Loading...
HomeMy WebLinkAboutCOM 0096.023 2010-2012William P. Kenoi Mayor December 30, 2011 County of Hawaii Finance Department 25 Aupuni Street, Suite 2103 • Hilo, Hawaii 96720 (808) 961-8234 • Fax (808) 961 -8569 Dominic Yagong Council Chair and Members of the Hawaii County Council Hawaii County Council 25 Aupuni Street Hilo, Hawaii 96720 Re: Report of Change Orders Authorized Nancy E. Crawford Director Deanna S. Sako Deputy Director w a a? Pursuant to Ordinance 11 -2, the Report of Change Orders Authorized for the period 12/1/11 to 12/15/11 is transmitted herewith for your review. Should you have any questions regarding the contracts, please contact the identified department. Nancy Crawford Director of Finance Enc. Hawaii County is an Equal Opportunity Provider and Employer Comm. No. 96 .23 Ref. To FG Ref. Date JAN 3 201tN , REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 12/1/11-12/15/11 Legend: CO Change Order SA Supplemental Agreement PS Professional Services C Construction PTA Price Term Agreement GS Other Goods & Services Execution Dale Job # Contract # Project Title Contract Type Dept. Original Contract Amount Original Contract Dale CO /SA No. CO /SA Amount % of Ong Cont Cumulative CO /SA Total % of Orig Cont Contractor Project Manager Project Status Purpose 12/1/2011 P -3780 C.002678 Mamalahoa Hwy. Earthquake repairs. Federal Aid project ER- 15(9) C DPW $4,269,280.00 1/5/2010 3 $16,945.56 0.40% $82,945.56 1.94% Isemoto Contracting Co. Ltd. Ben Ishii - Engineering Division Open Contract documents allow for price adjustment of certain short supply materials if the price of such short supply materials is increased by more than 5 %. The proposal for this project lists reinforcing steel as a short suooly material. 12/6/2011 RFP2036 C.000450 Organics Diversion and g Organics Program GS DEM $900,000.00 6/17/2005 20 $1,600,000.00 177.78% $11,344,000.00 1260.44% EKO Systems, Inc. Gilbert Benevides Open Request for an additional 180 day extension period while working on new specification, cumulative total includes all supplemental agreements. 12/9/2011 N/A C.003163 Fair Housing Analysis of Impediments p PS Housing g $25,000.00 6/29/2011 1 $0.00 0.00% 0.00 /° $0.00 0.00 % 0.00% Belt Collins Hawaii Ltd. Alan Rudo Open Time extension requested: Housing Policy study data needed. 12/9/2011 P -3780 C.002678 Mamalahoa Hwy. Earthquake repairs. Federal Aid project ER- 15(9) C DPW $4,269,280.00 1/5/2010 4 $130,108.00 3.05% $213,053.56 4.99% Isemoto Contracting Co Ltd Ben Ishii- Engineering Division Open Quantities of contract items and extra work items need to be increased due to differing subsurface site conditions encountered during rock anchor installation process. REPORT OF CHANGE ORDERS AUTHORIZED FOR THE PERIOD OF: 12/1/11-12/15/11 Total # of Contracts 1 Total Original Contract mo Aunt $44,871,555.74 Execution Date Job # Contract # Project Title Contract Type Dept. Original Contract Amount Original Contract Date CO /SA No. CO /SA Amount % of Orig Cont Cumulative CO /SA Total % of Orig Cont Contractor Project Manager Project Status Purpose 12/9/2011 P -3780 C.002678 Mamalahoa Hwy. Earthquake repairs. Federal Aid project ER 15(9) C DPW $4,269,280.00 1/5/2010 5 $58,707.00 1.38% $271,760.56 6.37% Isemoto Contracting Co Ltd Ben Ishii Engineering Division Open Quantities of contract items and extra work items need to be modified due to the existing waterline that was found to be higher than as -built drawings from DWS - culvert needs to be installed under waterline instead of above in order to maintain minimum required cover below the road and minimum separation from the 12/9/2011 E -4018 C.003062 Lindsey Road Bridge Rehabilitation. Fed. Project No STP -109- 1(43) C DPW $465,500.00 3/16/2011 1 - $93,461.67 - 20.08% - $93,461.67 - 20.08% Global Specialty Contractors Inc Bob Yanabu Special Projects Open waterline Actual costs of force account work for additional water pollution, dust, and erosion control less than anticipated, additional police officers and /or control devices not needed. 12/14/2011 IFB2160 C.000506 Removal, Recycling and /or Reuse of Vehicle Tires. GS DEM $150,000.00 2/2/2006 10 $260,000.00 173.33% $1,310,000.00 873.33% Big Island Scrap Metal LLC Gilbert Benevides Open Request for an additional 180 day extension period while working on new specification, cumulative total includes all supplemental agreements. 12/14/2011 IFB2299 C.001281 Collection of Recyclable Materials GS DEM $484,030.00 11/29/2007 6 $397,200.00 82.06% $4,207,030.00 869.17% HMP Inc. dba Business Services Hawaii Gilbert Benevides Open Request for an additional 180 day extension period while working on new specification, cumulative total includes all supplemental agreements. 12/14/2011 RFP2657 C.002995 Kalapana Viewing Site Management Services GS Parks $145,848.98 12/15/2010 3 $131,340.00 90.05% $262,681.14 180.10% Jan Guard Hawaii Inc. Gilbert Benevides Open Optional extension for 6 months as allowed by bid agreement. 12/13/2011 ARR 1880(1) C.002698 Ane Keohokalole Highway, Hina Lani Street to WHCC C DPW $29,893,336.76 2/22/2010 13 $2,542,555.00 8.51% $4,345,235.90 14.54% Nan, Inc. Ben Ishii - Engineering Div. Open Extend roadway connection from West Hawaii Civic Center to Hina Lani Street, 100% federally funded. Total # of Contracts 1 Total Original Contract mo Aunt $44,871,555.74 Total CO /SA for Period 10 Total CO /SA Amount for Period $5,043,393.89