a uniform color until no streaks of
cement are visible; they shall be formed into a crater or trench
and practically all the water required shall be added at one time
and the mass turned until a homogeneous mortar of even consistency
is obtained. Water may be added during the process of mixing
but the concrete shall be turned at least once immediately after
its addition.
Machine Mixing; Machine mixing will be acceptable when a
concrete equivalent to quality specified is obtained. The mixing
of ail mortar and concrete shall be thorough and satisfactory to
the engineer and inspector.
Retempering; Retempering will not be permitted.
Depositing; The concrete shall be deposited before it shows
any tendency to harden, but in all cases the same shall be
deposited within thirty (30) minutes after being mixed, and
shall be transferred to the forms in water-tight wheelbarrows.
The wheelbarrows shall not be filled so full as to permit mortar
to slop out, and shall net be run over the fresh laid concrete.
Care of Base; 'Workmen shall not be permitted to walk on
freshly laid concrete, and where sand or dust gets on the base
it shall be carefully removed before the wearing course is applied.
Wearing Course: Immediately after the base course has been
deposited and thoroughly rammed, and before it becomes set, while
it is still soft and adhesive, a finishing course, three-fourths
(3/~) inch thick, consisting of mixture of one (1) part screen
sand, one (1) part Portland Cement and portioned two (2) pounds
of lamp black to each barrel of cement, sufficiently wet for
proper working, shall be deposited and brought to a true and
even surface, thoroughly worked and skillfully troweled to a
smooth and uniform finish surface.
Slab Marking; After working the top to a true surface
the slab marking shall be made directly over the joints in the
base with a tool which shall cut clear through to the, base and
completely separate the wearing courses of adjacent slabs.. This
tool shall be followed by a tool forming a grove at least one-
half (z) inch deep.
The marking of various width sidewalks shall be as directed
by the engineer and inspector.
Edge Rounding: The slabs shall be rounded on all surface
edges to a radius of about one-half (~) inch and when surface
is partially set it shall be troweled smooth, and the finished
surface shall then be protected from the direct rays of the sun
and kept moist for at least three (j) days before being opened
to the public.
Roughened Surfaces; On grades exceeding four (1}) per centum,
the surface shall be roughened.
'When a roughened surface
by the use of a grooving tool,
trowel or other suitable tool,
screenings into the surface.
is required, it may be obtained
toothed roller, brush wooden
or by working coarse sand or
o~~t. rro. 3
File tr u....--'-----------'-'-'-
-~- ._-..
M. B. 1J o. _..-.-.._---...
Aat,,: --•- --- -
Driveways: Wherever driveways occur, concrete shall not
be less than eight (8) inches in thickness and the surface
shall be finished with sufficient longitudinal grooves or
corrugations to provide a safe foot-hold for animals.
Stone paving, not less than eight (8) inches thick, set
in cement grout of approved construction may be substituted for
concrete in driveways.
Walks Laid Over Vaults, Areaways, etc.
(a) Substructure, Beam Work; The substructure shall
consist of steel L beams set not more than five (5) feet apart
from center to center, the outer end of said beams to rest at
least eight (8) inches on the curb wall and to be firmly bedded
in masonry to the top of flange of same. Where practicable the
inner erd of said beam shall penetrate the building wall not
less than six (o) inches.
The top of the completed iron substructure shall be a
plane parallel four (1}) inches below the top of the finished
walk.
The following sized steel cross-beams shall be used in
constructicn:
For ten (10) foot span, eight (8) inch beams weighing
seventeen and three-quarter (1? 3/!~) pounds per foot.
For twelve (lc) foot span, nine (y) inch beams weighing
twenty-five (2 j) pounds per foot.
(b) Concreting: Between the beams set in place as abo~.ie
specified, and securely fastened to the lower flange ~:t s-.rne,
shall be placed temporarily, arched forms er centers, smooth.
on the upper surface, which shall be removed when the concrete
has become thoroughly set. Said forms to be so set that the top
or crown of same shall be two (2) inches below the top of the
steel cross beams.
Section tl. 4Jhenever the Board of Supervisors of the
County of Hawaii shall deem it proper or necessary that any
sidewalk or sidewalks shall be curbed or curbed and constructed
as hereinbefore provided, it shall, by resolution, designate a
location or area of sidewalk construction which location or
area shall not be less in extent than one side of a street or
highway between two inters~ting cross streets. The resolution
shall also contain a provision requiring the owner or owners
of the land abutting on and adjoining any public street or
highway along which said sidewalk is to be so constructed within
such location or area, to curb or curb and construct, the same
as provided herein, and the said Board of Supervisors of the
County of Hawaii, after so requiring the owner or owners of any
land abutting on and adjoining any public street or highway to
lay any curbing, or to curb and construct anyy sidewalk. as
required herein and as provided by Chapter llj2 of the Revised
Laws of Hawaii 1955 shall cause a written notice to be given
such owner or owners or his or their duly authorized agent or
agents of such requirement such notice to be substantially in
the following form; ~/
NOTICE
TO .........................>....
................................
You are hereby notified that
Supervisors of the County of Hawaii,
on the __ day of
a resolution was adopted by the said
to curb and construct and maintain a
lines abutting on and adjoining your
Street, between
Streets, in the City of Hilo, County
in accordance with the provisions of
Laws of Hawaii 1955 and the Ordinance
at a meeting of the Board of
State of Hawaii, duly held
_ A. D, 19 ,
Board that you be required
sidewalk upon the established
property on
and _ _
of Hawaii, State of Hawaii,
Chapter 142 of the Revised
>s of the County of Hawaii.
You are further notified that if you fail to comply with
such direction for sixty days after this notice, the County of
Hawaii will proceed to construct such sidewalk at your expense as
provided by law.
BOARD OF SUPERVISORS
COUNTY OF HAWAII
STATE OF HAWAII
By
Clerk
Dated this day of
19
Section 5. Care of sidewalks. All owners of lands
abutting on and adjoining any public streets after curbing has
been laid, shall, at their own expense, keep their sidewalks
clean and free of all weeds, noxious growths or other vegetable
matter; provided, however, should the owners have grass grown
thereon they shall keep same cut so same shall not be a nuisance
or inconvenience to the public passing thereon.
Any person, firm or corporation who shall be convicted
of violating any of the provisions of this Section shall be fined
not more than One Hundred Dollars.
Os.l. I: o. _...___~.~ ............._
-8- File l.u. ----'-----'--...--.'....
Hate :......................................
A,D