My WebLink
|
Help
|
About
|
Sign Out
Home
REP AWESC 003 07/18/2012 2010-2012
ClerkCouncil
>
Council Records
>
Reports
>
2010-2012
>
Agriculture, Water, Energy, & Sustainability Committee (AWESC)
>
REP AWESC 003 07/18/2012 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2021 1:20:17 PM
Creation date
7/26/2012 3:33:45 PM
Metadata
Fields
Template:
Reports
Reports - Type
REP
Reports - Council Term
2010-2012
Report
003
Committee
AWESC
Meeting date
2012-07-18
Document Relationships
AGE COUNCIL 08/01/2012 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
COM 0778.000 2010-2012
(Related)
Path:
\Council Records\Communications\2010-2012
RES 277 Draft 01 2010-2012
(Related To)
Path:
\Council Records\Resolutions\2010-2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPORT OF THE <br /> COMMITTEE ON AGRICULTURE, WATER AND ENERGY SUSTAINABILITY <br /> DATE: July 18, 2012 RE: Comm. No. 778/Res. No. 277-12 <br /> PLACE: Council Chambers <br /> Kailua-Kona, Hawai`i <br /> TIME: 3:55 p.m. <br /> Council Chair and Members <br /> Hawaii County Council <br /> Hilo, Hawaii 96720 <br /> Your Committee on Agriculture, Water and Energy Sustainability, to which was referred <br /> Resolution No. 277-12, reports as follows: <br /> Resolution No. 277-12, transmitted by Chairperson Dominic Yagong via Communication No. 778, <br /> dated July 11, 2012, encourages the State of Hawaii Public Utilities Commission to raise Hawai`i <br /> Electric Light Company's (HELCO) renewable feeder penetration threshold from 15 percent of <br /> peak load to 50 percent of minimum load. <br /> Net Energy Metering is a system that allows customers who generate electricity (using wind, <br /> solar, etc.) primarily for their own consumption to sell excess electricity to the electric utility <br /> company. According to HELCO, there is a limited amount of Net Energy Metering systems that <br /> can be interconnected to HELCO's grid on each individual distribution feeder before significant <br /> impacts may occur to the reliability of electrical service provided to customers. The Public <br /> Utilities Commission has set a 15 percent threshold for the amount of excess electricity that may <br /> be delivered by Net Energy Metering systems to each individual distribution feeder. According <br /> to HELCO's Rule 14H, when the 15 percent threshold is exceeded in an individual distribution <br /> feeder, a Supplemental Review of the customer's application is required, which will most likely <br /> result in an Interconnection Requirements Study that would cost the customer between $2,000 <br /> and $100,000, depending on the size of the Net Energy Metering system. If the study determines <br /> that additional equipment or grid improvements are needed, then the customer would be <br /> responsible for those costs as well. Increasing the minimum threshold would provide HELCO <br /> the opportunity to work with companies such as National Energy Partners, LLC to negotiate <br /> financing of general upgrades and improvements to the electrical utility grid as an alternative to <br /> requiring the Interconnection Requirements Study. <br /> There were five testifiers from the Hilo Council Chambers and four from the Pahoa Council <br /> Office. All nine testifiers spoke in support of the resolution. <br /> Mr. Yagong submitted the following amendments via Communication No. 778.1: <br /> • Change "50 percent" to "100 percent" in the resolution title and the BE IT RESOLVED <br /> clause. <br /> AWESC Report No. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.