TESTIMONY on Communication 62.
Council Members, thank you for the opportunity to submit testimony.
One of the threats of the lava flow is that it restricts transportation to and from Puna
Geothermal Venture (PGV) and the surrounding community. A second threat is that it
poses the danger of placing one of the two transmission lines from PGV out of order for
a prolonged period of time. Both of these threats directly impact the validity of the
emergency response for casualties at PGV.
Threats from the lava flow pose similar challenges in a PGV upset as those faced by
Civil Defense during the landfall of Tropical Storm Iselle. A thorough evaluation of
lessons learned from Iselle should be done, followed by a thoughtful revision to both the
PGV and County portion of emergency response planning. I strongly urge both the
Mayor and the County Council to take strong action to address the issues outlined
below.
In the event of an approaching hurricane, the action required of PGV by Section 8.1.4 of
the PGV Emergency Response Plan modified in 2011 is quoted below:
8.1.4 Hurricane Nature of Hazard:
Hurricanes with devastating winds (74 miles per hour or more) can cause death,
extensive damage to lightly -built buildings and tall structures, uproot trees, snap utility
poles, and make destructive missiles of flying debris. However, because of the design
and construction of the PGV project, there is little potential for hurricane winds to
produce facility emergency situations which could threaten the health, safety, or
welfare of the public. Flooding produced by hurricane rainfall and storm surf generated
comm. No 6� 'Z
Ret .
Ref. Date
by high wind should not pose a threat to the project facilities since the project site is on
high ground.
Response Actions:
Upon notification or determination, PGV will take the following actions supplemental to
those listed at the beginning of Section 8.1:
1. Secure loose objects around project site and, if appropriate, cease drilling or plant
operations.
2. Notify the CDA immediately should the hurricane cause a facility emergency
situation that could threaten public health and safety.
3. Depending on the size of the hurricane, the power plant may be tripped.
(Emphasis added} If so, steam is released through the rock muffler and abatement
of hydrogen sulfide should start simultaneously. Respondents to an emergency
should approach the site from an upwind direction and have personal monitors
and self contained breathing apparatus (SCBA). Notify both CDA and HDOH,
Clean Air Branch (Table 3-1), if steam is released to emergency steam release
facility.
4. Check water and electrical lines.
5. Switch off electrical power if there is damage to power sources or wiring.
6. Await instructions from CDA.
7. Make other required verbal notifications.
The basis of the emergency response plan above is flawed. The emergency steam release
facility (ESRF) may protect the plant from damage from loss of load, but automatic protective
actions that release hydrogen sulfide can affect the community. It has long been understood
that road closures during high winds are inevitable, as such closures have occurred during
storms with far less wind speed than a tropical storm. Road closures from lava flows are
similarly predictable. Residents who will inevitably be trapped in their homes along the very
roads that first responders must use to approach PGV do not have monitoring or protective
gear. It is also likely that the road closures that slow resident evacuation will slow first
responders from reaching the plant.'
It is a fundamental engineering and plant operation principle that built in emergency safety
features should not be relied on as the primary safety protection. Therefore, when the
probability of plant trip becomes considerable, action should have been taken to protect the
plant without reliance on emergency safety features. Reliance on the ESRF to protect the plant
and abate the release of hydrogen sulfide into the community creates a situation where a more
serious accident becomes inevitable if additional failures occur.
I The EPA Review of August 2000 entitled Puna Emergency Response: Report on the Review of Hawai'I County
Emergency Operations Plan and Puna Geothermal Venture Emergency Response Plan states, "In particular, the
Review Team was concerned about the capability of local responders to carry out a timely response in the PGV
facility. Hawai'i County responders need to evaluate their capacity for emergency response and their ability to
participate as part of an Incident Command System. The Hawari County Fire Department, Pahoa Substation should
work with PGV to gauge the potential severity of an incident"
Although on a slower timeline, the lava flow can create challenges similar to the hurricane.
Access to the plant and possible evacuation routes will be restricted by road closures.
flow.lava • - - t but not effectively - • • - - • .
• Inadequate warnft and alarm to the communit
• Inadequate staging of resources to allow effective first respons
• Inadequate
• InadeQuate practice and rehearsal for casualties at PG
documents present requirements for County of Hawaii response to emergencies at PGV.
The first of these is The County of Hawaii Emergency Operating Procedures [COH EOP] and
the second is the County Trifold, "Keeping You Safe In Case Of A Geothermal Plant Incident."
Applicable portions of the County of Hawaii Emergency Operating Procedures read:
A build-up period will precede some emergencies, providing sufficient time to warn the public and implement
prevention measures designed to reduce loss of life, property damage, and effects on the environment... All
Hawaii County departments and agencies must be prepared to promptly and effectively respond to any
foreseeable emergency, taking all appropriate actions, including requesting and providing mutual aid
The Preparedness Phase involves the range of deliberate, critical tasks and activities necessary to build,
sustain and improve the operational capability to prevent, protect against, respond to, and recover from
incidents_. Preparation includesll� organizing, equipping, training, exercising, evaluating
performance (actual and exercise), and then revising the plan based on changes in performance, organization
and equipmm ..
Exercises provide opportunities to test plans and improve proficiency in a risk-free environment Exercises are
the natural extension oftraining and allow departments/agencies to assess and validate proficiency levels,
clary and faminarize personnel to roles and responsibilities.
According to a County of Hawaii Trifold, "Keeping You Safe In Case Of A Geothermal
Plant Incident":
if an emergency at the plant causes a release of H2S, our First Responders will monitor
the situation. If the concentration of H2S begins to rise, the affected areas will be
evacuated before levels become unsafe. The public will be kept informed when any
significant event ( ,,UrS.z
I The assertion that "H2S is released from active volcanic vents and can be part of ambient air conditions downwind
of eruptive activity' is wrong. When present in a gas stream with sulfur dioxide, hydrogen sulfide is rapidly converted
to water and sulfur. Almost no hydrogen sulfide is present downstream of eruptive activity. This has been confirmed
by the USGS in a briefing given 10 the geothermal public health assessment group in early 2013.
If the County had follows the Concept of Operations of the COH EOP, the impact of the toxic
release from PGV could be lessoned. Now following problems during Iselle the County has the
opportunity to take those actions to address dangers of the lava flow.345
In the four months following Iselle, the County has taken no formal action to evaluate the
emergency response to the release from PGV on August 7, 2014. Lessons learned have not
been collected and used as a road to improvement.
In conclusion, over one hundred people experienced health effects from the toxic release from
PGV on August 7. The County of Hawaii's failure to follow the COH EOP and Trifold guidance
strongly contributed. Even more distressing is that even after this event, the County has done
nothing to evaluate its poor performance or to modify future response for improvement. The
time is critical for the County to take this action now before lava or a similar casualty creates
challenges similar to those faced with Tropical Storm Iselle.
Thank you.
/s/ Thomas Lee Travis
3 The County Trifold dealing specifically with PGV casualties is error riddled, conceptually flawed, and impossible to
execute under many circumstances. One problematic contributing factor is the few number of samplers, the
positioning of the samplers, and the overall lack of knowledge of what the actual H2S level is at various locations
during a casualty. The County Trifold states that 9 the plant staff is unable to manage the release, sound levels are
excessive, and H2S levels continue to rise and before concentrations reach 10 parts per million, an evacuation notice
will be issued. Although these conditions were clearly met during the evening of August 7, the County did not order
an evacuation.
L Sufficient time was available before Iselle landfall to warn the public and implement measures designed to mitigate
the effects of the toxic release expected. For example, the plant could have been ordered shutdown by the County; if
decision makers decided to keep It operational despite the overwhelming logic of shutting it down, neighbors to PGV
could have been warned of the likelihood of a toxic release, hazardous material units of the Fire Department could
have been pre -staged, and crews to keep the roads open could have been put into place. (Some might say doing so
would put the Fire Department and road crews in danger, but this argument is silly considering the fact the the County
ordered residents to evacuate through the same area). Additionally the Fire Department could have been supplied
with the equipment required by the PGV emergency response plan.
5 Releases of 1-12S from PGV can be from numerous locations on the site, can be high or low temperature, can be
part of high or low pressure releases, and can be the consequence of maintenance, material failure, or human
operational error, plant procedural problems, or plant design issues. As such, the idea that readings will slowly reach
an alarm level and then increase gradually is only true in the most general sense. Actually, bubbles of gas can move
up and down, left and fight. The measurements available to the County indicating level of 1-12S can vary by several
orders of magnitude based on location and time from the incident.