HomeMy WebLinkAboutCOM 0082.000 2014-2016William P. Kenoi
Mayor
January 15, 2015
County of Hawaii
Finance Department
25 Aupuni Street, Suite 2103 • Hilo, Hawaii 96720
(808) 961 -8234 . Fax(808)961 -8569
Dru Kanuha, Council Chair and
Members of the Hawaii County Council
Hawaii County Council
25 Aupuni Street
Hilo, Hawaii 96720
Re: Capital Budget
Deanna S. Sako
Director
Lisa K. Miura
Deputy Director
•_ n
v�+
k�
A
The Department of Environmental Management is requesting to add an appropriation to
Ordinance 14 -82, the Capital Budget, for their Hilo Ocean Outfall Assessment and Repair
project. This project is for design and construction costs related to the protection of the
outfall at shoreline due to erosion and to allow an assessment to be performed of the ocean
outfall and permanent leakages.
Enclosed is a bill for an ordinance to add the project titled "Hilo Ocean Outfall
Assessment and Repair" and to appropriate $4,950,000 to the Capital Budget for this
project.
If there are any questions, please do not hesitate to call Robin Bauman, of the Department
of Environmental Management at 961 -8179.
"-y-W (o A t4
Deanna S. Sako
Director of Finance
Enc.
cc: Environmental Management
�161%kk �10)
Hawai'i County is an Equal Opportunity Employer and Provider
Comm. No._ il-
Ruf.
Ruf. Cote IAI�J 1 5 2[1j5
Form #: B -52
7/18/91
DEPARTMENT OF FINANCE
REQUEST FOR COUNCIL ACTION
DEPARTMENT: Dept of Environmental Management DATE:
STAFF CONTACT: Dora Beck PHONE
A. REQUEST:
01/12/2015
961 -8513
Request to amend Ordinance 14 -82, Capital Improvement Budget, to include an appropriation for the
following project:
Hilo Ocean Outfall Assessment and Repair — $ 4,950,000 from General Obligation Bond
B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED):
Additional funds are needed for design and construction to allow protection of the outfall at shoreline due to
erosion as well as to allow an assessment of the ocean outfall and permanent repairs of joint leakages in
accordance with EPA Findings of Violations and Order, Docket No. CWA- 309(a) -14 -005 dated September 18,
2014.
Protection of the outfall at shoreline is required to address erosion at of protective covering of the outfall at the
shoreline in order to ensure stability of the outfall as well as to prevent damage to the outfall during high surf
conditions.
Assessment of the Hilo Ocean Outfall and repair of leaking joints is required by United States Environmental
Protection Agency ( USEPA) Finding of Violation and Order for Compliance, Docket No. CWA- 309(a) -14 -005.
While the existing leaks are small, the USEPA has determined that the small leaks constitute discharges at
locations which are not authorized by the National Pollutant Discharge Elimination System (NPDES) Permit for
the facility, and that as such, the discharges constitute a violation of permit.
The Design /Survey costs include costs for the consultant to utilize a Remote Operated Vehicle (ROV) to perform
an internal inspection of the outfall (3/4 mile in length) in order to perform the assessment. It is currently
anticipated that internal repair methods will be utilized to perform permanent repairs at joint leaks in order to
minimize the effects to the environment.
A Project Data /Financial Impact Statgrrient is attached.
SIGNED:
n DATE: 'L
Department Head
County of Hawaii
PROJECT DATA /FINANCIAL IMPACT STATEMENT
Fiscal Year 2014 - 2015
1. DEPARTMENT AND DIVISION: Department of Environmental Management - Wastewater Division 2. DATE: 1/12/2015
3. PROJECT NAME: Repair Hilo Outfall 4. SUBMITTER: Dora Beck
S. COUNCIL BENEFIT DISTRICT(S): 1,2,3 6. TMK /JUDICIAL: (3) 2 -1 /South Hilo
7. LOCATION (COUNCIL DISTRICT): 3 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,950,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT /PROGRAM DESCRIPTION: 1. Temporary repair of existing joint leaks from the exterior as well as a 30 -foot section of undermining caused by strong underwater currents beneath pipe outfall
identifed during the 2010 inspection; 2. Replace the protection around the outfall pipe portion exposed at the shoreline as a result of years of erosion. 3. Perform an Internal Inspection and Assessment
of Ocean Outfall and Repair leaking joints as per EPA Findings of Violation and Order for Compliance Docket No. CWA- 309(a) -14 -005.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Repair /Maintenance of infrastructure; Enhances quality of life, Regulatory requirement
12. LONG RANGE PLANS /COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment and provding a safe shoreline area for users.
13. COUNTY MATCHING FUNDS REQ'D? (Y /N) DESCRIBE:
14. LEGAL MADATE? (Y /N) DESCRIBE: As of 9/18/2014, mandated under EPA Docket No. CWA- 309(a) -14 -005 (Findings of Violation & Order for Compliance)
15. IMPACT ON OPERATIONAL BUDGET: None
16. SUSTAINABILITY FOCUS (List all that apply): Preserves & protects our natural environment; Strengthens & sustains our community; Promotes health & safety
17. PROJECT READINESS (List all that apply): Funds allotted; Planning of project is complete; Staff available to manage project; Can encumber funds in a contract within 3 years
18. EXPENDITURE PHASING (X$1000):
Prior Funds
Allotted
(not lapsed)
This FY 15 -16
Request
FY 16 -17
FY 17 -18
FY 18 -19
FY 19 -20
FY 20 -21
Beyond 6
Years
TOTAL:
Planning
Land Acquisition
Design /Survey
1,700
$1,700
Construction
1,000
3,250
$4,250
TOTAL:
$1,000 IF
$4,950
$5,950
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond /Other
1,000
4,950
$5,950
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$1,00011
$4,950
1
$5,950