Loading...
HomeMy WebLinkAboutCOM 0096.018 2010-2012William P. Kenoi COUNTY CLERK Mayor COUNTY OF HAWAII ZO11 OCT 13 AM ID 21 October 13, 2011 County Finance 25 Aupuni Street, Suite (808) 961-8234 Dominic Yagong Council Chair and Members of the Hawaii County Council Hawai'i County Council 25 Aupuni Street Hilo, Hawaii 96720 Re: Report of Change Orders Authorized of Hawaii Department 2103 • Hilo, Hawaii 96720 • Fax (808) 961 -8569 Nancy E. Crawford Director Deanna S. Sako Deputy Director Pursuant to Ordinance 11 -2, the Report of Change Orders Authorized for the period 9/16/11 to 9/30/11 is transmitted herewith for your review. Should you have any questions regarding the contracts, please contact the identified department. Nancy Crawford Director of Finance Enc. Hawaii County is an Equal Opportunity Provider and Employer Comm. No. 96 Ref. To: F Ref, Date °C PI F#2011 � REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 9/16/11- 9/30/11 Legend: CO Change Order SA Supplemental Agreement PS Professional Services C Construction PTA Price Term Agreement GS Other Goods & Services Execution Date Job # Contract # Project Title Contract Type Dept. Original Contract Amount Original Contract Date CO /SA No. CO /SA Amount % of Orig Cont Cummulative CO /SA Total % of Orig Cont Contractor Project Manager Project Status Purpose 9/16/2011 RFP -2657 C.002995 Kalapana Viewing Site Management Services GS Parks $145,848.98 12/15/2010 2 $65,670.57 45.03% $131,341.14 90.05% Jan Guard Hawaii Inc. Gilbert Benevides Open 2nd Supplemental agreement for an additional 3 month extension period from 9/16/11-12/15/11. 9/16/2011 B -3648 C.002964 Pahala Ballfield Accessibility Improvements C DPW $292,463.00 10/8/2010 1 - $3,000.00 - 1.03% - $3,000.00 - 1.03% Bolton Inc. Ochi, P &R Open Time extension due to delays in fabrication and shipping of bleachers; assessment of liquidated damages. 9/21/2011 B -3647 C.003097 Punaluu Park Acessibility Improvements C DPW $102,609.00 4/26/2011 1 $1,536.35 1.50% $1,536.35 1.50% Site Engineering Inc. Jeff Ochi, P &R Open Two existing electrical conduits that were not shown on the plans were damaged during the demolition of the existing concrete slab and needed to be replaced. 9/19/2011 WW -4056 C.003178 Project 19 Sewage Pump Station Wet Well Improvements. C DPW $23,985.00 6/29/2011 1 - $570.00 - 2.38% - $570.00 - 2.38% Keauhou Kona Construction Corp. Rizalino Mangaoang Open Project was satisfactorily accomplished without invoking Additive Alternate No. 1. Additional material procurement was required to address the unforeseen condition of the existing wet well configuration. 9/21/2011 B -3765 C.002564 DPW Facilities ADA Compliance and Improvements Phase 1 C DPW $4,118,169.00 7/29/2009 4 $199.00 ° 0.00 /° $10,392.00 0.25% Site Engineering, Inc. James Imanaka, Building Division Open Re -key Waimea Police Station exterior doors lockset cylinders to accommodate staff keys. 9/23/2011 B -3893a R) C.003176 South Hilo Baseyard Improvements, Phase 1 C DPW $544,631.21 6/29/2011 1 $3,334.39 0.61% $3,334.39 0.61% Heartwood Pacific, LLC Daren Kodani, Building Division Open Extend metal roofing up the ridge to provide required support for new ridge cap, roof anchor and roof ventilators. REPORT OF CHANGE ORDERS AUTHORISED FOR THE PERIOD OF: 9/16/11- 9/30/11 Total # of Contracts 13 Total Original Contract Amount $12,237,921.50 Execution Date Job # Contract # Project Title Contract Type Dept. Original Contract Amount Original Contract Date CO /SA No. CO /SA Amount % of Orig Cont Cummulative CO /SA Total % of Orig Cont Contractor Project Manager Project Status Purpose 9/23/2011 B -3632 C.003004 A.J. Watt Gym (Mt. View) Accessibility Improvements C DPW $376,300.00 1/13/2011 1 $0.00 0.00% $0.00 0.00% Site Engineering, Inc. Jeff Ochi, P &R Open Changed metal doors to wood to compliment the wood frames and granted additional time extension for long -lead electrical items. 9/23/2011 H -3964 C.002781 Phase 1 Improvements for Kaloko Housing Project C DPW $3,324,738.00 4/27/2010 3 $1,088,490.00 ° 32.74% $1,026,687.00 30.88% Isemoto Contracting Co., Ltd. Dan Russell, Housing Open To provide additional site work construction for complexes A, B and C of the Kaloko Housing Project. Additional work is possible because of additional federal funding received. 9/23/2011 N/A C.003101 Create Traffic Safety Educational Materials PS DPW $9,609.31 5/10/2011 1 $0.00 0.00% $0.00 0.00% Valerie Ferrari dba Windward Designs Noelani Whittington - PIES Open Extension in completion date through 9/30/11. 9/23/2011 P -3944 C.002347 Ane Keohokalole Hwy. Extension and Imp (Henry St to Hine Lani St) PS DPW $2,278,400.00 6/8/2009 1 $35,699.17 ° 1.57 /° $35,699.17 1.57% Belt Collins Hawaii Ltd. Ben Ishii, Engineering Division Open To complete additional archaeological services required by the State Historic Preservation Division (SHPD) for approval of the construction plans. 9/28/2011 IFB -2671 N/A Helicopter flight operations & maintenance. GS Fire $0.00 1/24/2011 1 $0.00 #DIV /0! $0.00 #DIV /0! Manuiwa Airways dba Volcano Helicopters Gilbert Benevides Open Exercise option year. 9/28/2011 N/A C.002959 WIA Dislocated Worker Program GS Housing $546,323.00 10/27/2010 2 $0.00 ° 0.00 /° - $24,914.43 - 4.56% State of Hawaii Dept. of Labor K. Nielson Open No cost amendment to extend time of performance - PY 2010 WIA Dislocated Worker, through 12/31/11. 9/28/2011 N/A C.002958 WIA Adult Program GS Housing $474,845.00 10/27/2010 2 $0.00 0.00% $117,566.37 24.76% State of Hawaii Dept. of Labor K. Nielson Open No cost amendment to extend time of performance PY 2010 WIA Adult, through 12/31/11. Total # of Contracts 13 Total Original Contract Amount $12,237,921.50 Total CO /SA for Period 13 Total CO /SA Amount for Period $1,191,359.48