Your Committee on Public Works to which was referred Communication
1750 and Resolution No . 480-88, reports as follows:
The purpose of Resolution No . 480-88 is to authorize the County to
grant a license to Pacific Waste Recovery Systems, Inc . and Waste
Recovery System, Kona , which will allow those companies to enter the
Hilo and Kailua landfills , as well as other County-owned areas , as
may be deemed appropriate by the Chief Engineer , for the purpose of
removing junked cars , scrap metal and other waste materials from
those areas .
The authorization cited in Resolution No . 480-88 is Section 2-111 of
the Hawaii County Code 1983, relating to powers of Council , which
states that the Council may, by resolution approved by a majority of
its members , direct the finance director or chief engineer to dispose
of real property by lease , license or permit .
Your Committee has reviewed Communication No . 1750 from the Chief
Engineer , which transmits Resolution No . 480-88 and states that the
resolution will allow waste metal (junked cars ) removal at various
locations around the County, including the Kailua and Hilo landfills
and reclamation (mining ) of Kailua landfill to recover recyclable
materials and to produce a compost soil amendment .
Communication No . 1750 also states that proposals were received from
four firms in March 1988 ; Waste Recovery Systems was selected for
final negotiation; and the Department is prepared to execute
contracts toward implementation. The main features of the contr..cts
are as follows:
Waste Metal Removal
1 . Contractor will use his equipment to crush , bale and
transport junked cars and will store and market them.
2 . There is no cost to the County .
3. Both landfill sites will be cleared before other areas
belonging to the County .
4. Contract duration is five years and is renewable by
written agreement of both parties .
PWC REPORT 277
PDOPTED : OCT 51988
PWC-277 Page 2 September 29, 1988
Landfill Reclamation Project
1 . Contractor will construct a portable facility at the
Kailua landfill to separate mined refuse into glass ,
plastics , metals , papers and compost and then will store
and market the separated refuse .
2. There is no cost to the County .
3. Unuseable landfills will be returned to developable lands .
4. Will allow for control of landfill fires .
5 . Contract duration is eight years .
Your Committee considered Resolution No . 480-88 and Resolution 480-88
Draft 2, which was circulated at the meeting on August 30 , 1988 .
Your Committee heard testimony from the Chief Engineer that he worked
on the proposal to remove junked cars at the landfills and to
extinguish fires at the Kailua landfill for two years and four
months . In response to the Department of Public Works Requests for
Proposals (RFP' s ) , four proposals were submitted by the following:
1 . John Zinc Co . for incineration at a cost of nearly
14 ,000 ,000 ;
2. Shane Rohan for a recycling project at a cost of 150 ,000
to 160 ,000 ;
3 . Western Waste Industries , a California Company that
proposed taking over our landfill ; and
4 . Waste Recovery System, which involves removal of the
junked cars and for mining the Kona landfill .
The Chief Engineer testified that the RFP' s were not related to the
initiative for waste to energy incineration [Resolution No . 330-87 ]
and the Department of Public Works is proceeding with the feasibility
study to see if incineration is workable within the County .
The Chief Engineer explained that the purpose of Resolution 480-88 is
to allow use of the land for more than one year and to allow Pacific
Waste Recovery System and Waste Recovery System Kona the rights to
the materials in the landfill as well as the junked cars .
Your Committee heard a short presentation from Boyd Hansen, President
of Waste Recovery System, who handed out brochures on the equipment
he would use for the junk car removal . The portable equipment would
allow the company to move to Hilo after completing junked car removal
in Kona . He anticipated removing junked cars from around the island
and possibly the State and other areas in the Pacific . He plans to
compact the cars and sell them FOB from Kawaihae or Hilo to
international jobbers .
PWC-277 Page 3 September 29, 1988
Your Committee had concerns regarding handling of hazardous waste ,
what the County requires of the contractor , including liability
insurance and bond amounts , fires , the public 's access to the Kailua
landfill , and tipping fees .
Mr . Hanson testified that his company 's employees are trained to
identify hazardous waste .
The Chief Engineer testified as follows :
1 . Any hazardous waste that is produced as a result of the
contractor 's operation becomes the contractor 's
responsibility ; however , if hazardous waste exists in the
landfill , the County will take appropriate action .
2. Half a million dollars insurance is a minimum requirement
with the County named as an additional insured in addition
to defending the County of Hawaii and a hold harmless
clause .
3 . The major County requirement is for the contractor to
coordinate his work with the Department of Public Works
and this will be reflected in the contracts by the wording
"as mutually agreed on" to assure that the reclamation
operations do not interfere with the Department ' s
operation of the landfill and transfer station .
4 . The contractor will take care of the existing landfill ,
not the incoming waste stream, so that any fire that
occurs in the newer portion of the landfill where the
County will still be working would be the County 's
responsibility .
5 . The public will be using the transfer station and that the
contractor will be working from the back side of the
landfill and there won 't be a mix or conflict of traffic
movements at the landfill .
6 . Tipping fees are not in place now and the Department has
no authority to assess tipping fees .
The Chief Engineer also testified that the reclamation products would
be separated and made into pellets which either could be marketed and
landfilled, as they are highly compressed, or could be used for the
generation of electricity at one of the burners currently in
operation at Hamakua Sugar or HELCO. He stated that he is excited
about the project in light of the EPA's latest declaration , which may
be retroactive for existing landfills , and that this proposal would
return landfills to developable lands , instead of unusable lands for
30 years .
PWC-277 Page 4 Sepember 29, 1988
Two Committee members and the Committee Chairwoman stated that before
the Committee approves any resolution authorizing the County to make
an agreement , the Council must know what the contract will be . The
Managing Director testified that the reason that the resolution is
before the Committee is because the Council has the authority to
dispose of or lease land for more than one year . He further
testified that the Council could see the contracts after the
negotiation with the contractor is completed and at that time the
Council could approve the Mayor signing the contract or not .
Your Committee Chairwoman stated that there are problems in the
resolution and she asked Corporation Counsel to review the
resolution , which was substantially changed in the form of Resolution
480-88 Draft 2 by deleting two "whereas " paragraphs and changing the
designation of County owned area because the landfills are held by
executive order .
Boyd Hanson pointed out the site of a proposed butler building on a
sketch of the 16-acre Kailua landfill and windrows of compost on five
acres makai of the transfer station. In response to a Committee
member who asked if the building would be left on the site ,
Mr . Hanson replied that it depends on what happens at the end of
eight years and how the public feels about them .
The Chief Engineer testified that once the contract is executed, it
will take about eighteen months before the facility is completed and
put into operation . After operation begins , the contractor would
take whatever is in the landfill and the County would be responsible
for the incoming waste stream.
Members of your Committee expressed support for reclamation of the
landfill and junked car removal , but expressed concerns regarding
unavailability of the contracts , the total waste problem of West
Hawaii and the lack of a plan or total program for total waste
disposal in West Hawaii , lack of solid waste impact in the impact fee
ordinance , and how the reclamation program ties in with the new and
growing waste stream in West Hawaii .
The Chief Engineer stated that the contract has been reviewed by all
the parties who have to review it and it awaits execution on the
approval of Resolution No . 480-88 .
Your Committee Chairwoman recommended deferring action on Resolution
No . 480-88. Your Committee concurred with the Chairwoman 's
recommendation .
Your Committee considered Resolution No . 480-88 again on
September 29, 1988 . Copies of the contracts were circulated .
•
PWC-277 Page 5 September 29, 1988
Resolution No . 480-88 Draft 3 contains two "BE IT RESOLVED"
paragraphs . The first "RESOLVED" authorizes the County to grant a
license to Pacific Waste Recovery Systems , Inc . and to Waste Recovery
System, Kona , which will allow those companies to enter upon
County-owned , managed or controlled areas , as may be deemed
appropriate by the chief engineer , for the purpose of removing junked
cars , scrap metal and other waste materials from those areas . The
second "RESOLVED" paragraph authorizes the County to enter into
contracts , as reviewed by the Council , to accomplish the purposes
mentioned in the first "BE IT RESOLVED" paragraph .
Your Committee reviewed the contracts and Resolution No . 480-88
Draft 3 . Your Committee heard testimony from the Chief Engineer that
the contracts have undergone three reviews by Corporation Counsel ,
the contractor and himself . The Chief Engineer recommended
expediting the Kailua landfill reclamation and the removal and
disposal of junked cars at Kailua and Hilo landfills by approval of
Resolution No . 480-88 Draft 3. He also stated that proceeding with
the reclamation of Kailua landfill will save the County 1600 ,000 in
costs to close the Kailua landfill in conjunction with opening a new
landfill at Puuanahulu in two and a half years and will save the cost
of monitoring which would have been needed to comply with EPA
Subtitle D requirements .
Your Committee expressed concerns about the cost of the final
landscaping of the Kailua landfill after reclamation . The Deputy
Chief Engineer stated that the final cost will depend on the future
use , such as a park , and should be less than $600 ,000 .
The Chief Engineer and Boyd Hanson agreed with a Committee member
that condition 2d under Services of the County on page 4 of the
contracts could be eliminated . This condition provides that the
County bear the cost of internal clerical work necessary for the
County to administer the terms of the contract .
Your Committee finds that the proposed dispositions of public
property by license serves the public purpose .
Your Committee Chairwoman recommended that the Committee approve
Resolution No . 480-88 Draft 3 . Your Committee concurred with the
Chairwoman ' s recommendation .
PWC-277 Page 6 September 29, 1988
Your Committee on Public Works is in accord with the purpose of
Resolution No . 480-88 Draft 3 and recommends - adoption by the
County Council .
',
M r• LE K. LAI, CHAI 'WOMAN
• I / 1), if
(ABSENT)
•USSELL S. KOKUBUN, VICE CHR. FRANK DE LUZ III, MEMBER
1TAK SHI DOMI GO, ME BER SHERWOOD R. H. GREENWELL, MEMBE
LA/TW