Loading...
HomeMy WebLinkAboutRES 030 Draft 01 1965 d County of Hawaii-State of Hawaii Resolution No. 30 BE IT RESOLVED BY THE BOARD OF SUPERVISORS in and for the County of Hawaii that the sum of, TWELVE THOUSAND'THREE HUNDRED FORTY-FIVE AND 57100 DOLLARS 12,345-57 ) be and the same is hereby TRANSFERRED out and f rom G-8633.2 INCREMENT III - KONAWAENA HIGH SCHOOL $12,345.57 GENERAL FUND. and placed to the credit of the following named account: G_8633.1A KONAWAENA SCHOOL, SEC. 1, ACT 201 SLH 1963 - COMPLETION OF THIRD PHASE OF SECONDARY SCHOOL TO INCLUDE SPECIALTY BUILDINGS _ S. K. ODA, LTD $12,34557 Public Works, Report No. 68 (November 16, 1964) • Communication No. 3238 (Attached herewith Extra Work Order No..1) as 4 el' ~3~ i i BE IT FURTHER RESOLVED that the County Clerk be and she. is hereby directed and instructed to forward copies of this resolution each to the County Auditor and County Treasurer, and that said County Auditor and County Treasurer. be and they gre hereby authorized to make the necessary transfers i in accordance with the terms of this resolution. Introduced by Dated at Hilo Hawaii , 65 Supervisor 2nd Senatorial January 26 19 District. X. B. No-_61 7-C.- *a Cl L? t~ a.._~~JAN 2 6_ 19 a DEPARTMENT OF PUBLIC WOKS a COUNTY OF HAWAII ff 1h W""K ORDER LA I RA S. K. ODA9 LTD. Contractor------- 14148 1 Job No------------- Order No. 12 9 1965 Contract------------------ 64------ 36 --------------------------------------------------------------Date - -Ja-----nu---ary - CONDITIONS OF EXTRA WORK ORDER KONAWAENA HIGH AND ELEMENTARY SCHOOLS INCREMENT 3 HN- Note here as specifically as possible the item, quantity, and location of the extra work required, with an accurate descrip- tion of its character, using sketches if necessary. Also note any quantities or work which this replaces and show net value or quantity of extra. I Dismantling and salvaging of material from shop building, 6-classroom building and water tanks. Justification The work under Increment 3 includes the removal of several classroom buildings9 water tanks, and other structures located in the area of the new construction. The contract drawings specify the dismantling and salvaging of material to be done by the County in order to provide work for the Kona carpenter crew. However, due to the consolidation of Keauhou School with Holualoa School, construction of additional classrooms and the enlargement of the dining hall at Holualoa are necessary. In view of the immediate nature of both the construction of new facilities at Holualoa and the. dismantling work at Konawaena, it is necessary to contract the latter work to the Konawaena School contractor. Cost Labor $ 8,989.90 Equipment 1.382.35 10,372.25 Overhead and Profit (15%) 1,555.84 11,928.09 Gross Inc. Tax (32%) 417.48 TOTAL $129345.57 1-Recomm ded 2-Ap ed ` ~ Chairman & Executive Officer Project Engineer /*3'=Noted with-Approval 4-Accepted sf En.g3.,xtQEmlr ` - - - Contractor or his Representative ?J--rcrT-s_ _ -vr_-r--r----