Loading...
HomeMy WebLinkAboutCOM 0541.000 2010-2012William P. Kenoi Mayor January 12, 2012 County of Hawaii Finance Department 25 Aupuni Street, Suite 2103 • Hilo, Hawaii 96720 (808) 961-8234 • Fax (808) 961-8569 Dominic Yagong, Council Chair and Members of the Hawaii County Council Hawaii County Council 25 Aupuni Street Hilo, Hawaii 96720 Re: Capital Budget Nancy E. Crawford Director Deanna S. Sako Deputy Director The Department of Public Works indicates that the Reed's Island Rehabilitation project is intended to strengthen the bridge to meet current truck and lateral seismic design loads, as prescribed by the Federal Highway Administration (FHWA). The existing wooden bridge deck will be replaced by a combination of wide - flanged steel beams and structural grating deck. Concrete rock anchors and micropiles will be installed beneath the existing bridge foundation and abutments to strengthen and increase vertical and horizontal load resistance capacity. Lateral structural steel bracing members will be installed to enable the bridge to resist earthquake design forces. Additionally, special steel coatings and hot dip galvanizing will be applied to the structural steel members to protect and extend service life. Enclosed is a bill for an ordinance adding the project titled "Reed's Island Bridge Structural Rehabilitation ", and appropriating $6,308,000 to the Capital Budget of which $5,046,000 is provided by federal funding sources, and $1,262,000 by the County. If there are any questions, please do not hesitate to call Warren H.W. Lee, Director of the Department of Public Works at 961 -8324. Nancy l rawford Director of Finance Enc. cc: Public Works (iil ( n6) Hawaii County is an Equal Opportunity Provider and Employer Comm. No. 551 Ref. 7o; FG Ref. Date JAN 12 2012 Form #: B -52 7/18/91 DEPARTMENT OF FINANCE REQUEST FOR COUNCIL ACTION DEPARTMENT: Public Works DATE: December 27, 2011 STAFF CONTACT: Robert Yanabu PHONE: 961 -8586 A. REQUEST: Amend Ordinance 11 -60, the Capital Budget by adding the following appropriations: Reed's Island Bridge Structural Rehabilitation - Federal $ 5,046,000.00 Reed's Island Bridge Structural Rehabilitation - County $ 1,262,000.00 B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): The rehabilitation project is designed for and will be constructed to strengthen the bridge to meet current truck and lateral seismic design loads, as prescribed by the Federal Highway Administration (FHWA). The existing wooden bridge deck will be replaced by a combination of wide - flanged steel beams and structural grating deck. Concrete rock anchors and micropiles will be installed beneath the existing bridge foundation and abutments to strengthen and increase its vertical and horizontal load resistance capacity. Lateral structural steel bracing members will be installed, in both the longitudinal and transverse directions, enabling the bridge to resist earthquake design forces. Special steel coatings, in addition to hot -dip galvanizing, will be applied to the structural steel members to protect and extend its service life. SIGNED: Department Head DATE: 12 -27 -11 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2011 to 2012 1. DEPARTMENT AND DIVISION: Public Works / Engineering 2. DATE: 12/27/2011 3. PROJECT NAME: Reed's Island Bridge Structural Rehabilitation 4. SUBMITTER: Robert Yanabu 5. COUNCIL BENEFIT DISTRICT(S): 2 6. TMK /JUDICIAL 2 -3 -014 / South Hilo 7. LOCATION (COUNCIL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,262,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvements, Planning, Feasibility, Engineering, or Design Studies 10. PROJECT /PROGRAM DESCRIPTION: Work includes strengthening the bridge to meet current truck and lateral seismic design loads, as prescribed by the Federal Highway Administration (FHWA). 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): The weight limit for the existing wooden bridge is six (6) tons, which prohibits passage of fire trucks and other heavier vehicles. This bridge rehabilitation project will rectify this weight restriction and allow passage of trucks and heavier vehicles in the future. 12. LONG RANGE PLANS /COMMUNITY VALUES: Department vision, mission, core values and goals; and community value and desirability. 13. COUNTY MATCHING FUNDS REQ'D? (Y /N) Yes DESCRIBE: FHWA will fund 80% of eligible costs. 14. LEGAL MADATE? (Y /N) No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The bridge will meet the current FHWA standards and will require less maintenance, 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; and strengthens and sustains our community; and promotes health and safety. 17. PROJECT READINESS (List all that apply): Previously appropriated. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 11 -12 Request FY 12 -13 FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 593 $593 Construction 6,308 $6,308 TOTAL: $593 $6,308 $6,901 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): Cty G.O. Bond /Other 119 1,262 $1,380 State Revolving Fund State CIP Federal (including ARRA- Stimulus) 474 5,046 $5,521 Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $593 $6,308 $6,901 Reed's Island Bridge Rehabilitation Feet 0 250 500 1,000 1,500 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2010 -2011 Print Date: April 19, 2010 1