From: Pastor Gary [pastorgary@gracekona.org] o
Sent: Wednesday, July 08, 2009 2:57 PM v =}~~„
To: dikeda@co.hawaii.hi.us r)'? ~
` `~=
Cc: r'. `-J
dyagong@co.hawaii.hi.us; jyoshimoto@co.hawaii.hi.us; donishi@co.hawaii.hi.us; Z,{., r,D ~ .
enaeole@co.hawaii.hi.us; genriques@co.hawaii.hi.us; bford@co.hawaii.hi.us; -=
~
phoffmann@co.hawaii.hi.us; kgreenwell@co.hawaii.hi.us ~
; ~`~
Subject: Information Requested from Planning Committee Hearing 7/7/09 '' =~~
ti ~`= *.~ `-~
O
Attachments: DWS Facilities Charge Itr.pdf; Lettwr to DWS 3-13-09.pdf; Letter from DWS, Fax .,
:.-, .S
transmittal.pdf =-
Aloha Mr. Ikeda,
During the Planning Committee hearing yesterday regarding the proposed amendments to Change of Zone
Ordinance 09-08 (Bill 101), you requested that the Church provide evidence to the Committee members regarding
water units allocated to the property.
Attached are three PDF files for the review of interested Committee members. The first document is the recent
letter received from DW S regarding facilities charges due for 6 units related to property use (five far the Church,
one for the Pastor's residence). There is one remaining unit allocated to the property that is not presently being
used.
The second and third documents are correspondence between the Church and DWS dating to March 2009. The
seven units of water allocated to the property are referenced and/or discussed in these documents as well. Further
affinnation of the available units can be obtained from inquiry to the Department of Water Supply.
For the record, it should be noted that the Church offered to pay for the water commitments for all seven units
(even though units to be used was not yet determined) last October. DW S declined the Church's offer, which was
made verbally to Jason Killam (961-8070, ext. 249). Alternatively, we offered to pay the facilities charges for the
four units we then believed would be required for the Church property, as a good faith deposit toward the actual
charges, if different. Again, our offer was refused by Mr. Killam.
We have received no verbal or written request from DWS for payment of the commitment fees. However, as we
explained during the hearing, we expect to pay the facilities charges within the next week, which we understand is
a de facto payment of the commitment fees. We are ready to proceed with turn lane construction as soon as DPW
issues the permit to work in the right-of--way.
Thank you for this opportunity to provide information which we believe will explain some of the background on
the water unit issue. We look forward to receiving notice of the Council hearing where Bill ] 01 will be
considered.
Mahalo Nui Loa,
Gary Summers, Assistant Pastor
Grace Community Church
(808) 345-4300 Cell
Comm. No. /~ 0 ~_
Ref. Too
Ref. Date~~ ~ 20
7/9/2009
DEPARTMENT OF WATER SUPPLY COUNTY OF HAWAII
345 KEKUANAO'A STREET, SUITE 20 Hh10, HAWAII 96720
TELEPHONE (006)961-8050 • FAX (606)961-6657
June 9, 2009
Mr. Dan Bolton f'
Bolton, Ina _. ,
P.O. Box 898
Kailua-Kona, HI 96745
WA`t'ER USAGE CALCiILATIONS
SPECIAL PERMIT (SPP 1010)
APPLICANT -GRACE COMMUNITY CHURCH
TAX N1AP ICEY 7-4-006:038
We have reviewed the estimated average daily water usage calculations for the proposed church anld
find them acceptable.
Based on the estimated average daily usage of 1,766 gallons per day (UPD), or five (5) equivalent
units of water at 400 GPD per unit, water can be made available for the church, and a 1-inch meter!
should be adequate to provide the estimated demand. A reduced pressure type backflow prevention
assembly must be installed within five (5) feet of the meter on private property and the installation u
must be inspected and approved by the'Departmerit before. water service can be activated.
Also, please be informed that the existing service is adequate for only one dwelling unit at an average
daily usage of 400 gallons. Inasmuch as this application is proposing an additional dwelling (Pastor's
house), the installation of a separate $/8-inch meter is required. -
Therefore, prior to granting water service, the prevailing facilities charge, which.is subject to change,
of $33,000.00 must be paid. The facilities charge is due upon completion of the necessary water
system improvements
Please be reminded that after the completion of water system improvement and payment of applicable
fees, there will be no water available for a proposed school. Extensive improvements and additions,
which may include, but not limited to source, storage, booster pumps, transmission, and distribution
facilities, would be required. Currently, sufficient funding is not available tiom the Department far
such improvements and no time schedule is set.
... ~V V2~61' ~NGi2GU t9NOC~YPJ9... -
The Department or Water Supply Is an Equal Opportunity provider and employer. To/ fle a cnmpfalnt o(tllacdminfltionl wrlle: USDA, Director, Oifice c( Civil
Riyhte, Room 326-W, Whitton 6uildiny. 1Alh and Independence Avenue, SW. Washington DC 20250-9410. Or UII (202) 720-5364 (voice and TDD)
Mr. Dan Bol[on
Page 2
June 9, 2009
Should there be any questions, please contact Mr. Ryan Quitoriano of our Water Resources and
Planning Branch at 961-8070, extension 256.
Sincerely yours,
i o D. Pavao, P.F,.
~ Man r
RQ:dfg
copy-•(~race Community Church
DWS Customer Service Sections (Kona and Hilo)
r~~~
,~
March 13, 2009
Mr. Milton Pavao, P.E., Manager
Department of Water Supply
345 Kekuanaoa Street Street, Suite 20
Hilo, HI 96720
Aloha Mr. Pavao,
COMMUNITY-
~cd~i~~~/~~a~~rr3
~ ~eJt1J
Thank you for providing your Department's memos dated August 21, 2008 and February 3, 2009
to the Planning Department. They were forwarded to us on March 9, 2009. This is the first time
we have seen or known about the memo dated August 21, 2008. We appreciate the opportunity
to now be directly included in communicatons from DWS.
With regard to our currently pending applications before the Planning Commission, we
understand that Dan and Jan Bolton (owners of a portion of the'property on which our church is
situated) visited your Department's offices on September 2, 2008 and met with Kurt Inaba and
Sherry Komata. We believe they resolved the issues mentioned in your memo dated August 21,
2008, including the Department's understanding of the reasons=forthe withdrawal of the
previous subdivision map. That withdrawal was required by Bruce McClure, Director of Public
Works, in a meeting that took place on May I, 2003. This was understood to be aquid-pro-quo
t'or DPW agreeing to pay f'or a portion of the HELCU & Hawaiian Tel utility relocations required
on Palani Road. The promised County contribution of $75,000 was paid to HELCO in
November last year.
Based on a copy of a fax memo sent by Jason Killam of DWS to Dan Bolton on October 2, 2008,
wherein the 7 units of water allocated are specifically referenced, it seems apparent that the units
have been restored to the property on which our Church is located. We are very grateful to D W S
for that action.
Part of the problem we have experienced during the past few ycazs is that we have been outside
the "loop" oi'DWS communications on matters related to the water waits for ow' property and
payments that may have been due. While we cannot change the past, we aze committed to
proactively staying abreast of matters requiring our resolution and/or action. W e have asked that
we be copied on any communications that occur between DW S and any other entities, so that we
can stay informed about matters that arise relating to our project. We can and will pursue prompt
resolution of those as we aze made aware of them by DWS.
Rev. Bruce W. Campbell, Pastor .Gary Summers, Assistant Pastor . Brian.Keiser, Youth Pastor
74-4889 Pulan~ Rd. Kaflua-Kona, HI 96740 (808) 32G-9580 Fax (808) 334-05P8
Yesterday in telephone discussions with JasoniKillam, we offered payment of the $150 per unit
water commitment fee in advance of receiving a request for same from DWS. Jason does not
believe that can happen before our engineer (Leo Fleming) provides water demand calculations,
but we are nonetheless prepazed to do it as a sign of good faith. We are likewise ready, willing
and able to pay the required facilities chazges as soon as requested by DWS. This has always
been our desire and intent.
Untbrtunately, being outside the line of direct communication has caused much confusion and
misunderstanding for us all. Our goal is to put that behind. us and move forward with as much
speed as can be applied, to bring this project to completion. We aze sincerely grateful for your
personal involvement in helping to make this happen, as well as for the much-appreciated help
from DWS staff.
I am personally available to meet with you at any time,. in any place to kee~ things on track. Due
to a prior commitment, I will be out of State from Mazch 16"' to Mazch 30` ,and back in the
office on April I s`. Except for that short period, you aze welcome to call me anytime needed.
Mahalo Nui Loa,
Grace Community Church
Gary Sn
Assisti~t Pastor
cc: Planning Departrnent
DEPARTMENT OF WATER SUPPLY COUNTY OF HAWAII
345 KEK UANAO`A STREET, SUITE 20 HILO, HAWAII 9Fi720
TELEP HONE (808)961.8050 FAX (808)961-8657
Ntarch 11.2009
Mr. Gnry Summers
Grace Community Church
74-4489 Palani toad
Kailua-Kona, HI 96740
GRACI; COMMUNITY CHURCH
'i'AX MAP KrY 7-4-0U6:U38
"this letter is iu response to your phone conversation last week with Mr. Jason Killam of our F,ngineering
Division.
-the last set of plans submitted for review of the Grace Cornmunily Church was received on October i(l, 2008
and were returned on October 28, 2008. The llepar[Inent of Water Supply has not received any set of plans for
Grace Community Church since then. Our primary concern on the. construction plans were the proper anchoring
and support of the nhove ground high pressure temporary bypass line, as this has the potential to cause property
damage and injury to passerby.
Secondly, the issue of water commitments is not resolved. In your letter dated October 10, 2008, there is
mention of 10 water eotnmitments. Huwever, our May 19, 1997, memo to the Planning Department indicates
six (6) additional water commitments were made available from a Change of Zone application. Those water
mots combined with the one (l) water unit from the existing 5/8-inch meter servicing the parcel, would result in
a maximum of seven (7) units available for your project.
Furthennoro, the submitud water usage hisrory, although appreciated, does not satisfy the requirement of the
engineer certified water demand calculations as requested in our May 19, 1997, and October 2, 2008, loners.
Please have a licensed engineer submit water demand calculations, water unit allocations for each lot and
assignmont of any left. over units. Please be advised, if water availability in this area should change then any
unallocated units may be lost.
Finally, the letter also mentions the possibility of a furore school, please he advised that based on current
availability, dtere is no sufficient water units for n school, nor the 5/8-incb meter would be .ufticiently-sized.
These matters will need to be addressed prior to water service being granted to the proposed school.
Should you have any questions or would like to
J W K:dlg
above further, please do not hesitate to contact us.
yours,
Pavao, P.E.
copy-Nlr. Dan Bolton, Bolton Inc-
... (/l/aLeN ~rirt.~.a ~ro~C.r¢sa...
The Department of Water Supply is an Equal Opportunity providor and employer. To file a complaint of discrimination, write: USDA. Director, Office of Civil
Rights, Room 32G-W, Whitten Ouilding, 14th and Independence Avenue. SW, Washington DC 20250-9410. Or call (202) 720-5964 (voice antl TDD)
COUNTY OF HAWAII
DEPARTMENT' OF WATER SUYPLY
-ts titaht:~,tx,tc,,t ;raisr.'t. sour: ac
TRANS\t 1'1"fAf. SHIT B'1`
'ro~. naoxr
~~Ir. I)an l3olron ~ason f{illam
c onn•,~:a'. oxrc:
Bolton. Inc. 10%02/2005
I'1IUtiL 'It]'P:J_ NO. OR P.5:9 FS ISCLLRH~G :"OV52:
329-8340 1
i°,~?: srvrnse~s acn=.arncr_ ~u,.itm:a:
~~~-IZ~+7 zoos-wkp
41-' Nf NIi2F:Ai:b Nh hlRElt
C)race Cotrununitp Chtueh 1'eL~ ivLllt KF.Y: 7-4-0CI(:038
^ uti<;ear ^ tort xrvn~:w- ^ rt.ensis ronantr:nt' ^ vt,r:nsts aei°t,v ^ ri.ansi± rzi°cra,r:
SU'I'TS /COA1Fd l?NT3
\ir. Dan Bolton,
V'v'e ue writing this memo to avoid vty confu_don regarding the submission process fox Grace
Contmunin~ Church. 13ascd on a precious meeting between Kurt Inaba, Shari I{otnata and Dan
Bolton we uttdcxstand drat a subdivision is Trot cttnendv beutg done, and ,rte waiting on the
following from you in Waiting before proceedirig.
1) ~ set of consnvetion plans showing the location of dtc 3 proposed meters, a mm-about
and any casements to be dedicated to du Depamnctit. (I'lcasc note: 1Watcx Demand
Calculations will need to be submitted during the construction plan rctie~v process)
2) A lrttex eeyuestutg the 7 water wmtitirments that weee otiginally secured through dte
original change of zone for the project iIn dtis letter it should be adutowledgcd that since
you are using the maximum allotmenr.of water, that water for aup future subdivision for
these pazccls will be based on current avaiLabilirn and nvly not be acail<161e.
Please be aware drat construction plans need to be approved before we accept any payment of
the facilities charge.
Should you have any questions, please call me at 961-x070, extension 249
--S'inccrrlt u:~,
la~: am
! _...
Colt}: Pastor Gat)• ~ Grace Community Church /~N G~~-..__
l
PTI CI :; P, 4fil-Hrit6 - PSg )pt-Nr,80