Loading...
HomeMy WebLinkAboutRES 236 Draft 01 1965 County of Hawaii-State of Hawaii Resolution No. 236 BE IT RESOLVED BY THE BOARD OF SUPERVISORS in and for the County of Hawaii that the sum of SEVEN THOUSAND SIX HUNDRED TWENTY-SEVEN AND 45100 DOLLARS ($7,627.45 ) be and the same is hereby TRANSFERRED out and from NFC 8031 CONSTRUCTION OF CONCRETE LINED CHANNEL THROUGH $7,627.45 NAALEHU VILLAGE AND A DEBRIS BASIN NAALEHU FLOOD CONTROL FUND. and placed to the credit of the following named account: NFC 8031A CONSTRUCTION OF FLOOD WATER CHANNEL & DEBRIS BASIN $7,627.45 k REINFORCED CONCRETE SLAB BRIDGE, ACCESS ROAD AND APPROACH AND CHAIN LINK FENCING ALONG CHANNEL - S.'K..ODA, LTD: Finance Committee Report No. 30 Communication No. 1031 ? rv, < a BE IT FUR.TIIER RESOLVED that the County Clerk be and she is hereby directed and instructed to forward copies of this resolution each to the County Auditor and County Treasurer, and that said County Auditor and County Treasurer, be and they gre hereby authorized to make the necessary transfers in accordance with the terms of this resolution. f. t Introduced by Dated at Hilo, Hawaii,rlAo~ ` Super sor 2nd, Senatorial. ' August`, I9..65 District. Res. No...-........ ....a=ana m.o4 File No. M. B. No.. -f D ..AURA . 1965 a 4 . i DEPARTMENT OF PUBLIC WORKS COUNTY OF HA®9 II 1) R tX-flRf"' WOIKK Contractor:------ Job No------------ Order No. Contract t` Date ..._s_ ~5------------ CONDITIONS OF EXTRA WORK ORDER HN Note here as specifically as possible the item, quantity, and location of the extra work required, with an accurate descrip- any quantities or work which this re tion of its character, using sketches if necessary. Also note an places and show net value or quantity of extra. . ~.i.: `~*a +..~4 ,-.s- _tl•...°~~.' - _ e ~%.~F,. I .J O''~~j '-k~ a.7,~+y.-4.~-~, :.:L ~:+~Q y~. .s _ ..y~~. ,++yy1.., - 1 3•'f~w: ~ i{. 1., ~'v ? :'~.4 .~a.4#.,40' 1 _ t} - 3J: . . 4if~ v-r.-+)k~ •v'.s - -x.51 0~+. .I.t+ ~.r I i j._ y. 1,4, N+' 'i^n~ti_.ky V3 M.: kfP~J'4.s[}-~0.1.Gt'N;d6 Gt 1-Recommended 2-Ap ed Project Engineer Chairman & /xeutve Officer 3-Noted with Ppproval 4-Accepted 'ZA - ~ f L"h:Le f Eng i na etk' Contractor or his Representative I 4 _ .