HomeMy WebLinkAboutCOM 0328.000 2010-2012County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
:additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION' Department of Environmental Management - Wastewater Division 2. DATE: 12/7/2009
3. PROJECT NAME. Kealakehe Wastewater Treatment Plant Sludge Removal 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7 --4- 008:058
7. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement
10. PROJECT /PROGRAM DESCRIPTION:
Remove sludge from the treatment plant lagoons to support the planned aeration system upgrade. Presence of sludge contributes to high Total Suspended Solids levels which is a
potential violation of the discharge permit limitations prescribed for the plant.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements for establishment of an Effluent Reuse system
System. Decreasing Total Suspended Solids will lessen the likelihood of clogging of the seepage pit as well as benefit the future effluent reuse water when the plant undergoes the R -1
upgrade.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by continuing to discharge effluent that
meets re:ualator dischar:e requirements.
13. COUNTY MATCHING FUNDS REQ'D? NO', YES' DESCRIBE:
14. LEGALMADATE? NO r, YES DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
No expected impact on the Operational budget.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
17. PROJECT READINESS (List all that apply): The design is currently in progress. Construction is anticipated to begin June 2010.
18. EXPENDITURE PHASING (X $1000)
Prior Funds
Received
This FY 09 -10
Request
c
FY 10 -11
FY 11 -12
t
FY 1713
FY 13 -14
FY 14 -1S
Beyond 6 Years
TOTAL.
�
Planning
Land Acquisition
Design /Survey
Construction
4,000
$4,000
TOTAL:
$4,000
1
54,000
19. 0 & M COSTS (x $1000):
20. FUNDING SOURCE (x 51000):
Cty G.O. Bond /Other
4,000
54,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share /Park Dedication, etc)
Special Financing District
TOTAL:
54.000
II
-II- 54,001
County of Hawaii
PROJECT DATA /FINANCIAL IMPACT STATEMENT
Additional Economic 5timulu, Prot'rts
1. DEPARTMENT AND DIVISION. Department of Environmental Management - Wastewater Division 2. DATE: 12/3/2009
3. PROJECT NAME: Naalehu & Pahala LCC Replacement 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(5)' 6 6. TMK: 7-4-008:0058,072
7. LOCATION (JUDICIAL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $18,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement
10. PROJECT /PROGRAM DESCRIPTION:
Installation of new collection sewer system and treatment /disposal system
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety Enhances Quality of Life, Service Improvements as establishment of an Effluent Reuse system
This project replaces the existing old sewer system and allows closure of Large Capacity Cesspools. While this project is currently not a legal mandate, it has the potential to become one in
April 2010. •
12. LONG RANGE PLANS /COMMUNITY VALUES: The project Is consistent with the Department's goal of protecting the environment by minimizing direct discharge of effluent to the
environment, conserve potable water resources in the area, and is consistent with the goals established by the Kona Community Development Plans
13. COUNTY MATCHING FUNDS REQ'D? NO s YES DESCRIBE:
14. LEGAL MADATE? NO rr YESr DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional operating costs to be offset by establishing sewer rates commensurate with operating expenses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
17. PROJECT READINESS (List at that apply): Design is in progress for Naalehu. Bid process to begin in mid -2010. Pahala bid process to begin in mid -2011.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11 FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Years
TOTAL:
—
Planning —
Land Acquisition
Design /Survey
- --
Construction
18,000
518,011
TOTAL:
518,000
518,011
19. 0 & M COSTS (x $1000): —�
20. FUNDING SOURCE (x $1000):
rs. :. !: °:
•
fd rae; t..a- .,�...:_.,:.
4,000
";`,* -:.
riwr.'
Le1 .,- .:a'k.:.-a,2C
- ∎41•,..
_ 5.nf =`'�±s .,,a. -4
54,001
Cty G.O. Bond /Other
State Revolving Fund
14,000
514,00
State CIP
Federal
Private (Grants)
CBA (Fair Share /Park Dedication, etc)
Special Financing District
TOTAL:
518,000
518,011
County of Hawaii
PROJECT DATA /FINANCIAL IMPACT STATEMENT
Additional Economic Srin;uius Projerts
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/18/2009
3. PROJECT NAME: Kalanianaole Interceptor Rehabilitation - Phase 2 4. SUBMITTER: Dora Beck, Division Cnref
5. COUNCIL BENEFIT DISTRICT(S): 1,2,3,4 6. TMK: 2 -1
7. LOCATION (JUDICIAL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $6,150
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement (Sewer Interceptor Rehabilitation)
10. PROJECT /PROGRAM DESCRIPTION:
Repair /Rehabilitation of approximately 6600 lineal feet of reinforced concrete sewer interceptor due to deterioration from Hydrogen Sulfide gas.
11. PROTECT JUSTIFICATION & OUTCOME(S) The Kalanianaole Avenue Sewer Interceptor north of the Pua Sewage Pump Station ranges in size from 42- inches to 48- inches
in diameter and serves the majority of the properties currently connected to the sewer collection system. The existing deterioration is severe and failue of the interceptor would result
in a sewer spill of approximately 2.5 million gallons per day to the Wailoa River. The interceptor south of the Pua Sewage Pump station is also severely deteriorated and failure would
result in a sewage spill of approximately 0.7 million gallons per day to Puhi Bay.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing sewer spills to the environment.
13. COUNTY MATCHING FUNDS REQ'D? NO 11 YESI DESCRIBE:
14. LEGAL MADATE? NO l VESI DESCRIBE: While not currently a legal mandate, collapse and a large sewer spill would likely result .0 sanctions.
15. IMPACT ON OPERATIONAL BUDGET:
Rehabilitation work would reduce the labor hours currently expended to assess the condition due to the severe deterioration.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality since a large sewer spill would result in contamination of shoreline areas and potential reduction in visitors,
Preserves and Protects our Natural Environment, Promotes Health and Safety
17. PROJECT READINESS (List all that apply): Project Bid documents were previously completed but the project was not initiated due to a lack of CIP funds. Updating of the project bid
documents is expected to entail 2 -3 months of work.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 1117
FY 12 -13
FY 13 -14
FY 14.11
Beyond 6 Years
TOTAL:
Planning
Land Acquisition
Design /Survey
150
5150
Construction
6,000
56,00.
TOTAL:
$6,150
56,15c
19. 0 & M COSTS (x 51000):
20. FUNDING SOURCE (x $1000):
-
-
Cty G.O. Bond /Other
6,150
56.150
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share /Park Dedication, etc)
Special Financing District
TOTAL:
-
--
56.150
11111■111T 56.150
BRENDA J. FORD
Council Member
District 7 - Central Kona
Phone:
Fax:
E -Mail:
HAWAII COUNTY COUNCIL
County of Hawaii
West Hawaii Civic Center
74 -5044 Ane Keohokalole Hwy.
Kailua -Kona, Hawaii 96740
DATE: August 24, 2011
TO: Dominic Yagong, Chairperson
and Members of the Hawai`i County Council
FROM: Brenda J. Ford, Council Member
(808) 323-4277
(808) 329- 4786
bford @co.hawaii.hi.us
am, f3:57Mq 1 RUG y2 �.
.,r Grimy Goundl
SUBJECT: Transmitting for discussion Resolution No. 289 -09, sewer projects request for possible
stimulus funding
Resolution No. 289 -09 was a request for stimulus funds from the Federal American Recovery
and Reinvestment Act and other federal sources to complete certain wastewater projects, as
enumerated in the resolution.
Please distribute the following attachments to all council members: 1) Summary Spreadsheet, 2)
Exhibit 1, 3) Financial Impact Sheets and Maps by project.
Please place this matter for discussion on the appropriate committee at the Council committees
September 7, 2011 agenda.
BJF /dkr
att.
Serving the Interests of the People of Our Island
Hawai `i County is an Equal Opportunity Provider and Employer
Comm No. 32-g
Ref. To: M G
Ref. Date AUG 2 4 2011
Department:
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Additonal Economic Stimulus Projects
PRIORITY
PROJECT
FUNDING
(in thousands)
FUNDING FORECAST BY FISCAL YEAR
(in thousands L
TOTAL
ESTIMATED
PROJECT
COST
Stimulus
State
Federal
Private
CBAe'
SFD "•
Prior
funding
received
Stimulus Funding
. Beyond
6 years
1
Ronakaa L Capacity Cesspool - Phase 2
6,000
6,000
6.000
2
Kaianianaae Interceptor Renadmaeon • Pna e t
6,150
6,150
6.150
3
No lenu 5 Pahala LOC Redxemere
18,000
16,000
18.000
4
Keels eh wastewater Treatment Plant Stage Removal
4,000
4,000
4,000
5
Kealakehe Wastewater Treatment Plant Aeration Upgrade
6,000
6,000
6,000
6
Kealakehe Effluent Reuse • Makai
4.811
4,841
4,841
7
Keatakene Wastewater Treatment Plant R•1 Upgrade
11,875
11,875
11,875
9
Kealakehe Wastewater Treatment Plant Photovoltaic System
7000
7,000
7,000
9
Noon Kona Sewer - Phase 2
10,224
10.224
10,224
10
Keatakehe Effluent Reuse • Mauaa
14,173
14,173
14,173
11
Kahaluu Basin Sewer
8,675
8,675
8,675
12
Wnae Sands Sewer Basin
2.574
1574
2,574
13
Kanakai Sewer Basin
1,188
1.188
1.188
14
Saman, Tree Sewer Basin
4,158
4,158
4,158
15
Konalani Sewer Basin
990
990
990
16
Kilohana Sewer Basin
2,970
2,970
<" ",970
17
one Kona Sewer Basin
1,782
1782
1,782
18
Al k Kai and Kalan, Makai Sewer Basin
3.564
3,564
3,564
19
Alone Kona Sewer Basin
5,148
5,148
5.148
20
Kealohl Kai Sewer Basle
1,386
1,386
1.386
21
Lake St Sewer Basin
1,040
1,040
1,340
22
Aranou Sewer Basin
1.320
1,320
1,320
23
Kona Mintiest Sewer Basin
1,782
1,782
1,782
24
Komohana Kai Subd.vision Sewer Basin
4,942
4,942
4,942
25
Kona Sea view Sewer Basin Are a
4,372
4,372
4,372
26
Pano0hoe Mauka Sewer Basin Area
1,884
1 884
1,884
TOTAL.
136,038
136,038
136,038
Created By:
Date'
Private- Foundation Grants
'• Community Benefit Assesments: Fair Share, Park Dedication, E
Special Financing District Improvement District, Community Facilities Distract, Tax Increment Financing District
File: Exhibit 1 - Wastewater projects.xls
EXHIBIT 1
WASTEWATER PROJECTS FOR HAWAII COUNTY
Proj.
#
Project
Location
CD
Marine Water
Classification
Description
$ Cost
(millions)
4
Honoka`a Large Capacity
Cesspool Replacement Project -
Phase 2
liamakua
1
AA - Open
Coastal & A
Oceanic
Mandated closure of two non - county -owned LCCs by
connecting to a collection system serviced by wastewater
treatment and disposal system.
6.00(
1
Kalanianaole Interceptor Sewer
Rehabilitation - Phase 2
Hilo
1,_,
4
A - Open
Coastal & A
Oceanic
Replaces 6600 lineal feet of reinforced concrete sewer
interceptor due to deterioration from hydrogen sulfide gas.
6.150
?, 3
Na'alehu Large Capacity
Cesspool Replacement Project &
Pahala Large Capacity Cesspool
Replacement Project
Ka'u
6
AA - Open
Coastal & A
Oceanic
Mandated closure of three non - county -owned Large
Capacity Cesspools ( LCC ) by connecting to a collection
system serviced by wastewater treatment and disposal
system.
18.000
5
Kealakehe Wastewater
Treatment Plant
North
Kona
5.1
Sludge removal
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Required due to the majority of the treatment lagoons
being at capacity for Total Suspended Solids (TSS) which
causes clogging in the seepage pit and jeopardizes the
effluent disposal system.
4.000
5.3
Upgrade the Kealakehe WWTP
Aeration Upgrade
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Provides additional plant capacity due to Biological
Oxygen Demand (BOD) and TSS mass loading to the
facility is higher than the plant was originally designed for
resulting in a reduction of WWTP capacity.
6.000
5.5b
Kealakehe Effluent
Reuse - Makai
North
Kona
7,8
AA -Open
Coastal & A
Oceanic
Install -1 mile of effluent reuse piping fir irrigation use,
construction of storage pond for R -1 reuse water ( -1MG
reservoir), install irrigation pumping system at Kailua
Park for irrigation and also to adjacent properties.
4.841
5.5a
Kealakehe Wastewater
Treatment Plant R -1 Upgrade
North
Kona
7.8
AA - Open
Coastal & A
Oceanic
Upgrade of the Kealakehe WWTP to provide R -1 quality
reuse water to provide effluent for irrigation in the area.
11.875
File: Exhibit 1 - Wastewater projects.xls
EXHIBIT 1
WASTEWATER PROJECTS FOR HAWAII COUNTY
Proj.
#
Project
Location
CD
Marine Water
Classification
Description
$ Cost
(millions)
millions
S
Installation of a
photovoltaic system
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Reduces dependence on oil, protect the environment
through the use of green technologies, and minimize costs
to customers.
7.000
5.4
North Kona
Sewer Project, Phase 2
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Construct new sewage pumping station to service areas
north of Kealakehe Pkwy. Instaall —.7 miles of dual force
mains from the SPS to Kealakehe Pkwy. Install —.4 miles
of gravity sewer from Queen Ka ahumanu Hwy. to the
Kealakehe WWTP.
10.224
5.6
Kealakehe Effluent
Reuse - Mauka
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install —4.3 miles of effluent piping from Kealakehe
WWTP to areas above the facility to be used for disposal
of effluent by irrigation; install storage tank and booster
station at — elevation of 280 feet; install storage tank at --
elevation 600 feet to provide store and irrigation water
system pressure.
14.173
6
Kailua -Kona
Sewer Expansion Project
North
Kona
AA - Open
Coastal & A
Oceanic
Requires design and construction of sewer infrastructure
(wastewater mains) and appropriate pumping stations
between Ali`i Drive and up to one mile inland of the
shoreline to eliminate cesspools of residents and
businesses along the shoreline and near shoreline, and
prevent leaching of cesspool effluent into the ocean.
6. I
Kahaluu
Sewer Basin
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install — 1.0 mile of gravity sewer, new pumping station,
1/2 mile of dual force main from the new pumping station
with connection to the existing gravity sewer main.
8.675
6.2
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install — 1.3 miles of gravity sewer, within Critical
Wastewater Disposal Area (CWDA) with connection to
the existing gravity sewer main.
2.574
2
File: Exhibit 1 - Wastewater projects.xls
EXHIBIT l
WASTEWATER PROJECTS FOR HAWAII COUNTY
Proj.
#
Project
Location
CD
Marine Water
Classification
Description
$ Cost
(millions)
6.3
Kahakai
Sewer Basin
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install — .6 miles of gravity sewer to service Kahakai
Elementary School Access Road, within Critical
Wastewater Disposal Area (CWDA) with connection to
the existing gravity sewer main.
1 188
6.4
Kamani Trees
Sewer Basin
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install — 2.1 miles of gravity sewer which is within
Critical Wastewater Disposal Area (CWDA) with
connection to the existing gravity sewer main.
4.158
6.5
Konalani
Sewer Basin
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install — .3 miles of gravity sewer which is within Critical
Wastewater Disposal Area (CWDA) with connection to
the existing gravity sewer main.
0.990
6.6
Kilohana
Sewer Basin
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install — 1.5 miles of gravity sewer which is currently
served by LCCs and within Critical Wastewater Disposal
Area (CWDA). Will connect to the existing gravity sewer
main.
2.970
6.7
Lono Kona
Sewer Basin
North
Kona
8
AA - Open
Coastal & A
Oceanic
Install . .9 miles of gravity sewer which is within Critical
Wastewater Disposal Area (CWDA) with connection to
the existing gravity sewer main.
1.782
6.8
Ali`i Kai & Kalani Makai
Sewer Basin
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install — 1.8 miles of gravity sewer which is within
Critical Wastewater Disposal Area (CWDA) with
connection to the existing gravity sewer main.
3.564
6.9
Aloha Kona
Sewer Basin
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install — 2.6 miles of gravity sewer which is within
Critical Wastewater Disposal Area (CWDA) with
connection to the existing gravity sewer main.
5.148
6. 10
Kealohi Kai
Sewer Basin
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install — .7 miles of gravity sewer which is within Critical
Wastewater Disposal Area (CWDA) with connection to
the existing gravity sewer main.
1.386
6.1 1
Lako Street
Sewer Basin
North
Kona
7,8
AA - Open
Coastal & A
Oceanic 1
Install -- .5 miles of gravity sewer which is within Critical
Wastewater Disposal Area (CWDA) with connection to
the existing gravity sewer main.
1.040
File: Exhibit 1 - Wastewater projects.xls
EXHIBIT 1
WASTEWATER PROJECTS FOR HAWAII COUNTY'
Proj.
#
Project
Location
CD
Marine Water
Classification
Description
$ Cost
(millions)
6.12
Alahou
Sewer Basin
North
Kona
7.8
AA - Open
Coastal & A
Oceanic
Install — .4 miles of gravity sewer which is within Critical
Wastewater Disposal Area (CWDA) with connection to
the existing gravity sewer main.
1.320
6.13
Kona Hillcrest Sewer
Basin
North
Kona
7.5
AA - Open
Coastal & A
Oceanic
Install �- .9 miles of gravity sewer with connection to the
existing gravity sewer main. Location is located —.5 miles
from the shoreline.
1.752
6.14
Komohana Kai Subd.
Sewer Basin
North
Kona
7.8
AA - Open
Coastal & A
Oceanic
Install -- 2.6 miles of gravity sewer with connection to the
existing gravity sewer main. Location is located —.35
miles from the shoreline.
4.942
4
File: Exhibit 1 - Wastewater projects.xls
EXHIBIT I
WASTEWATER PROJECTS FOR HAWAII COUNTY
Proj.
#
Project
Location
CD
Marine Water
Description Description
S Cost
(millions)
6.15
Kona Seaview
Sewer Basin
North
Kona
7.8
AA - Open
Coastal & A
Oceanic
Install -- 2.3 miles of gravity sewer with connection to the
existing gravity sewer main. Location is located —.36
miles from the shoreline.
4.372
6.16
Pahoehoc Mauka
Sewer Basin
North
Kona
7,8
AA - Open
Coastal & A
Oceanic
Install — .6 miles of gravity sewer with connection to the
existing gravity sewer main. Location is located —.36
miles from the shoreline.
1.884
TOTAL
S 136.038
5
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/18/2009
3. PROJECT NAME Honokaa Large Capacity Cesspool Replacement Phase 2 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S), 1 6. TMK: 2 -1
7. LOCATION (JUDICIAL DISTRICT): 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $6,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement (Existing treatment system capacity upgrade)
10. PROJECT /PROGRAM DESCRIPTION:
Upgrade the existing treatment plant in to meet additional flows from new collection system installed under Phase 1.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all This project is a continuation of of an EPA mandate to close the County -owned large capacity cesspools In Honokaa Town
and providing an adequate sewage collection and treatment /disposal system to handle the new flows.
12. LONG RANGE PLANS /COMMUNITY VAt UFS The project is consistent with the Department's goal of protecting the environment by discontinung discharge of raw sewage into the ground.
13. COUNTY MATCHING FUNDS RECI'D? NO is YES r DESCRIBE:
14. LEGAL MADATE? NO YES G DESCRIBE: yes
X115. IMPACT ON OPERATIONAL BUDGET.
Additional operatin; costs to be offset by establishing sewer rates commensurate with operatin; expenses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment; Promotes health and Safety
17. PROJECT READINESS (List all that apply)• Design is in progress now. Bid process to commence in 2nd quarter of 2010.
18. EXPENDITURE PHASING (X $1000).
Prior Funds
Received
This FY 09.10
Request
FY 1011
FY 11 -12
FY 12 -I3
FY 13 -14
FY 14 -15
Beyond 6 Years
TOTAL
Planning
and Acquisition
Design /Survey
Construction
-.
.111
TOTAL
j -. -,._.
S6.ur
19. 0 & M COSTS (x $1000).
20. FUNDING SOURCE (n $1000)
- -_
ty G.O. Bond /Other
- --
State Revolving Fund
State CIP
6.000
S6,00a
Federal
Private (Grants)
-,' --
CBA (Fair Share /Park Dedication, etc)
Special Financing District
I
TOTAL
--
_ -. -. -- $6.000
- -
--
$6.001
Honokaa WWTP Upgrade
,r
H0140KAA-Y ✓A/gOtit)
IWWTP Upgrade
p
Existing Sewer Lin'
0
9
9.
T�
9
L
New Sewer Line Phase 1
FiPA PJAii BELT R
0
\G
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
11. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/18/2009
3. PROJECT NAME: Kalanianaole Interceptor Rehabilitation - Phase 2 4. SUBMJTTER: Dora Beck, Division Chief
S. COUNCIL BENEFIT DISTRICT(S): 1,2,3,4 6. TMK: 2-1
. LOCATION JUDICIAL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: 56,150
• . CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Im • rovement Sewer Interce • tor Rehabilitation
10. PROJECT /PROGRAM DESCRIPTION.
Repair /Rehabilitation of approximately 6600 lineal feet of reinforced concrete sewer interceptor due to deterioration from Hydrogen Sulfide gas.
11. PROJECT JUSTIFICATION & OUTCOME(S)
in diameter and serves the majority of the properties
in a sewer spill of approximately 2.5 million
r-c Its II i.
The Kalanianaole Avenue Sewer Interceptor north of the Pua Sewage Pump Station ranges in size from 42- inches to 48- inches
currently connected to the sewer collection system. The existing deterioration is severe and failue of the interceptor would result
gallons per day to the Wailoa River. The interceptor south of the Pua Sewage Pump station is also severely deteriorated and failure would
i'•n;.l•i -• ••. •P_.i
The project is consistent with the Department's goal of protecting the environment by minimizing sewer spills to the environment. '..
12. LONG RANGE PLANS /COMMUNITY VALUES:
13. COUNTY MATCHING FUNDS REQ'D? NO • YES DESCRIBE:
14. LEGAL MADATE? NO I YES_ DESCRIBE: While not currently a legal mandate, collapse and a large sewer spill would likely result in sanctions.
15. IMPACT ON OPERATIONAL BUDGET:
Rehabilitation work would reduce the labor hours currents ex .ended to assess the condition due to the severe deterioration.
16. SUSTAINABILITY FOCUS (list all that apply): Promotes Economic Vitality since a large sewer spill would result in contamination of shoreline areas and potential reduction in visitors,
Preserves and Protects our Natural Environment, Promotes Health and Safety
17. PROJECT READINESS (List all that apply): Project Bid documents were previously completed but the project was not initiated due to a lack of CIP funds. Updating of the project bid
documents is ex • ected to entail 2 -3 months of work.
18. EXPENDITURE PHASING (X $1000):
Prior Funds This FY 09 -10
Received Request FY 10 -11
- ?- _
FY 11 -12
-
FY 12.13
-
FY 13 -14
-_-
FY 14 -15
TOTAL:
Planning
Land Acquisition
- !---
-
-
-
-
-_
Design/Survey
150
- -
-_
-
-
--
--
5151
$6,111
Construction
6,000
TOTALS
-
-
56,150
-
--
- -_
-�
56,151
19. 0 & M COSTS (x $1000 :
20. FUNDING SOURCE (x $1000)
'•
-
.
6,150
amp.
- -
',
- --
$6,151
'Cty G.O. Bond /Other
-
I tate Revolvin: Fund
-
,__
- -
- --
tate CIP
--
-
--
--
----
-
-
-
_
$6.150
-_
- -
- -
- -
- -
- --
-_ -��,
- --
- --
- --
-_-
Federal
•rivate (Grants)
BA (Fair Share /Park Dedication, etc)
pecial Financin: District TOTAL:r--
$6,151
Map /Results
Map/ Results
Page I of 1
Kalanianaole Ave. Interceptor
Sewer Rehabilitation - Phase 2
(Approx. 6600 lineal feet)
http: / /coh40 /aspnet_ client / ESRI / WebADF/ PrintTaskLayoutTemp lates /default.htm 11/18/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economk Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/3/2009
3. PROJECT NAME: Naalehu & Pahala ICC Replacement 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK: 7- 4-008:0058,072
7. LOCATION (JUDICIAL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $18,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement
10. PROJECT /PROGRAM DESCRIPTION:
Installation of new collection sewer system and treatment /disposal system
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety Enhances Quality of Life, Service Improvements as establishment of an Effluent Reuse system
This project replaces the existing old sewer system and allows closure of Large Capacity Cesspools. While this project is currently not a legal mandate, it has the potential to become one in
April 2010. •
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing direct discharge of effluent to the
environment, conserve potable water resources in the area, and is consistent with the goals established by the Kona Community Development Plans
13. COUNTY MATCHING FUNDS REQ'D? Nor; YESr- DESCRIBE:
14. LEGALMADATE? NO P YES!'" DESCRIBE:
SS. IMPACT ON OPERATIONAL BUDGET:
Additional operating costs to be offset by establishing sewer rates commensurate with operating expenses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
17. PROJECT READINESS (list all that apply): Design is in progress for Naalehu. Bid process to begin in mid -2010. Pahala bid process to begin in mid -2011.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Years
TOTAL:
Planning
Land Acquisition
Design /Survey
Construction
18,000
$18,11 a
TOTAL:
518,000
$18,
19. 0 & M COSTS (x $1000):
4,000
$4,111
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond /Other
State Revolving Fund
14,000
514,'"I
State CIP
Federal
Private (Grants)
CBA (Fair Share /Park Dedication, etc)
Special Financing District
TOTAL:4
$18,000
$18,018
Map /Results
Map /Results
Page 1 of I
Na'alehu Collection
and
Wastewater Treatment System
http: / /coh40 /aspnet client/ ESRI/ WebADF/ PrintTaskLayoutTemplates /default.htm 12/7/2009
Map /Results
Map / Results
Page 1 of 1
New Collection System
to WWTP
(Treatment System f
Pahala Collection
and
Wastewater Treatment System
http: / /coh40 /aspnet_ client / ESRI /WebADF/ PrintTaskLayoutTemplates /default.htm 12/7/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/7/2009
3. PROJECT NAME: Kealakehe Wastewater Treatment Plant Sludge Removal 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7-- 4- 008:058
. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000
' . CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Im • rovement
10. PROJECT /PROGRAM DESCRIPTION:
Remove sludge from the treatment plant lagoons to support the planned aeration system upgrade. Presence of sludge contributes to high Total Suspended Solids levels which is a
potential violation of the discharge permit limitations prescribed for the plant.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of LJfe, Service Improvements for establishment of an Effluent Reuse system
System. Decreasing Total Suspended Solids will lessen the likelihood of clogging of the seepage pit as well as benefit the future effluent reuse water when the plant undergoes the R -1
upgrade.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by continuing to discharge effluent that
meets re. ualato dischar: a re • uirements.
13. COUNTY MATCHING FUNDS REQ'D? NO 0 YESr DESCRIBE:
14. LEGAL MADATE? NO 0 YESr DESCRIBE:
r5. IMPACT ON OPERATIONAL BUDGET:
No ex•ected im•act on the O•erational bud:et.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
17. PROJECT READINESS (list all that apply): The design is currently in progress. Construction is anticipated to begin June 2010.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09-10
- Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
`
TOTAL:
[Planning
Land Acquisition
- -
-
-
-
-_-
Design /Survey
- -
_
-
-
-
--
Construction
-.
4,000
-_
-
-
-
-
--
-
-
111111111110111133M
®=
TOTAL:
- -
$4,000
19. 0 & M COSTS (x $1000):
"i
-
P :. i"
-
^„ �. __
4,000
-
>.-
-
Lw _'� , ti _ :F
-
--
{-
20. FUNDING SOURCE (x $1000):
: '_.•
f .. _
=
ty G.O. Bond /Other
State Revolvin: Fund
- i-
-
-
-
-
--
�.
State CIP
-
_
-
-
- I-
--
---
-
-----
-
-
_--
-
-
_
-
-
-
-
-
-
-
--
-
--
-_
-_-
-_
-,.
-,.
Federal
Private (Grants)
BA (Fair Share /Park Dedication, etc)
Special Financing District
TOTAL
-tt
$4,000
-
--
-
r�r
Map /Results
Map / Results
Page 1 of 1
Kealakehe We_stewater Treatment Plant
Sludge Removal /Aeration Upgrade /Photovoltaic System
http:// coh40/ aspnet_ clientJESRI/ WebADF/ PrintTaskLayoutTemplates /default.htm 12/7/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/7/2009
3. PROJECT NAME: Kealakehe Wastewater Treatment Plant Aeration Upgrade 4. SUBMITTER: Dora Beck, Division Chief
S. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7-4-008:058
. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $6,000
:. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement
10. PROJECT /PROGRAM DESCRIPTION:
Upgrade the treatment plant's aeration system in order to regain treatment capacity which had decreased due to recently higher than historic organic loading. The plant was not originally
designed to treat the current strength exhibited by the incoming wastewater. Therefore, there is a need to upgrade the plant process.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements for establishment of an Effluent Reuse
system. This project coupled with the Kealakehe Wastewater Treatment Plant Sludge Removal will serve to reduce both the Biological Oxidation Demand and the Total Suspended Solids
levels to the treatment facility which will help with staying in compliance with the discharge regulatory requirements.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing direct discharge of effluent to the
environment, conserve potable water resources in the area, and is consistent with the goals established by the Kona Community Development Plans
13. COUNTY MATCHING FUNDS REQ'D? NO 4a NISI— DESCRIBE:
14. LEGAL MADATE? NO f:: YESr DESCRIBE: While not currently a legal mandate, a reuse system was a part of the Grant Conditions for the Kealakehe WWTP.
15. IMPACT ON OPERATIONAL BUDGET:
There will be an increase in electicity costs due to the need for additional blowers required for increased aeration.
16. SUSTAINABIUTY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
17. PROJECT READINESS (List all that apply): The design is currrently in progress. Construction is anticipated to begin in June 2010.
18. EXPENDITURE PHASING (X 51000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -1I
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Years
TOTAL:
Planning
Land Acquisition
esign /Survey
onstructlon
6,000
$6,000
TOTAL:,
56,000
56,000
19. 0 & M COSTS (x 51000):
0. FUNDING SOURCE Or $1000):
ty G.O. Bond /Other
w
�
6,000
<<
56,000
State Revolving Fund
Late CIP
Federal
rivate (Grants)
BA (Fair Share /Park Dedication, etc)
�• pecial Financing District
,
TOTAL:!
1
4
56,000
56,000
Map/Results
Map /Results
Pace I of I
Kealakehe Wastewater Treatment Plant
Sludge Removal /Aeration Upgrade /Photovoltaic System
http: / /coh40 /aspnet_ client/ESRI/ WebADF/ PrintTaskLayoutTemplates /default.htm 12/7/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Protects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/19/2009
3. PROJECT NAME: Kealakehe Effluent Reuse - Makai 4. SUBMITTER: Dora Beck, Division Chief
S. COUNCIL BENEFIT DISTRICT(5): 7,8 6. TMK: 7-- 4-008:002, 7 -5- 005:007, 083
7. LOCATION (JUDICIAL DISTRICT): 8 B. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,841
9. CAPITAL PROJECT EUGIBIILTY (List Criteria):
Infrastructure Improvement (Reuse Infrastructure)
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 1 mile of Effluent Reuse Piping to Kailua Park for irrigation use, construction of storage pond for R -1 Reuse water (approx. 1 MG reservoir), installation of
Irrigation pumping system at Kailua Park to provide irrigation water for Kailua Park and adjacent propertis.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety Enhances Quality of Life, Service Improvements as establishment of an Effluent Reuse system
reduces the direct discharge of effluent from the Kealakehe WWTP to the environment and conserves potable water resources in the area by utilizing effluent reuse water for irrigation
of properties.
r12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing direct discharge of effluent to the
environment, conserve potable water resources in the area, and is consistent with the goals established by the Kona Community Development Plans
13. COUNTY MATCHING FUNDS REQ'D? NO P YES,- DESCRIBE:
14. LEGAL MADATE? NO fJ YEW— DESCRIBE: While not currently a legal mandate, a reuse system was a part of the Grant Conditions for the Kealakehe WWTP.
15. IMPACT ON OPERATIONAL BUDGET:
Additional operating costs to be offset by establishment of Effluent Reuse rates commensurate with operating expenses.
16. SUSTAINABIUTY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety, Green Infrastructure,
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): The Kealakehe Effluent Reuse Master Plan prepared in February 1999 is to be updated and design needs to be initiated.
118. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
1 This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Year
TOTAL:
tanning
202
$20
Land Acquisition
(Design /Survey
605
$60
onstruction
4,034
$4,03
Y
TOTAL:
$4,841
$4,84
19. 0 & M COSTS (x 51000):
20. FUNDING SOURCE (x $1000).
Cty G.O. Bond /Other
54,84
4,841
State Revolving Fund
tate CIP
Federal
Private (Grants)
BA (Fair Share /Park Dedication, etc)
pecial Financing District
- ....
TOTAL:
-- ---
_
- --- -- - --
.$4,841
- -- -- --
---
-
$4,84
Map/Results
Map /Results
•
Page I of I
Reuse Piping to Kailua Park via existing Sewer
Force Main Easement (Approx. 1 mile)
Storage Pond for R -1 Reuse as landscape feature
and storage for Irrigation of Kailua Park and adjacent
properties (Approx. 1 Million Gallons)
Irrigation Pumping System and
Approx. 0.6 Miles of Irrigation
Infrastructure
<ailua Park
TMK 7- 5- 005:007 and 083)
Hale Halawai PS
http: / /coh40 /aspnet_ client / ESRI / WebADF/ PrintTaskLayoutTemplates /default.htm 11/19/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Kealakehe Wastewater Treatment Plant R -1 Upgrade 4. SUBMITTER: Dora Beck, Division Chief
. COUNCIL BENEFIT DISTRICT(5): 7,8 6. TMK: 7- 4- 008:0058,072
7. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: 511,875
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Im • rovement Reuse Infrastructure
10. PROJECT /PROGRAM DESCRIPTION:
Upgrade of the Kealakehe Wastewater Treatment Plant to provide R -1 Quality Reuse Water to provide effluent for irrigation in the area.
I-11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety Enhances Quality of Ufe, Service Improvements as establishment of an Effluent Reuse system
Reduces the direct discharge of effluent from the Kealakehe WWTP to the environment and conserves potable water resources in the area by utilizing effluent reuse water for irrigation
of properties.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing direct discharge of effluent to the
environment, conserve • otable water resources in the area, and is consistent with the . oals established b the Kona Communi Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NO :r YESr DESCRIBE:
14. LEGAL MADATE? NO fl.7 YESr DESCRIBE: While not currently a le: al mandate, a reuse system was a part of the Grant Conditions for the Kealakehe WWTP.
15. IMPACT ON OPERATIONAL BUDGET:
• dditional 0 •eratin• costs to be offset b establishment of Effluent Reuse rates commensurate with o •eratin• ex•enses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety, Green Infrastructure,
Fosters Inter - Departmental Collaboration and Cross - Sector Im • lementation
17. PROJECT READINESS (List all that apply): Kealakehe Effluent Reuse Master Plan prepared in February 1999 is to be updated under this project and design needs to be initiated.
Prior Funds - This FY 09 -10
18. EXPENDITURE PHASING (X $1000): Received Request
Planning 1_—
Land Acquisition — ---
FY 10 -11
FY 11-12
FY 12 -13
FY 13 -14
FY 14 -15
TOTAL:
950
-
-
--
.
$951
-
-
-_
—�
Design /Survey
—
1,425
-
-
-
--
$1,42'
onstruction
9,500
-
-
-
--
r
TOTAL:
Y—
---
—
511,875
11,875
-
-
-
-
-
--
-
--
-
$11,87'
-_
$11,87
19. 0 & M COSTS x $1000):
20. FUNDING SOURCE (x $1000)
G.O. Bond /Other
—
tate Revolvin: Fund
—
—
---
- -
-
-
-
-_
- --
-
-_
State CIP
Federal
—
—
—
—
-
_ -
- -_
_---
- -
-__— _$11,875
-
-
-
-
-
-
-
- --
- --
- -
- --
- -
-
-
- -,
$11,87
Private (Grants)
BA (Fair Share /Park Dedication, etc)
Special Financing District
_.- TOTAL:
Map /Results
Map /Results
7 4 006
7.4008 002
Page I of I
•
Kealakehe Wastewater Treatment Plant
TMK 7-4- 008:058 and 7-4- 008:073
http: / /coh40 /aspnet_ client / ESRI/ WcbADF/ PrintTaskLayoutTemplates /default.htm 11/21/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. GATE: 11/21/200912/7/09
3. PROJECT NAME: Kealakehe Wastewater Treatment Plant Photovoltaic System 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7-4- 008:058
7. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $7,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement
10. PROJECT /PROGRAM DESCRIPTION:
Installation of a Photovoltaic System at the treatment plant based on the results of a feasibility study currently in progress per County Council Resolution No. 758 -08.
C11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's vision of reducing dependence on oil, protecting the environment through the use
of green technologies and minimizing costs to customers.
13. COUNTY MATCHING FUNDS REQ'D? NO I-, NISI— DESCRIBE:
14. LEGAL MADATE? NO Ir YES I' DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Reduction in electicity costs are expected to offset additional operational costs.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Stengthens and Sustains Community,
Manages Growth
117. PROJECT READINESS (List all that apply): Following review of the feasibility report by County Council, the engineering design and construction phases are the next steps.
I
18. EXPENDITURE PHASING (X 51000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Yea
TOTAL:
Planning
Land Acquisition
Design /Survey
500
$5
Construction
6,500
$6,5'
TOTAL:
$7,000
—
$7, r
19. 0 & M COSTS (x $1000):
1
20. FUNDING SOURCE (x $1000):
t €�_.
.,
7,000
..
'
ty G.O. Bond /Other
State Revolving Fund
State CIP
Federal
Private (Grants)
BA (Fair Share/Park Dedication, etc)
Special Financin: District
TOTAL:
_
$7,000
$7,00',
Map /Results
Map /Results
Page I of I
Kealakehe Wastewater Treatment Plant
Sludge Removal/Aeration Upgrade /Photovoltaic System
http: / /coh40 /aspnet_ client / ESRI / WebADF/ PrintTaskLayoutTemplates /default.htm 12/7/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
if 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: North Kona Sewer - Phase 2 4. SUBMITTER: Dora Beck, Division Chief
S. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7 -4-008
. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: 510,224
tt CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement; Planning, feasibility, engineering, or design studies
110. PROJECT /PROGRAM DESCRIPTION:
Construction of a new Sewage Pump Station (SPS) to service areas north of Kealakehe Parkway, installation of approximately 0.7 miles of dual force mains from the SPS to Kealakehe
iii Parkway, and installation of approxmately 0.4 miles of gravity sewer from Queen Kaahumanu Highway to the Kealakehe Wastewater Treatment Plant.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system north of Kealakehe Parkway aids in protection of the shoreline water quality in the area by allowing connection to the Kealakehe Wastewater
Treatment Plant which provides secondary wastewater treatment in lieu of the use of Individual Wastewater Systems.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the goals established by the Kona Community Development Plans
13. COUNTY MATCHING FUNDS REQ'D7 NOJ VEST DESCRIBE:
14. LEGAL MADATE7 NO iJ YEW" DESCRIBE:
r1S. IMPACT ON OPERATIONAL BUDGET:
Additional operatingcosts to be offset by establishment of sewer rates commensurate with operating expenses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12.13
FY 13 -14
FY 14 -15
Beyond 6 Years
TOTAL:
Planning
414
$414
Land Acquisition
300
$300
Design /Survey
1,241
$1,2411
onstruction
8,270
$8,270
TOTAL:,
510,224
$10,224
19. 0 & M COSTS (x 51000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond /Other
10,224
$10,224
State Revolving Fund
tate CIP
Federal
Private (Grants)
CBA (Fair Share /Park Dedication, etc)
Special Financing District
TOTAL:
510,224
$10,224
Map /Results
Map / Results
Page 1 of 1
0
0
0
Dual Force Main to
Kealakehe WWTP
Note - Force Main from Pump Station to
Kealakehe Parkway installed under North
Kona Sewer Project in conjunction with
State DOT Queen Kaahumanu Phase 2
Protect.
a
0
0
B
0
"A+4 LAN1
New Honokohau Sewage
Pump Station
7.3 -009 028
'9
e
0
New Gravity Main to
Kealakehe WWTP
7 -4008 002
.7 4008 Q58
North Kona Sewer - Phase 2
http: / /coh40 /aspnet_ client / ESRI /WebADF/ PrintTaskLayoutTemplates /default.htm 11/21/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Addiriona(Fconomic Stimulus Protects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/19/2009
3. PROJECT NAME: Kealakehe Effluent Reuse - Mauka 4. SUBMITTER: Dora Beck, Division Chief
S. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7-4-008:002, 7 -5- 005:007, 083
. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $14,173
9. CAPITAL PROJECT EUGIBIILTY (List Criteria):
Infrastructure Im • rovement Reuse Infrastructure
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 4.3 miles of Effluent Reuse Piping from Kealakehe WWTP to areas above the facility to be used for disposal of effluent by use of the effluent for irrigation,
installation of storage tank and booster station at an elevation of approximately 280 ft., and installation of storage tank at an elevation of approximately 600 ft. to provide store and
it ii. i. w- -r .. m • 7
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety Enhances Quality of Life, Service Improvements as establishment of an Effluent Reuse system
reduces the direct discharge of effluent from the Kealakehe WWTP to the environment and conserves potable water resources in the area by utilizing effluent reuse water for irrigation
of properties.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing direct discharge of effluent to the
environment, conserve • otable water resources in the area, and is consistent with the : oals established b the Kona Communit Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NO YEW— DESCRIBE:
14. LEGAL MADATE? NO r YESr DESCRIBE: While not currently a le: al mandate, a reuse system was a .art of the Grant Conditions for the Kealakehe WWTP.
15. IMPACT ON OPERATIONAL BUDGET:
Additional o •eratin • costs to be offset b establishment of Effluent Reuse rates commensurate with o •eratin• ex•enses.
16. SUSTAINABIUTY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety, Green Infrastructure,
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): The Kealakehe Effluent Reuse Master Plan prepared in February 1999 is to be updated and design needs to be initiated.
18. EXPENDITURE PHASING (X 51000):
Prior Funds
Received
This FY 09 -10
Request
FY 10.11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14.15
Beyond 6 Year
TOTAL:
Planning
—
—
591
-
-
-
--
$591
Land Acquisition
—
-
-
-
-
-
--
Design /Survey
—
—
1,772
-
-
-
--
$1,77 .
onstruction
—
—
11,811
-
-_
--
$11,81
TOTAL:
—
$14,173
-
$14,17
19. 0 & M COSTS (x $1000):
—
-
,s,-
-
14,173
- -
-
-_
,
20. FUNDING SOURCE (x $1000):
Cty G.O.Bond /Other
$14,17
State Revolvin: Fund
—
-
-
- -
-
--
State CIP
— -
— ---
— ---
— -
-
-_
- -
-
-
-
-
-
-
-
--
-
-
--
-�-
-_-
Federal
Private (Grants)
BA (Fair Share /Park Dedication, etc)
Special Financing District
— }-
-
- -
-
--
TOTAL:
--
$14,173
- -
-
$14,17
Map /Results
Map /Results
Pagel of 1
Reuse Piping to Kealakehe
Pkway. (Approx. 0.7 mile)
KON AN■ RD
Np0
Reuse Piping to Puohutihilu St.
(Approx. 0.5 mile)
Kealakeh
Reuse Piping from AK Hwy. to
Storage Tank (Approx. 0.8 mi e)
(
Reuse Piping to HHFDC
Development (Approx. 0.9 mile)
Reuse Piping to Ane Keohokalole
Hwy. (Approx. 1.4 mile)
09'
003 :0
�.5
Lanihau PS
Kona Bay Estates PSL'Igect 19 Ps'` Keopu PS
http: / /coh40 /aspnet_ client /ESRUWebADF/ PrintTaskLayoutTemplates /default.htm 11/19/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Protects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/19/2009
3. PROJECT NAME: Kahaluu Basin Sewer 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7 -7, 7-8
7. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $8,675
• . CAPITAL PROJECT EUGIBIILTY (List Criteria):
Infrastructure Im • rovement• Plannin: feasibili en: ineerin: or deli. n studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 1 mile of gravity sewer from servicing areas south of Queen Kalama (end of existing Kona Sewer System), installation of a new Sewage Pumping Station in
the vicinity of the Kahaluu Beach Park, and installation of approximately 0.5 miles of dual force main (1 mile total) from the new Sewage Pumping Station with discharge to the existing
r.vi -w-r i .
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the area south of Queen Kalama to the Kahaluu Beach Park provides sewer service to areas adjacent to the shoreline and within the Critical
Wastewater Disposal Area (CWDA) as defined by HAR 11 -62. Sewer service in the area aids in the protection of shoreline quality by allowing connection of these properties to the
C.un -w-r ct-m.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing
and is consistent with the goals established b the Kona Com_ muni Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NOl. YESr- DESCRIBE:
discharge of raw sewage to the
14. LEGAL MADATE? N017 YESr- DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional o.eratin • costs to be offset b establishment of sewer rates commensurate with o.eratin • ex. enses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter- Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
TOTAL:
Planning
--
694
- -
-
--
$69 .,
Land Acquisition
-
-
-
- -
-
--
Design /Survey
1,041
-
-
--
$1,04
onstruction
I-
-
6,940
- -
-
--
$6,9. 1
TOTAL:
-
-
$8,675
- -
-
--
$8,67.
19. 0 & M COSTS (x $1000): __
-
T Y .
-
-
-
-
-
_---
-
-
8,675
-
- -
- -
- -
-
-
-
-
--
--
-__
--
.. $8,67 •
-�
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond /Other
State Revolving Fund
tate CIP
Federal
-
-
-
- -
-
--
Private (Grants)
-
-
-
- -
-_-
CBA (Fair Share /Park Dedication, etc)
-
-
_--
-
-
-
--
-
-
--
-.-
Special Financing District
TOTAL:
--
$8,675
- -
- --
$8,67
Map/Results
Map /Results
0
Page 1 of 1
ryAti A'.. 1' -
Kahaluu Sewer Basin Area I
••
Dual Force Main with discharge
to existing gravity sewer.
••
•
••
•
•
•
•
•
•
•
I
Gravity Sewer
Line
!Sewage Pump Station I
Kahaluu Beach Park PS
A!3i
'WC A Cobra' Wale Disposal Area
Owned and operated by
Kamehameha Investment
Company
KAMEHAMEHA IA RD
Kahaluu Sewer Basin Area
http: / /coh40 /aspnet_ client/ ESRUWebADF /PrintTaskLayoutTemplates /default.htm 11/20/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Protects
1. DEPARTMENT AND DIVISION: Department of Environmental Management . Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: White Sands Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7 -7
. LOCATION (JUDICIAL DISTRI 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,574
• . CAPITAL PROJECT EUGIBIILTY (List Criteria):
Infrastructure Im • rovement' Plannin:. feasibili en. ineerin: or desi. n studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 1.3 mile of gravity sewer to service areas within the White Sands Subdivision which is located within a Critical Wastewater Disposal Area (CWDA) as
established under HAR 11 -62, Wastewater Systems.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the area provides sewer service to areas adjacent to the shoreline and within the Critical Wastewater Disposal Area (CWDA) as defined by HAR 11
62 thereby helping to protect shoreline water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES. The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the : oals established b the Kona Communi Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NO 4 YEsr DESCRIBE:
14. LEGAL MADATE? NO s YES- DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional o •eratin • costs to be offset b establishment of sewer rates commensurate with o.eratin: ex senses.
16. SUSTAINABILITY FOCUS (list all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000).
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12-13
FY 13 -14
FY 14 -15
TOTAL:
Planning
--
206
-
-
--
520.
Land Acquisition
- -
-
-
-
-
--
Design /Survey
309
-
-
-
--
$30'
onstruction
- -
2,059
-
-
-
--
52,05 •'
TOTAL
-
--
-
52,574
-
-
-
-
--
$2,57
52,57
19. O & M COSTS (x $1000):
-
_
2,574
20. FUNDING SOURCE (x $1000):;
'Ct G.O. Bond /Other
tate Revolving Fund
- -
-
- -
-
--
State CIP
- ---
-
-
-
- -
-
-
-
--
-
--
Federal
Private (Grants)
- -
-
--
BA (Fair Share /Park Dedication, etc)
- -
-
-_
-
--
Special Financing District
- -
-
-_
-_-
TOTAL
52,574
- -
-
-
$2,57'.
Map /Results
Map /Results
•
Page 1 of 1
7 -7- 004:043
Critical Wastewater Disposal
Area Boundary
LWDA Cesspool allowed
A • 1 9 0
Mile from Shoreline
White Sands Sewer Basin Area
AN ON % OAt
AAA`
8„
0
Zone 7 North Kon
District 7 - ord
White Sands Sewer Basin Area
Overview
http: / /coh40 /aspnet_clientI ESRI /WebADF/ PrintTaskLayoutTemplates /default.htm 11/20/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Protects
'1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Kahakai Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7-6
. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,188
:. CAPITAL PROJECT EUGIBIILTY (List Criteria):
Infrastructure Im • rovement• Plannin: feasibili en: ineerin: or desi. n studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 0.6 miles of gravity sewer to service the Kahakai School and areas between Kahakai School Actress Road and Alii Drive which are located within a Critical
Wastewater Disposal Area (CWDA) as established under HAR 11 -62, Wastewater Systems.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the area provides sewer service to areas adjacent to the shoreline and within the Critical Wastewater Disposal Area (CWDA) as defined by HAR 11
62 thereby helping to protect shoreline water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the goals established by the Kona Community Development Plans
13. COUNTY MATCHING FUNDS REQ'D? NO P YESr DESCRIBE:
14. LEGAL MADATE? NO o VEST" DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
'Additional operating costs to be offset by establishment of sewer rates commensurate with operating expenses.
16. SUSTAINABIUTY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Year
TOTAL:
• fanning
95
$95
Land Acquisition
resign /Survey
143
$143
onstruction
950
$95, '
TOTAL:
51,188
19. O &MCOSTS x$1000:
20 FUNDING SOURCE (x $1000):
G.O. Bond/Other
i
1,188
��
te, -_... .....w....b,..
�,�. ,
.ksa�Lr:Y�.,n�$'
`tsu.z..a.
•_:ea.:z., "ui...lm' i s
r �Ix':. �.
51,18:
ral
Private (Grants)
BA (Fair Share/Park Dedication, etc)
• pecial Financing D
TOTAL:
$1,188
T 5148:
Map /Results
Map /Results
0
Page 1 of 1
http: / /coh40 /aspnet_ client /ESRUWebADF/ PrintTaskLayoutTemplates /default.htm 11/20/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Kamani Tree Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7-6
. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,158
:. CAPITAL PROJECT EUGIBIILTY (List Criteria):
Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 2.1 miles of gravity sewer to service the Kamani Tree Subdivison area which is located within a Critical Wastewater Disposal Area (CWDA) as established
under HAR 11 -62, Wastewater Systems.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Ufe, Service Improvements
Installation of the new sewer system in the area provides sewer service to areas adjacent to the shoreline and within the Critical Wastewater Disposal Area (CWDA) as defined by HAR 11
62 thereby helping to protect shoreline water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the goals established by the Kona Community Development Plans
13. COUNTY MATCHING FUNDS REQ'D? NO (7 YESr DESCRIBE:
14. LEGAL MADATE? NO (r YESr DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional operating costs to be offset by establishment of sewer rates commensurate with operating expenses.
16. SUSTAINABILITY FOCUS (list all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Yea
TOTAL:
Planning
333
533
Land Acquisition
Design /Survey
499
$4
1 onstruction
I
3,326
53,3
TOTAL:
54,158
54,15:
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x 51000):
4,158
54,15:'
ty G.O. Bond /Other
State Revolving Fund
State CIP
Federal
• rivate (Grants)
CBA (Fair Share /Park Dedication, etc)
Special Financing District
-
_
-
-
-
-
--
TOTAL:
54,158
- -
-_
54,15:'
Map /Results
Map /Results
Page 1 of I
Kaman' Tree $gwer Bash Ana
http: / /coh40 /aspnet_ client /ESRI/ WebADF/ PrintTaskLayoutTemplates /default.htm 1 1 '2012009
County of Hawaii
PROJECT OATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
I. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Konalani Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT'S): 7,8 6. TMK: 7 -5-018
l7. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $990
• . CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 0.3 miles of gravity sewer to service the Konalani Subdivison area which is located within a Critical Wastewater Disposal Area (CWDA) as established under
HAR 11 -62, Wastewater Systems.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the area provides sewer service to areas adjacent to the shoreline and within the Critical Wastewater Disposal Area (CWDA) as defined by HAR 11
62 thereby helping to protect shoreline water quality.
1-
LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the goals established by the Kona Community Development Plans
_13. COUNTY MATCHING FUNDS REQ'O? NO (V WV" DESCRIBE:
114. LEGAL MADATE? NO I✓ YESI— DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
• dditional operating costs to be offset by establishment of sewer rates commensurate with operating expenses.
16. SUSTAINABIUTY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
7
,18. EXPENDITURE PHASING (X 51000):
Prior Funds
Received
This FY 09 -10
Request
FY 10-11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Yea -
TOTAL:
Planning
79
$7•
Land Acquisition
• esign /Survey
119
511.
onstruction
792
$79
TOTAL:
$990
$..1
19. 0 & M COSTS (x $1000 :
-
0. FUNDING SOURCE (x $1000):
990
$9'1
ty G.O. Bond/Other
tate Revolving Fund
ederal
Private (Grants)
BA (Fair Share /Park Dedication, etc)
—
-
-
-
-
-_-
pecial Financing District
TOTAL:
$990
—
—
_
$• • •
Map /Results
Map /Results
Page I of 1
KQnalan' Sewer Basin Area
http: / /coh40 /aspnct_ client/ ESRl/ WebADF/ PrintTaskLayoutTemplates /default.htm 1 1/20/200 9
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1.. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Kilohana Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7 -6
. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,970
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Im • rovement• Plannin. feasibili en: ineerin. or desi. n studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 1.5 miles of gravity sewer to service the Kilohana Subdivison which is currently served largely by large Capacity Cesspools and properties adjacent to Royal
Ponciana Drive which are located within the Critical Wastewater Disposal Area (CWDA) as established under HAR 11 -62, Wastewater Systems.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the Kilohana Subdivision allows property owners to close their existing Large Capacity Cesspools which currently service the majority of the
properties in the subdivision. Installation of the sewer line on Royal Ponciana Drive also allows properties within the CWDA to connect to the County sewer system.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the . oals established b the Kona Communit Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NO . YESr DESCRIBE:
14. LEGAL MADATE? NO (7 VEST' DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional o •eratin: costs to be offset b establishment of sewer rates commensurate with o •eratin: ex. enses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X 51000):
_
Prior Funds
Received
This FY 09 -10
Request
FY 10-11
-
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
TOTAL:
Plannin B
-
-
238
- -- -
-
- --
-_
-
--
523.
Land Acquisition
-
---
-
-
-
-
-_
• sign /Survey -
-
356
-
-
-
--
$37:
--
onstruction
TOTAL:i;-.-
19. 0 & M COSTS (x $1000) i
---
2,376
$2,970
-
-
-
-
-
-
-
-
--
--
-
-
$2,37:
52,97•
-.
�._
20. FUNDING SOURCE (x $1000): �
ty G.O. Bond /Other --
`• '
2,970
�'�
-
� '"-' `'
-
"' z^°
-
--
•`
$2,97•
tate Revolving Fund -
-
-
-
-
-
--
State CIP
-
-
__
-
-
--
Federal
-
-
-
-
-
---
--
-
_
-
-
-
-
-
_
-
--
-
-
-
--
-
-
-_-
-■
Private (Grants)
BA (Fair Share /Park Dedication, etc)
pecial Financing District _
TOTAL:
--
__$2.970
-
-
--
$2,971
Map /Results
Map /Results
Page 1 of 1
\\A N
Kilohana Sewer Basin
Kliabanalsintliailmanpa
http: / /coh40 /aspnet_ client / ESRI/ WebADF /PrintTaskLayoutTemplates /default.htm 11/20/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Protects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Lono Kona Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
. COUNCIL BENEFIT DISTRICT(S): 8 6. TMK: 7 -5-022
. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,782
• . CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Im • rovement• Plannin. feasibilit en. ineerin. or desi .n studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 0.9 miles of gravity sewer to service the Lono Kona Subdivison area which is located within a Critical Wastewater Disposal Area (CWDA) as established
under HAR 11-62, Wastewater Systems.
ii
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of life, Service Improvements
Installation of the new sewer system in the area provides sewer service to areas adjacent to the shoreline and within the Critical Wastewater Disposal Area (CWDA) as defined by HAR 11
.2 thereby helping to protect shoreline water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
nd is consistent with the : oals established b the Kona Communi Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NO YEsr DESCRIBE:
14. LEGAL MADATE? NO .0 YESi DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
. dditional o • eratin: costs to be offset b establishment of sewer rates commensurate with o.eratin • ex. enses.
16. SUSTAINABIUTY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross -Sector Im • lementation
17. PROJECT READINESS (list all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
® FY 12-13
FY 13 -14
FY 14 -15
+
TOTAL:
Planning
nd Acquisition
--
143
-
-
-
-
-
--
$143
• sign /Survey
onstruction
-
-
214
1,426
-
-
-
-
-
-
-
--
$21 •
1111111REE
TOTAL:
19. O 8 M COSTS x $1000 :
FUNDING / (x $ );._
SOURCE x 1000
G.O.Bond Other
--
-
-
$1,782
-
-
-
,e .
-
-
--
-
a
--
--
--
$ 1.78
• fate Revolvin: Fund
-
=
-
--
tate CIP
-
----
--
---
-
-
-
- -
-
-
-
-
-
--
-
-
-�
--
ederal
• rivate (Grants)
BA (Fair Share /Park Dedication, etc)
-
-
li---
-
-
-
- -
-
--
-
-
--
•
• pecial Financin: District
TOTAL:
-
-_ ---- $1,782
-1-
-
-
-
51.78
Map /Results
Map /Results
Page 1 of 1
-V
4
Lono Kona Sewer
Basin
PLP�p` RD
Lono Kona Sewer Basin rea
http: / /coh40 /aspnet_ client/ ESRI/ WebADF/ PrintTaskLayoutTemplates /default.htm 11/20/20(19
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Alil Kai and Kalani Makai Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
COUNCIL BENEFIT DISTRICT/5): 7,8 6. TMK: 7 -6
. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $3,564
CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 1.8 miles of gravity sewer to service the Alii Kai and Kalani Makai Subdivisons which is located within a Critical Wastewater Disposal Area (CWDA) as
established under HAR 11 -62, Wastewater Systems.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the area provides sewer service to areas adjacent to the shoreline and within the Critical Wastewater Disposal Area (CWDA) as defined by HAR 11
2 thereby helping to protect shoreline water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
nd is consistent with the : oals established b the Kona Communi Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NO f3 TEST' DESCRIBE:
14. LEGAL MADATE? NO YESr DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
• dditional operating costs to be offset by establishment of sewer rates commensurate with operating expenses.
16. SUSTAINABIUTY FOCUS (list all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross- Sector Implementation
17. PROJECT READINESS (List an that apply): Planning and Design needs to be accoumplished
•
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12-13
FY 13 -14
FY 14 -15
Beyond 6 Years
TOTAL:
Manning
285
5285
nd Acquisition
• sign /Survey
428
$428
onstruction
2,851
$2,85
TOTAL:
$3,564
53,56 •
9. O & M COSTS x $1000 :
0. FUNDING SOURCE (x $1000):
G.O. Bond /Other
-
-,-
-
3,564
� ...
a
53,56 •
tate Revolvin Fund
• tate CIP
-
--
ederal
rivate Grants)
BA (Fair Share /Park Dedication, etc)
_
_
• • ial Financin: District
TOTAL:
53,564
53,56'
Map /Results
Map /Results
Page 1 of
Alii Kai and Kalani Makai
Sewer Basin
IVAL
44
9 �
9 IJ )A (. oI allow. - 1
s
ay
'UA (:ritv %Nat. lost Area
Holualoa PS
Kai and Kalani MA& Sewer
Basin Area
http: / /coh40 /aspnet_ client/ ESRI/ WcbADF /PrintTaskLayoutTemplates /default.htm II/20/20099
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Aloha Kona Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7 -S
7. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: 55,148
9. CAPITAL PROJECT EUGIBIILTY (List Criteria):
Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 2.6 miles of gravity sewer to service the Aloha Kona Subdivison and adjacent areas including portions which are within the Critical Wastewater Disposal
Aread (CWDA) established by HAR 11 -62, Wastewater Systems.
11. PROJECT JUSTIFICATION & OUTCOME(5) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the Aloha Kona Subdivision and adjacenet areas allows portions located within the CWDA to connect to the County Sewer thereby helping in
protecting the shoreline water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the goals established by the Kona Community Development Plans
13. COUNTY MATCHING FUNDS REQ D7 NO P YEN' DESCRIBE:
14. LEGAL MADATE7 NO YESI•- DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional operating costs to be offset by establishment of sewer rates commensurate with operating expenses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X 51000):
Prior Funds '
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Years
TOTAL:
Planning
412
$41
Land Acquisition
Design /Survey
618
561:•
Construction
a
4,118
54,11:
TOTAL:
55,148
55,14
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x 51000):
Cty G.O. Bond/Other
_,._.
5,148
rt �..� �
m... �msait"
$5,14:
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share /Park Dedication, etc)
Special Financing District
TOTAL:
■ 55,148
T 55,1481
Map/Results
Map /Results
•
Page 1 of 1
1 Mile from Shoreline
Critical Wastewater Disposal Area
Boundary
KP`NENP S
KI
Aloha Kona Sewer Basin
Aloha Kona Sewer Basin Area
http: / /coh40 /aspnet_ client /ESRI/ WebADF / PrintTaskLayoutTemplates /default.htm 11/21/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Protects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Kealohi Kai Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7 -7-004
. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,386
. CAPITAL PROJECT EUGIBIILTY (List Criteria):
Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 0.7 miles of gravity sewer to service the Kealohi Kai Subdivison and areas above Alii Drive above the Kealohi Kai Subdivision which are within the Critical
astewater Disposal Aread (CWDA) established by MAR 11 -62, Wastewater Systems.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the Kealohi Kai Subdivision and areas above the Kealohi Kai Subdivision within the CWDA allows properties to connect to the County Sewer
hereby helping in protecting the shoreline water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the : oals established b the Kona Communl Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NO VEST- DESCRIBE:
14. LEGAL MADATE? NO P YESr DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
dditional operating costs to be offset by establishment of sewer rates commensurate with operating expenses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X 51000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Years
TOTAL:
fanning
111
5111
nd Acquisition
esign/Survey
166
5166
onstruction
1,109
$1,10
TOTAL:
$1,386
51, 38
9. O & M COSTS (x $1000):
0. FUNDING SOURCE (x $1000):
ty G.O. Bond /Other
1,386
$1,38
tate Revolving Fund
tate CIP
ederal
rivate (Grants)
BA (Fair Share /Park Dedication, etc)
• pecial Financing District
TOTAL:
$1,386
$1,38.
Map /Results
Map /Results
Page 1 of 1
http: / /coh40 /aspnet_ client/ ESRI/ WebADF /PrintTaskLayoutTemplates /default.htm 11/20/2009
Map /Results
Map /Results
I'1LIc I oI I
8�
1
- 004.0
-1
1
Critical Wastewater Disposal
Area Boundary
Kealohi Kai Sewer
Basin
fLOHV KAV P
Zone 7 - + Kona
District ord
O 0
O Y
� � 0
O 0
rn
cD
0
-4
o c
0
0 D 0
0 Ot
0 p
r
0
al Nate! D�sp -�sei Area
7 -7- 004.071
O
W
a)
-4
0
0
-004
0) 0
7 7 -p04'063
Pahoehoe PS
7 -7- 008:021
7- 7- 008.031
O O
O �
O
77p08.029
7-7-008
AA P
20
Kealohi Kai Sewer Basin
http: / /coh40 /aspnet_ client / ESRI/ WebADF/ PrintTaskLayoutTemplates /default.htm 11/20/2009
Map /Results
Map /Results
Page 1 of 1
Lako Street Basin Area
http: / /coh40 /aspnet_ client / ESRI / WebADF /PrintTaskLayoutTemplates /default.htm 11/20/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Alahou Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(5): 7,8 6. TMK: 7 -5
7. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,320
9. CAPITAL PROJECT EUGIBIILTY (List Criteria):
Infrastructure Im • rovement• Plannin: feasibili en: ineerin : or desi: n studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 0.4 miles of gravity sewer to service the areas above Kuakini which are within the Critical Wastewater Disposal Aread (CWDA) established by HAR 11 -62,
Wastewater Systems.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service improvements
Installation of the new sewer system within the Alahou basin which is within the CWDA allows properties to connect to the County Sewer thereby helping in protecting the shoreline
water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the . oals established b the Kona Communi Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NOP YES(— DESCRIBE:
14. LEGAL MADATE? NO P YESr DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional o •eratin: costs to be offset b establishment of sewer rates commensurate with o •eratin • ex•enses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross -Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000):
..—
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
TOTAL:
(Planning
--
106
_---_
$10•.
Land Acquisition
—
-
-
-
-
-
-_
Design /Survey
_
158
----_
$15:
Construction
--
1,056
——
$1,05:
TOTAL:
—
—
-
$1,320
-
1,320
-----
-
-
-
--
$1,32'
$1,32'
19. 0 & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond /Other
tate Revolving Fund
—
-
-
-
-
---
State CIP
—
—_
-
--
Federal
_
-
-
-
-
---
Private (Grants)
—
-
-
-
-
-
--
BA (Fair Share /Park Dedication, etc)
—
—
_
-
-
-
--
SPecial Financing District
Financing str ict
—
TOTAL:
--
$1,320
—
—
—
—
—
$1,32'
Mar Results
Map /Results
•
Page 1 of I
Alahou Sewer Basin Area
http: / /coh40 /aspnet_ client /ESRI/ WebADF/ PrintTaskLayoutTemplates /default.htm 11/20/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Kona Hillcrest Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 8 6. TMK: 7 -5 -030
. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: 51,782
• . CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Im • rovement' Plannin: feasibili en : ineerin: or desi: n studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 0.9 miles of gravity sewer to service the Kona Hillcrest Subdivison which is located approximately 0.5 miles from shoreline.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of life, Service Improvements
Installation of the new sewer system in the Kona Hillcrest Subdivison allows properties to connect to the County Sewer thereby helping in protecting the shoreline water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the : oals established b the Kona Communi Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NO 4 YESr DESCRIBE:
14. LEGAL MADATE? NO .17 YESI— DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional o•eratin • costs to be offset b establishment of sewer rates commensurate with o.eratin • ex.enses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
TOTAL:
Planning
—
, —
143
-
-
-
--
514
Land Acquisition
—
----
214
-
-
-
-
-
-_
-
-�1
Design /Survey
$21•
onstruction
-
-
1,426
-
-
-
--
51,42.
TOTAL:
-
$1,782
-
-
-
--
$1,78.
19. 0 & M COSTS (x 51000):
r
—
—
1,782
-
-
-
--
$1,78 r
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond /Other
State Revolving Fund
—
-
-
-
-
-
--
State CIP
—
-
-
-
-
-
--
Federal
—
-
-
-
-
-
--
Private (Grants)
—
—
_
-
-
-
--
CBA (Fair Share /Park Dedication, etc)
—
—
---
—
_-
-
-
-
-
- ---
-_
--
Special Financing District
TOTAL:
--
$1,782
- -
- --
$1,78
Map /Results
Map/ Results
•
Parse I of I
Critical Wastewater Disposal
Area Boundary
CWDA - Cnlwl Wale, DrsWsal Area
Kana HIUcreeilewer Bask Area
http: / /coh40 /aspnet _ client/ ESRI/ WebADF/ PrintTaskLayoutTemplatesidcfault .htm 1 1 21 /2009
County of Hawaii
PROJECT DATA /FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Komohana Kai Subdivision Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
S. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7 -6
. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,942
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement; Planning, feasibility, engineering, or design studies
110. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 2.6 miles of gravity sewer to service the Komohana Kai Subdivison which is located approximately 0.35 miles from shoreline.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the Komohana Kai Subdivison allows properties to connect to the County Sewer thereby helping in protecting the shoreline water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the goals established by the Kona Community Development Plans
13. COUNTY MATCHING FUNDS REQ'0? NO Iz-• YESI DESCRIBE:
14. LEGALMADATE? NO so PEST- DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional operating costs to be offset by establishment of sewer rates commensurate with operating expenses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
Beyond 6 Yea
TOTAL:
Planning
206
$2r .
Land Acquisition
Design /Survey
618
$61
onstruction
4,118
$4,11
TOTAL:
$4,942
$4,94
19. O & M COSTS (x $1000:
4,942
$4,94 •
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond /Other
State Revolving Fund
State CIP
Federal
Private (Grants)
BA (Fair Share /Park Dedication, etc)
Special Financing District
TOTAL:
$4,942
$4,94 •
Map /Results
Map /Results
•
Page 1 of 1
7
t
9
9
vir
Komohana Kai Sewer Basin
CWDA- Cesspool allowed
WDA- GnUc,al LNatei Dispcnal Aira
.r"
0
kAo
Komohana Kai $.wsr Basin Arsa
http: / /coh40 /aspnet_ client / ESRI / WebADF/ PrintTaskLayoutTemplates /default.htm 11/20/2009
County of Howoll
PROJECT DATA /FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Kona Seaview Sewer Basin Area 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7 -7
. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,372
• . CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Im •rovement•Plannin. feasibili en.ineerin. ordesi:nstudies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 2.3 miles of gravity sewer to service the Kona Seaview Sewer Basin area which is located approximately 0.36 miles from shoreline.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the Kona Seaview basin area allows properties to connect to the County Sewer thereby helping in protecting the shoreline water quality.
F12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the : oafs established b the Kona Communi Develo. ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NO r YESr• DESCRIBE:
14. LEGAL MADATE? NO ' YESr DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional o •eratin: costs to be offset b establishment of sewer rates commensurate with o•eratin: ex•enses.
16. SUSTAINABILITY FOCUS (Ust all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X 51000):
Prior Funds
i Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
TOTAL:
Planning
--
182
-
-
-
--
$18 •
Land Acquisition
- ---
-
-
-
-
-_
Design /Survey
S46
-
--
$54.
onstruction
_
3,643
-
-
-
-
-
--
--
53,64 ,
54,37.
TOTAL
-'
$4,372
19. 0 & M COSTS )x $1000)
20. FUNDING SOURCE (x 51000):
ty G.O. Bond /Other
-
_
-
(--
-
----
-
--
-t-
---
_
-
-
---
4,372
-
-
-
-_
$a•372
-
-
-
-
-_
-_
-
-
-
-
-
-
-
-
-
-
-
-
-
--
--
--
-_
-
-
-_
-_-
---
-_-
$4,37 .
$4,37 .
tate Revolving Fund
tate CIP
Federal
Private (Grants)
BA (Fair Share /Park Dedication, etc)
pecial Financing District
TOTAL:
Map /Results
Map /Results
Page 1of I
1 Mile from Shoreline
Critical Wastewater Disposal
Area Boundary
v
V
I. VJDA • C:nusd Mate
IAAIOA As_,E�.—
Ha �CIHP�'
Kona Seaview Sewer Basin Area
http: / /coh40 /aspnet_ client /ESRI/ WebADF/ PrintTaskLayoutTemplates /default.htm 11/21/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
3. PROJECT NAME: Pahoehoe Mauka Sewer Basin Area 4. SUBMITTER: Dora Beck, Division Chief
5. COUNCIL BENEFIT DISTRICT /5): 7,8 . 6. TMK: 7 -7 -008
7. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,884
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Im • rovement• Plannin. feasibili en; ineerin. or deli: n studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 0.6 miles of gravity sewer to service the Pahoehoe Mauka Sewer Basin area which is located approximately 0.36 miles from shoreline.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the Pahoehoe Mauka basin area allows properties to connect to the County Sewer thereby helping in protecting the shoreline water quality.
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
and is consistent with the : oals established b the Kona Communi Develo • ment Plans
13. COUNTY MATCHING FUNDS REQ'D? NO .* YE51— DESCRIBE:
14. LEGAL MADATE? Now YESi— DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional o.eratin: costs to be offset b establishment of sewer rates commensurate with o•eratin • ex•enses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter- Departmental Collaboration and Cross- Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
This FY 09 -10
Request
FY 10 -11
FY 11 -12
FY 12 -13
FY 13 -14
FY 14 -15
TOTAL:
Planning
Land Acquisition
--
—
—
127
300
-
-
-
-_
--
--
- -
$12
Design /Survey
190
-
-
-
--
1 onstruction --
1,267
-
-
-_—
$1,26
TOTAL— :
F
--
-
ty
....r ..,. ..,
—
-
51,884
-
�
1,884
-
-
-_
"
.. a..r+.a,w.x
-
-
-
a.. ..ar,. ,. „r -x
-
-
--
-
.ru, va SV .a.. ..A .
-
-
--
Y... n�.„... «n �.
-
--
s ,..m +
-
;;.
-..
-1
19. 0 & M COSTS (x $1000):
—
'' '
:ss ...
—
—
20. FUNDING SOURCE (x $1000):
ty G.O. Bond /Other
tate Revolving Fund
tate CIP — -
- -
-
-
--
Federal
—
—
—
-
---
-
- -
- -
-
-
-
-
-
-
--
-
--
-_-
Private (Grants)
CBA (Fair Share /Park Dedication, etc)
Special Financing District — -
- -
-
-
--
TOTAL:1— —
M1
—
—
—
—
$1.88'
Map /Results
Map /Results
Page 1 of 1
1 Mile from Shoreline
Critical Wastewater Disposal
Area Boundary
VGA - Cesspool aUo,
Pahoehoe Mauka
Sewer Basin
Pahoehoe Mauka Sewer Basin Area
http: / /coh40 /aspnet_ client /ESRI/ WebADF / PrintTaskLayoutTemplates /default.htm 11/21/2009
Map /Results
Map /Results
Page 1 of 1
\)I
Kealakehe ■AT: I
;WDA. CnOCai Water Uspos:a A,-,�
17 - Lono Kona
Sewer Basin Area
I er r'ill,n•.
22 - Alahou
Sewer Basin
Area
"riliel giros
TrA .sp:,,;l .dl
23 - Kona Hillcrest
Sewer Basin Area
18 -Alii Kai and Kalani Makai
Sewer Basin Area
15 - Konalani
Sewer Basin Area
16 - Kilohana Sewer
Basin Area
14 - Kamani Tree
Sewer Basin Area
20 - Kealohi Kai
Sewer Basin Area
13 - Kahakai Sewer
Basin Area
ts
24 - Komohana Kai Sewer
Basin Area
21 - Lako St.
Sewer Basin Area
25 - Kona Seaview
Sewer Basin Area
q 26 - Pahoehoe
Mauka Sewer Basin
Area
C
11 - Kahaluu Sewer Basin Area
Notes;
1 - Priority ranking was based on vicinity of the
area to shoreline waters. development density,
and whether of not the basin areas is located
within a Critical Wastewater Disposal Area
CWDA) as established by HAR 11 -62
2 - Areas not included within sewer basin areas
are either already sewered, are accessible to the
sewer, of in the cases of large properties. it is
assumed that the developer would be required to
install the sewer infrastructure in the event of
development in the future.
http: / /coh40 /aspnet_ client /ES/
Additional Economic Stimulus funding Projects
Kailua -Kona Sewer Expansion Project
Sixteen Sewer Basin Area Locations
and
Priority Ranking
11/21/09
1 11/21/2009
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Additional Economic Stimulus Projects
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 11/21/2009
PROJECT NAME: Lako St. Sewer Basin 4. SUBMITTER: Dora Beck, Division Chief
S. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK: 7 -7 -004
. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,040
• CAPITAL PROJECT ELIGIBIILTY (List Criteria):
Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT /PROGRAM DESCRIPTION:
Installation of approximately 0.5 miles of gravity sewer to service areas above Aiii Drive which are within the Critical Wastewater Disposal Area (CWDA) established by HAR 11 -62,
astewater Systems.
11. PROJECT JUSTIFICATION & OUTCOME(S) Addresses Public Health and Safety, Enhances Quality of Life, Service Improvements
Installation of the new sewer system in the Lako St. Sewer basin within the CWDA allows properties to connect to the County Sewer thereby helping in protecting the shoreline water
quality. ,
12. LONG RANGE PLANS /COMMUNITY VALUES: The project is consistent with the Department's goal of protecting the environment by minimizing discharge of raw sewage to the
nd is consistent with the goals established by the Kona Community Development Plans
13. COUNTY MATCHING FUNDS REQ'D? NO ••• YESr DESCRIBE:
14. LEGAL MADATE? Now YESr DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
Additional operating costs to be offset by establishment of sewer rates commensurate with operating expenses.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects our Natural Environment, Promotes Health and Safety
Fosters Inter - Departmental Collaboration and Cross - Sector Implementation
17. PROJECT READINESS (List all that apply): Planning and Design needs to be accoumplished
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Received
` This FY 09 -10
Request
FY 10-11
FY 11 -12
FY 12-13
FY 13 -14
FY 14 -15
Beyond 6 Yea
TOTAL:
Planning
83
583
and Acquisition
6 sign /Survey
125
$12S
onstruction
832
583
TOTAL:
$1,040
$1,046
19. 0 & M COSTS x$1000:
0. FUNDING SOURCE (x $1000):
ty G.O. Bond /Other
1,040
* '
51,04.
tate Revolving Fund
tate CIP
ederal
vate (Grants)
BA (Fair Share /Park Dedication, etc)
pedal Flnancin : District
.$1,041
TOTAL:
$1,040
l
Map /Results
Map /Results
•
Page I of 1
Lako St. Basin Area
Lako Street Basin Area
http: / /coh40 /aspnet_ client /ESRI/ WebADF/ PrintTaskLayoutTemplates /default.htm I1 /20/2000