HomeMy WebLinkAboutCOM 0070.014 1998-2000 0 0 INVESTIGATING THE IMPACT OF THE YEAR 2000 PROBLEM U.S.SENATE SPECIAL COMMITTEE ON THE YEAR 2000 TECHNOLOGYIFt®RbEM-.., (excerpts) rim, B Data__ C rh / 91' ...the Committee concluded that the utilities were proceeding in the right direction �fych ° j3atW ' c - " remedial efforts was too slow and there was so much remaining to be done that there was significant cause for concern. Only two of the eight firms reported completion of assessment, making assertions of Y2K compliance by December 1999 highly suspect. Committee concern was heightened because the most difficult tasks — renovation and testing— were yet to come. The utilities' lack of information re- girding Y2K compliance of their major suppliers, vendors, and sery -ice providers created additional concerns about the utilities assertions of readiness. The survey results raise significant levels of concern given that the fimis surveyed were among the largest utilities and were dedicating many resources to Y2K (collectively over $400 million). Smaller firms with fewer resources are presumably further behind in their Y2K remediation efforts. (p.23) While the NERC surveys clearly show progress in August, Sep- tember, and October, the question is whether there is sufficient time to complete Y2K remediation efforts. The data presented in the NERC report do not seem to support the optimistic tone contained in the report's executive summary. Of particular concern is that, with only alittle over a year to go, 34% of the fimrs are operating without a written plan. In addition, the assessment phase isonly 75% complete Remediation and testing is only 36% complete. Given that Y2K experts contend that between 40 and 70% of the total effort will be expended in testing alone, there may not be suffi -cient time to complete this. The highly interconnected nature of the grids raises concern about cas- cading failures. This in turn rensers obvious the need for contingency planning, (p.25) particularly plans for addressing capacity shortages and overages which only 13% of thefinms surveyed have in place. Nuclear facilities are lagging behind other electric facilities in their Y2K assessment and remediation efforts. Overall Y2K remediation progress has been slow due to the industry's late start, the complexity of the power grids, and the magnitude of the problems. As a result, power companies must (p.26) step up their efforts, and develop workable contingency plans in the event their best efforts fall short. There are no comprehensive studies concerning the number of entities that wouldhave to fail to put the entire grid at risk, but some experts suggest that it may be a very small per - centage if in key locations. Comm. No. / �7 0. 0 (t I // ^ y File No. F ( N 4I-i �ew I Ref. To: Presented co hc44- Pa; Thfn 3 - 18 -99 0 0 Nuclear plants are at various stages of Y2K remediation. Some have only recently begun to assess the systems within their plants. OIL & GAS UTILITIES (p.27) Gas and oil utilities face a variety of Y2K problems in their administrative systems, as well as the microprocessors or computer chips embedded in the production, transportation and distribution systems used in this industry. Survey results published by the Federal Energy Regulatory Commission (FERC) in September1998 show that this industry, like many others, started its Y2K efforts late. According to the survey. most of the critical systems in this industry are still in the inventory and assessment phase, leaving little time for the more difficult phases of Y2K remediation and testing. As a result, the industry is not likely to complete repairs of all of its system in time, which in turn means that possible disruptions in the production, transportation, and distribution of gas and oil are possible. (p.28) Thousands of embedded systems in millions of miles of pipelines all must be checked and, if necessary, re- placed. Vulnerable systems include distributed control systems, pro - grammable logic controllers, digital recorders, control stations, record- ers,meters, meter reading and calibration software, and SCADA. Any date- dependentapplication, system or component may experience problems that result in complete system or station shut -down (p28) a gas utility will typically have between 50 and 100 systems with embedded processing located in such areas as storage fields, gascontrol and management operations, metering and facilities, and SCADA systems. Experience suggests that the process of identi - fying, replacing or upgrading, and testing takes 12 to 18 months to complete. (p 29) AGA, a trade association of almost 300 natural gas transmission, distribution, gathering and marketing companies, and 181 local natural gas utilities that deliver gas to 54 million homes and businesses, has also been actively involved in Y2K. AGA members account for more than 90 percent of natural gas delivered in the United States Assessment.... included both electric and gas and oil utility companies. Concerns resulting from the survey expressed in the electric utility section of this report also apply to the gas and oil utilities. Progress is slow progress, assertions that they will complete Y2K remediation efforts in time are overly optimistic. the industry lacks knowledge about suppliers' Y2K status, and contingency plan -ning is deficient.