Loading...
HomeMy WebLinkAboutCOM 0494.001 2008-2010 Page 1 of 1 Murashige, Laura Co m M ~ 4 P R From: Bob Ward [rgward007@hawaii.rr.com]- Sent: Sunday, August 30, 2009 7:20 PM To: Council Testimony "i ,UG 3 Cc: planning@co.hawaii.hi.us Subject: Testimony - Planning Committee Attachments: PC-Palamanui.pdf Aloha, I have attached my testimony before the Planning Committee for Bill 136 and Bill 137 and the new zoning changes for Palamanui. IF certain changes are made, I would be in favor of the request. Thanks, Robert Ward CORMi ft '/?4'./ Ref. To,. Re 8/31/2009 f. QQ V TESTIMONY - HAWAII COUNTY PLANNING COMMITTEE RE: PALAMANUI GLOBAL HOLDINGS LLC- TMK: 7-2-5:1 - Bill 136 & 137 1 have reviewed the Planning Director's and Leeward Planning Commission's perspectives on the proposed zoning condition changes for Palamanui. Deferring actual construction of both on-site facilities and off-site roadways may well be justified by the current constraints on financial resources, however I believe that additional changes are warranted. I would be happy to discuss these recommended changes further and how they will impact implementation of the Community Development Plan. Delaying actual construction of the Mamalahoa connector road (actually a Minor Arterial) might be reasonable in a shrinking economy; HOWEVER, delaying indefinitely the Planning, Engineering, and Right of Way acquisition is not acceptable or necessary. The developer should have adequate resources to advance the off-site road projects to the pre-construction stage (or `shovel ready' in the current vernacular). Consequently, I RECOMMEND that the developer provide the County with all design plans, bid specifications, meets and bounds surveys, legal descriptions and other necessary documents for the County to acquire sufficient right-of-way and advertise bids (if necessary) for construction. This route remains a crucial component, and must provide for both the Arterial capacity and the Switchback (meandering, to conform to AASHTO and ADA guidelines) Shared-Use Path required in the Kona CDP. These should be delivered to the County before the original construction deadline. Active recreation facilities may, or may not be required until the project is actually occupied; HOWEVER recreation is still needed by clients, customers, students, workers, faculty, patients, and other guests of the project. The developer should have adequate resources to provide the County with passive recreation facilities, again relying on in- kind resources. Consequently, I RECOMMEND that the developer should provide (at a minimum) 10-foot paved Shared-Use Paths (conforming to AASHTO and ADA guidelines) along the HELCO utility easement adjacent to the proposed park site as well as University Drive and Kamanu Street as valuable components of the Kona CDP. It would be reasonable to expect the developer to complete the park Master Plan (with public input) as well. These should be completed on a defined schedule and prior to the original park completion deadline. Changes in the zoning structure may be justified; HOWEVER, the original requirements for providing mixed-use development was a crucial component of meeting community goals The Developer should have sufficient capabilities to provide enhanced mixed-use development. Therefore, I RECOMMEND that the developer warrant a minimum of 20-percent of all commercial, retail, wholesale, and distribution parcels will contain mixed-use residential units as well. This is a cost effective means of achieving the goals delineated in the Kona CDP. This should be achieved on a cumulative annual sales basis. Thank you. Robert Ward