Loading...
HomeMy WebLinkAboutORD 2012-087 2010-2012 COUNTY OF HAWAI ' I .--,.-.,-7.;'''''''''''''''''.. . cr.•f " '••.I. •• - s' , A WI/:. , r.oik : : ,...,..... . ,„... ,...... . 1.,..:1„,.........., 1,,,,,, 417 :* •• Z. • ••0 J.• • •4Ta" OF•la" PART II The Capital Budget and Six-Year Capital Improvements Program FY 2012 - 2013 ORDINANCE NO. 12-87 COUNTY OF HAWAII STATE OF HAWAII BILL NO. 198 ORDINANCE NO. 1 2 ,S' (DRAFT 4) AN ORDINANCE RELATING TO PUBLIC IMPROVEMENTS AND FINANCING THEREOF FOR THE FISCAL YEAR JULY 1, 2012 TO JUNE 30, 2013. BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAII: SECTION 1. The following amounts to be received from the sale of general obligation bonds, and other sources are hereby appropriated to the projects and for the purposes designated in Section 2. CAPITAL PROJECTS FUND Amount Federal Grants Receivable $38,456,000 State CIP & Revolving Fund Loan $35,451,000 General Obligation Bonds, Capital Projects $99,574,000 Fund Balance and /or Other Source Private Funds $24,225,000 Fair Share Contributions $832,000 Total $198,538,000 Section 2. The monies to be provided from the sources specified in Section 1 shall be appropriated for the purposes and in the amounts as follows: [The remainder of this page is intentionally left blank] FY NO. PROJECTS APPROPRIATIONS (in thousands) FEDERAL GRANTS RECEIVABLE 2012034 Ane Keohokalole Highway 3,600 2012035 Kaiminani Drive Roadway Improvements, Mamalahoa Hwy. to Vicinity of Ahiahi St., FAP NO. STP- 0198(001) 10,000 2012036 Kaiminani Drive Roadway Improvements, Ahiahi St. to Vic. of Ane Keohokalole Hwy. 13,000 2012037 Kilauea Avenue Improvements 4,016 2012039 Ali'i Drive Culvert Replacement FAP No. STP- 0186(8) 500 2012041 Kamehameha Hwy Reconstruction, Wailoa Bridge to Ponahawai Street FAP No. STP- 1910(1) 5,720 2012044 Mamalahoa Hwy Safety Improvements (Holualoa) 400 2012045 Laupahoehoe & Manowaiopae Homestead Roads Improvements 700 2012064 Transit Baseyard /Admin Facility 400 2012073 Miloli'i Fire Department Water Tank & Connector #1 40 2012074 Miloli'i Fire Department Water Tank & Connector #2 40 2012075 Kona Paradise Fire Department Water Tank & Connector 40 Subtotal 38,456 STATE CIP & REVOLVING FUND 2012002 North Kona Sewer (reapp. 5696.31) 3,104 2012003 North Kona Effluent Reuse (reapp. 5696.30) 3,643 2012004 Na'alehu Wastewater System 4,485 2012006 Pahala Wastewater System (reapp. 5698.15) 8,219 2012008 Kealakehe Effluent Reuse - Makai 16,000 Subtotal 35,451 GENERAL OBLIGATION BONDS, CAPITAL PROJECTS FUND BALANCE AND /OR OTHER SOURCES 2012001 Rural Transfer Station Replacement /Enhancement 2,000 2012005 Pahala Wastewater System (reapp. 5698.15) 4,481 2012006 South Hilo Landfill Closure 750 2012007 Repair Hilo Outfall 1,000 2012009 Hilo Coating Rehabilitation 400 2012010 Repair Hilo Digesters 500 2012011 Repair Pua Wet Well 400 2012012 Lono Kona Improvement District 550 2012013 Kawailani Fire Station Replacement 6,400 2012014 Na'alehu Fire Station (reapp.5298.38) 300 2012015 Lifeguard Towers /Stands Upgrades 150 2012016 Puna Water Safety District Operations Facility 150 2012017 DPR ADA Compliance 4,240 2012018 DPR Repairs & Improvements to Facilities 4,000 2012019 DPR Hazardous Materials Abatement & Mitigation 1,000 2 FY NO. PROJECTS APPROPRIATIONS (in thousands) 2012020 DPR Play Equipment Upgrade & Improvements 1,000 2012021 DPR Ahalanui /Pohoiki Bay Beach Parks (reapp.5590.58) 6,000 2012022 DPR Kahuku Park Community /Senior Center & Gym (reapp.5598.74) 8,000 2012023 DPR Honu'apo Planning (reapp. 5598.76) 500 2012024 DPR Kealakehe Regional Park Master Plan (reapp. & increase 5596.21) 1,000 2012025 DPR Waimea Trails & Greenways (reapp. 5594.65) 4,000 2012026 Downtown Hilo Restrooms 1,000 2012027 DPR Kailua Park - New Canoe Hale 218 2012028 Public Safety Complex Repainting (reapp. 5292.75) 125 2012029 Police Records Section Receiving Counter Renovation (reapp. 5292.76) 55 2012030 Kona Evidence Warehouse ( reapp. 5296.91) 500 2012031 DPW Facilities Hazardous Material Abatement 2,500 2012032 DPW Facilities ADA Compliance 2,500 2012033 DPW Facilities Repair and Maintenance 2,500 2012034 Ane Keohokalole Highway 700 2012035 Kaiminani Drive Roadway Improvements, Mamalahoa Hwy. to Vicinity of Ahiahi St., FAP NO. STP- 0198(001) 320 2012036 Kaiminani Drive Roadway Improvements, Ahiahi St. to Vic. of Ane Keohokalole Hwy. 3,000 2012038 La'aloa Avenue Extension 14,000 2012039 Ali'i Drive Culvert Replacement FAP No. STP- 0186(8) 125 2012040 Leilani Street Drainage Improvement 100 2012041 Kamehameha Hwy Reconstruction, Wailoa Bridge to Ponahawai Street FAP No. STP- 1910(1) 3,240 2012042 Napo'opo'o Road Retaining Wall Improvements 200 2012043 Manono Street Improvements, Lanikaula Street to Kekuanao'a Street 100 2012044 Mamalahoa Hwy Safety Improvements (Holualoa) 100 2012045 Laupahoehoe & Manowaiopae Homestead Roads Improvements 1,285 2012046 Manowai'opae Homestead Road Retaining Wall 550 2012047 DPW Facilities Renovation 750 2012048 DPW Facilities Energy Efficiency 2,000 2012049 DPW Facilities Hardening 1,500 2012050 Land Acquisition for DPW Facilities 100 2012051 Kapi'olani Street Extension, Lanikaula Street to Mohouli Street 500 2012052 Kawailani Street Improvements, Iwalani St. to Pohakulani St., FAP NO. STP- 2760(2) 100 2012053 Hamakua Road Baseyard Warehouse 1,250 2012054 North Hilo /Hamakua Highway Maintenance Building Construction 2,105 2012055 South Kohala Road Baseyard Warehouse 1,196 2012056 South Hilo Roads Baseyard Storage /Warehouse Building 1,105 2012057 Kona Baseyard Storage /Warehouse Building 1,200 3 FY NO. PROJECTS APPROPRIATIONS (in thousands) 2012058 Ulu Wini Homes Expansion 2,000 2012059 Ulu Wini Sewer Line Extension 1,500 2012060 Paniolo Drive Extension 500 2012061 'Ouli 'Ekahi Cottages Improvements 320 2012062 Wai'ula Drive Improvements 30 2012063 Island -wide Bus Shelter Program 750 2012064 Transit Baseyard /Admin Facility 100 2012065 Greenwell Park Flooding 250 2012066 Kona Baseyard Expansion 172 2012067 Hawaiian Beaches /Hawaiian Paradise Park Connector Road (Papio St. /Government Beach Road) 200 2012068 'Apa'a Street Improvements /Re- alignment (blind curve) 200 2012069 Lehua Street Sidewalk Improvements 920 2012070 Napo'opo'o Junction Bus Stop; Park & Ride 237 2012071 Napo'opo`o Park Improvements 275 2012072 Kona Water Safety District Operations Facility (reappro. 5296.68), $25,000 increase 175 2012082 Lower Puna Community Relief Center 200 Subtotal 99,574 PRIVATE FUNDS 2012026 Downtown Hilo Restrooms 25 2012034 Ane Keohokalole Highway 200 2012076 Theater -in- the - round; HI Cty, St of HI, UH, & Private Partnership 4,000 2012077 Tennis Complex; HI Cty, St of HI, UH, & Private Partnership 4,000 2012078 Outdoor Amphitheater Complex; HI Cty, St of HI, UH, & Private Partnership 4,000 2012079 Football- Soccer Complex; HI Cty, St of HI, UH, & Private Partnership 4,000 2012080 Baseball Complex; HI Cty, St of HI, UH, & Private Partnership 4,000 2012081 Aquatic Complex; HI Cty, St of HI, UH, & Private Partnership 4,000 Subtotal 24,225 FAIR SHARE CONTRIBUTIONS 2012026 Downtown Hilo Restrooms 25 2012027 DPR Kailua Park - New Canoe Hale 782 2012071 Napo'opo'o Park Improvements 25 Subtotal 832 Grand Total 198,538 SECTION 3. The Director of Finance shall open appropriate accounts for each project, make monies available, and expend funds for the projects listed herein. 4 SECTION 4. The appropriation and authorization in Section 2 includes land purchase, plans, site preparation, equipment purchase, improvements to land, and construction. SECTION 5. The Mayor shall initiate authorized projects taking into consideration the factors of public need, general financial condition of the general fund, highway fund, sewer fund, parking meter fund, bikeway fund, beautification fund, vehicle disposal fund, solid waste fund, golf course fund, geothermal relocation revolving fund, housing fund, and fair share contributions as well as the County's general economic conditions. SECTION 6. Severability. If any provision of this ordinance or the application thereof is held invalid, such invalidity shall not affect other provisions or applications of the ordinance which can be given effect without the invalid provision or application, and to this end, the provisions of this ordinance are declared to be severable. SECTION 7. As required by Section 10 -6(a) of the Hawai'i County Charter, the estimated cost of each capital improvement pending or proposed to be undertaken, the estimated operating cost, and the pending or proposed method of financing are set forth in the attached Project Data and /or Financial Impact Statement sheets. SECTION 8. This ordinance shall take effect on July 1, 2012. INTRODUCED BY: Hilo, Hawaii Date of Introduction: Date of 1st Reading: Date of 2nd Reading: Effective Date: REFERENCE: Comm May 14, 2012 May 14, 2012 May 31, 2012 July 1, 2012 605.27 COUNCIL MEMBER, COUNTY OF HAWAII 5 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT DORA BECK, P.E., DIRECTOR (This Page Intentionally Left Blank) Department: Environmental Management SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 PRIORITY PROJECT 2012 -13 FY FUNDING (in thousands) FUNDING FORECAST BY FISCAL YEAR (in thousands) TOTAL ESTIMATED PROJECT COST County State Federal Private CBA Prior Funds Allotted (not lapsed) 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 Beyond 6 years 1 Rural Transfer Station Replacement /Enhancement 2,000 5,008 2,000 2,000 2,000 2,000 2,000 2,000 17,008 2 North Kona Sewer (reapp. 5696.31) 3,104 1,751 3,104 2,130 14,177 21,162 3 North Kona Effluent Reuse (reapp. 5696.30) 3,643 2,056 3,643 1,000 3,000 9,699 4 Na'alehu Wastewater System 4,485 8,763 4,485 13,248 5 Pahala Wastewater System (reapp. 5698.15) 4,481 8,219 1,303 12,700 14,003 6 South Hilo Landfill Closure 750 750 4,000 4,000 5,000 13,750 7 Repair Hilo Outfall 1,000 265 1,000 1,265 8 Kealakehe Effluent Reuse - Makai 16,000 16,000 16,000 9 Hilo Coating Rehabilitation 400 400 6,000 6,400 10 Repair Hilo Digesters 500 500 5,000 5,500 11 Repair Pua Wet Well 400 400 4,000 4,400 12 Lono Kona Improvement District 550 185 550 5,000 5,735 13 Ocean View Recycling and Transfer Station 1,176 3,000 4,176 14 Hilo Scrap Metal Salvage Facility 50 3,000 3,050 15 Kailua Landfill Remediation 2,000 2,000 16 Old Kona Scrap Metal Cleanup and Remediation 3,000 3,000 17 West Hawaii Materials Recovery Facility (MRF) 250 5,000 5,250 18 Hilo Scrap Metal Yard Remediation 1,800 1,800 19 Volcano Transfer Station Enhancement 5,000 5,000 20 Replace Pua Odor Control System 1,500 1,500 21 Primary Sludge Pump and DAFT Retrofit 3,000 3,000 22 Wai'i hinu Transfer Station Enhancement 9,000 9,000 23 Glenwood Transfer Station Enhancement 5,000 5,000 24 Kaumana Gardens Collector Sewer 750 5,000 5,750 25 Ainako Aina Nani Collector Sewer 600 4,000 4,600 26 Ainako Interceptor Sewer Phase 2 600 3,000 3,600 27 Pahala Transfer Station Enhancement 5,000 5,000 28 Kalaniana'ole Collector Sewer Phase II 600 4,000 4,600 29 Modify HWWTP Digester 1,680 8,400 10,080 30 Renovate P19 SPS 1,800 1,800 31 Lanihau Upgrade and FM Replacement 3,000 3,000 32 Abandon Keopu and Modify Collection System 3,600 3,600 33 Paukaa New Force Main 360 2,400 2,760 34 Renovate Onekahakaha SPS and Dual Force Main 660 4,400 5,060 35 Renovate Kolea SPS and Dual Force Main 275 2,000 2,275 TOTAL 10,081 35,451 20,557 45,532 42,180 35,427 30,200 14,600 17,375 17,200 223,071 8 (This Page Intentionally Left Blank) 9 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management- Solid Waste Division 2. DATE: 4/13/2012 3. PROJECT NAME: Rural Transfer Station Replacement /Enhancement 4. SUBMITTER: Greg Goodale, Chief 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK /JUDICIAL: Various 7. LOCATION (COUNCIL DISTRICT): Various 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement; New structures; Planning, Engineering, and Design 10. PROJECT /PROGRAM DESCRIPTION: This project is intended to address public health and safety risks and is required to ensure compliance with State (HAR -58.1) regulations as they relate to solid waste transfer systems. This project consists of major repairs and replacement at various transfer stations. Significant repairs scheduled for FY12 -13 include work at Volcano and Waiohinu. Deterioration at Waiohinu and Volcano has progressed to the point that the retaining walls need to be replaced as soon as possible. Major reconstruction is necessary to address safety concerns for the workers and users. We are fast tracking design and construction in tight sequence to minimize design costs. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public health and safety, Inadequate service or facility, Improves operational efficiency, Replaces a deteriorated facility, Repair infrastructure, Enhances Quality of Life, Service Improvement. 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets our Department's vision and is in compliance with State and Federal requirements and permits. Protecting the public health and the environment are in accordance with the County of Hawaii General Plan. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: No impact on operational budget. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects Our Natural Environment, Strengthens and Sustains our Community, Promotes Health and Safety 17. PROJECT READINESS (List all that apply): Design is currently underway, Staff available to manage project Terin Gloor, Funds can be encumbered in 2012. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 488 $488 Construction 4,520 2,000 2,000 2,000 2,000 2,000 2,000 $16,520 TOTAL: $5,008 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $17,008 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): Cty G.O. Bond /Other 5,008 2,000 2,000 2,000 2,000 2,000 2,000 $17,008 State Revolving Fund State GIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $5,008 $2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $17,008 10 North Kona Sewer TM Ks: 7 -3- 051:999; 7-4- 020:999 0 1,500 3,000 6,000 Feet 9,000 11 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012.2013 Print Date: January 24, 7!117 Print Date: January 24, 2012 CoH Dept of Planning GIS County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/28/2011 3. PROJECT NAME: North Kona Sewer (reapp. 5696.31) 4. SUBMITTER: Lyle Hirota 5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK /JUDICIAL: (3) 7 -3, (3) 7 -4/ North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement, Planning, feasibility, engineering, or design studies. 10. PROJECT /PROGRAM DESCRIPTION: Design and Construction of Sewer infrastructure between Kealakehe Wastewater Treatment Plant and Hina Lani St. with installation of Sewage pump station in the vicinity of TMK 7 -4- 008:077 to discharge sewage north of Kealakehe Parkway to the Kealakehe Wastewater Treatment Plant. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Heath and Safety, Enhances Quality of Life, provides Service Improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets the Department's Vision, Mission, Goals of helping to protect the environment, meets the vision of the Kona Community Development Plan by providing wastewater service north of Kealakehe Parkway in order to minimize impact to shoreline waters. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MANDATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Additional expenses associated with Operation and Maintenance of the wastewater system intended to be offset by sewer user charges. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality; Preserves and Protects our Natural Environment; Promotes Health and Safety; Fosters Inter - Departmental Collaboration and Cross - Sector Implementation. 17. PROJECT READINESS (List all that apply): Previously appropriated; Installation of Phase I infrastructure (Kealakehe Parkway to Hina Lani) currently being installed with DOT Queen K Phase 2 project, Staff available to manage project 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 162 2,130 $2,292 Construction 1,589 3,104 14,177 $18,870 TOTAL: $1,751 $3,104 $2,130 $14,177 $21,162 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE x$1000: Cty G.O. Bond /Other 1,751 2,130 14,177 $18,058 State Revolving Fund 3,104 $3,104 State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $1,751 $3,104 $2,130 $14,177 $21,162 12 North Kona Effluent Reuse TM Ks: 7 -3- 051:999; 7 -3- 058:999; 7-4- 020:999 0 2,000 4,000 8,000 Feet 12,000 13 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print Date: January 24, �(�t� Print Date: January 24, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/28/2011 3. PROJECT NAME: North Kona Effluent Reuse (reapp. 5696.30) 4. SUBMITTER: Lyle Hirota 5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK /JUDICIAL: (3) 7 -3, (3) 7 -4/ North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement, Planning, feasibility, engineering, or design studies. 10. PROJECT /PROGRAM DESCRIPTION: Design and Construction of Effluent Reuse infrastructure between Kealakehe Wastewater Treatment Plant and Kohanaiki Industrial Subdivision 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Heath and Safety, Enhances Quality of Life, provides Service Improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets the Department's Vision, Mission, Goals of helping to protect the environment, meets the vision of the Kona Community Development Plan by providing effluent reuse service in order to minimize impacts to the environment. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MANDATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Additional expenses associated with Operation and Maintenance of the effluent reuse system intended to be offset by user charges. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality; Preserves and Protects our Natural Environment; Promotes Health and Safety; Fosters Inter - Departmental Collaboration and Cross - Sector Implementation. 17. PROJECT READINESS (List all that apply): Previously appropriated; Installation of Phase I infrastructure (Kealakehe Parkway to Kohanaiki Industrial) currently being installed with DOT Queen K Phase 2 project, Staff available to manage project 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 190 1,000 $1,190 Construction 1,866 3,643 3,000 $8,509 TOTAL: $2,056 $3,643 $1,000 $3,000 $9,699 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): Cty G.O. Bond /Other 2,056 1,000 3,000 $6,056 State Revolving Fund 3,643 $3,643 State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $2,056 $3,643 $1,000 $3,000 $9,699 14 Na`alehu and Pahala Wastewater Systems 0 750 1,500 3,000 Feet 4,500 15 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 odo�n�re�.i�„����, 24, on» Print Date: January 24, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/28/2011 3. PROJECT NAME: Na'alehu Wastewater System 4. SUBMITTER: Lyle Hirota 5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK /JUDICIAL: (3) 9 -5/ Ka'u 7. LOCATION (COUNCIL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Land Acquisition, Infrastructure Improvement, Planning, feasibility, engineering, or design studies. 10. PROJECT /PROGRAM DESCRIPTION: Design and Construction new Wastewater Collection, Treatment, and Disposal System to allow closure of three (3) each existing Large Capacity Cesspools currently owned and operated by the County of Hawai'i. This project was previously combined as the Naalehu and Pahala LCC Replacement project which is now being separated into two projects. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Heath and Safety, addresses Inadequate Service or Facility, Improves Operational Efficiency, Replaces a Deteriorated Facility, Enhances Quality of Life, provides Service Improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets the Department's Vision, Mission, Goals of helping to protect the environment, Mayoral Directive from previous administration. 13. COUNTY MATCHING FUNDS REQ'D? Yes DESCRIBE: $1,843,000 provided as a Federal Grant. 14. LEGAL MANDATE? Yes DESCRIBE: Closure of the existing Large Capacity Cesspools is required by EPA Mandate. Additionally, installation of the new system serves as a Supplemental Environmental Project which will allow closure of CAFO 90-WW-E0-10 related to the old Kailua WWTP (replaced with Kealakehe WWTP) 15. IMPACT ON OPERATIONAL BUDGET: Additional expenses associated with Operation and Maintenance of the system intended to be offset by user charges. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality; Preserves and Protects our Natural Environment; Promotes Health and Safety; Fosters Inter - Departmental Collaboration and Cross - Sector Implementation. 17. PROJECT READINESS (List all that apply): Previously appropriated; Design currently under way; Land acquisition currently underway; Staff available to manage project 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 300 $300 Design /Survey 1,241 $1,241 Construction 7,222 4,485 $11,707 TOTAL: $8,763 $4,485 $13,248 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): i$ � Cty G.O. Bond /Other 1,205 $1,205 State Revolving Fund 5,715 4,485 $10,200 State CIP Federal (including ARRA - Stimulus) 1,843 $1,843 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $8,763 $4,485 $13,248 16 Na`alehu and Pahala Wastewater Systems 0 750 1,500 3,000 Feet 4,500 17 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print i�h���.,, 24, ono Print Date: January 24, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/28/2011 3. PROJECT NAME: Pahala Wastewater System (reapp. 5698.15) 4. SUBMITTER: Lyle Hirota 5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK /JUDICIAL: (3) 9 -6/ Ka'O 7. LOCATION (COUNCIL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,481,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Land Acquisition, Infrastructure Improvement, Planning, feasibility, engineering, or design studies. 10. PROJECT /PROGRAM DESCRIPTION: Design and Construction new Wastewater Collection, Treatment, and Disposal System to allow closure of one (1) each existing Large Capacity Cesspool currently owned and operated by the County of Hawai'i. This project was previously combined as the Naalehu and Pahala LCC Replacement project which is now being separated into two projects. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Heath and Safety, addresses Inadequate Service or Facility, Improves Operational Efficiency, Replaces a Deteriorated Facility, Enhances Quality of Life, provides Service Improvements 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets the Department's Vision, Mission, Goals of helping to protect the environment, Mayoral Directive from previous administration. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MANDATE? Yes DESCRIBE: Closure of the existing Large Capacity Cesspools is required by EPA Mandate. 15. IMPACT ON OPERATIONAL BUDGET: Additional expenses associated with Operation and Maintenance of the system intended to be offset by user charges. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality; Preserves and Protects our Natural Environment; Promotes Health and Safety; Fosters Inter - Departmental Collaboration and Cross - Sector Implementation. 17. PROJECT READINESS (List all that apply): Previously appropriated; Design currently under way; Land acquisition currently underway; Staff available to manage project 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 550 $550 Design /Survey 753 700 $1,453 Construction 12,000 $12,000 TOTAL: $1,303 $12,700 $14,003 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000):a 1,303 4,481 r $5,784 Cry G.O. Bond /Other State Revolving Fund 8,219 $8,219 State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $1,303 $12,700 $14,003 18 -11111um . r.Ta iii 0160 m +1111111.rill1 0,111k -$ , _1�_,, wrogar1 unuumo It airAumn or, : Inmmurtson nerennIN ;1 ' iikli • -. -- --s- .:. "k ..,....•.. . ...... wk.. .p 7 1,. `_\ . '\ �' �Irlll "' �_ ... . 1..--filiWi .����1■■ .x1111111 1..N1:_.. _ South Hilo Landfill Closure TM Ks: 2 -1- 013:152, 156, 162 0 1,500 3,000 6,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012.2013 Feet 9,000 19 o�... Date: i�.,���.,, 24, ono Print Date: January 24, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Environmental Management- Solid Waste Division 2. DATE: 1/13/2012 3. PROJECT NAME: South Hilo Landfill Closure 4. SUBMITTER: Greg Goodale, Chief 5. COUNCIL BENEFIT DISTRICT(S): 4 6. TMK /JUDICIAL: (3) 2 -1- 013:152,156,162 / South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $750,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement 10. PROJECT /PROGRAM DESCRIPTION: Design of a final closure system for the portions of the South Hilo Landfill that are at their final fill capacity. This design will take into consideration a multi phase closure process for this site. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public health and safety, Enhances Quality of Life, addresses Department of Health concerns regarding the closure of an unlined landfill site. 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets Department's vision, mission, goals, in accordance with the County of Hawai'i General Plan, in compliance with State and Federal requirements and permits 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MANDATE? [ No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Future impacts to operational budget due to on going need for maintenance of the site. 16. SUSTAINABILITY FOCUS (List all that apply): Preserves and Protects Our Natural Environment, Promotes Health and Safety 17. PROJECT READINESS (List all that apply): Closure for this site has been evaluated for this site for several years; Staff is available to manage project - Terin Gloor. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 750 4,000 4,000 5,000 $13,750 Construction TOTAL: $750 $4,000 $4,000 $5,000 $13,750 19. 0 & M COSTS (x $1000): I $0 20. FUNDING SOURCE (x $1000): Cty G.O. Bond /Other 750 4,000 4,000 5,000 $13,750 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $750 $4,000 $4,000 $5,000 $13,750 20 (This Page Intentionally Left Blank) 21 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/28/2011 3. PROJECT NAME: Repair Hilo Outfall 4. SUBMITTER: Lyle Hirota 5. COUNCIL BENEFIT DISTRICT(S): 2,3,4 6. TMK /JUDICIAL: (3) 2 -1/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Land acquisition (easements), Infrastructure Improvement, Planning, feasibility, engineering, or design studies. 10. PROJECT /PROGRAM DESCRIPTION: Repair three (3) each existing joint leaks and 30 ft. section of undercutting of the outfall identified during 2010 inspection of the outfall. Work includes re- inspection of the outfall during the design phase to confirm no additional damage to the outfall prior to initiating construction work. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Heath and Safety, Repair /Maintenance of Infrastructure, Enhances Quality of Life 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets the Department's Vision, Mission, Goals of helping to protect the environment as well as meeting Keaukaha Community values of protecting shoreline waters. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MANDATE? No DESCRIBE: While not currently a legal mandate, failure of the outfall at the undermined section would likely result in enforcement action as the discharge would be occurring at a different location than that specified under the facility's permit. 15. IMPACT ON OPERATIONAL BUDGET: None 16. SUSTAINABILITY FOCUS (List all that apply): Preserves and Protects our Natural Environment; Strengthens and Sustains our Community; Promotes Health and Safety 17. PROJECT READINESS (List all that apply): Consultant Contract currently executed using Equipment Replacement Funds; Staff available to manage project 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 265 $265 Construction 1,000 $1,000 TOTAL: $265 $1,000 $1,265 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000):;. y ,:,, 265 ��a � 1,000 .. .; •:'I ..�, yii fir" � �� ' � " iii $1,265 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $265 $1,000 $1,265 22 Kealakehe Effluent Reuse TM Ks: 7 -4- 008:002; 7 -5- 005:007, 083 0 2,000 4,000 8,000 Feet 12,000 23 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print Date: January 24, 2012 CoH Dept of Planning GIS County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/27/2011 3. PROJECT NAME: Kealakehe Effluent Reuse - Makai 4. SUBMITTER: Lyle Hirota 5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK /JUDICIAL: (3) 7 -4- 008:002, (3) 7 -5- 005:007, 083/ North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Land acquisition (easements), Infrastructure Improvement, Planning, feasibility, engineering, or design studies. 10. PROJECT /PROGRAM DESCRIPTION: Kealakehe Effluent Reuse is intended to upgrade the Kealakehe Wastewater Treatment Plant to provide approximately 500,000 gallons per day of R -1 water to be used for irrigation of the Old Kailua Airport, around the buffer zone for the Kealakehe WWTP, and other potential areas along the infrastructure path to the Old Kailua Airport. In addition to upgrade of the Kealakehe facility, distribution and transmission systems will be installed up to and within the park to enable irrigation of the park facilities utilizing R -1 water. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Heath and Safety, Improves Operational efficiency for the Parks Dept. by allowing irrigation using non - potable water, Enhances Quality of Life, provides Service Improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets the Department's Vision, Mission, Goals of helping to protect the environment as well as establishing and effluent reuse system, Meets the vision of the Kona Community Development Plan by providing effluent reuse systems, meets planning documents for the Old Kailua Airport Park which indicates the intent to utilize R -1 reuse for irrigation of the park. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: CWSRF monies intended to be utilized. 14. LEGAL MANDATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Additional expenses associated with Operation and Maintenance of the reuse system and infrastructure intended to be offset by establishment of Effluent Reuse rates commensurate with operating expenses. 16. SUSTAINABILITY FOCUS (List all that apply): Preserves and Protects our Natural Environment; Strengthens and Sustains our Community; Promotes Health and Safety; Fosters Inter - Departmental Collaboration and Cross - Sector Implementation. 17. PROJECT READINESS (List all that apply): Staff available to manage project 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 200 $200 Land Acquisition Design /Survey 800 $800 Construction 15,000 $15,000 TOTAL: $16,000 $16,000 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x 1000: , x.� �, ,, i Cty G.O. Bond /Other State Revolving Fund 16,000 $16,000 State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $16,000 $16,000 24 Hilo Coating Rehabilitation TM K: 2-1-013:002 0 2,000 4,000 8,000 Feet 12,000 25 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print Date: January 25, 2012 CoH Dept of Planning GIS County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/28/2011 3. PROJECT NAME: Hilo Coating Rehabilitation 4. SUBMITTER: Lyle Hirota 5. COUNCIL BENEFIT DISTRICT(S): 2,3,4 6. TMK /JUDICIAL: (3) 2 -1- 013:002/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $400,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement, Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings 10. PROJECT /PROGRAM DESCRIPTION: Repair Hilo Wastewater Treatment Plant Headworks due to concrete deterioration from hydrogen sulfide corrosion. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Heath and Safety, Improves Operational Efficiency, Repair /Maintenance of Infrastructure, Enhances Quality of Life 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets the Department's Vision, Mission, Goals of helping to protect the environment as well as maintaining existing assets (Asset Management) 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MANDATE? No DESCRIBE: While not currently a legal mandate, failure of the headworks would likely result in enforcement action and the possibility of raising issues regarding maintenance of facilities in accordance with Grant Conditions. 15. IMPACT ON OPERATIONAL BUDGET: None 16. SUSTAINABILITY FOCUS (List all that apply): Preserves and Protects our Natural Environment; Promotes Health and Safety 17. PROJECT READINESS (List all that apply): Staff available to manage project 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 400 $400 Construction 6,000 $6,000 TOTAL: $400 $6,000 $6,400 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000):• %i !., y M k Cry G.O. Bond /Other 400 6,000 $6,400 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $400 $6,000 $6,400 26 Repair Hilo Digesters TM K: 2 -1- 013:002 0 2,000 4,000 8,000 Feet 12,000 27 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print Date: January 25, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/28/2011 3. PROJECT NAME: Repair Hilo Digesters 4. SUBMITTER: Lyle Hirota 5. COUNCIL BENEFIT DISTRICT(S): 2,3,4 6. TMK /JUDICIAL: (3) 2 -1- 013:002/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement, Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings 10. PROJECT /PROGRAM DESCRIPTION: Repair Hilo Wastewater Treatment Plant Digesters. Repairs to include removal of debris from digesters, replacement of inoperable valves, replacement of deteriorated piping, repair to existing Digester Covers 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Heath and Safety, Improves Operational Efficiency, Repair /Maintenance of Infrastructure, Enhances Quality of Life 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets the Department's Vision, Mission, Goals of helping to protect the environment as well as maintaining existing assets (Asset Management) 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MANDATE? No DESCRIBE: While not currently a legal mandate, failure of the digesters would likely result in exceedances of facility permit requirements, enforcement action, and the possibility of raising issues regarding maintenance of facilities in accordance with Grant Conditions. 15. IMPACT ON OPERATIONAL BUDGET: None 16. SUSTAINABILITY FOCUS (List all that apply): Preserves and Protects our Natural Environment; Promotes Health and Safety 17. PROJECT READINESS (List all that apply): Staff available to manage project 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 500 $500 Construction 5,000 $5,000 TOTAL: $500 $5,000 $5,500 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x$1000): ? ! Cty G.O. Bond /Other 500 5,000 $5,500 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $500 $5,000 $5,500 28 Repair Pua Wet Well TM K: 2 -1- 011:010 0 500 1,000 2,000 Feet 3,000 29 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print January 25, �(11� Print Date: January 25, 2012 CoH Dept of Planning GIS County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/28/2011 3. PROJECT NAME: Repair Pua Wet Well 4. SUBMITTER: Lyle Hirota 5. COUNCIL BENEFIT DISTRICT(S): 2,3,4 6. TMK /JUDICIAL: (3) 2 -1- 011:010/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $400,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement, Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings 10. PROJECT /PROGRAM DESCRIPTION: Repair Pua Wet Well due to concrete deterioration from hydrogen sulfide corrosion. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Heath and Safety, Improves Operational Efficiency, Repair /Maintenance of Infrastructure, Enhances Quality of Life 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets the Department's Vision, Mission, Goals of helping to protect the environment as well as maintaining existing assets (Asset Management) 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MANDATE? No DESCRIBE: While not currently a legal mandate, failure of the Pua Wet Well would likely result in enforcement action and the possibility of raising issues regarding maintenance of facilities in accordance with Grant Conditions. 15. IMPACT ON OPERATIONAL BUDGET: None 16. SUSTAINABILITY FOCUS (List all that apply): Preserves and Protects our Natural Environment; Promotes Health and Safety 17. PROJECT READINESS (List all that apply): Staff available to manage project 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 400 $400 Construction 4,000 $4,000 TOTAL: $400 $4,000 $4,400 19. O & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 400 4,000 $4,400 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $400 $4,000 $4,400 30 Lono Kona Improvement District TMKs: 7 -5 -003; 004; 022 0 1,000 2,000 4,000 Feet 6,000 31 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012.2013 Print Date: January 25, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 12/27/2011 3. PROJECT NAME: Lono Kona Improvement District 4. SUBMITTER: Lyle Hirota 5. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK /JUDICIAL: (3) 7 -5 -003, 004, 022/ North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $550,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Land acquisition (easements), Infrastructure Improvement, Planning, feasibility, engineering, or design studies. 10. PROJECT /PROGRAM DESCRIPTION: Lono Kona Sewer Improvement District 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): County Council Resolution No. 120 -11 (Council Initiated Improvement District). Addresses Public Heath and Safety, Enhances Quality of Life, provides Service Improvements. As per Resolution 120 -11 installation of a sewer system would allow closure of existing Large Capacity Cesspools (LCC) in the Lono Kona Subdivision thereby assisting property owners with complying with Environmental Protection Agency mandate for closure of all LCC's. 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets the Department's Vision, Mission, Goals of helping to protect the environment; Meets the vision of the Kona Community Development Plan by providing wastewater service to areas close to shorelines. 13. COUNTY MATCHING FUNDS REQ'D? Yes DESCRIBE: USDA Loan /Grant intended. Assumed 20% matching funds. Final contribution to be determined pending application submittal and review by USDA. 14. LEGAL MANDATE? No DESCRIBE: Existing LCC's are privately owned. 15. IMPACT ON OPERATIONAL BUDGET: Additional expenses associated with Operation and Maintenance of the Collection System and Treatment and Disposal Systems to be funded via Sewer Fees. 16. SUSTAINABILITY FOCUS (List all that apply): Preserves and Protects our Natural Environment; Promotes Health and Safety; Fosters Inter - Departmental Collaboration and Cross - Sector Implementation. 17. PROJECT READINESS (List all that apply): Feasibility Study currently underway; Staff available to manage project 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 185 $185 Land Acquisition 200 $200 Design /Survey 350 $350 Construction 5,000 $5,000 TOTAL: $185 $550 $5,000 $5,735 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 185 i,:.,. 550 \ 1,000 ' ' .,..' $1,735 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) 4,000 $4,000 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $185 $550 $5,000 $5,735 32 (This Page Intentionally Left Blank) 33 FIRE DEPARTMENT DARREN J. ROSARIO, FIRE CHIEF (This Page Intentionally Left Blank) 35 Department: FIRE SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 PRIORITY PROJECT 2012 -13 FY FUNDING (in thousands) FUNDING FORECAST BY FISCAL YEAR (in thousands) TOTAL ESTIMATED PROJECT COST County State Federal Private CBA Prior Funds Allotted (not apsed) 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 Beyond 6 years 1 Kawailani Fire Station Replacement 6,400 6,400 6,400 2 Na'alehu Fire Station (reapp.5298.38) 300 300 7,000 7,300 3 Lifeguard Towers /Stands Upgrades 150 50 150 200 4 Puna Water Safety District Operations Facility 150 150 150 5 Kona Water Safety District Operations Faciltiy (reapp.5296.68), $25,000 increase 175 175 500 150 825 6 Miloli`i Fire Department Water Tank & Connector #1 40 40 40 7 Miloli`i Fire Department Water Tank & Connector #2 40 40 40 8 Kona Paradise Fire Department Water Tank & Connector 40 40 40 TOTAL 7,175 120 50 7,295 7,150 14,995 36 (This Page Intentionally Left Blank) 37 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: FIRE 2. DATE: 1/13/2012 3. PROJECT NAME: Kawailani Fire Station (replacement) 4. SUBMITTER: Fire Chief Darren J. Rosario 5. COUNCIL BENEFIT DISTRICT(S): 2, 3, 4 6. TMK /JUDICIAL: TBD 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $6,400,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New Building 10. PROJECT /PROGRAM DESCRIPTION: The road improvements to Kawailani Street (including traffic light improvements to the Kawailani /Iwalani intersection) will encroach on the station's property and bring the roadway close to the building. Either relocation or extensive modification of the existing station is needed for continued safe fire station operations. Investigation of possible alternatives are underway and funding is requested for the design and construction of a new station or renovation of the existing building. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): The purpose of this project is to deal with the impact of Kawailani Street improvements and the resulting road expansion. The fire fighters dorm room and apparatus bay (fire truck garage) will both be negatively affected by the road changes. The close proximity of the new roadway will make both the dorm and garage unsafe. This project will allow for the development of a safe fire station. 12. LONG RANGE PLANS /COMMUNITY VALUES: This project addresses our commitment to provide appropriate services throughout the County. 13. COUNTY MATCHING FUNDS REQ'D? No 1 DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: I 15. IMPACT ON OPERATIONAL BUDGET: The facility will be designed with minimal infrastructure and maintenance costs will be low. 16. SUSTAINABILITY FOCUS (List all that apply): Facility will be designed to reduce long term costs and the design will incorporate use of native plants. 17. PROJECT READINESS (List all that apply): Discussions with Public Works and County Property Management are underway to investigate building and location alternatives. This project is high priority due the impending roadwork. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 600 $600 Construction 5,800 $5,800 TOTAL: I $6,400 $6,400 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000):" �.,,.� ` sxr,; ;� �'.i ..''�i. .. „' Cty G.O. Bond /Other 6,400 $6,400 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: I $6,400 $6,400 38 (This Page Intentionally Left Blank) 39 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: FIRE 2. DATE: 1/13/2012 3. PROJECT NAME: Na'alehu Fire Station 4. SUBMITTER: Fire Chief Darren J. Rosario 5. COUNCIL BENEFIT DISTRICT(S): 6,7 6. TMK /JUDICIAL: TBD 7. LOCATION (COUNCIL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $300,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New building 10. PROJECT /PROGRAM DESCRIPTION: The construction of a new fire station to provide emergency response capabilities in an area that is presently without a reasonable level of service. Requesting re- appropriation of $300,000. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Improves response time to this area of Ka'u. Provides services in an area that is currently underserviced by the Fire Department and improves operational efficiency. 12. LONG RANGE PLANS /COMMUNITY VALUES: This project addresses our commitment to provide appropriate services throughout the County and consistent with our vision to be "the leader in the field of emergency services." 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: I 14. LEGAL MADATE? 16. SUSTAINABILITY FOCUS (List all that apply): Facility will be designed to reduce long term costs, to incorporate use of native plants, and for increased services which will result in an increase in staffing levels to meet those needs. The Fire Station should provide a positive impact and influence on the community, improve public safety, and will be designed for use by other agencies. This station is expected to employ the use of solar energy for water heating and photovoltaic energy. 17. PROJECT READINESS (List all that apply): 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 300 300 $600 Construction 6,700 $6,700 TOTAL: I $300 I $7,000 $7,300 19. 0 & M COSTS (x $1000): L 20. FUNDING SOURCE (x $1000): J,. .', !„ ., / \ �„ �,, .` ✓ Cty G.O. Bond /Other 300 7,000 $7,300 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: I $300 $7,000 $7,300 40 (This Page Intentionally Left Blank) 41 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: FIRE 2. DATE: 1/13/2012 3. PROJECT NAME: Lifeguard Towers /Stands Upgrades 4. SUBMITTER: Fire Chief Darren J. Rosario 5. COUNCIL BENEFIT DISTRICT(S): Various 6. TMK /JUDICIAL: TBD /Various 7. LOCATION (COUNCIL DISTRICT): Various 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $150,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Upgrade of structures utilized by Water Safety Officers to modern lower maintenance structures. 10. PROJECT /PROGRAM DESCRIPTION: This project is for purchase of new lifeguard towers as funds allow - for beach parks throughout the island. This towers are exposed to the harsh shoreline environment that causes deterioration of the structures. Older high maintenance wooden towers are deteriorating and need replacement. Project sites will be determined after evaluations of towers at various locations. We are requesting the $150,000 for new weather resistant towers. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public safety by upgrading lifeguard towers to meet current design standards to provide appropriate services to the public, and improves operational efficiency by providing Water Safety Officers upgraded facilities from which to work from. New towers will purchased for exiting towers determined to be deteriorated to a point that replacement is required. 12. LONG RANGE PLANS /COMMUNITY VALUES: This project would be consistent in our vision "to be the leader in the field of emergency services ". 13. COUNTY MATCHING FUNDS REQ'D? I No 1 DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The new towers are designed for low maintenance costs. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety by providing a safe environment for public to enjoy outdoor water recreational activities. 17. PROJECT READINESS (List all that apply): Staff available include Gerald Kosaki for this ongoing effort to upgrade and purchase needed replacement ocean safety lifeguard towers. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 50 150 $200 TOTAL: $50 I $150 $200 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 150 ` . ,4 ? ` 7f %: Cty G.O. Bond /Other $150 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) 50 $50 TOTAL: $50 $150 $200 42 (This Page Intentionally Left Blank) 43 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: FIRE 2. DATE: 1/13/2012 3. PROJECT NAME: Puna Water Safety District Operation Facility 4. SUBMITTER: Fire Chief Darren J. Rosario 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK /JUDICIAL: 1 -3- 008 /Puna 7. LOCATION (COUNCIL DISTRICT): 5 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $150,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New building 10. PROJECT /PROGRAM DESCRIPTION: Design and construct a facility for water safety officers that will provide for storage, training facility and supervisor office space for a district encompassing several beach operations. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): This is a needed facility for operations for the Water Safety Officers, improves operational efficiency by providing a secure faculty in close proximity to the beaches served, and allows for equipment storage for the vital function our Water Safety Officers provide - a safe environment for beachgoers. 12. LONG RANGE PLANS /COMMUNITY VALUES: This project would be consistent in our vision "to be the leader in the field of emergency services ". 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The faculty will be designed for minimal infrastructure and for low maintenance costs. 16. SUSTAINABILITY FOCUS (List all that apply): Strengthens communities by provide services the include junior lifeguard programs for the youth of Puna, enhances public safety by providing operations faculty for water safety officers, and will collaboration with the Parks and Recreation as part of the Pohoiki Park Master Plan. 17. PROJECT READINESS (List all that apply): Staff available include Gerald Kosaki and this will be included in the master planning for the Pohoiki Park. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 150 $150 Construction 850 $850 TOTAL: $150 $850 $1,000 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x$1000): ' '.,. : " Cty G.O. Bond /Other 150 850 $1,000 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $150 $850 $1,000 44 (This Page Intentionally Left Blank) 45 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Fire Department 2. DATE: 5/9/2012 3. PROJECT NAME: Kona Water Safety District Operations Facility (reappro. 5296.68) 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 7 6. TMK: To be Determined 7. LOCATION (JUDICIAL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $175,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 1 - Land acquisition; 2 - Adds new FD facility for storage of water safety vehicles and equipment in the Kona area. 10. PROJECT /PROGRAM DESCRIPTION: This new building will house the vehicles and equipment necessary to the Water Safety operations including the jet ski program as it progresses beyond the pilot program and training. The facility will provide for vehicles and equipment storage, training facility, and supervisor office space for a district encompassing several beach operations. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1 - Addresses public health and safety by adding a jet ski program for faster access during ocean accidents; 2 - provides increased area coverage by ocean safety lifeguards; 3 - enhances quality of life for community members and residents since the ocean safety lifeguards can respond faster and to greater areas when rescue is necessary, promotes resident and visitor ocean safety; 4 - improves current level of service in ocean rescue; can bring victims to the shore faster for treatment as needed. 12. LONG RANGE PLANS /COMMUNITY VALUES: 1- Promotes the Fire Department's goals and mission; 2 - Promotes the Kona Community Development Plan, Policy PUB -2.3, for Fire protection, EMS Rescue, and Hazmat Level of Service, and Policy PUB -2.4, Beach Safety Level of Service; and 3 - Promotes community value or desirability by increasing level of service to beach areas for residents and tourists. 13. COUNTY MATCHING FUNDS REQ'D? YES DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Additional cost for building maintenance and utilities. 16. SUSTAINABILITY FOCUS (List all that apply): This facility, its equipment, and training opportunities will assist in providing an increased level of service to our beach areas. 17. PROJECT READINESS (List all that apply): 1- Strengthens and sustains our community by providing increased level of service to our beaches; 2 - promotes health and safety. Land needs to be acquired and the facility built. This is a long -term project that would be achieved in phases. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 25 $25 Land Acquisition 500 $500 Design /Survey 150 $150 Construction 150 $150 TOTAL: $175 $500 $150 $825 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): s,,, Cty G.O. Bond /Other 175 500 150 $825 State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share /Park Dedication, etc) Special Financing District TOTAL: $175 $500 $150 $825 46 MILOLI`I FD WATER TANK & CONNECTOR #1 County of Hawai i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Fire Department 2. DATE: 5/9/2012 3. PROJECT NAME: Miloli'i Fire Department Water Tank & Connector #1 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK: 8 -9- 013:020 7. LOCATION (JUDICIAL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $40,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; to provide a Fire Department - quality water tank to refill brush truck to extinguish fires without driving twelve or more miles outside of the subdivision to obtain water. 10. PROJECT /PROGRAM DESCRIPTION: This remote community does not have a fire station, only volunteer fire fighters and a brush truck with a 300 - gallon tank. Currently, when a fire exists, fire fighters must leave area for the nearest hydrant to replenish water which can be 12 -15 miles away depending on the location of the fire. Provide an approximately 30,000 gallon gunite water tank with NSF 61 coating and a 2.5 inch male fire department connection with gated valve to refill brush truck tank during fire suppression activities. Water tank must meet all Fire Department requirements, have a fitted top tight to prevent wind removal or insect and debris penetration, must be on concrete pad and have a level place next to water tank for fire apparatus fill -up. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1 - Addresses public health and safety; 2 - provides needed services and facilities for an underserved area and population; 3 - improves operational efficiency of the fire department; and 4 - improves current levels of service. 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets departmental goals and mission and meets the Kona Community Development plan for public services. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: Attempting to get grant for this water tank. 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Periodic maintenance for Fire Department connection, initial and any subsequent filling of tank with water, otherwise minimal operational funds. 16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains the community by improving the community's capacity to protect themselves with the support of the fire department; provides for the public health and safety in extinguishing house fires; and builds partnerships between community groups and government. 17. PROJECT READINESS (List all that apply): The land is available next to existing water tanks serving the brackish water system. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 40 $40 TOTAL: $40 $40 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): .,.. „' ;; °� l � ' \ �.. , >�,.... U.... Cty G.O. Bond /Other State Revolving Fund State CIP Federal 40 $40 Private (Grants) CBA (Fair Share /Park Dedication, etc) Special Financing District TOTAL: $40 $40 48 MILOLI`I FIRE DEPARTMENT TANK & CONNECTOR #2 380,, rt F(A" PO,PrrI.N of HoorufLN Lwor 301'7 "} x .. 49 C. l:TAEN {hu' PA RC x SC A LC: i'n gE004 County of Hawai i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Fire Department 2. DATE: 5/9/2012 3. PROJECT NAME: Miloli'i Fire Department Water Tank & Connector #2 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK: 8 -9 -013 (No location at this time) 7. LOCATION (JUDICIAL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $40,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; to provide a Fire Department - quality water tank to refill brush truck to extinguish fires without driving twelve or more miles outside of the subdivision to obtain water. 10. PROJECT /PROGRAM DESCRIPTION: This remote community does not have a fire station, only volunteer fire fighters and a brush truck with a 300 - gallon tank. Currently, when a fire exists, fire fighters must leave area for the nearest hydrant to replenish water which can be 12 -15 miles away depending on the location of the fire. Provide an approximately 30,000 gallon gunite water tank with NSF 61 coating and a 2.5 inch male fire department connection with gated valve to refill brush truck tank during fire suppression activities. Water tank must meet all Fire Department requirements, have a fitted top tight to prevent wind removal or insect and debris penetration, must be on concrete pad and have a level place next to water tank for fire apparatus fill -up. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1 - Addresses public health and safety; 2 - provides needed services and facilities for an underserved area and population; 3 - improves operational efficiency of the fire department; and 4 - improves current levels of service. 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets departmental goals and mission and meets the Kona Community Development plan for public services. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: Attempting to get grant for this water tank. 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Periodic maintenance for FD connection, initial and any subsequent filling of tank with water, otherwise minimal operational funds. 16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains the community by improving the community's capacity to protect themselves with the support of the fire department; provides for the public health and safety in extinguishing house fires; and builds partnerships between community groups and government. 17. PROJECT READINESS (List all that apply): The land is available next to existing water tanks serving the brackish water system. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 40 $40 TOTAL: $40 $40 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): Cty G.O. Bond /Other State Revolving Fund State CIP Federal 40 $40 Private (Grants) CBA (Fair Share /Park Dedication, etc) Special Financing District TOTAL: $40 $40 50 (This Page Intentionally Left Blank) 51 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Fire Department 2. DATE: 5/9/2012 3. PROJECT NAME: Kona Paradise Fire Department Water Tank & Connector 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK: 8 -7 -015, 016, 017, 018, 019, 020 (To be determined) 7. LOCATION (JUDICIAL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $40,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; to provide a Fire Department - quality water tank to refill brush truck to extinguish fires without driving twelve or more miles outside of the subdivision to obtain water. 10. PROJECT /PROGRAM DESCRIPTION: This remote community does not have a fire station, only volunteer fire fighters and a brush truck with a 300 - gallon tank. Currently, when a fire exists, fire fighters must leave area for the nearest hydrant to replenish water which can be 12 -15 miles away depending on the location of the fire. Provide an approximately 30,000 gallon gunite water tank with NSF 61 coating and a 2.5 inch male fire department connection with gated valve to refill brush truck tank during fire suppression activities. Water tank must meet all Fire Department requirements, have a fitted top tight to prevent wind removal or insect and debris penetration, must be on concrete pad and have a level place next to water tank for fire apparatus fill -up. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1 - Addresses public health and safety; 2 - provides needed services and facilities for an underserved area and population; 3 - improves operational efficiency of the fire department; and 4 - improves current levels of service. 12. LONG RANGE PLANS /COMMUNITY VALUES: Meets departmental goals and mission and meets the Kona Community Development plan for public services. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: Attempting to get grant for this water tank. 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Periodic maintenance for Fire Department connection, initial and any subsequent filling of tank with water, otherwise minimal operational funds. 16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains the community by improving the community's capacity to protect themselves with the support of the fire department; provides for the public health and safety in extinguishing house fires; and builds partnerships between community groups and government. 17. PROJECT READINESS (List all that apply): The land is available next to existing water tanks serving the brackish water system. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 40 $40 TOTAL: $40 $40 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): % .,. -` =r * .'' Cty G.O. Bond /Other State Revolving Fund State CIP Federal 40 $40 Private (Grants) CBA (Fair Share /Park Dedication, etc). Special Financing District TOTAL: $40 1 $40 52 (This Page Intentionally Left Blank) 53 DEPARTMENT OF PARKS AND RECREATION ROBERT A. FITZGERALD, DIRECTOR (This Page Intentionally Left Blank) 55 Department: PARKS AND RECREATION SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 PRIORITY PROJECT 2012 13 FY FUNDING (in thousands) FUNDING FORECAST BY FISCAL YEAR (in thousands) TOTAL OTAL ESTIMATED PROJECT COST County State Federal Private* CBA ** Funds Allotted (not lapsed) 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 Beyond 6 years 1 DPR ADA Compliance 4,240 36,465 4,240 4,330 4,280 2,300 51,615 2 DPR Repairs & Improvements to Facilities 4,000 10,358 4,000 4,000 4,000 4,000 4,000 4,000 On -going 34,358 3 DPR Hazardous Materials Abatement & Mitigation 1,000 1,975 1,000 1,000 1,000 1,000 1,000 1,000 On -going 7,975 4 DPR Play Equipment Upgrade & Improvements 1,000 845 1,000 1,000 1,000 1,000 1,000 1,000 On -going 6,845 S DPR Ahalanui /Pxhoiki Bay Beach Parks 6,000 1,868 6,000 7,868 6 DPR Kahuku Park Community/Senior Center & Gym 8,000 399 8,000 10,000 18,399 7 DPR Honu'apo Planning 500 200 500 2,000 2,700 8 DPR Kealakehe Regional Park Master Plan 1,000 1,000 1,500 5,750 5,750 5,750 5,750 5,000 30,500 9 DPR Waimea Trails & Greenways 4,000 774 4,000 1,000 4,000 1,000 4,000 1,000 6,000 21,774 10 Downtown Hilo Restrooms 1,000 25 25 1,050 600 1,000 2,650 11 DPR Kailua Park - New Canoe Hale 218 782 1,000 1,000 12 Napo'opo'o Park Improvements 275 25 300 1,500 1,800 13 Theater -in- the - round; HI Cty, St of HI, UH, & Private Partnership 4,000 4,000 40,000 44,000 14 Tennis Complex; HI Cty, St of HI, UH, & Private Partnership 4,000 4,000 20,000 24,000 15 Outdoor Amphitheater Complex; HI Cry, St of HI, UH, & Private Partnership 4,000 4,000 40,000 44,000 16 Football- Soccer Complex; HI Cty, St of HI, UH, & Private Partnership 4,000 4,000 40,000 44,000 17 Baseball Complex; HI Cty, St of HI, UH, & Private Partnership 4,000 4,000 40,000 44,000 18 Aquatic Complex; HI Cty, St of HI, UH, & Private Partnership 4,000 4,000 40,000 44,000 TOTAL 31,233 24,025 832 52,884 56,090 246,930 21,030 15,050 15,750 12,750 11,000 431,484 56 (This Page Intentionally Left Blank) 57 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 1/13/2012 3. PROJECT NAME: DPR ADA Compliance 4. SUBMITTER: Park Planner 5. COUNCIL BENEFIT DISTRICT(S): Island -wide 6. TMK /JUDICIAL: Various 7. LOCATION (COUNCIL DISTRICT): Island -wide 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,240,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement; New buildings or structures or addition to building; Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings. 10. PROJECT /PROGRAM DESCRIPTION: Elimination of architectural barriers and the provision of accessibility improvements at numerous recreational sites, facilities, amenities, etc. as set forth in the County of Hawai`i's Self Evaluation and Transition Plan and as required to ensure compliance with the Americans with Disabilities Act and similar accessibility regulations and obligations of the County. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety; Inadequate service or facility; Improves operational efficiency; Repair /maintenance of infrastructure or building; Enhances quality of life; Service Improvements. Providing accessibility improvements immediately impacts the safety of the patrons at park facilities and equal access provides opportunities for the public to participate in active, passive and personal recreational pursuits of their choice. Likewise, this work will ensure more and more varied recreational opportunities are accessible to all users and allows the department to more efficiently provide its programs and activities to a greater number of communities and locales improving services and quality of living for all to benefit from. 12. LONG RANGE PLANS /COMMUNITY VALUES: This effort is consistent with the Department's strategic plan; facilitates fulfillment of County's ADA Transition Plan; and respects our society's and our community's values. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? Yes DESCRIBE: ADA Act (1990), Title 28, CFR 35.150; COH's Consent Decree U.S.D.C. Civil No. 97- 01102SPK - June 4, 1998 15. IMPACT ON OPERATIONAL BUDGET: The efforts involved are anticipated to have a net positive impact on the department's operational budget as the improvements will replace, upgrade and enhance the condition and quality of many aspects of our facilities, sites and amenities while providing for equal access. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; Preserves and protects our natural environment; Strengthens and sustains our community; Enhances education, culture and the arts; Promotes health and safety. 17. PROJECT READINESS (List all that apply): The department has sufficient in -house staff to manage and facilitate this effort which is comprised of numerous individual projects (typically by park site) in varying stages of planning, design and construction ensuring funds will be encumbered and expended responsibly by June 30, 2014. There are no related operating budget needs associated with this work. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 3,950 790 445 450 125 $5,760 Construction 32,515 3,450 3,885 3,830 2,175 $45,855 TOTAL: $36,465 $4,240 $4,330 $4,280 $2,300 $51,615 19. O & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000) ✓�! Cty G.O. Bond /Other 23,284 4,240 4,330 4,280 2,300 $38,434 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 13,181 $13,181 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $36,465 $4,240 $4,330 $4,280 $2,300 $51,615 58 (This Page Intentionally Left Blank) 59 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 1/13/2012 3. PROJECT NAME: DPR Repairs & Improvements to Facilities 4. SUBMITTER: Park Planner 5. COUNCIL BENEFIT DISTRICT(S): Island -wide 6. TMK /JUDICIAL: Various 7. LOCATION (COUNCIL DISTRICT): Island -wide 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land acquisition; Infrastructure improvement; New buildings or structures or addition to building; Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings; Planning, feasibility, engineering, or design studies; Information and communications technology. 10. PROJECT /PROGRAM DESCRIPTION: The repair, renovation, upgrade, addition, modification, alteration, improvement, demolition, landscaping, development, etc. of park sites, facilities, amenities, infrastructure, utilities, components, etc. necessary to facilitate and support safe use thereof and to address the needs of department staff, programs, activities, communities, recreational groups to fully or best utilize the department's inventory of land and recreational developments to support the needs of the public. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety; Inadequate service or facility; Improves operational efficiency; Replaces a deteriorated facility; Repair /maintenance of infrastructure or building; Enhances quality of life; Service Improvements. The complex and varied nature of the enumerable types of efforts that this proposes to support ensure that all of these outcomes will indubitably be achieved and fulfilled many times over. 12. LONG RANGE PLANS /COMMUNITY VALUES: This effort is consistent with the Department's strategic plan and is essential to its purpose and function; is consisted with all Community Development Plans in ensuring preservation of existing inventory and services and responding to new needs; addresses numerous communities' needs and desires; and respects Mayoral directives. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The efforts involved are anticipated to have a net positive impact on the department's operational budget as the improvements will replace, upgrade and enhance the condition and quality of many aspects of our facilities, sites and amenities. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; Preserves and protects our natural environment; Strengthens and sustains our community; Enhances education, culture and the arts; Promotes health and safety; Manages growth. 17. PROJECT READINESS (List all that apply): The department has sufficient in -house staff to manage and facilitate this effort which is comprised of numerous individual projects (typically by park site) in varying stages of planning, design and construction ensuring funds will be encumbered and expended responsibly by June 30, 2014. There are no related operating budget needs associated with this work. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 889 500 500 500 500 S00 500 On -going $3,889 Construction 9,469 3,500 3,500 3,500 3,500 3,500 3,500 Ongoing $30,469 TOTAL: $10,358 $4,000 $4,000 $4,000 $4,000 $4,000 $4,000 $34,358 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): Cty G.O. Bond /Other 10,358 4,000 4,000 4,000 4,000 4,000 4,000 On-going $34,358 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $10,358 $4,000 $4,000 $4,000 $4,000 $4,000 $4,000 $34,358 60 (This Page Intentionally Left Blank) 61 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 1/13/2012 3. PROJECT NAME: DPR Hazardous Materials Abatement & Mitigation 4. SUBMITTER: Park Planner 5. COUNCIL BENEFIT DISTRICT(S): Island -wide 6. TMK /JUDICIAL: Various 7. LOCATION (COUNCIL DISTRICT): Island -wide 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement; Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings 10. PROJECT /PROGRAM DESCRIPTION: The abatement, mitigation, removal, demolition , etc. of existing structures, building components, finish materials and site conditions that contain hazardous materials (e.g., lead, asbestos, arsenic, mercury, PCBs, chlordane, etc.) and other similarly hazardous conditions and the subsequent scope of work necessary to restore, replace, refinish, improve or similarly accommodate any existing use(s) impacted by the direct efforts. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety; Inadequate service or facility; Improves operational efficiency; Replaces a deteriorated facility; Repair /maintenance of infrastructure or building; Enhances quality of life; Service Improvements. Many of our sites and facilities are pre -1980 era improvements when many of the more common hazardous materials were specifically intended for use as building materials or components or their adverse health effects were not identified or understood. Their presence, combined with the chronic deterioration of our facilities due to aging and extensive use present health issues that the department needs to address to ensure safe, responsible use by the public. 12. LONG RANGE PLANS /COMMUNITY VALUES: This effort is consistent with the Department's strategic plan and is essential to its purpose and function; is consisted with all Community Development Plans in ensuring preservation of existing inventory and services and responding to new needs; addresses numerous communities' needs and desires; and respects Mayoral directives. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The efforts involved are anticipated to have a net positive impact on the department's operational budget as the improvements will replace, upgrade and enhance the condition and quality of many aspects of our facilities, sites and amenities while providing for the resolution of hazardous conditions. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; Preserves and protects our natural environment; Strengthens and sustains our community; Enhances education, culture and the arts; Promotes health and safety; Manages growth; Fosters inter - departmental collaboration and cross- sector implementation. 17. PROJECT READINESS (List all that apply): The department has sufficient in -house staff to manage and facilitate this effort which is comprised of numerous individual projects (typically by park site) in varying stages of planning, design and construction ensuring funds will be encumbered and expended responsibly by June 30, 2014. There are no related operating budget needs associated with this work. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 1,163 100 100 100 100 100 100 On -going $1,763 Construction 812 900 900 900 900 900 900 On -going $6,212 TOTAL: $1,975 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $7,975 19. O& M COSTS (x $1000): 0 0 0 0 0 0 0 20. FUNDING SOURCE (x $1000): °' .. �y 1,975 - 1,000 t; ° :....i ,, 1,000 1,000 1,000 1,000 1,000 On -going $7,975 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $1,975 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $7,975 62 (This Page Intentionally Left Blank) 63 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 1/13/2012 3. PROJECT NAME: DPR Play Equipment Upgrade & Improvements 4. SUBMITTER: Park Planner 5. COUNCIL BENEFIT DISTRICT(S): Island -wide 6. TMK /JUDICIAL: Various 7. LOCATION (COUNCIL DISTRICT): Island -wide 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement; Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings 10. PROJECT /PROGRAM DESCRIPTION: Implementation of new playground equipment and appurtenances; replacement, refurbishment, augmentation, upgrades and repair of existing playground equipment, safety surfacing, and appurtenances. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): ADDRESSES PUBLIC HEALTH AND SAFETY; INADEQUATE SERVICE OR FACILITY; REPLACES A DETERIORATED FACILITY; REPAIR /MAINTENANCE OF INFRASTRUCTURE OR BUILDING; ENHANCES QUALITY OF LIFE; SERVICE IMPROVEMENTS: Children's playground equipment has a tremendous, positive impact on local communities when they are installed at public parks where children can participate in a safe and challenging play experience. Older playground equipment that did not meet with more recent safety standards were completely removed years ago and not yet replaced at those locations and new parks and locations that could service other communities are in need of playground equipment as well. 12. LONG RANGE PLANS /COMMUNITY VALUES: This effort is consistent with the Department's strategic plan and is essential to its purpose and function. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The installation of new playground equipment will have minimal immediately impact on operational costs due to the typical 10 -15 year service life of the equipment; replacement and repair of existing playground equipment will have a dollar- for - dollar positive impact on operational costs as maintenance and repair are reduced or deferred. 16. SUSTAINABILITY FOCUS (List all that apply): STRENGTHENS AND SUSTAINS OUR COMMUNITY; ENHANCES EDUCATION, CULTURE AND ARTS; PROMOTES HEALTH AND SAFETY. 17. PROJECT READINESS (List all that apply): Playgrounds are exempt from building permit regulations and HRS 343 requirements therefore and can be designed, bid and constructed relatively easily (without the need for professional architectural or engineering services). 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 845 1,000 1,000 1,000 1,000 1,000 1,000 On -going $6,845 TOTAL: $845 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $6,845 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 845 :. 1,000 1,000 1,000 1,000 1,000 1,000 On -going $6,845 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $845 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $6,845 64 1 -3- 008:01 1 -3- 008:014 1 -4- 002:008 1 -3- 008:033 1-3-008:021 1- 4- 002:061 Ahalanui / Pohoiki Bay Beach Parks TM Ks: 1 -3- 008:014, 016, 021, 033; 1 -4- 002:008; 1 -4- 002:061 0 750 1,500 3,000 Feet 4,500 65 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012-2013 Print Date: January 23, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 1/13/2012 3. PROJECT NAME: DPR Ahalanui /Pohoiki Bay Beach Parks (reapp.5590.58) 4. SUBMITTER: Park Planner 5. COUNCIL BENEFIT DISTRICT(S): 5 6. TMK /JUDICIAL: (3) 1 -3- 008:14, 16, 21, 33; (3) 1 -4- 002:008; 1 -4- 002:061/ Puna 7. LOCATION (COUNCIL DISTRICT): 5 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $6,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement; New Buildings or Structures. 10. PROJECT /PROGRAM DESCRIPTION: Improvements to expand and improve the developed area and amenities of these two beach parks in lower Puna to improve the levels of service at each for an underserved population. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): ADDRESSES PUBLIC HEALTH AND SAFETY; INADEQUATE SERVICE; ENHANCES QUALITY OF LIFE: Isaac Hale Beach Park's (Pohoiki) continued development to replace the park land and amenities lost due to the 1990 lava flows at Kalapana is necessary to provide the varied array of recreational amenities for the public that have long since gone without. Water system improvements facilitated by the recent completion of the new waterline at the bypass road will allow the park to provide necessary water pressure and volume, as well as fire protection necessary to serve the park. Ahalanui Beach Park is also in need of repairs and a permanent comfort station to replace the existing portable toilets that have been attractive targets to vandals over the years. The quality of both parks must be upgraded to provide minimum levels of service to the public. 12. LONG RANGE PLANS /COMMUNITY VALUES: Conforms to the department's approved strategic plan and is in keeping with the public input process that was solicited in the development of Isaac Hale Beach Park to replace the Kalapana parks. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Expanding the parks will increase the operational costs for the department for daily maintenance needs, supplies and manpower. The removal of temporary toilets will slightly reduce the overall increase but the community benefits more than substantiate the increased operating costs. 16. SUSTAINABILITY FOCUS (List all that apply): STRENGHTENS AND SUSTAINS OUR COMMUNITY; PROMOTES HEALTH AND SAFETY. 17. PROJECT READINESS (List all that apply): Staff is available to manage this project and the funds can realistically be encumbered prior to June 30, 2013. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 521 $521 Design /Survey 438 750 $1,188 Construction 909 5,250 $6,159 TOTAL: $1,868 $6,000 $7,868 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): z r, /, 'ai „u . Cty G.O. Bond /Other 1,347 6,000 $7,347 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 521 $521 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $1,868 $6,000 $7,868 66 ,--Aww 7 xxxvs■ %--,ow_m•--si .13%.0— ...— wII.4 V.17 OA *V at $ IAA i-rwi . .. •�• •tom WW �: ., 1 _,\,_ •\ wo,.., .,0‘x,o,,,- ssIg -ts%01,111 olss.„0__,,,Asvo•Aa v \._ wo.sww01., ‘_w__,„. ■- xxxml '0_45■„ Apw3xy or 1 III A0.,1„a-lx.0%,%-_10 ; � - w% sx.‘-\s‘01 Aff •g„_, at ■,,,- $ MAIII mah.,_www/11 m ,... ,, _. ._,-A Kahuku Park Community / Senior Center and Gym TMKs: 9 -2- 094:036; 9 -2- 101:032 0 750 1,500 3,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Feet 4,500 67 Print Date: January 23, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 1/13/2012 3. PROJECT NAME: DPR Kahuku Park Community /Senior Center & Gym (reapp.5598.74) 4. SUBMITTER: Park Planner 5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK /JUDICIAL: (3) 9 -2- 094:036, (3) 9 -2- 101:032/ Ka'u 7. LOCATION (COUNCIL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $8,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement; New Buildings or Structures. 10. PROJECT /PROGRAM DESCRIPTION: Development and construction of a new multi- function facility to serve as a gymnasium, community center and senior center for the HOVE area of the Ka'u district that will also be a civil defense shelter for the community. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): ADDRESSES PUBLIC HEALTH AND SAFETY; INADEQUATE SERVICE; ENHANCES QUALITY OF LIFE: The facility will be designed and constructed to serve as a civil defense shelter for natural disasters in a community that has minimal shelter options and space for its residents. The provision of a new gym /community /senior center will provide a facility and services currently unavailable in the area and will enhance the recreational opportunities as well as the amounts of programs and services the department can provide. The facility can also be used by its residents for community gatherings, rented out for private parties and become a nucleus for the HOVE community thereby enhancing the quality of life for all. The recent development of a well on an adjacent site has opened up the opportunity to have permanent water service to the park that should enhance the overall quality of all facets of the park's recreational experiences. 12. LONG RANGE PLANS /COMMUNITY VALUES: Conforms to the department's approved strategic plan. 13. COUNTY MATCHING FUNDS REQ'D? I No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: I 15. IMPACT ON OPERATIONAL BUDGET: Developing new park facilities will result in increased daily maintenance costs, future repair costs, and ongoing utility costs for the department that are justified for the enhanced services and functions the improvements allows the department and community. 16. SUSTAINABILITY FOCUS (List all that apply): STRENGTHENS AND SUSTAINS OUR COMMUNITY, ENHANCES EDUCATION, CULTURE AND THE ARTS; PROMOTES HEALTH AND SAFETY. 17. PROJECT READINESS (List all that apply): Staff is available to manage this project and the funds can realistically be encumbered prior to June 30, 2013. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 399 750 $1,149 Construction 7,250 10,000 $17,250 TOTAL: $399 $8,000 510,000 $18,399 19. 0 & M COSTS (x $1000): $75 $75 $75 $75 Ongoing $300 20. FUNDING SOURCE x 1000: T " -- "' ! P ' Cty G.O. Bond /Other 399 8,000 10,000 $18,399 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $399 $8,000 510,000 $18,399 68 Honuapo Planning TM Ks: 9 -5- 014:022 -007, 029, 052 -060 0 750 1,500 3,000 Feet 4,500 69 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print Date: January 23, 2012 CoN Dept of Planning G IS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 1/13/2012 3. PROJECT NAME: DPR Honu'apo Planning (reapp. 5598.76) 4. SUBMITTER: Park Planner 5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK /JUDICIAL: (3) 9 -5- 014:002 -007, 052 -059, 029, 060/ Ka'u 7. LOCATION (COUNCIL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement; New Buildings or Structures, Planning & Design. 10. PROJECT /PROGRAM DESCRIPTION: Preparation of a master plan and all of the background research, studies and subsequent permitting and approvals necessary to develop a Master Plan for the Honuapo area for responsible utilization and preservation practices; land acquisition may be required. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): ADDRESSES PUBLIC HEALTH AND SAFETY; INADEQUATE SERVICE; ENHANCES QUALITY OF LIFE: The area was recently EO's to the County for park purposes and the community is wanting to use its own resources to begin development of park amenities and improvements, however, studies, planning and permitting /approvals are required before that can take place. The site is rich in cultural artifacts and history and a responsible plan for public use going forward is required to provide additional recreational camping and daytime use of the area. 12. LONG RANGE PLANS /COMMUNITY VALUES: Conforms to the department's approved strategic plan. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Development of any improvements will result in increased operational costs, daily and long -term. However, the County has an MOU with a community organization to help maintain, care for and develop the site which should minimize if not offset the impact to the county's operational costs. 16. SUSTAINABILITY FOCUS (List all that apply): STRENGTHENS AND SUSTAINS OUR COMMUNITY, ENHANCES EDUCATION, CULTURE AND THE ARTS; PROMOTES HEALTH AND SAFETY. 17. PROJECT READINESS (List all that apply): Staff is available to manage this project and the funds can realistically be encumbered prior to June 30, 2013 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 100 $100 Land Acquisition 100 $100 Design /Survey 500 $500 Construction 2,000 $2,000 TOTAL: $200 $500 $2,000 $2,700 19. 0 & M COSTS (x $1000): $10 $10 $10 $10 On -going $40 20. FUNDING SOURCE (x $1000): _ t�, Cty G.O. Bond /Other 200 500 2,000 $2,700 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $200 $500 $2,000 $2,700 70 Kealakehe Regional Park Master Plan TM K: 7-4-020:007 0 1,000 2,000 4,000 6,000 8,000 Feet 10,000 71 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print January 24, 7!117 Print Date: January 24, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 1/13/2012 3. PROJECT NAME: DPR Kealakehe Regional Park Master Plan (Reapp. & Increase 5596.21) 4. SUBMITTER: Park Planner 5. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK /JUDICIAL: (3) 7 -4- 020:007/ North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Planning and Design Study 10. PROJECT /PROGRAM DESCRIPTION: Development of a Master Plan to include necessary research, investigation, studies, public participation, a charrette workshop and other necessary actions to develop a master plan, Final Environmental Assessment and course of action for implementation of the master plan. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Health and Safety; Inadequate Service or Facility; Improves Operational Efficiency; Replaces Deteriorated Facilities; Enhances Quality of Life; Service Improvements: The Kona area of the County is in need of a regional park to support its recreational demands and to provide larger - capacity and more formal recreational venues for athletic events and community activities. The Kona districts have also been underserved with respect to recreational amenities and this project /site is intended to help ameliorate those shortfalls and relieve pressure off other existing parks in the area such as Kailua Park, which is heavily used by a multitude of sports organizations for different purposes. This MP project is also intended to support the department's /community's push to implement the Kailua Park MP, which does not intend to expand upon active recreation amenities which are in great demand. 12. LONG RANGE PLANS /COMMUNITY VALUES: Conforms to the department's approved strategic plan, the Kona Community Development Plan, and is consistent with the strong community support of the Kailua Park Master Plan and final EA. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The project is anticipated to result in a regional complex that will require additional staff, operating expenses and budget, but until the master plan and vision for the project is completed, we are unable to project these costs with any sense of accuracy. 16. SUSTAINABILITY FOCUS (List all that apply): PROMOTES ECONOMIC VITALITY; PRESERVES AND PROTECTS OUR NATURAL ENVIRONMENT; STRENGTHENS AND SUSTAINS OUR COMMUNITY; ENHANCES EDUCATION, CULTURE AND THE ARTS; PROMOTES HEALTH AND SAFETY; MANAGES GROWTH; and FOSTERS INTER - DEPARTMENTAL COLLABORATION AND CROSS- SECTOR IMPLEMENTATION. 17. PROJECT READINESS (List all that apply): Staff is available to manage this project and the funds can realistically be encumbered prior to June 30, 2013. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 750 $750 Land Acquisition Design /Survey 250 1,500 750 750 750 750 $4,750 Construction 5,000 5,000 5,000 5,000 5,000 $25,000 TOTAL: $1,000 $1,500 $5,750 $5,750 $5,750 $5,750 $30,500 19. 0 & M COSTS (x $1000): ( 0 0 $50 $75 $100 On -going $225 20. FUNDING SOURCE (x $1000): %; . ri Cty G.O. Bond /Other 1,000 1,500 5,750 5,750 5,750 5,750 5,000 $30,500 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $1,000 $1,500 $5,750 $5,750 $5,750 $5,750 $5,000 $30,500 72 (This Page Intentionally Left Blank) 73 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 1/13/2012 3. PROJECT NAME: DPR Waimea Trails & Greenways (reapp. 5594.65) 4. SUBMITTER: Park Planner 5. COUNCIL BENEFIT DISTRICT(S): 9 6. TMK /JUDICIAL: Various/ South Kohala 7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement, New Buildings or Structures. 10. PROJECT /PROGRAM DESCRIPTION: Development and construction of a new multi -use, non - vehicular trail and greenway to connect various outlying subdivision to the center of Waimea town. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): ADDRESSES PUBLIC HEALTH AND SAFETY; INADEQUATE SERVICE; ENHANCES QUALITY OF LIFE: The trail and greenway promotes healthy and safe lifestyle choices allowing pedestrian and cycling opportunities for accessing town from residential areas around town, the community has been supportive and advocating this project for a long time and it will enhance the quality of life for this community that wants to preserve its agrarian and laid -back lifestyle. 12. LONG RANGE PLANS /COMMUNITY VALUES: Conforms to the department's approved strategic plan and numerous years of support from all aspects of the community. 13. COUNTY MATCHING FUNDS REQ'D? Yes DESCRIBE: County is applying for FHWA STIP funds at 80/20 FED /County split. 14. LEGAL MADATE? No 1 DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Development of the path will have some impact on the operation budget for landscape maintenance and long -term repairs of the trail. However, daily maintenance by the department is expected to be minimal because the department intends to work with the community to maintain and upkeep the trail as much as possible. 16. SUSTAINABILITY FOCUS (List all that apply): STRENGTHENS AND SUSTAINS OUR COMMUNITY, ENHANCES EDUCATION, CULTURE AND THE ARTS; PROMOTES HEALTH AND SAFETY. 17. PROJECT READINESS (List all that apply): Staff is available to manage this project and the funds can realistically be encumbered prior to June 30, 2013. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 774 750 1,000 1,000 1,000 $4,524 Construction 3,250 4,000 4,000 6,000 $17,250 TOTAL: $774 ( $4,000 $1,000 $4,000 $1,000 $4,000 $1,000 $6,000 $21,774 19. 0 & M COSTS (x $1000): I $10 $10 $10 $10 $10 On -going $50 20. FUNDING SOURCE (x $1000): ' • /O - 4 Cty G.O. Bond /Other 774 4,000 1,000 800 1,000 800 1,000 1 1,200 $10,574 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 3,200 3,200 4,800 $11,200 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $774 $4,000 $1,000 $4,000 $1,000 $4,000 $1,000 $6,000 $21,774 74 (This Page Intentionally Left Blank) 75 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 1/13/2012 3. PROJECT NAME: Downtown Hilo Public Restrooms 4. SUBMITTER: Department of Parks and Recreation 5. COUNCIL BENEFIT DISTRICT(S): 2,3,4 6. TMK /JUDICIAL: To Be Determined 7. LOCATION (COUNCIL DISTRICT): 2,4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,050,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New buildings or structures or additions to a building; Nonrecurring rehabilitation or deferred maintenance of infrastracture and buildings; and Planning, feasibility, engineering, or design studies. 10. PROJECT /PROGRAM DESCRIPTION: The lack of clean, safe, and accessible Public Restrooms have consistently been identified as a top need for the Downtown Hilo community for more than several decades. There is a need for 1) construction of at least 2 new public restroom facilities in the core commercial and immediate surrounding area Downtown Hilo. Currently, restroom facilities in Downtown Hilo - are located at Mo'oheau Bus Station, Lincoln Park, and the Armory; all which have limited access hours. The existing Mooheau Bus station restrooms are overused and insufficient to accommodate the large number of visitors, bus patrons, residents, park users, and community during special events at the Mooheau Bandstand. In order to ensure that Downtown Hilo remains a welcoming, safe, acccessible, and attractive gathering place & destination, restroom facilities are a basic need within the Downtown Hilo core commercial area where people gather or where major events and activities are held. Funds would be used to support expansion of existing public restrooms on County lands, proposed new restrooms /comfort stations, and acquisition of land for the development of new public restrooms, and any joint partnership opportunities that may form to provide this needed service. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public health and safety; Inadequate service or Facility; Replaces a deteriorated facility; Repair /Maintenance of infrastructure or building; Enhances quality of life; and Service improvements. The number of people who utilize the Hilo Information Center at the Mooheau Bus Terminal is approx. 2,000 per month with visitors comprising about 25% or 500 per month during peak season. This does not include the people that drive, walk, or frequent the Bandstand. This could double the number of people who might need restroom facilities. Reoccuring incidents with defecation on sidewalks along storefronts and museum entryways are a clear indicator that restrooms are needed to serve people who frequent Downtown Hilo. Best loctions: within the CDH district or properties surrounding the edge of Downtown. 12. LONG RANGE PLANS /COMMUNITY VALUES: EnVision Downtown Hilo 2025 Plan Focus Area 5: Promoting Health and Safety. Strategy: 5.2 Establish measures to make downtown safe and inviting. Action 5.23. Develop accessible, clean, and safe public restrooms in downtown. Community polls and businesses have consistently identified public restrooms as a top priority. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MADATE? YES DESCRIBE: Lack of restroom and non -ADA compliance may Jeopardize public health and safety. 15. IMPACT ON OPERATIONAL BUDGET: None for repair of existing sites - however, construction of new restrooms may require new maintenance staff and additonal utility costs. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves /Protects Our Natural Environment, Strengthens & Sustains Our Community, Promotes Health & Safety. 17. PROJECT READINESS (List all that apply): As an immediate 'quick fix', the Hilo Downtown Improvement Association Public Safety Committee is exploring the installation of portable toilets at several locations where restrooms could serve the needy population during after -hours when the public restrooms are closed. Source of funding has not been identified, Further, this would only be an interim solution, until permanent restrooms are constructed. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning (EIS, SMA, Permits) 50 $50 Land Acquisition 1,000 $1,000 Design /Survey 50 200 $250 Construction 350 1,000 $1,350 TOTAL: $1,050 $600 $1,000 $2,650 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): F& 6r' �i` %:. Cty G.O. Bond /Other 1,000 550 1,000 $2,550 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) 25 $25 CBA (Fair Share, Park Dedication, etc) 25 50 $75 TOTAL: $1,050 $600 $1,000 $2,650 Kailua Park - New Canoe Hale TM Ks: 7 -5- 005:007 & 083 0 500 1,000 2,000 3,000 Feet 4,000 77 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print Date: April 25, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 4/13/2012 3. PROJECT NAME: DPR Kailua Park - New Canoe Hale 4. SUBMITTER: Park Planner 5. COUNCIL BENEFIT DISTRICT(S): 7 6. TMK /JUDICIAL: (3) 7 -5- 005:007 & 083/ North Kona 7. LOCATION (COUNCIL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement; New buildings or structures or addition to a building; Planning, feasibility, engineering, or design studies. 10. PROJECT /PROGRAM DESCRIPTION: 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public health and safety; Inadequate service or facility; Improves operational efficiency; Replaces a deteriorated facility; Enhances Quality of life; Service Improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: Consistent with Department's Mission, County General Plan, Community Development Plan, and is desired by the community. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MADATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: 16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality; Preserves and Protects Our Natural Environment; Strenghtens and Sustains Our Community; Enhances Education, Culture and the Arts; Promotes Health and Safety; Manages Growth; Fosters Inter - Departmental Collaboration adn Cross - Sector Implementation. 17. PROJECT READINESS (List all that apply): Staff is available to manage the project and can realistically encumber the funds prior to June 30, 2015. 18. EXPENDITURE PHASING (X $1000): Pnor Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 1,000 $1,000 TOTAL: $1,000 $1,000 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x 51000): " ..,. i % %% . ' . •:' ,_ % Cty G.O. Bond /Other 218 $218 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) 782 $782 TOTAL: $1,000 $1,000 78 NAPO`OPO`O PARK IMPROVEMENTS 8 z 06 C Arr d53 £s■ z'L},9C3 N. /asst 30 Ra4c) /1 un 205"11 F C O A ,.. - j3HlR�" �i VI SIOtt ,2.07A M 'i LO775, NAMAUPOA 79 8.2 06. ..._.. C£L9 hl.L�- ion z Sbf • County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Parks and Recreation 2. DATE: 5/9/2012 3. PROJECT NAME: Napo'opo`o Park Improvements 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK: 8 -2 -006: 025 7. LOCATION (JUDICIAL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $300,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): County park improvements; public health; quality of life improvement; food sustainability; gathering. 10. PROJECT /PROGRAM DESCRIPTION: The County already owns this shoreline park; however, no improvements have ever been implemented. This project will add a non - polluting comfort station; one paved ADA- compliant parking stall, multiple graveled parking spaces, and some graveled walking paths through the park, and add potable water access. County water is already available about 100 feet away. Additionally, the invasive species will be removed and the land re- vegetated with native Hawaiian plant species. Coconut trees shall not be allowed due to the danger and the cost of maintenance. There are burials and the burial council requirements need to be addressed in the planning stage. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 2 - The greater Napo`opo'o area needs a county shoreline -park. Current state park is not providing the public with the safety, management, and has access issues. 6 - This County park is currently used for net and pole fishing and day activities. The improvement of this county park reduces congestion at the state park, provides access for sustainability 12. LONG RANGE PLANS /COMMUNITY VALUES: 3 - Kona Community Development Plan (Policy PUB -6.2) states that neighborhood parks shall be provided. Some park improvements will be added by local support groups and volunteer labor. Future additions may include Hawaiian -style shade pavilions built by "Friends of the Park" using ancient Hawaiian techniques and materials. Community members have already offered to remove invasive species. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Maintenance of the comfort station, periodic police scrutiny along with Friends of the Park, and periodic facility maintenance will be required. 16. SUSTAINABILITY FOCUS (List all that apply): This park will be mostly maintained by the local community ( "Friends ") and Neighborhood Watch. 17. PROJECT READINESS (List all that apply): Need to contact 1) local families and neighbors, 2) Burial Council and local Hawaiian families for assistance on locating burials and developing burial plan, 3) buffer all burials and historic sites, and 4) remove invasive species. Local person has already volunteered to remove invasive species. Re- vegetation specialist has already been contacted for guidance on which Hawaiian species to plant. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 125 $125 Land Acquisition Design /Survey 175 $175 Construction 1,500 $1,500 TOTAL:I $300 $1,500 $1,800 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x 1000: R !h;, iii 275 1,500 $1,775 Cty G.O. Bond /Other State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share /Park Dedication, etc) 25 $25 Special Financing District TOTAL: $300 $1,500 $1,800 80 Hawaii County, State of Hawaii, UH — WH Campus, & Private Partnership 81 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Parks & Recreation 2. DATE: 5/23/2012 3. PROJECT NAME: Theater in the round - HI Cty - Private Partnership - State of HI - UH -WH Campus 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK: 7 -3 -010: 042 & 032 7. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Increase the performing arts capability of the island with local and professional performances to attract residents and tourists. Theater -in- the -round is an indoor theater with a large, circular, rotating stage for performing arts. The audience is sitting in a circle around the rotating stage. This project provides a new professional - quality theater -in- the -round for the new UH- WH and for public performances; planning, feasibility, engineering, and design studies. 10. PROJECT /PROGRAM DESCRIPTION: This is a combination State of Hawai'i, County of Hawai'i, University of Hawai'i or other university, private funding project to be located on the new UH -WH campus. The State of Hawai'i will provide the land, private funds will build the theater -in- the - round, and Hawai'i County Parks & Recreation Department will lease, rent, and maintain the facility under contract until the facility becomes owned by a university or the county at the end of a lease. The facility may be used by college, high school, local or professional performances for residents and tourists. Whenever possible, construction and operational funding will come from the private sector. The construction of this complex will bring needed revenue into the WH community, create construction and long -term maintenance and performing arts jobs, begin a WH university campus (either UH or other university) with a performing arts program, and improve the financial and cultural quality of life for residents, improve the post- secondary educational opportunities for local and non - resident students, and extend these community benefits for 50 -100 years. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): West Hawai'i currently has inadequate college infrastructure and lacks a 4 -year university. The WH community has been financially devastated, educationally deprived of a 4 -year university, and has attempted to get UH to build a campus. This public - private partnership will begin the campus, provide long -term employment, and improve the educational and cultural opportunities for local and non - resident students, and bring professional quality performances and tourists to the island. 12. LONG RANGE PLANS /COMMUNITY VALUES: The West Hawai'i community and the HCC -WH have been begging for a 4 -year university for almost 20 years. This project meets the Kona Community Development Plan goals, provides a professional - quality performing arts complex for the county's residents and visitors, and provides long -term jobs in construction, maintenance, and post- secondary education. Meets P &R goals of providing more cultural facilities for the community. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The County will operate the complex paid by local taxes or rental of the complex. The complex may be used for local, regional, and professional performances for residents and tourists. Need for more employees for maintenance and performing arts positions. 16. SUSTAINABILITY FOCUS (List all that apply): This complex will meet the needs of the community for many decades in several areas: financial, recreation, cultural, and education. 17. PROJECT READINESS (List all that apply): Need an Executive Order from the Governor to use the land. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning & Arch - Biological - Historical Studies 2,000 52,000 Land Acquisition Design /Survey 2,000 $2,000 Construction 40,000 $40,000 TOTAL: 54,000 540,000 544,000 19. 0 & M COSTS (x 51000): 20. FUNDING SOURCE (x$1000):,, iar Cty G.O. Bond /Other State Revolving Fund State CIP Federal Private (Grants) 4,000 40,000 544,000 CBA (Fair Share /Park Dedication, etc) Special Financing District TOTAL: $4,000 540,000 I $44,000 82 Hawaii County, State of Hawaii, UH — WH Campus, & Private Partnership i 9 -4 .ti'A�vrY.eF' A +i 83 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Parks & Recreation 2. DATE: 5/23/2012 3. PROJECT NAME: Tennis Complex - HI Cty - Private Partnership - State of HI - UH -WH Campus 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK: 7 -3 -010: 042 & 032 7. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New professional - quality tennis complex including showers, restrooms, locker rooms, and bleachers for competitions; planning, feasibility, engineering, and design studies. 10. PROJECT /PROGRAM DESCRIPTION: This is a combination State of Hawai'i, County of Hawai'i, University of Hawaii or other university, private funding project to be located on the new UH -WH campus. The State of Hawai'i will provide the land, private funds will build the tennis complex, and Hawai'i County Parks & Recreation Department will lease, rent, and maintain the facility under contract until the facility becomes owned by a university or the county at the end of a lease. The facility may be used by college and high school teams, youth, seniors, residents, and be used for local, national, and international competition which will bring more tourism. Whenever possible, construction and operational funding will come from the private sector. The construction of this complex will bring needed revenue into the WH community, create construction and long -term maintenance jobs, begin a WH university campus (either UH or other university) with an athletic program, and improve the financial quality of life for residents, improve the post- secondary educational opportunities for local and non - resident students, and extend these community benefits for 50 -100 years. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): West Hawai'i currently has inadequate college infrastructure and lacks a 4 -year university. The WH community has been financially devastated, educationally deprived of a 4 -year university, and has attempted to get UH to build a campus. This public - private partnership will begin the campus, provide long -term employment, and improve the educational opportunities for local and non - resident students, tourists, and residents. 12. LONG RANGE PLANS /COMMUNITY VALUES: The West Hawai'i community and the HCC -WH have been begging for a 4 -year university for almost 20 years. This project meets the Kona Community Development Plan goals, provides a professional - quality tennis complex for the county's residents and visitors, and provides long -term jobs in construction, maintenance, and post- secondary education. Meets P &R goals of providing more sports facilities for the community. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The County will operate the complex paid by local taxes or rental of the complex. The complex may be used for "local" teams, visitors, residents, as well as national and international competitions which will bring more tourism. Need for more employees for maintenance. Statewide, national, and even international competitions may provide revenue to the complex. 16. SUSTAINABILITY FOCUS (List all that apply): This complex will meet the needs of the community for many decades in several areas: financial, recreation, and education. 17. PROJECT READINESS (List all that apply): Need an Executive Order from the Governor to use the land. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning & Arch - Biological - Historical Studies 2,000 $2,000 and Acquisition Design /Survey 2,000 $2,000 Construction 20,000 $ 20,000 TOTAL: I $4,000 $20,000 $24,000 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): � � � �� ., ',W G Cty G.O. Bond /Other State Revolving Fund State CIP Federal Private (Grants) 4,000 20,000 $24,000 CBA (Fair Share /Park Dedication, etc) Special Financing District TOTAL: $4,000 $20,000 [ $24,000 84 Hawaii County, State of Hawaii, UH — WH Campus, & Private Partnership ah cHI T [71,1 a ?Mlpp 85 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Parks & Recreation 2. DATE: 5/23/2012 3. PROJECT NAME: Outdoor Amphitheater - HI Cty - Private Partnership - State of HI - UH -WH Campu:4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK: 7 -3 -010: 042 & 032 7. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New professional - quality outdoor amphitheater for the new UH -WH and for public performances; planning, feasibility, engineering, and design studies. 10. PROJECT /PROGRAM DESCRIPTION: This is a combination State of Hawai'i, County of Hawai'i, University of Hawai'i or other university, private funding project to be located on the new UH -WH campus. The State of Hawai'i will provide the land, private funds will build the amphitheater, and Hawai'i County Parks & Recreation Department will lease, rent, and maintain the facility under contract until the facility becomes owned by a university or the county at the end of a lease. The facility may be used by college, high school, local or professional performances for residents and tourists. Whenever possible, construction and operational funding will come from the private sector. The construction of this complex will bring needed revenue into the WH community, create construction and long -term maintenance and performing arts jobs, begin a WH university campus (either UH or other university) with a performing arts program, and improve the financial and cultural quality of life for residents, improve the post- secondary educational opportunities for local and non - resident students, and extend these community benefits for 50 -100 years. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): West Hawai'i currently has inadequate college infrastructure and lacks a 4 -year university. The WH community has been financially devastated, educationally deprived of a 4 -year university, and has attempted to get UH to build a campus. This public - private partnership will begin the campus, provide long -term employment, and improve the educational opportunities for local and non - resident students, and bring professional quality performances and tourists to the island. 12. LONG RANGE PLANS /COMMUNITY VALUES: The West Hawaii community and the HCC -WH have been begging for a 4 -year university for almost 20 years. This project meets the Kona Community Development Plan goals, provides a professional - quality performing arts complex for the county's residents and visitors, and provides long -term jobs in construction, maintenance, and post- secondary education. Meets P &R goals of providing more cultural facilities for the community. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The County will operate the complex paid by local taxes or rental of the complex. The complex may be used for local, regional, and professional performances for residents and tourists. Need for more employees for maintenance and performing arts positions. 16. SUSTAINABILITY FOCUS (List all that apply): This complex will meet the needs of the community for many decades in several areas: financial, recreation, and education. 17. PROJECT READINESS (List all that apply): Need an Executive Order from the Governor to use the land. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning & Arch - Biological - Historical Studies 2,000 $2,000 Land Acquisition Design /Survey 2,000 $2,000 Construction 40,000 $40,000 TOTAL: 54,000 $40,000 $44,000 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x 1000: ` ii, ;i_ � t / r V. Cty G.O. Bond /Other State Revolving Fund State CIP Federal Private (Grants) 4,000 40,000 $44,000 CBA (Fair Share /Park Dedication, etc) Special Financing District TOTAL: $4,000 $40,000 $44,000 86 Hawaii County, State of Hawaii, UH — WH Campus, & Private Partnership 87 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Parks & Recreation 2. DATE: 5/23/2012 3. PROJECT NAME: Football - Soccer Complex - HI Cty - Private Partnership - State of HI - UH -WH 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK: 7 -3 -010: 042 & 032 7. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New professional - quality football- soccer complex including separate showers, restrooms, locker rooms, and bleachers for competitions; planning, feasibility, engineering, and design studies. 10. PROJECT /PROGRAM DESCRIPTION: This is a combination State of Hawaii, County of Hawaii, University of Hawai'i or other university, private funding project to be located on the new UH -WH campus. The State of Hawai'i will provide the land, private funds will build the college - quallity football- soccer complex, and Hawai'i County Parks & Recreation Department will lease, rent, and maintain the facility under contract until the facility becomes owned by a university or the county at the end of a lease. The facility may be used by college and high school and youth teams, and be used for local and statewide competition which will bring more tourism. Whenever possible, construction and operational funding will come from the private sector. The construction of this complex will bring needed revenue into the WH community, create construction and long -term maintenance jobs, begin a WH university campus (either UH or other university) with an athletic program, and improve the financial quality of life for residents, improve the post- secondary educational opportunities for local and non - resident students, and extend these community benefits for 50 -100 years. 11. PROJECTJUSTIFICATION & OUTCOME(S) (List all that apply): West Hawai'i currently has inadequate college infrastructure and lacks a 4 -year university. The WH community has been financially devastated, educationally deprived of a 4 -year university, and has attempted to get UH to build a campus. This public - private partnership will begin the campus, provide long -term employment, and improve the educational opportunities for local and non - resident students, tourists, and residents. 12. LONG RANGE PLANS /COMMUNITY VALUES: The West Hawai'i community and the HCC -WH have been begging for a 4 -year university for almost 20 years. This project meets the Kona Community Development Plan goals, provides a college - quality football- soccer complex for the county's residents and visitors, and provides long -term jobs in construction, maintenance, and post- secondary education. Meets P &R goals of providing more sports facilities for the community. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The County will operate the complex paid by local taxes or rental of the complex. The complex may be used for "local" teams, visiting college and high school teams which will bring more tourism. Need for more employees for maintenance. Statewide competitions may provide revenue to the complex. 16. SUSTAINABILITY FOCUS (List all that apply): This complex will meet the needs of the community for many decades in several areas: financial, recreation, and education. 17. PROJECT READINESS (List all that apply): Need an Executive Order from the Governor to use the land. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning & Arch - Biological - Historical Studies 2,000 $2,000 Land Acquisition Design /Survey 2,000 $2,000 Construction 40,000 $40,000 TOTAL: $4,000 $40,000 $44,000 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): d :; Cty G.O. Bond /Other State Revolving Fund State CIP Federal Private (Grants) 4,000 40,000 $44,000 CBA (Fair Share /Park Dedication, etc) Special Financing District 1^ TOTAL: $4,000 $40,000 1 $44,000 88 Hawaii County, State of Hawaii, UH — WH Campus, & Private Partnership AtO AKA LJL A 89 `r'rp G`y 1ZV NC iii !caw. sc+i County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Parks & Recreation 2. DATE: 5/23/2012 3. PROJECT NAME: Baseball Complex - HI Cty - Private Partnership - State of HI - UH -WH Campus 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK: 7 -3 -010: 042 & 032 7. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New professional quality - baseball sports complex; planning, feasibility, engineering, and design studies. 10. PROJECT /PROGRAM DESCRIPTION: This is a combination State of Hawai'i, County of Hawai'i, University of Hawaii or other university, private funding project to be located on the new UH -WH campus. The State of Hawai'i will provide the land, private funds will build the complex, and Hawai'i County Parks & Recreation Department will lease, rent, and maintain the facility under contract until the facility becomes owned by a university or the county at the end of a lease. The facility may be used by a professional baseball team, college or high school teams, and /or youth or senior teams. Whenever possible, construction and operational funding will come from the private sector. The construction of this complex will bring needed revenue into the WH community, create construction and long -term maintenance jobs, begin a WH university campus (either UH or other university) with an athletic program, and improve the financial quality of life for residents, improve the post- secondary educational opportunities for local and non - resident students, and extend these community benefits for 50 -100 years. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): West Hawaii currently has inadequate college infrastructure and lacks a 4 -year university. The WH community has been financially devastated, educationally deprived of a 4 -year university, and has attempted to get UH to build a campus. This public - private partnership will begin the campus, provide long -term employment, and improve the educational opportunities for local and non- resident students. 12. LONG RANGE PLANS /COMMUNITY VALUES: The West Hawai'i community and the community college have been begging for a 4 -year university for almost 20 years. This project meets the Kona Community Development Plan goals, provides a professional quality baseball complex for the county's residents, and provides long -term jobs in construction, maintenance, and post- secondary education. Meets P &R goals of providing more sports facilities for the community. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The County will operate the complex under a multi -year lease paid by the professional team interested in using the complex in the off- season. During the regular baseball season, the complex may be used for "local" teams. The lease for professional teams should cover the operational expenses annually. Need for more employees for maintenance. 16. SUSTAINABILITY FOCUS (List all that apply): This complex will meet the needs of the community for many decades in several areas: financial, recreation, and education. 17. PROJECT READINESS (List all that apply): Need an Executive Order from the Governor to use the land. Otherwise, the project could begin now with negotiations with professional baseball teams. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning & Arch - Biological - Historical Studies 2,000 $2,000 Land Acquisition Design /Survey 2,000 $2,000 Construction 40,000 $40,000 TOTAL:Ir $4,000 $40,000 $44,000 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000):', .,. Cty G.O. Bond /Other State Revolving Fund State CIP Federal Private (Grants) 4,000 40,000 $44,000 CBA (Fair Share /Park Dedication, etc) Special Financing District TOTAL: $4,000 $40,000 1 $44,000 90 Hawaii County, State of Hawaii, UH — WH Campus, & Private Partnership l }9 ic.'��AfNipB 91 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Parks & Recreation 2. DATE: 5/23/2012 3. PROJECT NAME: Aquatic Complex - HI Cty - Private Partnership - State of HI - UH -WH Campus 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK: 7 -3 -010: 042 & 032 7. LOCATION (JUDICIAL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New Olympic - quality aquatic sports complex; planning, feasibility, engineering, and design studies. 10. PROJECT /PROGRAM DESCRIPTION: This is a combination State of Hawai'i, County of Hawaii, University of Hawai'i or other university, private funding project to be located on the new UH -WH campus. The State of Hawai'i will provide the land, private funds will build the complex, and Hawai'i County Parks & Recreation Department will lease, rent, and maintain the facility under contract until the facility becomes owned by a university or the county at the end of a lease. The facility may be used by college and high school teams, youth and seniors and be used for local, national, and Olympic qualification events. Whenever possible, construction and operational funding will come from the private sector. The construction of this complex will bring needed revenue into the WH community, create construction and long -term maintenance jobs, begin a WH university campus (either UH or other university) with an athletic program, and improve the financial quality of life for residents, improve the post- secondary educational opportunities for local and non - resident students, and extend these community benefits for 50 -100 years. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): West Hawaii currently has inadequate college infrastructure and lacks a 4 -year university. The WH community has been financially devastated, educationally deprived of a 4 -year university, and has attempted to get UH to build a campus. This public - private partnership will begin the campus, provide long -term employment, and improve the educational opportunities for local and non - resident students. 12. LONG RANGE PLANS /COMMUNITY VALUES: The West Hawai'i community and the HCC -WH have been begging for a 4 -year university for almost 20 years. This project meets the Kona Community Development Plan goals, provides a Olympic - quality aquatic complex for the county's residents and visitors, and provides long -term jobs in construction, maintenance, and post- secondary education. Meets P &R goals of providing more sports facilities for the community. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The County will operate the complex paid by local taxes or rental of the complex. The complex may be used for "local" teams, visitors, and residents. Need for more employees for maintenance and lifeguards. Statewide, national, and even international competitions may provide revenue to the complex. 16. SUSTAINABILITY FOCUS (List all that apply): This complex will meet the needs of the community for many decades in several areas: financial, recreation, and education. 17. PROJECT READINESS (List all that apply): Need an Executive Order from the Governor to use the land. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning & Arch - Biological - Historical Studies 2,000 $2,000 Land Acquisition Design /Survey 2,000 $2,000 Construction 40,000 $40,000 TOTAL: $4,000 $40,000 $44,000 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000):' ` L� •. g'v .< ' �. Cty G.O. Bond /Other . State Revolving Fund State CIP Federal Private (Grants) 4,000 40,000 $44,000 CBA (Fair Share /Park Dedication, etc) Special Financing District TOTAL: $4,000 $40,000 $44,000 92 (This Page Intentionally Left Blank) 93 POLICE DEPARTMENT HARRY KUBOJIRI, POLICE CHIEF (This Page Intentionally Left Blank) 95 Department: POLICE SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 96 2012 -13 FY FUNDING FUNDING FORECAST BY FISCAL YEAR (in thousands) (in thousands) TOTAL ESTIMATED Prior Funds Allotted Beyond 6 years PROJECT COST PRIORITY PROJECT County State Federal Private CBA (not lapsed) 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 1 Public Safety Complex Repainting (reapp. 5292.75) 125 125 125 2 Police Records Section Receiving Counter Renovation (reapp. 5292.761 55 55 55 3 Kona Evidence Warehouse ( reapp. 5296.91) 500 500 700 1,200 TOTAL 680 680 700 1,380 96 Public Safety Complex - Repainting TM K: 2-4-025:028 0 750 1,500 3,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Feet 4,500 97 Print Date: January 24, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Police Depatment 2. DATE: 1/12/2012 3. PROJECT NAME: Public Safety Complex- Repainting (reapp. 5292.75) 4. SUBMITTER: Assist. Chief Marshall Kanehailua 5. COUNCIL BENEFIT DISTRICT(S): 4 6. TMK /JUDICIAL: 2 -4- 025:028/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $125,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Deferred maintenance of building. 10. PROJECT /PROGRAM DESCRIPTION: Exterior repainting of Public Safety Complex. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Repainting of the Public Safety Complex structures are desparately needed. Due to exposure to the elements, paint has peeled or is flaking and mildew and moss have grown on some surfaces. This unprofessional appearence is seen by the general public when they first arrive at the Police Station. The covered front entrance leading to the complex is heavily used by members of the general public to access our Chiefs office, Records section, Administration, Specialized divisions, and Drivers Licenses sections. Repainting will reflect a more professional appearence and will also extend the life of the structure. 12. LONG RANGE PLANS /COMMUNITY VALUES: In line with the Hawai'i Police Department's Vision and Mission Statement of providing the highest quality of police service. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: No impact 16. SUSTAINABILITY FOCUS (List all that apply): 17. PROJECT READINESS (List all that apply): Ready 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 125 $125 TOTAL: $125 $125 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000):.. k .. ..�..� ',. ,!iii � Cty G.O. Bond /Other 125 $125 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $125 $125 98 Police Records Section Receiving Counter Renovation TM K: 2- 4- 025:028 0 750 1,500 3,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012-2013 Feet 4,500 99 Print Date: January 24, 2012 CoH Dept of Planning GIS County of Hawaii' PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Police Depatment 2. DATE: 1/12/2012 3. PROJECT NAME: Renovation Police Records Section Receiving Counter (reapp. 5292.76) 4. SUBMITTER: Assist. Chief Marshall Kanehailua 5. COUNCIL BENEFIT DISTRICT(S): 4 6. TMK /JUDICIAL: 2 -4- 025:028/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $55,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Nonrecurring rehabilitation to our Records Section. 10. PROJECT /PROGRAM DESCRIPTION: Renovation of our Records Division receiving area to better serve the members of the public. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): The present set -up within the Records Division does not provide security and safety for our office personnel from members of the public registering firearms. There have been instances where members of the public have brought in loaded firearms for registration and in one instance an accidental discharge did occur. The renovation would consist of separating the area where the public is greeted and where firearms are registered along with the installation of bullet -proof type glass /shields for the area where firearms are registered to protect the staff. 12. LONG RANGE PLANS /COMMUNITY VALUES: In line with the Hawai'i Police Department's Vision and Mission Statement of providing the highest quality of police service. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: No impact 16. SUSTAINABILITY FOCUS (List all that apply): 17. PROJECT READINESS (List all that apply): Previously appropriated 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 55 $55 TOTAL: $55 $55 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): `' ' , "; - 55 , ; . .. .. ,;cd $55 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $55 $55 100 Kona Evidence Warehouse TM K: 7-4-020:021 0 1,000 2,000 4,000 Feet 6,000 101 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012-2013 Print Date: January 24, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Police Depatment 2. DATE: 1/12/2012 3. PROJECT NAME: Kona EvidenceWarehouse (reapp. 5296.91) 4. SUBMITTER: Assist. Chief Marshall Kanehailua 5. COUNCIL BENEFIT DISTRICT(S): 8 6. TMK /JUDICIAL: 7 -4- 008:017/ North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New Building 10. PROJECT /PROGRAM DESCRIPTION: Construct a 5,000 square foot warehouse at the Kealakehe Police Station site. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply):The evidence storage facility at the Kealakehe Police Station has been at overcapacity for several years, requiring the department to lease commercial storage facilities for additional storage, which creates undo risks in the security of evidence. Other facilities being utilized include two shipping (Matson) containers that are located at the Kealakehe facility. The Hawaii Police Department is also pursuing Accreditation through the Commission on Accreditation for Law Enforcement Agencies (CALEA), and in order to comply with national standards that are set for security and control of seized, recovered, and evidentiary property as well as abandoned, lost, or found property in our custody. 12. LONG RANGE PLANS /COMMUNITY VALUES: In line with the Hawai'i Police Department's Vision and Mission Statement of providing the highest quality of police service. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? Yes DESCRIBE: Chapter 84 of the Commission on Accreditation for Law Enforcement Agencies. 15. IMPACT ON OPERATIONAL BUDGET: Additional cost such as electricity and maintenance may be incurred but off set by terminating current lease agreements with commercial storage facilities. 16. SUSTAINABILITY FOCUS (List all that apply): 17. PROJECT READINESS (List all that apply): Not ready 18. EXPENDITURE PHASING (X $1000): Pnor Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 500 700 $1,200 TOTAL: $500 $1,200 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 40 d , 500 700 �; $1,200 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $500 $700 $1,200 102 (This Page Intentionally Left Blank) 103 DEPARTMENT OF PUBLIC WORKS Warren H.W. Lee, P. E., DIRECTOR (This Page Intentionally Left Blank) 105 Department: Public Works SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 PRIORITY PROJECT 2012 -13 FY FUNDING (in thousands) FUNDING FORECAST BY FISCAL YEAR (in thousands) TOTAL ESTIMATED PROJECT COST County State Federal Private CBA Prior Funds Allotted (not lapsed) 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 Beyond 6 years 1 DPW Facilities Hazardous Material Abatement 2,500 1,228 2,500 100 50 50 50 50 500 4,528 2 DPW Facilities ADA Compliance 2,500 3,820 2,500 6,320 3 DPW Facilities Repair and Maintenance 2,500 8,240 2,500 2,000 1,500 1,500 1,500 1,500 4,400 23,140 4 Ane Keohokalole Highway 700 3,600 200 39,611 4,500 44,111 5 Kaiminani Drive Roadway Improvements, Mamalahoa Hwy. to Vicinity of Ahiahi 320 10,000 2,498 10,320 12,818 St., FAP NO. STP -0198(001) Kaiminani Drive Roadway Improvements, Ahiahi St. to Vic. of Ane Keohokalole 6 Hwy. 3,000 13,000 620 16,000 4,000 20,620 7 Kilauea Avenue Improvements 4,016 3,200 4,016 7,216 8 La'aloa Avenue Extension 14,000 853 14,000 6,000 20,853 9 Ali'i Drive Culvert Replacement FAP No. STP - 0186(8) 125 500 1,065 625 10,400 12,090 10 Leilani Street Drainage Improvement 100 100 100 Kamehameha Hwy Reconstruction, Wailoa Bridge to Ponahawai Street FAP No. 11 S71,1910(1) 3,240 5,720 7,740 8,960 16,700 12 Napo'opo'o Road Retaining Wall Improvements 200 200 500 700 13 Manono Street Improvements, Lanikaula Street to Kek6ana6'a Street 100 380 100 5,000 5,480 14 Mamalahoa Hwy Safety Improvements (HBlualoa) 100 400 2,200 500 2,200 2,200 2,200 9,300 15 Laupahoehoe & Manowaiopae Homestead Roads Improvements 1,285 700 1,985 1,985 16 Manowaropae Homestead Road Retaining Wall 550 550 550 17 DPW Facilities Renovation 750 7,520 750 500 250 250 250 250 2,500 12,270 18 DPW Facilities Energy Efficiency 2,000 4,743 2,000 1,500 8,243 19 DPW Facilities Hardening 1,500 679 1,500 750 2,929 20 Land Acquisition for DPW Facilities 100 100 100 100 100 100 100 100 100 800 21 Kapi'olani Street Extension, Lanikaula Street to Mohouli Street 500 8,700 500 4,300 13,500 22 22 Kawailani Street Improvements, Iwalani St. to Pohakulani St., FAP NO. VIP- 2,926 100 17,500 20,526 2760(2) 23 Hamakua Road Baseyard Warehouse 1,250 1,250 1,250 24 North Hilo /Hamakua Highway Maintenance Building Construction 2,105 406 2,105 2,511 25 South Kohala Road Baseyard Warehouse 1,196 54 1,196 1,250 26 South Hilo Roads Baseyard Storage /Warehouse Building 1,105 95 1,105 1,200 27 Kona Baseyard Storage /Warehouse Building 1,200 1,200 1,200 28 Greenwell Park Flooding 250 250 2,000 2,250 29 Kona Baseyard Expansion - Kealakekua 172 172 172 30 Hawaiian Beaches /Hawaiian Paradise Park Connector Road (Papio 200 200 2,500 2,700 St. /Government Beach Road) 31 Apaa St. Improvements /Re- alignment (blind curve) 200 200 1,300 1,500 32 Lehua Street Sidewalk Improvements 920 920 920 33 Napo'opo'o Junction Bus Stop; Park & Ride 237 237 115 352 34 Lower Puna Community Relief Center 200 200 1,000 1,200 TOTAL 45,205 37,936 200 96,678 83,341 34,465 29,200 4,100 1,900 4,100 7,500 261,284 106 (This Page Intentionally Left Blank) 107 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Public Works, Building Division 2. DATE: December 27, 2011 3. PROJECT NAME: DPW Facilities Hazardous Material Abatement 4. SUBMITTER: David Yamamoto 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK /JUDICIAL: Various 7. LOCATION (COUNCIL DISTRICT): All 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,500,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings; 10. PROJECT /PROGRAM DESCRIPTION: Remove hazardous building materials as required prior to proceeding with the maintenance, renovation and repair of facilities. The National Emissions Standards Hazardous Air Pollutants (NESHAP) 1973 Act requires hazardous material demolition and repair /maintenance work to be properly performed by trained and certified worker(s), and a minimum 10 day notification to the EPA of any hazardous material abatement work. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1) Addresses Public Health and Safety; 5) Repair /Maintenance of infrastructure or building. 12. LONG RANGE PLANS /COMMUNITY VALUES: 1) Department's vision, mission or goal. Hawaii County Code Section 2 -39, "The director of public works shall be charged with the supervision, direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? Yes DESCRIBE: NESHAP 1973 Act `15. IMPACT ON OPERATIONAL BUDGET: No impact. Annual operating repair and maintenance budgets are designated for small scaled projects performed by County work forces. 16. SUSTAINABILITY FOCUS (List all that apply): 5) Promotes Health and Safety. 17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated 4) Staff available to manage project; 6) Can realistically encumber funds in a contract prior to June 30, 2015. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 865 200 10 5 5 5 5 50 $1,145 Construction 363 2,300 90 45 45 45 45 450 $3,383 TOTAL: $1,228 $2,500 $100 $50 $50 $50 $50 $500 $4,528 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000):, Cty G.O. Bond /Other 1,228 2,500 100 50 50 50 50 500 $4,528 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $1,228 $2,500 $100 $50 $50 $50 $50 $500 $4,528 108 (This Page Intentionally Left Blank) 109 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Public Works, Building Division 2. DATE: December 27, 2011 3. PROJECT NAME: DPW Facilities ADA Compliance 4. SUBMITTER: David Yamamoto 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK /JUDICIAL: Various 7. LOCATION (JUDICIAL DISTRICT): All 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,500,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings; 10. PROJECT /PROGRAM DESCRIPTION: ADA Compliance requirements in address of Architectural Barrier Identification and Cost Report prepared by court appointed consultant (Accessibility Planning & Consulting, Inc.). 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1) Addresses Public Health and Safety; 2) Inadequate service or facility; 6) Enhances Quality of life; 7) Service Improvements 12. LONG RANGE PLANS /COMMUNITY VALUES: 1) Department's vision, mission or goal. Hawaii County Code Section 2 -39, The director of public works shall be charged with the supervision, direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: No 14. LEGAL MADATE? 1 Yes DESCRIBE: 4) Court Order, Alexa Russell, Individually, Laak Russell, a minor guardian...v. County of Hawaii 15. IMPACT ON OPERATIONAL BUDGET: No impact. Annual operating repair and maintenance budgets are designated for small scaled projects performed by County work forces. 16. SUSTAINABILITY FOCUS (List all that apply): 3) Strengthens and Sustains Our Community; 5) Promotes Health and Safety. 17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated 4) Staff available to manage project; 6) Can realistically encumber funds in a contract prior to June 30, 2015. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 652 100 5752 Construction 3,168 2,400 $5,568 TOTAL: $3,820 $2,500 $6,320 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE x 1000: . , ; 3,820 2,500 >', $6,320 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA- Stimulus) Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $3,820 $2,500 $6,320 110 (This Page Intentionally Left Blank) 111 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Public Works, Building Division 2. DATE: December 27, 2011 3. PROJECT NAME: DPW Facilities Repair and Maintenance 4. SUBMITTER: David Yamamoto 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK /JUDICIAL: Various 7. LOCATION (JUDICIAL DISTRICT): All 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,500,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 2) Infrastructure improvement that adds value to the land or improves utility; 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings; 10. PROJECT /PROGRAM DESCRIPTION: Large to medium scale periodic and emergency repair and /or maintenance of current existing 73 and new DPW facilities. Repairs and /or replacement of damaged and /or deteriorated foundation, roof, wall, asphalt concrete pavement, paint, utilities, electrical equipment, mechanical equipment, security systems, etc). 52% of DPW current 73 existing facilities are more than 30 years old and require repair /maintenance. Due to budgetary constraints, scheduled repair and maintenance of DPW facilities were deferred in past years resulting in facilities requiring major repair and maintenance. Annual operating budgets allowances were determined inadequate to address large to medium scale projects. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1) Addresses Public health and safety; 3) Improves operational efficiency; 5) Repair /Maintenance of infrastructure or facility; 6) Enhances Quality of life 12. LONG RANGE PLANS /COMMUNITY VALUES: 1) Department's vision, mission or goal. Hawaii County Code Section 2 -39, "The director of public works shall be charged with the supervision, direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? Yes DESCRIBE: Potentially 15. IMPACT ON OPERATIONAL BUDGET: No impact. Annual operating repair and maintenance budgets are designated for small scaled projects performed by County work forces. 16. SUSTAINABILITY FOCUS (List all that apply): 3) Strengthens and sustains Our Community; 5) Promotes Health and Safety 17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated 4) Staff available to manage project; 6) Can realistically encumber funds in a contract prior to June 30, 2015. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 578 100 100 50 50 50 50 400 $1,378 Construction 7,662 2,400 1,900 1,450 1,450 1,450 1,450 4,000 $21,762 TOTAL: $8,240 $2,500 $2,000 $1,500 $1,500 $1,500 $1,500 $4,400 $23,140 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): z, -: + ° / :, , >�i€ Cty G.O. Bond /Other 8,240 2,500 2,000 1,500 1,500 1,500 1,500 4,400 $23,140 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $8,240 $2,500 $2,000 $1,500 $1,500 $1,500 $1,500 $4,400 $23,140 112 Ane Keohokalole Highway TMKs: 7-4- 020:010 & 022 0 500 1,000 2,000 3,000 4,000 Feet 5,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012-2013 113 Print Date: April 25, 2012 CoH Dept of Planning GtS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Public Works, Engineering Division 2. DATE: 3/2/2012 3. PROJECT NAME: Ane Keohokalole Highway 4. SUBMITTER: Ben Ishii 5. COUNCIL BENEFIT DISTRICT(S): 6,7,8 & 9 6. TMK /JUDICIAL: (3) 7 -4- 020:010,022/ North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $700,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New Infrastructure 10. PROJECT /PROGRAM DESCRIPTION: Construct a new major collector road parallel to Queen Kaahumanu Highway from Palani Road to Hina Lani Street 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Enhances the quality of life by reducing traffic congestion and reducing travel times. 12. LONG RANGE PLANS /COMMUNITY VALUES: Project is a much needed improvement to the transportation system and is one step in our attempt to provide adequate infrastructure for our people. 13. COUNTY MATCHING FUNDS REQ'D? YES DESCRIBE: FHWA will fund 80% of eligible costs. 14. LEGAL MADATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Maintenance of this new road when completed. 16. SUSTAINABILITY FOCUS (List all that apply): Encourages development of adjoining lands. Provides pedestrian and bicycle facilities. 17. PROJECT READINESS (List all that apply): Construction on- going. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 1,137 $1,137 Land Acquisition Design /Survey 3,474 $3,474 Construction 35,000 4,500 $39,500 TOTAL: $39,611 $4,500 $44,111 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 1 , c / , i y .. ! �:.. $5,311 Cty G.O. Bond /Other 4,611 700 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 35,000 3,600 $38,600 Private (Grants) 200 $200 CBA (Fair Share, Park Dedication, etc) TOTAL: $39,611 $4,500 $44,111 114 VOCIITIFTY Map NTS .t KA'IMINANI DRIVE ROADWAY IMPROVEMENTS MAMALAHOA HIGHWAY TO VICINITY OF AHIAHI STREET County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/21/2011 Kaiminani Drive Roadway Improvements, Mamalahoa Hwy. to Vicinity of 3. PROJECT NAME: 4. SUBMITTER: Allan Simeon Ahiahi St., FAP NO. STP- 0198(001) 5. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK /JUDICIAL: (3) 7 -3 -29 to 32 / North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $320,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement, Planning, Feasibility, Engineering and Design. 10. PROJECT /PROGRAM DESCRIPTION: Work includes roadway reconstruction, shoulder and drainage improvements, utility relocation, retaining wall construction, driveway /property tie -ins, roadway signing and striping, and other related improvements. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Address public health and safety; repair /maintenance of infrastructure or building; and enhances quality of life. 12. LONG RANGE PLANS /COMMUNITY VALUES: Department vision, mission, core values and goals; and community value and desirability. 13. COUNTY MATCHING FUNDS REQ'D? Yes DESCRIBE: FHWA will fund 80% of eligible costs. 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The improved road will require less maintenance. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; and strengthens and sustains our community; and promotes health and safety. 17. PROJECT READINESS (List all that apply): Project Bid Out: 12/11 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 100 $100 Construction 1,880 9,120 $11,000 TOTAL: $1,980 $9,120 $11,100 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE x 1000 ,,r� rs?., 1,168 320 $1,488 Cry G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) 80 10,000 $10,080 Private (Grants) CBA (Fair Share, Park Dedication, etc) 1,250 $1,250 TOTAL: $2,498 $10,320 $12,818 116 TAX MAP KEY: 7 -3-010, 033- 035, 039, 040 -042 VICINITY MAP KA'ThIINANI DRIVE ROADWAY IMPROVEMENTS AHIAHI STREET TO VICINITY OF ANE KEOHOKALOLE HIGHWAY NORTH KONA, ISLAND OF HAWAII, HAWAII County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/21/2011 3. PROJECT NAME: Kaiminani Drive Roadway Improvements, Ahiahi St. to Vic. of Ane Keohokalole 4. SUBMITTER: Allan Simeon Hwy. 5. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK /JUDICIAL: (3) 7 -3 -10, 33 -35, 39, 40 -42 / North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $3,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement, Planning, Feasibility, Engineering and Design. 10. PROJECT /PROGRAM DESCRIPTION: Work includes roadway reconstruction, shoulder and drainage improvements, utility relocation, retaining wall construction, driveway /property tie -ins, roadway signing and striping, and other related improvements. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Address public health and safety; repair /maintenance of infrastructure or building; and enhances quality of life. 12. LONG RANGE PLANS /COMMUNITY VALUES: Department vision, mission, core values and goals; and community value and desirability. 13. COUNTY MATCHING FUNDS REQ'D? (Y /N) YES DESCRIBE: FHWA will fund 80% of eligible costs. (Need to apply for STIP funding) 14. LEGAL MADATE? (Y /N) NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The improved road will require less maintenance. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; and strengthens and sustains our community; and promotes health and safety. 17. PROJECT READINESS (List all that apply): Consultant selection 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 100 $100 Land Acquisition Design /Survey 520 $520 Construction 16,000 4,000 $20,000 TOTAL: $6201 $16,000 $4,000 $20,620 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000):„ 620 '- t 3,000 :..,. � WI 1,000 / 'P; . %3 _,i $4,620 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) 13,000 3,000 $16,000 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $620 $16,000 $4,000 $20,620 118 Kilauea Avenue Improvements TMKs: 2 -2 -006 to 011 & 016 various 0 250 500 1,000 1,500 2,000 Feet 2,500 119 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print Date: April 25, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 3/15/2012 3. PROJECT NAME: Kilauea Avenue Improvements 4. SUBMITTER: Alan Keone Thompson 5. COUNCIL BENEFIT DISTRICT(S): 2 6. TMK /JUDICIAL: (3) 2 -2 -06 to 11, & 16/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Engineering, infrastructure improvement, nonrecurring rehabilitation or deferred maintenance of infrastructure. 10. PROJECT /PROGRAM DESCRIPTION: Reconstruction of roadway, installing curb, gutter, sidewalks and roadway drainage. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, enhances quality of life, service improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: The project will improve public safety. 13. COUNTY MATCHING FUNDS REQ'D? YES DESCRIBE: 20% County / 80% FHWA 14. LEGAL MADATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Reduction in maintenance cost. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety. 17. PROJECT READINESS (List all that apply): Design is underway. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 3,200 4,016 $7,216 TOTAL: $3,200 $4,016 $7,216 19. O & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): I y „ ' #! Cty G.O. Bond /Other 3,200 $3,200 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 4,016 $4,016 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $3,200 $4,016 $7,216 120 La'aloa Avenue Extension TMK: 7 -7- 008:030 0 750 1,500 3,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012.2013 Feet 4,500 121 Print Date: January 26, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/8/2011 3. PROJECT NAME: La'aloa Avenue Extension 4. SUBMITTER: Alan Keone Thompson 5. COUNCIL BENEFIT DISTRICT(S): 7 6. TMK /JUDICIAL: (3) 7 -7- 08:030/ North Kona 7. LOCATION (COUNCIL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $14,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land Acquisition, Infrastructure Improvement, Engineering and Design. 10. PROJECT /PROGRAM DESCRIPTION: RE- APPROPRIATION. Construct approximately 1,400 -ft of new 60 -ft wide road to extend the La'aloa Street from its present terminus to the Kuakini Highway, including a full movement signalized intersection with acceleration /deceleration lanes on Kuakini Highway. Construction also includes upgrading lower La'aloa Avenue thru White Sands Beach Estates Subdivision. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Public health & safety; enhances quality of life and service improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: To achieve Department's /Division's Vision, Mission, Core Values, and Goals. In conformance with the Kona Community Development Plan. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Will increase our maintenance obligations when constructed. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes Health and Safety. 17. PROJECT READINESS (List all that apply): Acquiring road ROW property. Final plans submitted. Project Manager is available. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 853 $853 Design /Survey Construction 14,000 6,000 $20,000 TOTAL: $853 $14,000 $6,000 $20,853 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): ,.• %�y ,;. Cty G.O. Bond /Other 853 14,000 6,000 $20,853 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $853 $14,000 $6,000 $20,853 122 KAILUA BAY •0•' 001_00014 �s% 1•► +• it 0-Abram 0.14 101,1 a Si !� C i 0 0 ONTO BAY KAHULUI BAY VERT BRIDGE NO. 75-4 T.M.K.: 7-5 -19:08 Adj. VICINITY MAP ALII DRIVE CULVERT REPLACEMENT NORTH BONA, ISLAND OF HAWAII, HAWAII County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/7/2011 3. PROJECT NAME: Ali'i Drive Culvert Replacement FAP No. STP- 0186(8) 4. SUBMITTER: Casey Yanagihara 5. COUNCIL BENEFIT DISTRICT(S): 7 6. TMK /JUDICIAL: (3) 7 -5 -19: 08 adj./ North Kona 7. LOCATION (COUNCIL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $125,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land acquisition, engineering and design. 10. PROJECT /PROGRAM DESCRIPTION: Acquire the necessary land and perform the required engineering design to accommodate a wider and longer bridge, along with the associated upstream channel improvements. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): The existing concrete culvert /bridge has an insufficient design flow capacity and is structurally deficient and functionally obsolete. The obsolescence is due to its substandard width and very low hydraulic conveyance capacity to pass a 100 -year design storm. 12. LONG RANGE PLANS /COMMUNITY VALUES: #1 Department's vision, mission, core values and goals to promote and ensure the health and safety to the public. 13. COUNTY MATCHING FUNDS REQ'D? Yes DESCRIBE: FHWA will fund 80% of eligble cost. 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Upon completion, operational budget increase is minimal. 16. SUSTAINABILITY FOCUS (List all that apply): #5 Promotes health and safety. 17. PROJECT READINESS (List all that apply): #6 Can realistically encumber funds in a contract prior to June 30, 2013. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 750 $750 Design /Survey 315 625 $940 Construction 10,400 $10,400 TOTAL: $1,065 I $625 $10,400 $12,090 19. 0 & M COSTS (x $1000): F 20. FUNDING SOURCE (x $1000): 63 .' ✓' .. ! 125 2,080 , ' f \ % ,.,i Cty G.O. Bond /Other $2,268 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 252 500 8,320 $9,072 Private (Grants) CBA (Fair Share, Park Dedication, etc) 750 $750 TOTAL: $1,065 $625 $10,400 $12,090 124 I. -- a • al all' rm. r ..wr r anal, ��■■ III■ 4.�owttiolva l r■ .. III■ 4. • • j% 7.• ..w. old .. 111■11111111E11111111111M111 IFEtb■ Mingo. mil ..��4 .♦ f � ,�- iii- �IIIII■ ■■ �■■ • ♦�D' I!iI i111:■:1:1Ii . . 111111 II ►� ♦ ..• 11/11111 pa= kIIII: 1111=1: 2.111111L" III ••■-. • - WIII • N * .*% , „...-.% tat.. ■ a # e4....t 1 Leilani Street Drainage Improvement TM Ks: 2 -2 -036: various CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012-2013 0 500 1,000 2,000 3,000 Feet 4,000 125 Print Date: January 26, 2012 CoH Dept of Planning GIS County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/15/2011 3. PROJECT NAME: Leilani Street Drainage Improvement 4. SUBMITTER: Alan Keone Thompson 5. COUNCIL BENEFIT DISTRICT(S): 4 6. TMK /JUDICIAL: (3) 2 -2 -036/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement 10. PROJECT /PROGRAM DESCRIPTION: Provide drainage improvements (drywells) for Leilani Street, between Manono and Laukapu Street. Midblock is a low point in the roadway with no drainage outlet, during heavy rains roadway becomes a pond. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Public health & safety; improves operational efficiency ; enhances quality of life and service improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: To achieve Department's /Division's Vision, Mission, Core Values, and Goals. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Will increase our maintenance obligations when constructed. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes Health and Safety. 17. PROJECT READINESS (List all that apply): Project Manager is available. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 100 $100 TOTAL: 1 $100 $100 19. O & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): ,. / , �! - % i ,... Cty G.O. Bond /Other 100 $100 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $100 $100 126 Kamehmeha Hwy Reconstruction, Wailoa Bridge to Ponahawai Street TMKs: 2 -2 -002; 003; 004; 005; 006 0 500 1,000 2,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Feet 3,000 127 Print Date: January 25, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/12/2011 Kamehameha Hwy Reconstruction, Wailoa Bridge to Ponahawai Street FAP 3. PROJECT NAME: 4. SUBMITTER: Pacheco, Kason No. STP- 1910(1) 5. COUNCIL BENEFIT DISTRICT(S): 4 6. TMK /JUDICIAL: (3) 2 -2 -02, 03, 04, 05, 06/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $3,240,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Engineering, infrastructure improvement, nonrecurring rehabilitation or deferred maintenance of infrastructure. 10. PROJECT /PROGRAM DESCRIPTION: Reconstruction of roadway, installing curb, gutter, sidewalks and roadway drainage system. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, enhances quality of life, service improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: The project will provide a complete roadway design and improve public safety. 13. COUNTY MATCHING FUNDS REQ'D? Yes DESCRIBE: 120% County /80% FHWA road 14. LEGAL MADATE? No DESCRIBE: 1 15. IMPACT ON OPERATIONAL BUDGET: Reduce maintenance 16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety. 17. PROJECT READINESS (List all that apply): Design is underway. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 200 $200 Design /Survey 500 $500 Construction 7,240 8,760 $16,000 TOTAL: $7,740 $8,960 $16,700 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): /r 4 yi Cry G.O. Bond /Other 500 3,240 $3,740 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 7,240 5,720 $12,960 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $7,740 I $8,960 $16,700 128 LOCKTOON MAP NTS NAPOOP00 ROAD RETAINING WALL IMPROVEMENTS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/21/2011 3. PROJECT NAME: Napo'opo'o Road Retaining Wall Improvements 4. SUBMITTER: Allan Simeon 5. COUNCIL BENEFIT DISTRICT(S): 6, 7 6. TMK /JUDICIAL: (3) 8 -2 -08/ South Kona 7. LOCATION (COUNCIL DISTRICT): 6, 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $200,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land Acquisition, Infrastructure Improvement, Planning, Feasibility, Engineering and Design. 10. PROJECT /PROGRAM DESCRIPTION: Work includes Right of Way acquisition, retaining wall installation to replace existing deteriorating /collapsing walls including guardrails, A.C. paving, and other related roadway improvements. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Enhance public health and safety; replaces deteriorated facility; repair and maintenance of infrastructure and enhance quality of life. 12. LONG RANGE PLANS /COMMUNITY VALUES: Department vision, mission, core values and goals; and community value and desirability. 13. COUNTY MATCHING FUNDS REQ'D? IL No DESCRIBE: I 14. LEGAL MADATE? No DESCRIBE: lI 15. IMPACT ON OPERATIONAL BUDGET: The improved walls will require less maintenance. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; and strengthens and sustains our community; and promotes health and safety. 17. PROJECT READINESS (List all that apply): Staff availability to manage project. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 100 $100 Design /Survey 100 $100 Construction 500 $500 TOTAL: $200 $700 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): x .• ;., ...,. 'i, ': o �y ; ? � '' -1, Cty G.O. Bond /Other 200 500\ $700 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: I $200 $500 $700 130 T.M.K.: 2 -2 -27, 2 -2 -36 & 2 -2 -34 PROJECT LOCATION MAP County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/21/2011 3. PROJECT NAME: Manono Street Improvements, Lanikaula Street to Kekuanao`a Street 4. SUBMITTER: Allan Simeon 5. COUNCIL BENEFIT DISTRICT(S): 1,2,3,4,5 6. TMK /JUDICIAL: (3) 2 -2 -27 & 36 / South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land Acquisition, Infrastructure Improvement, Planning, Feasibility, Engineering and Design. 10. PROJECT /PROGRAM DESCRIPTION: Bicycle and pedestrian access and roadway improvements. Work includes land acquisition, curbs, gutters, sidewalks, AC paving, concrete /CRM walls, drainage improvements and utility relocation. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): This project seeks to improve bicycle and pedestrian accessibility and safety. It will also improve vehicular circulation and safety as well as the drainage condition in the area. 12. LONG RANGE PLANS /COMMUNITY VALUES: Department vision, mission, core values and goals; and community value and desirability. County and State bike plans. Bicycle and Pedestrian Advisory Committee plans. 13. COUNTY MATCHING FUNDS REQ'D? Yes DESCRIBE: FHWA will fund 80% of eligible costs. 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Highway maintenance and Traffic Division will have to maintain the widened portion of the road. 16. SUSTAINABILITY FOCUS (List all that apply): This project will provide pedestrian and bicycle facilities and better traffic circulation and safety in the area. 17. PROJECT READINESS (List all that apply): Survey completed. Environmental permitting and consultation on- going. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 280 $280 Design /Survey 100 100 $200 Construction 5,000 $5,000 TOTAL: $3801 $100 $5,000 $5,480 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x 1000 f Cty G.O. Bond /Other 300 100 1,000 $1,400 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 80 4,000 $4,080 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $380 $100 $5,000 $5,480 132 Mamalahoa Hwy Safety Improvements TM Ks: 7-8 -009 0 1,000 2,000 4,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Feet 6,000 133 Print Date: January 25, >f11� Print Date: January 25, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/12/2011 3. PROJECT NAME: Mamalahoa Hwy Safety Improvements (Holualoa) 4. SUBMITTER: Pacheco, Kason 5. COUNCIL BENEFIT DISTRICT(5): 7 & 8 6. TMK /JUDICIAL: (3) 7 -8 -009/ North Kona 7. LOCATION (COUNCIL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement and nonrecurring rehabilitation or deferred maintenance of infrastructure . 10. PROJECT /PROGRAM DESCRIPTION: Project will provide safety improvements along sections of Old Mamalahoa Highway (Holualoa). 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, enhances quality of life. 12. LONG RANGE PLANS /COMMUNITY VALUES: The project will provide safer sections of the roadway, improve public safety, and may reduce crashes. 13. COUNTY MATCHING FUNDS REQ'D? Yes DESCRIBE: 20% County /80% FHWA road 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Reduce maintenance 16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety. 17. PROJECT READINESS (List all that apply): Can realistically encumber funds. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 200 200 200 200 $800 Design /Survey Construction 2,000 500 2,000 2,000 2,000 $8,500 TOTAL: $2,200 $500 $2,200 $2,200 $2,200 $9,300 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x$1000):' �. ". Vii, „ .', �; .�• �. �<, � i ��� ,, : `' ,'" � `r ,z i, r,; „'.' 6� �/ 'i ��.•:•• ' ' '. Cty G.O. Bond /Other 2,200 100 440 440 440 $3,620 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 400 1,760 1,760 1,760 $5,680 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $2,200 $500 $2,200 $2,200 $2,200 $9,300 134 .At\ MAMOW N\‘71 V1.10. 0. CEa t aryi County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Public Works, Engineering Division 2. DATE: 3/21/2012 3. PROJECT NAME: Laupahoehoe & Manowaiopae Homestead Roads Improvements 4. SUBMITTER: Carter Romero 5. COUNCIL BENEFIT DISTRICT(S): 1 6. TMK /JUDICIAL: (3) 3 -6- 006:045 & 059/ North Hilo 7. LOCATION (COUNCIL DISTRICT): 1 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,285,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement; new bridge structures; non - recurring rehabilitation of structures of more than $25,000 with a useful life greater than 10 years; planning, feasibility, engineering and design study related to individual capital improvement project. 10. PROJECT /PROGRAM DESCRIPTION: Construct 0.63 miles of new Laupahoehoe Homestead Road with five stream crossings, and repair 1.0 miles of existing Manowaiopae Homestead Road. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, Inadequate service or facility, Repair /Maintenance of infrastructure, Enhances quality of life. 12. LONG RANGE PLANS /COMMUNITY VALUES: Public Works' goal of systematically improving homestead /government roads, and provide access to the U.S Forest Service Pacific Southwest Research Station, which will research the feasibility of repopulating native species on the island. 13. COUNTY MATCHING FUNDS REQ'D? YES DESCRIBE: U.S. Forest Service requires minimum 50% matching funds from County 14. LEGAL MADATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Additional road inventory will require additional maintenance. Reduced road -in -limbo inventory will result in reduced hours spent by Public Works and Corporation Counsel in dealing with complaints and legal issues arising from ill- defined ownership of right -of -ways. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality by allowing vehicular access to land only accessible by foot; preserves and protects our natural environment through research at the U.S. Forest Research Station; enhances education by U.S. Forest providing opportunity for students to participate in research; promotes health and safety because a portion of the funds will be used to repair an existing undermined road and alleviate a sight distance problem on the same road; fosters interdepartmental collaboration and cross - sector implementation by utilizing input from County Planning Department, Department of Public Works' Highway, Engineering and Traffic Divisions, coordinating with surveys, construction plans and low -cost bridge technology provided by the U.S. Forest Service. 17. PROJECT READINESS (List all that apply): U.S. Forest Service, the applicant, has completed an Environmental Assessment and survey, and has acquired 3 properties for administrative facilities. Staff is available to manage the project. External funds and resources are available to proceed (two adjacent landowners are contributing cash, while another is offering free land- clearing and grading services). 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 300 $300 Design /Survey 60 $60 Construction 1,625 $1,625 TOTAL: $1,985 $1,985 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 1,285 ' '" %�\ iz z y $1,285 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) 700 $700 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $1,985 $1,985 136 Manowai`opae Homestead Road Retaining Wall TM K: 3- 6- 003:037 0 500 1,000 2,000 Feet 3,000 137 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012.2013 Print Date: January 25, 2012 CoH Dept of Planning GIS County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/12/2011 3. PROJECT NAME: Manowai'opae Homestead Road Retaining Wall 4. SUBMITTER: Pacheco, Kason 5. COUNCIL BENEFIT DISTRICT(S): 1 6. TMK /JUDICIAL: (3) 3 -6- 003:037/ North Hilo 7. LOCATION (COUNCIL DISTRICT): 1 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $550,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement. 10. PROJECT /PROGRAM DESCRIPTION: New retaining wall (approx. 200 ft.) along roadway to mitigate slope failure. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety. 12. LONG RANGE PLANS /COMMUNITY VALUES: Improve public safety. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Highway maintenance will not need to repair future slope failures along retaining wall. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety. 17. PROJECT READINESS (List all that apply): Preliminary design underway. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 50 $50 Construction 500 $500 TOTAL: I $550 $550 19. O & M COSTS (x $1000): 20. FUNDING SOURCE (x$1000): Cty G.O. Bond /Other k 1 „,'„ .. „ 550 ., 9 $550 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $550 $550 138 (This Page Intentionally Left Blank) 139 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Public Works, Building Division 2. DATE: December 27, 2011 3. PROJECT NAME: DPW Facilities Renovation 4. SUBMITTER: David Yamamoto 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK /JUDICIAL: Various 7. LOCATION (JUDICIAL DISTRICT): All 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $750,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 3) New buildings or structures or addition to a building; 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings; 10. PROJECT /PROGRAM DESCRIPTION: Large to medium scale renovation projects. 52% of DPW's 73 existing facilities are more than 30 years old. Departments regularly request renovation of existing facilities or lease space to address increasing number of employees, increasing electrical /data /communication demand, and changes in service program requirements. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1) Addresses Public health and safety; 3) Improves operation efficiency; 6) Enhances quality of life; 7) Service improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: 1) Department's vision, mission or goal. Hawaii County Code Section 2 -39, The director of public works shall be charged with the supervision, direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? Yes DESCRIBE: Potentially applicable 15. IMPACT ON OPERATIONAL BUDGET: No Impact Annual operating repair and maintenance budgets are designated for small scaled projects performed by County work forces. 16. SUSTAINABILITY FOCUS (List all that apply): 1) Promotes Economic Vitality; 3) Strengthens and Sustains Our Community; 5) Promotes Health and Safety 17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated 4) Staff available to manage project; 6) Can realistically encumber funds in a contract prior to June 30, 2015. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 1,120 50 40 20 20 20 20 200 $1,490 Construction 6,400 700 460 230 230 230 230 2,300 $10,780 TOTAL: [ $7,520 $750 $500 $250 $250 $250 $250 $2,500 $12,270 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): /'/ ;:' ^" 750 a, •; ,. , /r. 500 250 ,.. ' 250 tea., Y /ga', i \ '! \'; 250 � , �, .,.', Y, 250 .,: 0 i �� ✓�.•s Cty G.O. Bond /Other 7,520 2,500 $12,270 State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $7,520 $750 $500 $250 $250 $250 $250 $2,500 $12,270 140 (This Page Intentionally Left Blank) 141 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Public Works, Building Division 2. DATE: December 27, 2011 3. PROJECT NAME: DPW Facilities Energy Efficiency 4. SUBMITTER: David Yamamoto 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK /JUDICIAL: Various 7. LOCATION (JUDICIAL DISTRICT): All 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 2) Infrastructure Improvements that adds value to the land or utility; 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings; 10. PROJECT /PROGRAM DESCRIPTION: Retrofit DPW facilities with solar energy systems, high efficiency equipment replacements, and other building energy saving systems. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 3) Improves operation efficiency; 6) Enhances Quality of Life 12. LONG RANGE PLANS /COMMUNITY VALUES: 1) Department's vision, mission or goal. Hawaii County Code Section 2 -39, The director of public works shall be charged with the supervision, direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Reduce annual operating budgets through reduced grid power demand and consumption. 16. SUSTAINABILITY FOCUS (List all that apply): 1) Promotes Economic Vitality; 2) Preserves and Protects Our Natural Environment; 5) Promotes Health and Safety; 17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated 4) Staff available to manage project; 6) Can realistically encumber funds in a contract prior to June 30, 2015. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 100 50 $150 Construction 4,743 1,900 1,450 $8,093 TOTAL: $4,743 $2,000 $1,500 $8,243 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): �,� � � �,�� '� ' '' � ;� �� _ � � i �' ,ia irk Cty G.O. Bond /Other 4,743 2,000 1,500 $8,243 State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $4,743 $2,000 $1,500 $8,243 142 (This Page Intentionally Left Blank) 143 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Public Works, Building Division 2. DATE: December 27, 2011 3. PROJECT NAME: DPW Facilities Hardening 4. SUBMITTER: David Yamamoto 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK /JUDICIAL: Various 7. LOCATION (JUDICIAL DISTRICT): All 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,500,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 2) Infrastructure improvement; 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings; 10. PROJECT /PROGRAM DESCRIPTION: Retrofit existing DPW Facilities (Administration, Civil Defense, Fire, Police, Maintenance Baseyard, Fuel Depot, etc) to better survive and /or quickly recover from natural and man made disasters. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1) Address Public Health and Safety; 3) Improves operation efficiency; 7) Service improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: 1) Department's vision, mission or goal. Hawaii County Code Section 2 -39, The director of public works shall be charged with the supervision, direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: No Impact. 16. SUSTAINABILITY FOCUS (List all that apply): 5) Promotes Health and Safety; 17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated 4) Staff available to manage project; 6) Can realistically encumber funds in a contract prior to June 30, 2015. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 100 50 $150 Construction 679 1,400 700 $2,779 TOTAL: $679 $1,500 $750 $2,929 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x$1000): 679 ' %!� 1,500 750 �: $2,929 Cty G.O. Bond /Other State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $679 $1,500 $750 $2,929 144 (This Page Intentionally Left Blank) 145 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/8/2011 3. PROJECT NAME: Land Acquisition for DPW Facilities 4. SUBMITTER: Ben Ishii 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK /JUDICIAL: Various 7. LOCATION (COUNCIL DISTRICT): All 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land Acquisition. 10. PROJECT /PROGRAM DESCRIPTION: Purchase of land to resolve complaints of existing roadway or drainage facility encroachments into private property and other land acquisitions related to small roadway or drainage improvements. Funds to be also used for all related activities such as title search, appraisal and parcel map preparation. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Land purchase would normally eliminate the need to relocate the existing roadway or drainage facility and therefore reduce capital costs. 12. LONG RANGE PLANS /COMMUNITY VALUES: Department goal to properly maintain all existing facilities. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? Yes DESCRIBE: !Encroachments into private property are illegal. 15. IMPACT ON OPERATIONAL BUDGET: None 16. SUSTAINABILITY FOCUS (List all that apply): 17. PROJECT READINESS (List all that apply): Funding needs are normally complaint related. Once a decision is made to purchase land, funds can be expended relatively quickly. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 100 100 100 100 100 100 100 100 $800 Design /Survey Construction TOTAL: $100 $100 $100 $100 $100 $100 $100 $100 $800 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 100 100 100 100 100 $800 Cty G.O. Bond /Other 100 100 100 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $100 $100 $100 $100 $100 $100 $100 $100 $800 146 COCONUT ISLAND KUHIO BAY H I LO BAY BAYFRONT HWY. (19) KUAWA ST. 4.. PIIIANI 5T. LEIIANI 5T. E. LANIKAULA ST. �G. J'l PROJECT SITE WEST PUAINAKO ST. NIKOI.AU PL. = -�I EKE P4 r•1 1 PL•I�. 4S\ HALEKAUKA 51. POTiAKU SST. \ KUK4A ST. EAST AIAKAALA ST! 1E z' g 0 -_,OCA_1(3[N MAP NTS. EAST PUNNAKO 51 RON ST. S\ T KAPIOLANI STREET EXTENSION, MOHOULI ST. TO LANIKAULA ST. County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/21/2011 3. PROJECT NAME: Kapi`olani Street Extension, Lanikaula Street to Mohouli Street 4. SUBMITTER: Allan Simeon 5. COUNCIL BENEFIT DISTRICT(S): 2, 3, 4 6. TMK /JUDICIAL: (3) 2 -4 -01 and 56 / South Hilo 7. LOCATION (COUNCIL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land Acquisition, Infrastructure Improvement, Planning, Feasibility, Engineering and Design. 10. PROJECT /PROGRAM DESCRIPTION: Work includes Right of Way acquisition, roadway installation, concrete bridge construction, drainage and other related improvements. Enhance traffic, pedestrian, ADA, and bicycle circulation, between the University of Hawaii at Hilo and vicinity and Downtown Hilo. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Address public health and safety; and enhances quality of life. 12. LONG RANGE PLANS /COMMUNITY VALUES: Department vision, mission, core values and goals; and community value and desirability. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Highway Maintenance and Traffic Division will have to maintain the new road and two channelized /signalized intersections. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; and strengthens and sustains our community. Project will enhance traffic, pedestrian, ADA, ane bicycle circulation in the area. 17. PROJECT READINESS (List all that apply): Consultant selection. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 300 $300 Land Acquisition 400 $400 Design /Survey 600 100 $700 Construction 7,800 4,300 $12,100 TOTAL: $8,700 $500 $4,300 $13,500 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): ,.�;..� 8,700 500 4,300 ' i s i $13,500 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $8,700 $500 $4,300 $13,500 148 6i'6 1 KINOOLE ST. MAIKAI ST. SANTOS ST. KEHAUUW_I SL MIKAHALA ST. KEHAULANI ST. HOONANEA ST,r KEHAULANI ST. NOHEA ST. a NOHEA ST. ��� I ET! a a n'', a a, a w � (Z('(� ln(�{�( x O�_'^ Y�ILLIC X L ]cll g.�/'— rz = u NANIAKEA ST. 2 ANELA ST. KANOELANI ST. MALAWI ST. NOHEA ST. NANIAKEA ST. IWALANI ST. 2 w POHAKULANI ST. POHAKULANI ST. POHAKULANI ST. U, r ra a HEAHEA ST. �J a. V -JW - • W �'� �O� -. a maQ a ONEAWA Pl. �4 �MAUNAKAI ST. cl 0 Mph o` Qk. N Z 0 w KOMOHANA ST. MALAWAINA ST. IS. KUMUWAINA PL. -1 a z s o- idd1VNINVi NOHOANA 0 a w W 0 J. W ld 0 fa_ cn < • ZW U2� }— W — Y >`�Q 1< W O= z�r0 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/13/2011 3. PROJECT NAME: Kawailani Street Improvements, Iwalani St. to Pohakulani St., FAP NO. STP- 4. SUBMITTER: Allan Simeon 5. COUNCIL BENEFIT DISTRICT(S): 1, 2, 3, 4 6. TMK /JUDICIAL: (3) 2 -4 -15 and 19/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land Acquisition, Infrastructure Improvement, Planning, Feasibility, Engineering and Design. 10. PROJECT /PROGRAM DESCRIPTION: Installation of synchronized traffic signals at the Kawailani/lwalani and Kawailani /Pohakulani /Ainaola intersections. Work includes land acquisition, realignment of Ainaola Drive, channelization improvements, sight distance improvements, utility relocation and the construction of curbs, gutters, sidewalks, walls and related drainage improvements. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): This project seeks to improve vehicular and pedestrian safety as well as vehicular circulation through these high volume intersections by simplifying the street layout and installing traffic signals. This project will also provide bicycle and pedestrian facilities. 12. LONG RANGE PLANS /COMMUNITY VALUES: Department vision, mission, core values and goals; and community value and desirability. 13. COUNTY MATCHING FUNDS REQ'D? Yes DESCRIBE: FHWA will fund 80% of eligible costs. 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Highway Maintenance and Traffic Division will have to maintain the widened portions of the roads and two channelized /signalized intersections. 16. SUSTAINABILITY FOCUS (List all that apply): Project will provide pedestrian and bicycle facilities and it will also increase public safety by providing channelized /signalized intersections and better sight distance. 17. PROJECT READINESS (List all that apply): Right of Way acquisition has been completed except for a few properties, and pro ect design is approximately 90% complete. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 180 $180 Land Acquisition 800 $800 Design /Survey 750 $750 Construction 1,196 100 17,500 $18,796 TOTAL: $2,926 $100 $17,500 $20,526 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): Cty G.O. Bond /Other 1,409 100 3,500 $5,009 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 1,517 14,000 $15,517 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $2,926 $100 $17,500 $20,526 150 Hamakua Road Baseyard Warehouse TM K: 4 -2- 005:001 0 2,500 5,000 10,000 Feet 15,000 151 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print Date: January 25, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works - Building Division 2. DATE: 12/15/2011 3. PROJECT NAME: Hamakua Road Baseyard Warehouse 4. SUBMITTER: Stanley Nakasone 5. COUNCIL BENEFIT DISTRICT(S): 1 6. TMK /JUDICIAL: (3) 4 -2- 005:001/ Hamakua 7. LOCATION (COUNCIL DISTRICT): 1 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,250,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New building 10. PROJECT /PROGRAM DESCRIPTION: Construction of a replacement warehouse with approximately 40'x80' footprint. It will be used for storage space and for current equipment and supplies. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Replacement of inadequate facility. Improve operating efficiency. To protect County property against weather elements (rain, wind, etc.) and to prolong equipment useful life and supplies shelf life. (A new baseyard office will be build in the Pa'auilo area and staff will be relocated to this location.) Improve current levels of service. 12. LONG RANGE PLANS /COMMUNITY VALUES: To achieve Department's /Division's Vision, Mission, Core Values and Goals. 13. COUNTY MATCHING FUNDS REQ'D? 1 No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: No significant impact on annual operations and maintenance (A /C, grounds and facilities maintenance, utilities); District will relocate to this facility. 16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains our community through employment and workforce wages; Promotes public safety through road maintenance and emergency preparedness and responses to natural disasters. 17. PROJECT READINESS (List all that apply): Currently underway previously appropriated, Building Division is currently managing project and realistically able to encumber funds. Operating budget needs have been identified and requested. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 1,250 $1,250 TOTAL: $1,250 $1,250 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000):h', 1,250 $1,250 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $1,250 $1,250 152 North Hilo / Hamakua Highway Maintenance Building Construction TM K: 4-2-005:001 0 2,500 5,000 10,000 Feet 15,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012.2013 153 Print Date: January 25, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works - Building Division 2. DATE: 12/15/2011 3. PROJECT NAME: North Hilo /Hamakua Highway Maintenance Building Construction 4. SUBMITTER: Stanley Nakasone 5. COUNCIL BENEFIT DISTRICT(S): 1 6. TMK /JUDICIAL: (3) 4 -2- 005:001/ Hamakua 7. LOCATION (COUNCIL DISTRICT): 1 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,105,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New building 10. PROJECT /PROGRAM DESCRIPTION: Construction of a new North Hilo /Hamakua Road (Highways) Baseyard Facility. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Deteriorating condition of the present facility. The existing metal quonset hut is old; electrical lines do not meet safety standards and the building would require major repairs to its metal structure. The current storage area is inadequate for the equipment and supplies. The present facility is not on County property. A site (on County property) has been selected in the Pa'auilo area. This would centralize operations for the North Hilo /Hamakua District and increase operating efficiency. Improve current levels of service. 12. LONG RANGE PLANS /COMMUNITY VALUES: To achieve Department's /Division's Vision, Mission, Core Values and Goals. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: To achieve Department's /Division's Vision, Mission, Core Values and Goals. 16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains our community through employment and workforce wages; Promotes public safety through road maintenance and emergency preparedness and responses to natural disasters. 17. PROJECT READINESS (List all that apply): Currently underway previously appropriated, Building Division is currently managing project and realistically able to encumber funds. Operating budget needs have been identified and requested. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 405 $405 Construction 1 2,105 $2,106 TOTAL: $406 $2,105 $2,511 19. 0 & M COSTS (x $1000): 406 2,105 m� .�,. $2,511 20. FUNDING SOURCE (x $1000):, Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $406 $2,105 $2,511 154 South Kohala Road Baseyard Warehouse TM K: 6- 6- 001:050 0 1,000 2,000 4,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012.2013 Feet 6,000 155 Print Date: January 26, 2012 CoN Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works - Building Division 2. DATE: 12/15/2011 3. PROJECT NAME: South Kohala Road Baseyard Warehouse 4. SUBMITTER: Stanley Nakasone 5. COUNCIL BENEFIT DISTRICT(S): 8,9 6. TMK /JUDICIAL: (3) 6 -6- 001:050/ South Kohala 7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,196,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New building 10. PROJECT /PROGRAM DESCRIPTION: Construction of a replacement warehouse with approximately 40'x80' footprint. It will be used for storage space and for current equipment and supplies. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Replacement of inadequate facility. Improve operating efficiency. Existing structure is used by other Public Works divisions. Additional space is required for secure storage of equipment and supplies and to protect County property against weather elements (rain, wind, etc.) and to prolong equipment useful life and supplies shelf life. Improve current levels of service. 12. LONG RANGE PLANS /COMMUNITY VALUES: To achieve Department's /Division's Vision, Mission, Core Values and Goals. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Annual operations and maintenance (facility and grounds maintenance, utilities) 16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains our community through employment and workforce wages; Promotes public safety through road maintenance and emergency preparedness and responses to natural disasters. 17. PROJECT READINESS (List all that apply): Currently underway previously appropriated, Building Division is currently managing project and realistically able to encumber funds. Operating budget needs have been identified and requested. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 54 1,196 $1,250 TOTAL: $54 $1,196 $1,250 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 4 ,: '' � . "" � , `..,;;� . ..... � � � % �,. .. . > ��� • , , Cty G.O. Bond /Other 54 1,196 .�� $1,250 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $54 $1,196 $1,250 156 MN IIII ME iii ili NE - - .... uU w,wp ■ ■_ _■ _■■i; ■ ■■ lu-i. lai■■ii�. -- 41911. �. -iiu.0 -i.- IIMINE;=• =1111al MI IIIIMM INNI MM. �■■ ■ ■� �r ■■ MIEN ■ ■� IIII i:1:1��1 . M I u111 IIII1111 1I1:1 ■i1 IIIi ■� ■■ IIIIII WM MM MMOI In I M P IIIMMF' worm 1 PENMEN 1111111•IMI 1 +!7 =_ �' 0, ANE lintms Int044410NIN EN IIii South Hilo Roads Baseyard Storage /Warehouse Building TM K: 2 -2- 058:018 0 750 1,500 3,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012.2013 Feet 4,500 157 Print Date: January 26, 2012 CoH Dept of Planning GIS County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works - Building Division 2. DATE: 12/15/2011 3. PROJECT NAME: South Hilo Roads Baseyard Storage /Warehouse Building 4. SUBMITTER: Stanley Nakasone 5. COUNCIL BENEFIT DISTRICT(S): All Districts 6. TMK /JUDICIAL: (3) 2 -2- 058:018/ South Hilo 7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,105,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New building. 10. PROJECT /PROGRAM DESCRIPTION: Construction of a replacement warehouse and storage with approximately 40' x 80' footprint. This warehouse replaces previous structure that was demolished. It will be used for storage space and for current equipment and supplies. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Replacement of inadequate facility. Improve operating efficiency. Existing structure was demolished due to deteriorated roof structure that was damaged by high winds. Improve levels of service. 12. LONG RANGE PLANS /COMMUNITY VALUES: To achieve Department's /Division's Vision, Mission, Core Values and Goals. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Annual operations and maintenance (facility grounds maintenance, utilities). 16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains our community through employment and workforce wages; Promotes public safety through road maintenance and emergency preparedness and responses to natural disasters. 17. PROJECT READINESS (List all that apply): Currently underway previously appropriated, Building Division is currently managing project and realistically able to encumber funds. Operating budget needs have been identified and requested. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 95 1,105 $1,200 TOTAL: $95 $1,105 $1,200 19. O & M COSTS (x $1000): 20. FUNDING SOURCE (x$1000): `,ai Cty G.O. Bond /Other 95 1,105 $1,200 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $95 $1,105 $1,200 158 IW tori vo 111L11111111.61/4; 41 Kona Baseyard Storage - Warehouse Building TM K: 7-9-017:022 0 750 1,500 3,000 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Feet 4,500 159 Print Date: January 26, 2012 CoH Dept of Planning GIS County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works - Building Division 2. DATE: 12/15/2011 3. PROJECT NAME: Kona Baseyard Storage /Warehouse Building 4. SUBMITTER: Stanley Nakasone 5. COUNCIL BENEFIT DISTRICT(S): 6,7, 8 6. TMK /JUDICIAL: (3) 7 -9- 017:022/ North Kona 7. LOCATION (COUNCIL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,200,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New building 10. PROJECT /PROGRAM DESCRIPTION: Construction of a replacement warehouse with approximately 40'x80' footprint. It will be used for storage space and for current equipment and supplies. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Improving operating efficiency. Secure storage for equipment and supplies. To protect County equipment against weather elements (rain, wind, etc.) and to prolong equipment useful life and supplies shelf life. To provide covered area during job preparation and equipment service, especially at night or during emergency responses. Improve current levels of service. 12. LONG RANGE PLANS /COMMUNITY VALUES: To achieve Department's /Division's Vision, Mission, Core Values and Goals. 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Annual operations and maintenance (facility and grounds maintenance, utilities) 16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains our community through employment and workforce wages; Promotes public safety through road maintenance and emergency preparedness and responses to natural disasters. 17. PROJECT READINESS (List all that apply): Project is in initial funding request. 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 1,200 $1,200 TOTAL: $1,200 $1,200 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): to .,. , ..� 1,200 ...'' �i $1,200 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $1,200 $1,200 160 Amy Greenwell Botanical Garden & 9 13 370 DM/ a MDL 9'A! ea..sFr. LACE MAM4LANPA POP. u <MF_fM r4N'4KA 5-719'0. F.P, f919 d COP/FE FA FOR *UM MA MAKAt) /FntmPeIY 9/,. 9- 2'- all �T Road that floods in heavy rains 161 19/ MUi MAO/P 31.01 irnat TAR MAP 2 1 Greenwell Park (& Yano Hall) Water comes down the common road, through the ball field, then cascades over the rock walls onto the highway. PARCELS MAKAI OF AMY GREENWELL BOTANICAL GARDEN Drainage ditch that is eroding Ponding area on Mamalahoa Highway 0 v e t. 0 'COOKY t ANIIINC AXE .0 XONA. NAW4 N. NAWAft, "KFtt <k5404 RANCH 5080 ^ 1NC.AF4FNT / 5/05 r t. t, AW 0458' 9 P P '795 V ' kwi.�..ta. •mxA �.M TAR MAPS SICTNNV TAX MAP S . 2 15. 162 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 4/12/2012 3. PROJECT NAME: Greenwell Park Flooding 4. SUBMITTER: Brenda Ford 8 -2 -013 (mauka unnamed street), 8 -2 -015 (Hwy); S. COUNCIL BENEFIT DISTRICT(S): 7 (new 6) 6. TMK: 8 -2- 013:38 (Road F); 7. LOCATION (JUDICIAL DISTRICT): 7 (new 6) 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $250,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement, Planning, Feasibility, Engineering and Design. 10. PROJECT /PROGRAM DESCRIPTION: Work includes roadway reconstruction for unnamed road between Greenwell Botanical Garden and Yano Hall - Greenwell Park; shoulder and drainage improvements including drywells on the Mamalahoa Highway, the unnamed road, and Road F; possible utility relocation, possible retaining wall construction, driveway & property tie -ins (Road F), roadway signing and striping, other related improvements; reconstruction of the culvert under the Mamalahoa Hwy; and hardening of the ditch on TMK: 8 -2- 015:18 to prevent erosion. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Address public health and safety; repair and maintenance of infrastructures (roads, drywells, culverts, flooding); enhances quality of life. 12. LONG RANGE PLANS /COMMUNITY VALUES: Department vision, mission, core values and goals; and community value and desirability. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Improved roads and flooding mitigation will protect the community and reduce road maintenance. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic viability; strengthens and sustains our community; and promotes health and safety. 17. PROJECT READINESS (List all that apply): Need to acquire Road F property via donation or eminent domain; need to obtain bond funds. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 50 $50 Land Acquisition 100 $100 Design /Survey 100 $100 Construction 2,000 $2,000 TOTAL: $250 $2,000 $2,250 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): it% w/ >0 Cty G.O. Bond/Other 250 $250 State Revolving Fund State CIP Federal (flooding control) Private (Grants) CBA (Fair Share /Park Dedication, etc) 2,000 $2,000 Special Financing District TOTAL: $250 $2,000 $2,250 163 (This Page Intentionally Left Blank) 164 KONA BASEYARD EXPANSION 9 J e—. 0 W !AS "p 1,19, -••,,.. -,• 0 rd. POP A-ronslors SOdTW KONA, NAINA11 INNIAANy sOf #4.06) fr rot 1110•111.7 #25135411N1 MIAOW WSW, m CHANCE baarwea—TW ■•■614•II WW1 MIPS UAW* MPS CO PIIIVMA TAX PAAP 7.0t0 101Ane, 8 1 16 165 County of Hawai i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Department of Public Works 2. DATE: 5/3/2012 3. PROJECT NAME: Kona Baseyard Expansion - Kealakekua 4. SUBMITTER: Brenda Ford 5. COUNCIL BENEFIT DISTRICT(S): 6,7 6. TMK: 8 -1- 016:037 Portion 7. LOCATION (JUDICIAL DISTRICT): 6,7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $172,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Public Safety, road and highway maintenance. 10. PROJECT /PROGRAM DESCRIPTION: Land Acquisition to expand the existing Kona Baseyard to allow to more parking and future building for materials and supplies for road and highway maintenance. This FIS allows the acquisition of land adjoining the existing baseyard. The property has a willing seller. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Provide employee parking in the near term, then build a new storage building for materials and supplies in the future. 12. LONG RANGE PLANS /COMMUNITY VALUES: More efficient service for road and highway maintenance by ultimately being able to store materials and supplies on the west side of island for work crew. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Parking lot will not require operational money for many years. Ultimately, the new buillding for materials and supplies will need janitorial services, water, and electricity. 16. SUSTAINABILITY FOCUS (List all that apply): More efficient use of labor and materials and supplies to maintain our roads and highways. 17. PROJECT READINESS (List all that apply): The property owner is willing. A requirement of the project will be for the county to subdivide the property at the county's expense to create two lots. The makai lot on the Mamalahoa Highway will remain with the seller. The mauka lot of appropxiamtely 17,000 square feet will be owned by the county. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition 167 $167 Design /Survey 5 $5 Construction TOTAL: I JI $172 $172 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): Ai" .' % / N Cty G.O. Bond /Other 172 $172 State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share /Park Dedication, etc) Special Financing District TOTAL: $172 $172 166 1-5-09 3RD DIV 13 Bevwm n Y,t. <u w / .q^ £'g14.34 '. 55 4 5 . 7 9 • 7 4 9 . 9 r ....+ 9,9099 I.01+4. ,e..w na 56 sa o.La>....•,YS /+YB.v,: ne Wr 57 seaw,ca.; j...a, r.r. <••• /,Ys/y.A.A4.0 -A 53 w, //•a., e. r,e,./;/ -r /r I NSSEET 3i /GO 990 Aa Gran/ 2G47/ 111-riri'll kIli je is I %al IP! . .4•Emoommaim, 1011 �� � �l�G111 ��L. NI Hi 1W• Lint ri H O N (47. 2B w.., N 4 I_ V -4 0 L U 16 �0 49 .4.,, Yr C. po.. OF p /U/1 — KPONpP'oKO \(K/T"pVNA C/ P A <V P 2 4 .,.r°.+.'"°/se�.i /. if.,... ei. +,.. 167 4 4 4 �_ \ TAXATION MAPS HAWAII TERRITORY OF W.WAI1 TAX MAP / \ SUBJECT TO C vv THIRD DIVISION ZONE SEC. PL AT 09 CONTAINING PARCELS SCALE: I i 10001, County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works - Engineering Division 2. DATE: 5/8/2012 3. PROJECT NAME: Hawaiian Beaches /Hawaiian Paradise Park Connector Road /Pap4. SUBMITTER: Councilmember Fred Blas 5. COUNCIL BENEFIT DISTRICT(S): 5 6. TMK/JUDICIAL: Puna Makai 7. LOCATION (COUNCIL): 5 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $200,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Possible land acquisition, engineering, infrastructure. improvement 10. PROJECT /PROGRAM DESCRIPTION: Study the feasibility of opening and improving Papio Street/Government Beach Road between Hawaiian Beaches and Hawaiian Paradise Park. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): To provide connectivity in the area as well as a possible emergency route. This will also open up the shoreline area for recreational opportunities and shoreline access in Puna Makai. 12. LONG RANGE PLANS /COMMUNITY VALUES: This has been identified as a desireable walking /biking area. Improving the road will increase opportunities for local families to access the area for recreational purposes. [13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Project will require future funding for land acquisition and construction, also long term operating funds for maintenance and upkeep. 16. SUSTAINABILITY FOCUS (List all that apply): Project will increase traffic efficiency and provide access to shoreline areas for recreational uses. 17. PROJECT READINESS (List all that apply): Staff is available to manage this project and funds can realistically be encombered by June 30, 2013. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 50 $ 50 Land Acquisition 100 $ 100 Design /Survey 50 $ 50 Construction 2,500 $ 2,500 TOTAL: $ - $ 200 $ 2,500 $ 2,700 19. O & M COSTS (x $1000): 20. FUNDING SOURCE x $1000: ' ,.4%.::-- , , ., / ' 200 � . • �� � 2,500 � , .�M $ 2,700 Cty G.O. Bond /Other State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $ - $ 200 $ 2,500 $ 2,700 168 5 OR 4 of Ho., rstas.en. Ae) PL T 0 er. oh, La 2- .4- Li T-1 Lyman Gil. 18.0 Jar, Yr 2481- 0444cofte/ 0 a .44.1C-sz.z..A. "1,0/0Z7712 Aorifiiiimespen. h4 24f S J1ISA,. 0 t 0 N-.4.441-.14/G. /V..he ma. • F/a, A " ' SHNEV' ,a1A•C CC cvlror,m. 0. • THIRD DIVISION ZONE SEC • PLAT I 5 08 CONTAINING PARCELS SCALE, I Iry 1000 IT PRINTED 169 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works - Engineering Division 2. DATE: 5/7/2012 3. PROJECT NAME: Apaa Street improvement/re- alignment (blind curve) 4. SUBMITTER: Fred Blas 5. COUNCIL BENEFIT DISTRICT(S): 5 6. TMK/JUDICIAL: 1 -5 -01 /Puna 7. LOCATION (COUNCIL): 5 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $200,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Possible Land acquisition, engineering, and infrastructure improvement. 10. PROJECT /PROGRAM DESCRIPTION: Re -align a section of Apaa Street that is dangerous due of a blind curve. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Increased traffic on street due to transfer station improvements, increased residences served by the street and over all population growth in the district. 12. LONG RANGE PLANS /COMMUNITY VALUES: This area is being considered for LUPAG map amendments that will allow for mixed uses and is also considered in the Puna Community Development Plan as the preferred area for future commercial and light industrial development for the Pahoa Regional Town Center that Pahoa Village is destined to become. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Project will require future funding for planning and construction, as well as long term maintenance costs. 16. SUSTAINABILITY FOCUS (List all that apply): Project will address the roads capacity, accommodate increased traffic and increase public safety in the area. 17. PROJECT READINESS (List all that apply): Staff is available to manage this project and funds can realistically be encombered by June 30, 2013. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 50 $ 50 Land Acquisition 50 $ 50 Design /Survey 100 $ 100 Construction 1,300 $ 1,300 TOTAL: $ - $ 200 $ 1,500 19. 0 & M COSTS (x $1000): ,,, ,; , , ,.. / „ ;' J 20. FUNDING SOURCE (x $1000): Cty G.O. Bond /Other 200 1,300 $ 1,500 State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $ - $ 200 $ 1,300 $ 1,500 170 `_ ' r` ! l~ ir-- ----`- _'`Lj c^.-- t/ 11'"1 �? f T t f 11 ( -4 - i --7-7--- `'r -- "^;••"c. / I % F',.,+ iF'e: ii N 4.11 11 i ? t f 1 i ! 1.f Sr�'''`'C... JECT gp.�ir~ r., • :j / /I t 1, - , I l~`� tf / % `' I �/ `: / / r // wcri ppry (r t Lc- 'l I ■ t HAWAII BELT ROAD__. 3 1 ��j L i T F- 3 to i I T.M.K.: 4-5 -07:03, 04, 06, 06 & 07 Adj. VICINITY MAP LEHUA STREET SIDEWALK IMPROVEMENTS HAMAKUA, HAWAII County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2011 to 2012 1. DEPARTMENT AND DIVISION: Public Works 2. DATE: 5/8/2012 3. PROJECT NAME: Lehua Street Sidewalk Improvements 4. SUBMITTER: Dominic Yagong 5. COUNCIL BENEFIT DISTRICT(S): District 1 6. TMK: 4 -5 -07: 3, 4, 5, 6, & 7 adj. 7. LOCATION (JUDICIAL DISTRICT): Honoka'a, Hamaukua, Hawai'i 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $920,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Public safety, safe route to park and senior home, and drainage improvements to street and private homes. 10. PROJECT /PROGRAM DESCRIPTION: Provide a concrete sidewalk, with drainage improvements, along the eastern side of Lehua Street from Mamane Street (State Hightway Rte 240) until approximately 800 lineal feet. Presently there are no sidewalks and Lehua Street shoulders are relatively narrow. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Improve quality of life, road and sidewalk safety improvements, and drainage improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: Public safety, quality of life, enable walking on the street for health, improve drainage, and protect residences from flooding. 13. COUNTY MATCHING FUNDS REQ'D? NO X YES DESCRIBE: 14. LEGAL MANDATE? NO X YES DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Regular road and shoulder maintenance is already ongoing; concrete sidewalk will lessen the unimproved shoulder maintenance. Drainage improvements will mitigate flooding concerns. 16. SUSTAINABILITY FOCUS (List all that apply): Permanent safety and drainage improvements will be the long -term goal. 17. PROJECT READINESS (List all that apply): Needs land survey and engineering design work for sidewalk and drainage improvements. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 15 -16 Beyond 6 Years TOTAL: Planning Land Acquisition - - 20 -- Design /Survey $20 Construction 900 $900 TOTAL: $920 $920 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): i i g00, s?' r F3 ;', y, ! 4 ' i.:.. , . Cty G.O. Bond /Other 920 $920, State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share /Park Dedication, etc) Special Financing District $920 $920 172 TMK: 8 -1 -009: 051 Napo`opo`o Junction Bus Stop; Park & Ride KAAISALOA(MAK"A,).$(YUTH IkONA, fi4lYA / 173 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: 3. PROJECT NAME: 5. COUNCIL BENEFIT DISTRICT(S): 7. LOCATION (JUDICIAL DISTRICT): Department of Public Works 2. DATE: 5/9/2012 4. SUBMITTER: Brenda Ford 6. TMK: 8 -1 -009: 051 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $237,000 Napo'opo'o Junction Bus Stop; Park & Ride 6,7 7; New 6 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Public Service; Quality of Life; Traffic Reduction; contain the cost of living. 10. PROJECT /PROGRAM DESCRIPTION: Create a bus stop and park & ride near the new bypass highway at the Napo'opo`o Junction to allow more people to ride the bus to and from the job centers of West Hawai'i. This parcel is 1.716 acres of land which would allow the Hele -On bus to pull off of the highway to safely embark or disembark passengers. This parcel is located on the makai side of the intersection. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): This bus stop would allow more people to use the public transit system and park their vehicles off the highway safely saving the residents the increased expense of gasoline, reducing emissions, and increasing ridership. This bus stop could also be used for "short- distance" bus runs serving the mauka area of South Kona. 12. LONG RANGE PLANS /COMMUNITY VALUES: Increases public transportation availability, reduces cost of living and combustion emissions by removing more vehicles from roadways; and increases access to other businesses and services in the Kona area. 13. COUNTY MATCHING FUNDS REQ'D? YES DESCRIBE: If we can get a federal grant, we will need to match the construction funds. 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Mass Transit will need to add a short - distrance bus line from Captain Cook to other areas of Kona; Public Works will need to maintain the bus stop, paving, and trash collection at the bus stop. 16. SUSTAINABILITY FOCUS (List all that apply): Creates a more sustainable community with more public transportation hubs. 17. PROJECT READINESS (List all that apply): Land acquisition can begin immediately, but the construction project cannot begin until N5po'opo'o Junction re- construction begins. There is a local property owner who will donate free fill for the bypass, the bus stop, and the Napo'opo'o Junction intersection. This donation will reduce the cost of obtaining fill for these construction projects. 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 5 $5 Land Acquisition 237 $237 Design /Survey 10 $10 Construction 100 $100 TOTAL: $237 $115 $352 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 237 $237 Cty G.O. Bond /Other State Revolving Fund State CIP Federal 115 $115 Private (Grants) CBA (Fair Share /Park Dedication, etc) Special Financing District TOTAL: $237 $115 I $352 174 0,4 04044 03 0001 •,./s 4,47$' fsflf 0001 00441 .24.°30, 13 4001 71 4007 13 40.1 -040 .00441 .0 4,..V.44,„. A0.24440, 0404441 '*0 0441 *.frituM* lor 00141 1*3 4..1 *041 *0001 70 0001 et 44. 4,4.9 44.N 4044400 Afff10 .0. 11 0041 .3.0 0001 4,44,44,4, 406, 0f, 4041 -4, *04y - .4+4 4, f.444 1. 4041 At/ 44, 0001 44 004. •P 6100 ake, seivarY .44/4140 40001 SI 0001 4, .001 4' '44 0001 rr rr oo oorto 00 0001 ..”. 000? "V ..1,0, (t' ..* 0.ate f ,...,- 0.01 41 .f9, 40 0101 W. ,0 itt-t, 03 004. , R -tt.....0, .itp .. 3 3103 i•AO 4:!... V 4,' 0001 . 2 03' 0007 404,4044 X" °r. 21 .,4 0.4 04444 404444 •,..440.44,4. -..* .4444 04 0007 ..4.7,,' 4440.44.41 0001 Al •0.‘ 7407 0,...,7, ,,,,, b.-,4, ,,,,,,.......7 -.4, vy a..? .1. ....fa .....- 0001 14. •40• xf 40.1,0 .1 4001 ff., .01,, .4 0 4, ...f . , .4 400. , ..f, , 4 ...., 40 0001 0.404'9.'0'0 ..1'q 11 0001 .027'6.14 11 11 ,..... Att co la -,4 t1 ■ ■ s— 10 ....,, ....., ' ..27 cod v ' tttp ....., , 4 .0v 004, 4 .4., .., .., ql ., . •, i .. t ... 4 4* 4 4' '44 0001 County of Hawai i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Public Works - Engineering Division 2. DATE: 5/24/2012 3. PROJECT NAME: Lower Puna Community Relief Center 4. SUBMITTER: Fred Blas 5. COUNCIL BENEFIT DISTRICT(S): 5 6. TMK/JUDICIAL: 1 -3- 036 -48 & 1- 3- 036 -39 to 1- 3- 036 -43 7. LOCATION (COUNCIL): 5 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $200,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; New Buildings or Structures 10. PROJECT /PROGRAM DESCRIPTION: Development and construction of a new multi- function facility or renovation /retrofit of an existing facility to serve as a civil defense/ community - command /relief center for the Lower Puna area. The facility will function as a "staging" grounds for emergency personnel and a collection /evacuation point for persons with critical emergency needs, also to facilitate the transport/management of lower Puna residents and visitors that are stranded in the event of an emergency. The facility will serve a "flow" of individuals, goods and services and will support a capacity not to exceed 300 in the "covered" space and has unlimited capacity outdoors in the adjoining field. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): ADDRESSES PUBLIC HEALTH AND SAFETY; INADEQUATE SERVICE; ENHANCES QUALITY OF LIFE; The facility will serve as a civil defense community- command /relief center for natural disasters or other emergency situations, including but not limited to; earthquakes, tsunami, severe flooding, lava flows and geothermal events in a community that can easily become completely isolated by one event. 12. LONG RANGE PLANS /COMMUNITY VALUES: Conforms to the County's mandate to protect the public health and welfare. Supports the community's capacity to interface with appropriate agencies and to manage local resources and manpower in the event of an emergency. 13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE: 14. LEGAL MANDATE? NO DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: Developing a new facility will result in increased maintenance costs, future repair costs, and ongoing utility costs for the department that are justified for the enhanced services and functions the improvements allow the county and community. 16. SUSTAINABILITY FOCUS (List all that apply): STRENGTHENS AND SUSTAINS OUR COMMUNITY, PROMOTES HEALTH AND SAFETY. 17. PROJECT READINESS (List all that apply): Leilani Community Association Board members and CERT members are available to assist the County with the project. Staff is available to manage this project and the funds can realistically be encumbered prior to June 30, 2013. Negotiations between the Leilani Community Association and the County for site control will be necessary in the first phase. $50,000 is requested for "Land Acquisition ". 18. EXPENDITURE PHASING (X $1000): Prior Funds Received This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 50 $ 50 Land Acquisition 50 $ 50 Design /Survey 100 $ 100 Construction 1,000 $ 1,000 TOTAL: $ - $ 200 $ 1,000 $ 1,200 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): ,_ �� 200 1,000 ,., is' Cty G.O. Bond /Other $ 1,200 State Revolving Fund State CIP Federal Private (Grants) CBA (Fair Share /Park Dedication, etc) TOTAL: $ - $ 200 $ 1,000 j $ 1,200 176 (This Page Intentionally Left Blank) 177 OFFICE OF HOUSING AND COMMUNITY DEVELOPMENT Stephen J. Arnett, Housing Administrator (This Page Intentionally Left Blank) 179 Department: OFFICE OF HOUSING & COMMUNITY DEVELOPMENT SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 180 2012 -13 FY FUNDING FUNDING FORECAST BY FISCAL YEAR TOTAL (in thousands) (in thousands) ESTIMATED Prior Funds Allotted Beyond 6 PROJECT PRIORITY PROJECT County State Federal Private CBA (not lapsed) 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 years COST 1 Ulu Wini Homes Expansion 2,000 20,342 2,000 22,342 2 Ulu Wini Sewer Line Extension 1,500 1,500 1,500 3 Paniolo Drive Extension 500 500 500 4 'buli'Ekahi Cottages Improvements 320 320 320 5 Wai ula Drive Improvements 30 30 30 TOTAL 4,350 20,342 4,350 24,692 180 TM K: 7 -3- 009:055 Ulu Wini Homes Expansion 0 445 890 1,780 2,670 Feet 3,560 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print Date: January 11, 2012 181 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Housing & Community Development, Community Development Division 2. DATE: 1/11/2012 3. PROJECT NAME: Ulu Wini Homes Expansion 4. SUBMITTER: Jeremy McComber, Housing Specialist 5. COUNCIL BENEFIT DISTRICT(S): 8 6. TMK /JUDICIAL: 7- 3- 009:055 / North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): New buildings or structures 10. PROJECT /PROGRAM DESCRIPTION: Na Kahua Hale 0 Ulu Wini ( "Ulu Wini ", formerly known as Kaloko Housing Program) incorporates transitional (short-term, less than two years) and permanent rental housing for families with children, with a preference for those impacted by homelessness. Entire build -out of the site will include 96 two - bedroom units (transitional and rental), an administrative building, an employment training facility that will house organizations that will provide employment opportunities for program residents, and a wastewater treatment plant. Families engaged at Ulu Wini will be provided either transitional or rental housing, case management, mail and computer access, and access to an array of on -site support services (including employment and life skills training, mental health services, counseling and childcare). Oversight of the various on -site resources will be provided by HOPE Services Hawai'i. Ulu Wini will target families with children earning below 50% of the County's adjusted median income. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 2, 3, 6, 7 - According to the 2011 Hawaii Housing Planning Study (Prepared for the County of Hawai'i, SMS Research & Marketing Services, Inc.), Hawai'i County experienced the highest population growth rate in the State (at 2.39% between 2005 and 2001). As the "most" affordable county in the State (with median monthly rent amounts 20% lower than other counties), Hawai'i County has seen migration from not only other states, but the other counties as well. As such, over 1,000 rental units serving populations earning less than 50% of the average median income are needed in Hawaii County. Data from the Homeless Service Utilization Report, Hawai'i 2011 (University of Hawaii Center on the Family), confirms a total of 622 persons residing in shelter programs in Hawaii County. With more than 40% of those sheltered living in Hawai'i for the entire life, there is a clear need for additional housing program such as Ulu Wini. However, there is currently only one (1) housing program for families (non - special needs) that operates in East Hawaii. As such, the populations on the West side of the island have no programming available to service their needs. The Ka Hale 0 Kawaihae Transitional Housing Program ( "Kawaihae ") did provide similar services as that to be offered at Ulu Wini. However, effective 2/28/11, the Kawaihae program was closed, as the County was able to develop Ulu Wini and, thus, regain compliance with the Environmental Protection Agency by closing the large capacity cesspools located at Kawaihae. Nevertheless, the Kawaihae program is no longer operating, which has impacted the availability of programming available to our population in West Hawaii. A program like Ulu Wini is needed for the financially- challenged populations, as their path to financial sustainability will include the need to obtain and retain employment. As Ulu Wini is located in such close proximity to employment, as well as educational institutions, health care, social services, and daily living establishments (grocery stores, gas stations, etc.), expansion of this supportive housing program is most practical in housing and servicing the participants in proximity to resources so that they maintain a higher instance of success. Longer commuting distance, like those to other locations, would result in higher fuel costs in order to commute, as well as discouraged viability of participant's success by having to access scattered and /or remote resources. Participants may have limited to no transportation and may be likely to fall out of their plan to sustainability. Award of the requested funds will allow the County to complete the development of the last 16 permanent rental units. Completed units will allow for the provision of 320 months of affordability, serving approximately 144 families with children for the next 20 years. 12. LONG RANGE PLANS /COMMUNITY VALUES: 1, 2 (County General Plan, Section 9), 3 (Kona Community Development Plan), 4 (County Consolidated Plan, 2010 - 2014), 5 (State Consolidated Plan, 2010 - 2014), 7 13. COUNTY MATCHING FUNDS REQ'D? No 'DESCRIBE: 'DESCRIBE: 14. LEGAL MADATE? No 15. IMPACT ON OPERATIONAL BUDGET: The project will be administered without the need for additional staff or operating funds. 16. SUSTAINABILITY FOCUS (List all that apply): 1, 3, 5, 6 - Ulu Wini provides affordable, permanent rental housing in close proximity to employment centers. 17. PROJECT READINESS (List all that apply): 1 (Currently underway), 2 (First phase of vertical construction completed), 3 (Previous appropriations allotted and expended /encumbered), 4 (Existing staff to manage the project), 6, 7 (Existing staff to manage the project) 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 20,342 2,000 _ $22,342 TOTAL: $20,342 $2,000 $22,342 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): .': ' -' "' ` 4 V, u . '_ . Cty G.O. Bond /Other 9,980 2,000 $11,980 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 10,362 $10,362 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $20,342 $2,000 - $22,342 TM K: 7 -3- 009:055 Ulu Wini Homes Sewer Line Extension Feet 0 450 900 1,800 2,700 3,600 Print Date: January 11, 2012 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 183 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Housing & Community Development, Community Development Division 2. DATE: 1/11/2012 3. PROJECT NAME: Ulu Wini Sewer Line Extension 4. SUBMITTER: Jeremy McComber, Housing Specialist 5. COUNCIL BENEFIT DISTRICT(S): 8 6. TMK /JUDICIAL: 7 -3- 009:055 / North Kona 7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,500,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): 3 (Improves operational efficiency) 10. PROJECT /PROGRAM DESCRIPTION: Na Kahua Hale 0 Ulu Wini ( "Ulu Wini ", formerly known as Kaloko Housing Program) incorporates transitional (short -term, less than two years) and permanent rental housing for families with children, with a preference for those impacted by homelessness. Entire build -out of the site will include 96 two- bedroom units (transitional and rental), an administrative building, an employment training facility that will house organizations that will provide employment opportunities for program residents, and a wastewater treatment plant. Families engaged at Ulu Wini will be provided either transitional or rental housing, case management, mail and computer access, and access to an array of on -site support services (including employment and life skills training, mental health services, counseling and childcare). Oversight of the various on -site resources will be provided by HOPE Services Hawai'i. Ulu Wini will target families with children earning below 50% of the County's adjusted median income. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 3 - Installation of a dry sewer line for Ulu Wini will alleviate additional and future installation costs that would occur at the time the Hina Lani sewer connection is established. 12. LONG RANGE PLANS /COMMUNITY VALUES: 1, 2 (County General Plan, Section 11), 3 (Kona Community Development Plan), 7 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The project will be administered without the need for additional staff or operating funds. 16. SUSTAINABILITY FOCUS (List all that apply): N/A 17. PROJECT READINESS (List all that apply): 1 (Currently underway), to manage the project), 6, 7 (Existing staff to manage the project 2 (First phase of vertical construction completed), 3 (Previous appropriations allotted and expended /encumbered), 4 (Existing staff 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 300 $300 Construction 1,200 $1,200 TOTAL: $1,500 $1,500 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x$1000): ii %i 1,500 !ii t oi,, $1,500 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $1,500 $1,500 184 TM K: 6 -8- 002:026 Paniolo Drive Extension 0 290 580 1,160 1,740 Feet 2,320 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 Print Date: January 11, 2012 185 J County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Housing & Community Development, Community Development Division 2. DATE: 1/11/2012 3. PROJECT NAME: Paniolo Drive Extension 4. SUBMITTER: Jeremy McComber, Housing Specialist 5. COUNCIL BENEFIT DISTRICT(S): 9 6. TMK /JUDICIAL: 6 -8- 002:026 / South Kohala 7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): 2 (Infrastructure improvement) 10. PROJECT /PROGRAM DESCRIPTION: Kamakoa Nui Community ( "Kamakoa ") is a fee - simple workforce housing community for households earning below 140% of the County's adjusted median income. Entire build -out of the site will include 1,200 fee simple units, a community park (with baseball /soccer fields and a comfort station), a community center, a site for a future school, a future development areas. and open space. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1, 3, 6, 7 - Extension of the existing Paniolo Drive (which connects to Kamakoa) will alleviate potential car /pedestrian hazards for accessing Kamakoa. In addition, this primary access will reduce the current traffic burden on Iwikuamo'o Drive. 12. LONG RANGE PLANS /COMMUNITY VALUES: 1 (Public Works goal to improve traffic circulation), 2, 3 (South Kohala Community Development Plan), 7 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The project will be administered without the need for additional staff or operating funds. 16. SUSTAINABILITY FOCUS (List all that apply): N/A 17. PROJECT READINESS (List all that apply): 2 (Model units and community park completed), 3, (Provides primary access to affordable workforce housing) 6, 7 (Benefits those accessing housing as well as the community park; Benefits Public Works by reducing repair costs to Iwikuamo'o Drive). 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 500 $500 TOTAL: $500 $500 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): 500 $500 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $500 $500 186 TM K: 6 -2- 001:085 'Ouli 'Ekahi Cottages Improvements 0 225 450 Feet 900 1,350 1,800 Print Date: January 11, 2012 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 187 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Housing & Community Development, Community Development Division 2. DATE: 1/11/2012 3. PROJECT NAME: 'Ouli 'Ekahi Cottages Improvements 4. SUBMITTER: Jeremy McComber, Housing Specialist 5. COUNCIL BENEFIT DISTRICT(S): 9 6. TMK /JUDICIAL: 6 -2- 001:085 / South Kohala 7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $320,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): 4 (Deferred maintenance of infrastructure or buildings) 10. PROJECT /PROGRAM DESCRIPTION: The 'Ouli 'Ekahi Cottages ( "'Ouli ") is a 33 -unit permanent rental housing (2- bedroom units) community for families with children earning less than 50% of the County's adjusted median income. Management of the community is provided by Hawai'i Affordable Properties. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1, 2, 3, 4, 5, 6, 7 - By upgrading the roofs, updating paint and improving the sewer treatment plant, health and safety of the residents will be maintained. In addition, substantial costly repairs will be avoided in the future. Improvements made will extend the life of the 'Cull by 20 years - providing 660 months of affordability, serving approximately 462 families with children. 12. LONG RANGE PLANS /COMMUNITY VALUES: 1, 2 (County General Plan, Section 9) , 3 (South Kohala Community Development Plan), 7 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The project will be administered without the need for additional staff or operating funds. 16. SUSTAINABILITY FOCUS (List all that apply): 1, 3, 5 - 'Ouli provides affordable, permanent rental housing in close proximity to employment centers. 17. PROJECT READINESS (List all that apply): 2, 4 (Existing staff to manage the project), 6, 7 (Existing staff to manage the project) 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 320 $320 TOTAL: $320 $320 19. 0 & M COSTS (x $1000): I 20. FUNDING SOURCE (x$1000): �.,..'''`:s 320 his j $320 Cty G.O. Bond /Other State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $320 $320 188 TM K: 6 -2- 001:085 Wai'ula Drive Extensions 0 225 450 Feet 900 1,350 1,800 Print Date: January 11, 2012 CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 189 County of Hawaii PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Housing & Community Development, Community Development Division 2. DATE: 1/11/2012 3. PROJECT NAME: Wai'ula Drive Improvements 4. SUBMITTER: Jeremy McComber, Housing Specialist 5. COUNCIL BENEFIT DISTRICT(S): 9 6. TMK /JUDICIAL: 6 -2- 001:085 / South Kohala 7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $30,000 9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): 2 (Infrastructure improvement) 10. PROJECT /PROGRAM DESCRIPTION: Wai'ula Drive ( "Wai'ula ") provides primary access to the (1) 'Ouli 'Ekahi Cottages ( "'Ouli "), a 33 -unit permanent rental housing (2- bedroom units) community and (2) 'bull Self -Help, a 40 -unit housing community. Currently, Wai'ula is a private road, and is in need of upgrade to dedicable standard so that the Department of Public Works can accept and provide future maintenance. 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1, 2, 4 - By upgrading the road, health and safety of the residents will be maintained. In addition, substantial costly repairs will be avoided in the future. Improvements made will extend the life of both communities, while relieving cost burden to programs that do not generate large revenues, as they serve vulnerable populations. 12. LONG RANGE PLANS /COMMUNITY VALUES: 1 (Public Works goal to improve traffic circulation), 2 , 3 (South Kohala Community Development Plan), 7 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MADATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: The project will be administered without the need for additional staff or operating funds. 16. SUSTAINABILITY FOCUS (List all that apply): N/A 17. PROJECT READINESS (List all that apply): 2, 4 (Existing staff to manage the project), 6, 7 (Existing staff to manage the project) 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey Construction 30 $30 TOTAL: $30 $30 19. 0 & M COSTS (x $1000): J 20. FUNDING SOURCE (x $1000): Cty G.O. Bond /Other 30 $30 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $30 $30 190 (This Page Intentionally Left Blank) 191 MASS TRANSIT AGENCY TOM BROWN, ADMINISTRATOR (This Page Intentionally Left Blank) 193 Department: Mass Transit Agency SUMMARY OF DEPARTMENT REQUESTS SIX YEAR CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR 2012 -2013 PRIORITY PROJECT 2012 -13 FY FUNDING (in thousands) FUNDING FORECAST BY FISCAL YEAR (in thousands) TOTAL ESTIMATED PROJECT COST County State Federal Private CBA Prior Funds Allotted (not lapsed) 2012 -13 2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 Beyond 6 years 1 2 Island -wide Bus Shelter Program Transit Baseyard /Admin Facility 750 100 400 750 500 250 4,500 1,000 5,000 TOTAL 850 400 1,250 4,750 6,000 194 (This Page Intentionally Left Blank) 195 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Mass Transit Agency 2. DATE: 1/10/2012 3. PROJECT NAME: Island -wide Bus Shelter Project 4. SUBMITTER: Thomas Brown 5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK /JUDICIAL: To Be Determined 7. LOCATION (COUNCIL DISTRICT): All 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $750,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New buildings 10. PROJECT /PROGRAM DESCRIPTION: Construct 30 bus shelters in Hawaii County 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, Inadequate service, Improves operational efficiency, Service improvements. 12. LONG RANGE PLANS /COMMUNITY VALUES: Department Vision, Mission, or Goals 13. COUNTY MATCHING FUNDS REQ'D? No DESCRIBE: 14. LEGAL MANDATE? No DESCRIBE: 15. IMPACT ON OPERATIONAL BUDGET: $10,000 /per year maintenance and cleaning 16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains our community, Promotes health and safety, Manages growth 17. PROJECT READINESS (List all that apply): Site selection complete, Staff available to manage project, Can realistically encumber funds, Operating budget needs 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning Land Acquisition Design /Survey 100 50 $150 Construction 650 200 $850 TOTAL: $750 $250 $1,000 19. 0 & M COSTS (x $1000): L 20. FUNDING SOURCE (x $1000): •.;-.. ', ,,,, ;, Cry G.O. Bond /Other 750 250 $1,000 State Revolving Fund State CIP Federal (including ARRA - Stimulus) Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $750 $250 $1,000 196 (This Page Intentionally Left Blank) 197 County of Hawai'i PROJECT DATA /FINANCIAL IMPACT STATEMENT Fiscal Year 2012 to 2013 1. DEPARTMENT AND DIVISION: Mass Transit Agency 2. DATE: 1/10/2012 3. PROJECT NAME: Transit Baseyard /Admin Facility 4. SUBMITTER: Thomas Brown 5. COUNCIL BENEFIT DISTRICT(S): To Be Determined 6. TMK /JUDICIAL: To Be Determined 7. LOCATION (COUNCIL DISTRICT): To Be Determined 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000 9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Land Acquisition, New Buildings or Structures, Planning and design studies 10. PROJECT /PROGRAM DESCRIPTION: Design and construct a new baseyard and administrative facility for the mass transit agency 11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Inadequate service, Improves operational efficiency, Service improvements 12. LONG RANGE PLANS /COMMUNITY VALUES: Department Vision, Mission , or Goals 13. COUNTY MATCHING FUNDS REQ'D? Yes DESCRIBE: Received $4,000,000 federal grant for the project. A 20% local match ($1,000,000) is required. 14. LEGAL MANDATE? No DESCRIBE: 1 15. IMPACT ON OPERATIONAL BUDGET: New facility will improve operational efficiency. Reduce costs for office and bus parking rent. Facility will also be more energy efficient. 16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality, Preserves and protects our natural environment, Manages growth 17. PROJECT READINESS (List all that apply): Staff availabel to manage project, External funds/ resources available to proceed, Can realistically encumber funds 18. EXPENDITURE PHASING (X $1000): Prior Funds Allotted (not lapsed) This FY 12 -13 Request FY 13 -14 FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 Beyond 6 Years TOTAL: Planning 200 $200 Land Acquisition 750 $750 Design /Survey 300 $300 Construction 3,750 $3,750 TOTAL: $500 $4,500 $5,000 19. 0 & M COSTS (x $1000): 20. FUNDING SOURCE (x $1000): •, '' „..: ... `. ,;' ���. ;: �� ;, F: ', . Cty G.O. Bond /Other 100 900 � $1,000 State Revolving Fund State CIP Federal (including ARRA - Stimulus) 400 3,600 $4,000 Private (Grants) CBA (Fair Share, Park Dedication, etc) TOTAL: $500 $4,500 $5,000 198 (This Page Intentionally Left Blank) 199 OFFICE OF THE COUNTY CLERK County of Hawai`i Hilo, Hawai`i (Draft 3) Introduced By: Brenda Ford ,(B /R) Date Introduced: May 14, 2012 First Reading: May 14, 2012 Published: May 25, 2012 REMARKS: Second Reading: May 31, 2012 To Mayor: June 5, 2012 Returned: June 14, 2012 Effective: July 1., 2017 Published: June 21, 2012 REMARKS: 2(112 `fF an I LI Fr 1 2: 144 ROLL CALL VOTE AYES NOES ABS EX Blas X Ford X Hoffmann X Ikeda X Onishi X Pilago X Smart X Yagong X Yoshimoto X 6 0 3 0 (Draft 4) ROLL CALL VOTE AYES NOES ABS EX Blas X Ford X Hoffmann X Ikeda X Onishi X Pilago X Smart X Yagong X Yoshimoto X 8 0 1 0 I DO HEREBY CERTIFY that the foregoing BILL was adopted by indicated above. APPROVED AS TO FORM AND LEGALITY: DEPUTY CORPORATION COUNSEL COUNTY OF HAWAII Date JUN -72012 .-1 pproved /Dis I4 roved this day , 20 O.. MAYOR, COUNTY OF A WAI '1 t Count Coun it published as COUNCIL CHAIRPERSON 110 UNTY CLERK Bill No.: Reference: Ord No.: 198 (Draft 4) C- 605.27/FC -218 12 87