Loading...
HomeMy WebLinkAboutCOM 0604.004 2010-2012SUBMITTED BY: BOB FITZGERALD, DIRECTOR OF PARKS & RECREATION BILL 197 / Comm. 604 Parks Maintenance Division Parks and Recreation Department County of Hawaii Action Plan Update Preventive Maintenance- Critical Asset Inventory As of March 2012 P /sp►L FC- & WE COUNTY CLERK COU :TY O HAWAII 7017 APR 20 AM 11: 19 Pat Daly/ Deac deCamp 1. Preventive Maintenance Plan Ongoing Ongoing Description of Activities: - Develop guidelines that will defined and delineate the activities needed to develop a P &R Critical Asset PM program center primarily on roofs, gutters, fumigation, and exterior paint. - Defined and delineate to include- ranking, tracking, frequency, performance measures, accountability, and budgetary forecasts. Pat Daly/ Deac deCamp 2. Computer -based Inventory Program Done: Jan 2012 Done: Feb 2012 Done: Mar 2012 Description of Activities: - Develop a spreadsheet that will accommodate the logging of P& R Critical Assets inventory- conditions, appearance, findings, actions, etc. regarding Roofs, Gutters, Fumigation, Exterior Paint - Capture overview pictures of all districts' P &R facilities. Establish hyperlinks between spreadsheet comment sections and photos. Deac deCamp 3. Initial /Cursory Island -Wide Status Reports of P &R Critical Asset Inventory Ongoing - Deadline: May 2012 Sent out 15Feb12 Description of Activities: - Inspection of roofs, gutters, fumigation, and exterior paint of designated facilities /amenities. Send out requests for input to Recreation Administrator regarding the conditions of roofs, gutters, exterior paint, and termite activities at P &R Recreational facilities. Provide a basic questionnaire for Recreational staff to utilized and return. Received - 15Mar12 Daly /deCamp 4. Evaluation of Initial Data Ongoing_ Deadline: May /June -12 May /June -12 May /June -12 May /June -12 Description of Activities: - Entering of data into Spread Sheet - Evaluation, categorizing, and prioritize the collected data - Determination of accountability for repairs and replacement Daly /deCamp 5. Identification Priorities and Measures May /June -12 li_ w d .1 Description of Activities: - Development of a facility preventive maintenance priority list to include- - Generation of work orders for PMD action. Develop specs, scope of work, tentative timetable for completion, etc. [ /Consultation with PMD Building] Acquire vendor quotes for projects that required outsourcing due to scope of work. Action Plan - Critical Asset Inventory- PM Program- Update April 2012 4/19/2012 Comm. No. rI rT• Ref. To Pippw..ad I 20 2012 Ref. Date �,....r.... N. Kohala o* �� oti F1(a ' (% Structure /Photo Q-° QJ Qa Mahukona BP Pavilion and Comfort Station Structure: Pavilion and Comfort Station Structure: Pavilion /CS Structure: Pavilion /CS Material: Metal Date of inspection: 4/17/12 Material: Roof- Metal- Building -wood Date of inspection: 4/17/12 Inspector: D. Riordan Date of inspection: 4/17/12 Inspector: D. Riordan Structure- Wooden Inspector: D. Riordan Condition /Appearance: The roof is bad shape but functional. Outer edges have holes and rust. No inside leaks. Appearance is unsat. No gutters Last Action /Date: No Action Condition:Servicalbe and acceptable Last Painted: Unknown Infestation Level [1 -5] -- 5 HazMat/Structural Concerns: Findings /Actions: Roof needs total replacement. Memo to Komata with and for recommendations. NLT 4 -27- 12 Findings /Actions: Structure has termite and rotten wood pieces:floor is becoming weak but functional.Safe for use- Maintain vigilance. Status report memo to Komata. NLT 4 -27 -12 Findings /Actions:This structure is old and in marginal shape. Future replacement of entire building is advisable. Constant vigilance is mandatory. Notes: Notes: Structure: Structure: Structure: Material: Date of inspection: Material: Date of inspection: Inspector: Date of inspection: Inspector: Protocol: Inspector: Condition /Appearance: Last Action /Date: Condition: Last Painted: Infestation Level [1 -5] -- HazMat/Structural Concerns: Findings /Actions: Findings /Actions: Findings /Actions: N. Kohala o�` a,b o J ..e o" Structure /Photo Q� °' a`�ti� Q Kapa'au Senior Center Senior Center Structure: Senior Center Structure: Senior Center Structure: Senior Center Material:Metal Roof and Gutters Date of inspection: 4/17/12 Material:Wood Date of inspection: 4/17/2012 Inspector: D. Riordan Date of inspection: Inspector: D. Riordan Protocol: None to Date Inspector: Condition /Appearance: Roof and gutters are in good shape and serviceable. Appearance is acceptable. No reported leaks Last Action /Date: None Condition: Last Painted: Infestation Level [0 -5] -- 0 HazMat/Structural Concerns: Unknown to date. Notes: Findings /Actions:No action required to date. Continue to inspect. Findings /Actions: No termite activity or damage evident. Vo action required. Continue to audit for activity Findings /Actions:Some paint peeling on porch posts , window sills and wooden windows. WO to building maintenance to prep and paint these areas- Submitted 4/19/12 Notes: Structure: Structure: Structure: Material: Date of inspection: Material: Date of inspection: Inspector: Date of inspection: Inspector: Protocol: Inspector: Condition /Appearance: Last Action /Date: Condition: Last Painted: Infestation Level [1 -5] — HazMat/Structural Concerns: Findings /Actions: Findings /Actions: Findings /Actions: Notes: Structure: Structure: Structure: